Document kDzazEMzN0akg6VnXK7vbw1vy
MDflJTES _QF PRELIMHAHI DISCUSSIOH 01 EXPAISIO* PROGRAM Australian Blue Asbestos Limited Western Australia
Pr.ESENTt A. R. Fisher, G. K. Foster, C. W. R. Powell, K. C. King, C. D Horror, R. A. Denovan, X. V. Lindell
Mining Method
It was generally agreed that the present method of mining was both
inadequate and costly, and that a change in method was necessary in order
to obtain larger tonnage for production as well as to decrease the mining
cost. .
The present tonnage is all obtained from development driving or one
free face blasting. It was agreed that for preliminary purposes a long-
vall method of mining in 500-foot panels, backfilling mined out area for
both support and waste disposal, should be th" e basis**, f*o` 4r i*initial disouesions. The practicability of opening up large areas supported by backfill
is to be determined by trial* This question arises x'rom the fact that
the capping is a hard ferruginous quartsite or ironstone with numerous
horizontal partings 400 feet in height. It has been thought that opening
large areas would result in the capping failing at the working face where
the unsupported roof would be cantilevered. In any event pillars may be
left at intervals to control the size of falls and subsidence, and still
obtain a considerably larger tonnage extraction per foot of preliminary
development than the present method.
Drilling
'
It is proposed to use aual jib drill carriages mounted on pneumatic
tires for all drilling. One type to tie dual jibs mounted in pairs at
front end of carriage for development driving, and the other type to be
-2 -
dual jibs tandfah mounted for longwall drilling^
'.*.<! 5' '
i yV~ ,y *:/
) drilled in advance^ depth of out to be determined by trial*
Present drilling has all been done by the conventional forged drill
steel* Considerable difficulty has been experienced in maintaining the
gauge on drill bits with attendant'loss of drilling speed and requiring
many steel elaagpfr Use of detachable bits which can be unifoxally heat'
treated for-the required conditions, should be studied* This will also
involve the study of the dpsign^cf the bit f^c^best results in this
ground.
>*c^
Blasting *" .
' '-
.
\
*;W
,.. .
'
Was'* te-rock
will
be
blasted
in
sections t.
of
a- si.we*i^*O* *.b.*det*ra` >ine> d' ~.
>* ..
on the job to obtain leastoverbreakand lossofore.
`
;:r"`
Ore tobe blastedfrom-the: bottom aft ^stf red?ed*; This method^
will obtain larger tonnagerat a working: face fdr WsVdf^
. - * *. .*'*' ,*' -. . ' ' . ' .
, * v
conditions? with. mechanical equlp^ni?rfaoingfiMi4iuc^
reducing^bbstilfr."
^ +\
V".--y
V^:
"' ' - 3
' '' ' ' , v
.' - .. . ^
~
`-; *!
v?
Waste Handling
' ''*
' "' *
\/
' Waste'to;lb*'used for backfilling ained.
dieselIbulldoser. or equivalent. Benoit to be deanedx by'hand shovelling: ''' - . '
and backfills to the roof finished by hand/ shovelling^Thls^aUainatw? < .
hauling waste out of the aine.
'' '
' will wank or Ore Loading ".
_
f.,'.
.. 5* s.
.
"
' "".'"A
: *
'
A scraper loader of the air hoist* scraper and reap type will be
used for loading into low oars operated on' traok with30^1b.rail end -
steel ties*. Loading will be facilitated by. use of 3-ton battery locomo-
%
a
, ""
` : tivee and switching cars:te face by ,using Qalifontiq^typs^portahle- switch
Other methods were dismissed, such an
.
1* Joy Loaders 2. Shuttle Cars 3* Shaker Conveyors and Duckbills
4* Scraping to Loner Seam
It was agreed that these alternatives all had merit but that for
preliminary purposes in order to obtain higher production at the earliest
date with a proven method, scraper loading into cars should be used for
the basis of estimates*
Prior discussion on this subject brought out that two Joy loaders
and three shuttle cars are presently on order* With the longwall method
proposed, the Joy loader would be required to load one-half ton per
minute against its rated capacity of eight tons per minute to handle the
hourly output of 31 tons mill ore required for 10,000 ton fibre schedule*
One shuttle oar (10-ton capacity) would need to make 3 trips per hour to
service the loader* Trial of this equipment will determine their desira
bility and the economics of their operation* As this proposed method of
mining lends itself verywell to mechanisation, it was generally agreed-
V ',
that a method eliminating use of tracks at the working face was desirable* \1 ' `
Haulage
The two 6-ton diesel locomotives presently on the job would be-used
for haulage to the mill.
Power Supply The present power supply is inadequate for the increased tonnage*
It is proposed to purchase two 2,800 c.f.m. air compressors to- increase the air supply and larger lines to the mine will be required* Compressors to ee installed at the present mill site*
It was generally agreed xhat it was daairable to generate, all power at one location in preferably two large units, instead of operating many smaller units for generating power or driving compressors* This decreases maintenance costs as well as requiring fewer attendants. A new power plant for 2,290 Kw., building and power line will oe necessary, at a new location one mile from the mill. No allowance was made for increase to water supply.
Ghangehouse, Shops. Stores. Etc. Additional capacity has been allowed.
Tailing Disposal
. It is proposed to build one mile of new road to a tailings dump at
a new site. A 10-ton truck is proposed for this work.
Mill Equipment and Building
"i
-*
This phase of the operation will be discussed in a separate report*
:7a would record here, however, that' it is desirable to make immediate
additions to the present-mill using equipment proposed by Johns-Manville.
engineers, both to provide additional capacity to keep pace with the mine
as well as to permit testing suitability of the proposed new equipment
for the Australian ore.
Further study will be required to determine the economics of pushing
the main haulage underground, through the peninsula, to`the adjacent gorge
anc. erecting the new complete mill in a more central location in respect
to the future mining.
.
/LCG November 19, 1943
lining Equipment
COST ESTHATX
2 - 2750 F/M Compressor*
40 Drifters
13 Jumbos
20001 - 6"
Pipe
3000* - 4*
Pipe
5 Slusher Units
4 - 3Ton Battery Locos*
3 Spare Batteries
Rectifier Equipt.
30 Cars
3 Bulldozers
.
Fans & Auxiliary Blowers
Power line & Transformers
TOTAL.MINING.....................................
$60,000.00
40,000.00 54,000.00
3,000.00 9,000.00 17,500.00 16,000.00 3,500.00 3,000.00 24,000.00 12,000.00 10,000.00
Power & Miscellaneous
Power Plant 5 500K.W. Units Inst* 500,000.00
Power, line & Transformers
110,000.00
Power House with Crane
50,000.00
Compressor House
20,000.00
Shop,Stores office etc* Bldgs*
150,000.00 J
Change House
" 20,000.00
Tailings Disposal
_ 25.000.00
TOTAL POWER .& MISCELLANEOUS........ .. $875,000.00 '
WilliTiff
Milling Equipment Mill Bldg. Dust Collection St Miscellaneous TOTAL MILL
239,000.00 128,000.00 _143.0Q0.00$510,000.00
GRAND TOTAL
Mine Equipment
Power & Miscellaneous Mill Total
$297,000.00 875.000.00
510.000.00
GRAND TOTAL.......................... $1,682,000.00
/HOI November 19, 1948
..... Probable Delivery
3 nos. 1 mo. 4~6 mos. 7 7 4-6 oos. 6 mo*. 6 BOS. 6 oos. Australia 6-8 sos. 4-6 bos'. ' 12- mos.
3 BOS. 12 BOS.
_ *
'_
2 Coipriwri.............. ............... .......... .............................. ..
1000 H.P
Fan* & Blflmn............... ............................................................ 100 "
Sluahers.................................... ............... ...................... 250 *
Main Haulage Locos....................................................
200 *
4 Gathering Locos.................
100
2 Jay Loader*.....50 9
3 Shuttle Cars............................
60 *
Mill Connected Load.............
1760 1300 *
TOTAL CONNECTED LOAD....................................................................... 3060 11
Diversity Factor 0.8........................
8056 Efficancy 5 500 K.V. units required.
2450 * ' 1830 K.V,
2290 "
/EMI November 19, 1948
BASIC ASSUMPTIONS
Operating days per week...................... Operating days per year........................ Kins shifts per day............. . mil shifts per day................. Short tons Fibre required per year*. Short tons Fibre required per day... Short tons Mill Ore per day.. Short tons Mill Ore per mine shift.. Short tons waste rock per day....... Short tons Waste Rock per mine shift Short tons Total Rock per day........ ... Short tons Total Rock per mine shift Short tons Mill Ore per Mill shift. Short tons Mill Ore per mill hour..., Specific Gravity of Rock............... . % Fibre in Mill Ore............. . % Fibre in Mill Feed................. % Rock removed on Picking belt.........
/EMM November 19, 1948
5 250
2 3 10,000 40 500 __ 250 750^ 375 1250 y 625 167 21 3.4 8% 9.5 . 15.6
V
I
START,. COPY BOX NO./FILE DRAWER NO.
9 SIGNIFICANT
,
NOTES
quSl
-
INITIALS
DATE
SEGMENT NO. '