Document kDrZ00kXaQbL2N5XyDjBRzkrV
Cable Engineers Association
283 Vafloy Road, Montclair, N. J.
July 23, 1957
H*A, Schilling, Chairman
J*F* McClelland, Jr, Silver
Special Commlttoo DG
Gentlsasmi
Project 444
Subject: High Temperature C
Connector# - Joint
Committee
'
"4
At the July 9th meeting of the HEXA-XPCSA Coordinating-^. Committee It was stated that HSKA has decided to form a : ^ Joint Sections Committee between the lire and Cable Sections : and the Preesure Connector Croup to eonslder the subject of*' High Temperature Cable and Connectors,
The pressure Connector Group has noted that the present recognition and test program of Underwriters' Laboratories involves a 75 C limit for wire connectors used with insulated aluminum wire and cable* There Is apparently a problem In
connection with, the termination of conductors having asbestos and other insulations operating at higher temperatures and the Group thought that this problem should be considered by
representatives of the Pressure Connector Group and of the
Wire and Cable Section with Underwriters* Laboratories Accordingly, the Group recommended that the Joint Sections
1 discuss with ths Laboratories cables temperatures,
requested IPCSA to appoint three of t the HKHA Wire and Cable Section in
Our Executive Committee has selected you as Special Committee LG to handle the matter under the Project number and subject as givsn above,
X2KA has bean advised of your appointment and requested to advise you well in advance of the date of any proposed meeting of the Joint Sections Committee*
GMHj ah cci S.J, Bosch
Very truly yours. GX HASKELL Secretary
RBB 00469