SOUTHWESTERN OIL S< REFINING COMPANY
CORPUS CHRISTI,TEXAS
September 16,1964
J. T. Thorpe Corporation Houston, Texas
Attn: Mr. Collins
Subject: Fireproofing - Vessels
In line with our conversation, we are attaching hereto vessel sketches and UOP Specification #338 as required for sub ject vessels.
For your information and convenience, we tabulate below vessel number and sketch number of items for consideration in your quotations.
Quotations are to be addressed to H. H. Harding, Purchasing Agent, Southwestern Oil 6c Refining Company.
It is anticipated that Southwestern Oil 6c Refining Company will furnish and install the necessary standoff brackets and wire mesh required for the application of your Gunnite material.
8277-301-Rev. 2 8277-301-Rev. 6 8277-301-Rev. 3 8277-301-Rev. 2 8277-301-Rev. 1 8277-301-Rev. 4 8277-301-Rev. 3 8277-301-Rev. 2 8277-301-Rev. 2 8277-301-Rev. 1 8277-301-lev. 1
Feed Dryers, A-V1A 6c A-V1B Acid Storage Drum, A-V3 Acid Mixer-Settler, A-V4 Acid Regenerator, A-V5 Polymer Surge Drum, A-V6 Isostripper Column, A-V7 Depropanizer, A-V10 H.F. Stripper Column, A-V12 Propane KOH Treater, A-V13 Relief Gas Scrubber A-V15,Relief Header A-V14 Butane KOH Treater, A-V17
UOP Spec 338, Rev. 1 June 29, 1962 - Fi proofing i
DW:ph cc: H. H. Harding
Construction Project Engineer
THORPE
0 1 V. I SION
J
PRODUCTS COMPANY
OP
JT
TH. ORPE
COMPANY
DISTRIBUTORS P.O. BOX 33399 July 28, 1972
OF INDUSTRIAL INSULATION
644-2391
HOUSTON, TEXAS 77033
Mr. Pat Griffin MONSANTO COMPANY P. 0. Box 711 Alvin, Texas 77511
Subject:
OSHA Asbestos Dust Standard Effective July 7th, 1972
Thorpe has had many requests for information regarding compliance with these new standards and in regard to asbestos containing insulating materials which we are furnishing to industry.
This letter is to make available to you our latest information and to offer .any assistance possible where and when needed to assist you in compliance.
Attached is a copy of a news release from the U. S. Department of Labor which summarizes this new standard.
Also attached is a listing by type of material stocked or fabricated byThorpe. Those having dry. asbestos as a component are marked with an asterisk. Those most commonly used by industry are those included under Class I - Calcium Silicate and High Temperature Insulation.
We have taken
tn eliminate asbestos from all products which we
'stock and fabricate. 3v January lst^_I3731_we_expect_-o _have_a_new oice
--covering produced by Johns-Manville_whi.cn..will nave the same or_better
-"properties as Thermqbestqs but..will contain no Aspestos ~ozrffee Silica.
Until we have this new product we offer the following suggestions for compliance:
CP Eliminate ail field fabrication of Asbestos products. When
frequent removal of insulation is required, Thorpe can furnish prefabricated Thermobestos covers or completely incapsulated
removable metal covers.
f continued ......
6113 17630
BCC^MO
OSHA Asbestos Dust Standard Effective July 7th, 1972 Page 2 of 2 pages
Elbows can be insulated by the use of: A. Prefabricated or factory molded covers B. Aluminum covers filled with asbestos free insulating
y cement C. Zeston PVC covers with 1000 Fiberglas filler D. Zeston PVC covers with asbestos free insulating cement
II. Where cutting is required, the use of a respirator such as Safe line Products No. 5441 Mask with No. 5905 Filter or any respirator carrying the U. S. Bureau of Mines Approval No. 21B-81.
III. Use substitute materials containing no asbestos as follows: A. Microlok Fiberglass Pipe Covering to 500 F B. Mineral Fiber Pipe Covering to 1200 F C. Ceramic Fiber to 2300 F
Thorpe is currently monitoring its operation with the use of Micronair Personnel Air Samplers Catalog No. 3900-10 as produced by the Bendix Corporation and carrying OSHA Approval No. 1A-102. Dust analysis can be made by Shilstone Testing Laboratories, Houston, Texas.
We have made extensive provisions for dust collection in our warehouses and fabrication -facilities. Our cutting equipment have the most effective collection attachments that we can obtain. You- are welcome to visit our Houston facility at any tine. Arrangements can be made through the writer.
CAUTION: When considering Asbestos Free products, be sure also that they contain no Free Silica. Manufacturers will generally offer this information in writing.
The enclosed information is fragmentary. Please call us for additional information or assistance. Copies are available for your Safety Department or person responsible for OSHA compliance.
We appreciate your business and hope that the enclosed information will be beneficial to you and will help us earn your continued trust and confidence in our services.
THORPE PRODUCTS COMPANY
M. P. Proctor MPP:pb Enclosure
6113 17681
"541
FORTY-EIGHT INSULATIONS INC.
AURORA. ILLINOIS
FORTYEIGHT QUIK-SET CEMENT
3804 January 1972
QUIK-SET CEMENT is a one coat, hydraulic-setting, high temperature bonding canent that insulates and trowels or palms to a smooth, hard, white finish. QUIK-SET CEMENT is a dry mixture of fcigb temperature fibers and a combination of adhesive bonding and hydraulic-setting binders and contains no asbestos. QUIK-SET CDiENT combines the high temperature resistance and excellent insulating qualities of uniformly nodulated mineral fibers with the high strength, low shrinkage and smooth finish of hydraulic-setting cement. After mixing with water, it will remain workable for up to two hours. QUIK-SET CEMENT takes a green set in two to four hours and will then withstand effects of rain or moisture without softening. Initial troweling produces a satisfactorily white surface. Subsequent steel troweling within 30 minutes after application will give a superior surface with a bright, attractive glaze.
QUIK-SET CEMENT is designed for use on valves, fittings and heated equipment, or as
an insulating finish over other insulations. Outside applications must be protected with an appropriate weatherproofing.
m lt'-'
1^
wtmi n i nnj.pi .nuwiniiiii i j
i>n ,
yi wmimuyL--W.Ttlll
THERMAL CONDUCTIVITY
MEAN TEMPERATURE 200 F 400F 600 F 800 F
K-FACTOR .60 .70 .80 .96
SERVICE TEMPERATURE: Up to 1200F..
DENSITY; 40 lbs. per cubic foot.
COVERAGE: 30 sq. ft., 1" thick per 100 lbs ADHESION: Good. SHRINKAGE: Negligible
INITIAL SET: Approximately 2 hrs. after application.
WEATHER RESISTANCE: Will not soften after initial set.
LEACHABLE CHLORIDES: Less than 25 ppm.
SPECIFICATIONS:
Federal: A.S.T.M.:
MIL-C-2908A, Type II MIL-I-24244(SHIPS) SS-C-160, Type III, Crade F C-449
PACKAGING: Packaged in moistureproof raultiwall bags of 50 lbs. for longer warehouse storage life and additional on-site quality protection.
Values shown are subject to our normal manufacturing and testing methods and colerances.
6113 17684
THORPE
0 I V. I S I O N
PR8-0 UCTS COMPANY
TH. ORPE
COMPANY
DISTRIBUTORS P.O. BOX 33399 July 28, 1972
OF INDUSTRIAL INSULATION
64A-239I
HOUSTON, TEXAS 77033
Hr. Pat Griffin MONSANTO COMPANY P. 0. Box 711 Alvin, Texas 77511
Subject:
OSHA Asbestos Dust Standard Effective July 7th, 1972
Thorpe has had many requests for information regarding compliance with these new standards and in regard to asbestos containing insulating materials which we are furnishing to industry.
This letter is to make available to you our latest information and to offer.any assistance possible where and when needed to assist you in compliance.
Attached is a copy of a news release from the U. S. Department of labor which summarizes this new standard.
Also attached is a listing by type of material stocked or fabricated by Thorpe. Those having dry. asbestos as a component are marked with an asterisk. Those most commonly used by industry are those included under Class I - Calcium Silicate and High Temperature Insulation.
We have taken steps fp eliminate asbestos from all products which we ^ 'stock and fabricate. 3v January .lst^-HTS, we expect ^o Jiave a new nice "covering produced by Johns-Hanville_which. wi.y__ha.ve the same or_better '"properties as Thermobestos but..will contain no^ AsPestds~oF~free Silica.
Until we have this new product we offer the following suggestions for compliance:
3< ? Eliminate ail field fabrication of Asbestos products. When frequent removal of insulation is required, Thorpe can furnish prefabricated Thermobestos covers or completely inqapsulated removable metal covers.
f
continued .,. h
6113 17630
BCC^340
OSHA Asbestos Dust Standard Effective July 7th, 1972 Page 2 of 2 pages
Elbows can be insulated by the use of: A. Prefabricated or factory molded covers B. Aluminum covers filled with asbestos free insulating
y cement C. Zeston PVC covers with 1000 Fiberglas filler D. Zeston PVC covers with asbestos free insulating cement
II. Where cutting is required, the use of a respirator such as Safe line Products No. 5441 Mask with No. 5905 Filter or any respirator carrying the U. S. Bureau of Mines Approval No. 21B-81.
III. Use substitute materials containing no asbestos as follows: A. Microlok Fiberglass Pipe Covering to 500 F B. Mineral Fiber Pipe Covering to 1200 F C. Ceramic Fiber to 2300 F
Thorpe is currently monitoring its operation with the use of Micronair Personnel Air Samplers Catalog No. 3900-10 as produced by the Bendix Corporation and carrying OSHA Approval No. 1A-102. Dust analysis can be made by Shilstone Testing Laboratories, Houston, Texas.
We have made extensive provisions for dust collection in our warehouses and fabrication -facilities. Our cutting equipment have the most effective collection attachments that we can obtain. You- are welcome to visit our Houston facility at any time. Arrangements can be made through the writer.
*
CAUTION: When considering Asbestos Free products, be sure also that they contain no Free Silica. Manufacturers will generally offer this information in writing.
The enclosed information is fragmentary. Please call us for additional information or assistance. Copies are available for your Safety Department or person responsible for OSHA compliance.
We appreciate your business and hope that the enclosed information will be beneficial to you and will help us earn your continued trust and confidence in our services.
THORPE PRODUCTS COMPANY
H. P. Proctor MPP:pb Enclosure
4
6113 17681
600^341
THORPE PRODUCTS COMPANY *
HOUSTON
DALLAS
BEAUMONT
THE FOLLOWING IS A LISTING BY TYPE OF INSULATING MATERIALS STOCKED OR FABRICATED BY THORPE
I. CALCIUM SILICATE AND HIGH TEMPERATURE INSULATIONS
A. Thermobestos - Pipe Covering and Block *
B. Metal-On Pipe Insulation
*
C. Superex Block
II. FIBERGLASS INSULATIONS A. Micro-Lok Pipe Insulation (snap-on) B. Microlite Blanket C. Duct Liner - Lina Coustic
III.
MINERAL WOOL A. Spinglas 1000 Blanket B. #10 Blanket C. Griptex Block D. MF Pipe Covering E. Minibond - Stress Relieving Blanket F. Cerafelt G. ' Cerafiber
IV. FOAM INSULATIONS A. Urethane - Pipe Covering and Block B. T-Foam - Two Component Pour Urethane C. Styrofoam D. Ceramic Foam
V. UNDERGROUND INSULATION A. Witcolite B. Trisulite
VI. CELLULAR GLASS INSULATION A. Foamglas - Pipe Covering and Block
VII.
INSULATION. ACCESSORIES A. Cements
1. 48 Insulation, Inc. a. Quik Set (One Coat) b. Super 48
2. Johns Manville a. 352 Cement
1000 Temp. 1800 Temp.
*
Continued
6113 17683
7/1/72 - Page 1 of 3
.T n
FORTY- E IO HT INSULATIONS IMG.
AURORA, ILLINOIS
3802 January 1972
FORTY`13 EIGHT SUPER "48" CEMENT
SUPER "48" CEMENT is an all purpose, high temperature insulating and-bonding cement for the full range o temperatures to 1800F. It is manufactured frem a controlled blend of resilient, 1600F refractory fibers and special high temperature binders. SUPER "48" CQIENT contains no asbestos, is actively rust-inhibitive and will not cause or accelerate corrosion when properly applied to iron or steel surfaces. SUPER "48" has exceptional bonding adhesion, trowels smooth, has minimum shrinkage, and maximum thermal efficiency. Not hydraulic-setting, it is reclaimable at temperatures up to 1200F. Simply re-mix with clean water and use again.
SUPER "48" is recommended for use on irregular surfaces, general insulating and maintenance work, ducts, breeching, turbines, valves, fittings, or as a leveling material over other insulations. Application subjected to outside weathering must be protected.
anaatfcii..
...... ...
dbi
THERMAL CONDUCTIVITY
MEAN TEMPERATURE 200 F 400F 600F 800F
K-FACT0R .585 .64 .73 .85.
Hot Face 200 8 F 350*F 550*F
RECOMMENDED THICKNESSES:
Thickness
Hot Face
1" 7508F
ih" 950 *F 2" 1200*F
Thickness 2%" 3" 4"
SERVICE TEMPERATURE : Up to 1800F.
DRY COVERAGE: 45-50 sq. ft. 1" thick per 100 lbs.
INSTALLED DENSITY: Approx. 28 lbs. per cubic foot.
VOLUMETRIC SHRINKAGE: (Wet to dry) Approx. 15Z.
CORROSION TO STEEL: Non-corrosive.
LEACHABLE CHLORIDES: Less than 25 ppm.
SPECIFICATIONS: Federal: A.S.T.M.
HH-C-168 SS-C-160, Type III, Grade U MIL-C-2861D; MIL-I-24244(SHIPS) C-195
6113 17682
PACKAGING: Strong, multiwall bags of 50 pounds. V
^002342
EXHIBIT "I"
*
THORPt
OFFICE CORRESPONDENCE
from m. P. Proctor
to Board of Directors J T THORPE COMPANY
DATE
November 10, 1972
subject Proposed OSHA Compliance Procedure for Thorpe Products Company Asbestos Dust
We are setting out below steps that have been taken and proposed methods for future compliance with current OSHA Asbestos-Dust Standards.
Standard effective July 7, 1972
The 8 hour time-weighted average airborne concentration of asbestos fibers to which any employee may be exposed shall not exceed five fibers, longer than 5 micrometers, per cubic centimeter of air.
METHODS OF COMPLIANCE
I. Engineering Controls
Our fabrication shop has an effective dust collection system carefully maintained. In addition, we have added booster collectors to saws which cut asbestos containing materials.
The warehouse floors are vacuumed daily to remove loose fibers. Rail cars are vacuumed periodically as they are being unloaded. Delivery vans are vacuumed daily.
II. Personal Protective Equipment
A. Air purifying respirators
Approved respirators are provided each warehouse and shop employee. These are carried during working hours. They are worn when the following duties are performed and when Engineer ing Controls are not possible.
1. Unloading or loading rail cars.
2. Unloading or loading delivery vehicles.
3. Repackaging
4. Cutting
NOTE ee Hearing of respirators will be required until we have documentary proof of compliance.
continued
S4
T H O R P t=
OFFICE CORRESPONDENCE
FROM
- DATE
TO
Page 2
SUBJECT
II. Personal Protective Equipment (Cont'd)
B. Special Clothing - Does not apply.
C. Change Rooms -
Does not apply.
D. Laundering -
Does not apply.
NOTE: % B, C D not required unless exposure limits are
exceeded.
III. Monitoring
A. Personal monitoring
We have purchased a Micronaire air sampler No. 3900-10 produced by the Bendix Corporation and carrying OSHA Approval No. 1A-102. Dust collection Filters are as produced by Millipore Corporation Aerosol Cat. No. MAWP 037A0. An Aerosol Adapter No. XX6200004 is necessary for use with the Micronaire sampler.
Personal samples will be taken from those employees exposed to asbestos materials. Sampling frequency will be at least once each six months.
B. Environmental monitoring
Same as for personal monitoring but sampler will remain station ary at work station for full eight hours. All work stations with asbestos exposure will be monitored at least once each six months.
NOTE: Dust'Analysis will be done by J-M Industrial Hygiene
Engineering Services Division.
IV. Caution Labeling
A. Repackaging and Fabricated Materials are marked with Caution lable containing exact label specifications as set out in OSHA Standard.
continued........... ..
t
THORPt
OFFICE
CORRESPONDENCE
*P
rROM
o Page 3 IV. V.
VI.
Comment:
DATE
SUBJECT
Caution Labeling (Cont'd)
B. Waste Disposal - all waste is sealed in impermeable bags and tagged with caution label.
Record Keeping
A. All monitoring records will be maintained for a period of three years.
B. Each employee will have access to his personal record upon request.
C. Any employee found to be in excess of exposure limits will be notified in writing within 5 days of the finding.
Medical Examinations
A. Each warehouse and shop employee exposed to asbestos dust will be given a medical examination in accordance with OSHA require ments prior to January 31st, 1973 and annually thereafter.
B. New employees will be examined within 30 days of employment.
C. A medical examination will be made available to any employee within 30 days of termination.
D. Medical records will be maintained for 20 years.
E. Access to these records will be available to OSHA, NIOSH and to the employee or former employee.
We believe that we have taken steps as required by the law and in some instances beyond those required by the law to insure that our employees have a healthy atmosphere in which to work.
We believe that we are in full compliance with the law and have no dust exposures which exceed the standard. We will prove this with monitoring and our first complete analysis will be available prior to January 6th, 1973.
continued.
4A
I H- <J R P L
OFFICE CORRESPONDENCE
DATE TO SUBJECT
Page 4 The obvious long term solution is to eliminate asbestos fiber containing materials from our warehouses. We expect to do this by December, 1973.
THORPE PRODUCTS COMPANY
M. P. Proctor
i MPP:pb
EXHIBIT 66J"
November 16, 1972
J T THORPE COMPANY
ENGINEERS-CONSTRUCTORS
REFRACTORY, INSULATED ANO ACID PROOF STRUCTURES
P. O. BOX 33399
(713) 644-1247
HOUSTON, TEXAS 77033
Mr. F. C. Shelden, Jr., Director Board of Directors J T Thorpe Company 6833 Kirbyville Street Houston, Texas
PROGRESS REPORT ON IMPLEMENTATION OF 1971 FEDERAL OCCUPATIONAL SAFETY & HEALTH ACT
At the request of Mr. F. C. Shelden, Jr., a report has been prepared to outline our efforts thus far to comply with the Federal Occupational Safety & Health Act of 1971, and the work remaining to be done in this area.
The attached report Is in four parts. The first outlines In general the major areas of impact of the law on J T Thorpe Company's contract operations. This is followed by our overall plan for Implementation of the law and the steps we have taken thus far. Finally, we have outlined the work remaining to be done with particular emphasis of the year 1973.
Please advise if you have any specific questions on the foregoing, or wish to have any additional specific information.
PROGRESS REPORT IMPLEMENTATION-OF 1971 FEDERAL OCCUPATIONAL SAFETY & HEALTH AG
IN J T THORPE COMPANY CONTRACT OPERATIONS
NOVEMBER, 1972
I. Major Areas of Impact Physical Facilities Jobsite Practices Field Labor Productivity Contract Profitability 4 Estimating Procedures Type of Work 4 Materials Used
As you are aware, OSHA announced two programs at the outset, a target industries program and a target health hazards program. The target industries program was to concern itself with the five top injury prone industries; longshoring, roofing and sheetmetal, meat and wood products, lumber and wood products, and miscellaneous transportation equipment. We, of course, perform sheetmetal work although probably not in the sense that OSHA was zeroing in on. Their target health hazards program included lead, carbon monoxide, silica, asbestos and cotton dust. We, of course, are very much involved in the asbestos problem as has previously been outlined to you Mr. M. P. Proctor in his compliance procedures for Thorpe Products Company. In addition, certain of our operations put us In direct contact with the silica health hazard. In the very near future, we will be developing a detailed program to combat these latter two hazards in our field operations on a broad scale. We also anticipate the construction industry will become one of OSHA'S prime targets In the very near future.
The potential impact of the law is so great, it is difficult or nearly impossible to instantaneously implement all aspects of the law. Accordingly, our approach has been to make a beginning on a broad basis, correct imnediate and obvious violations of the Act, undertake an educational program for our employees, and develop a plan for the longrange.
Mentioned above were five areas of our activities where we anticipate significant change or effects due to the new Law. Physical facilities are the most obvious and the most easily inspected, and certain efforts and expenditures have been and will be undertaken to bring our warehouses and offices into compliance with the Law. As time progresses, and the Act becomes fully implemented in the construction industry, certain practices that have prevailed in the past on construction jobs will no longer be permitted, as indeed some of our past practices have already been changed or prohibited. Hand-in-hand with this implementation of the Law, will be a potential affect on field labor productivity. In some Instances, productivity may actually increase due to im proved working conditions. However, the effort and expense required to bring about this condition may adversely affect contract profit ability. To account for this eventuality, we will need to maintain a close watch over contract costs and possibly modify our estimating
-2-
Si
Procedures to account for this impact. You are certainly aware of the asbestos problem, and thus the materials we use in our work will be affected, and we may even need to reconsider the types of work we are now engaged in. On the brighter side of this picture, we feel companies such as Thorpe that are intending fully to comply with the law and are cognizant of its requirements, will have their services in greater demand in the coming years.
II. Overall Plan For Implementation Of The Law In Thorpe Contract % Operations. Our plan to implement compliance can be simply stated: Comply with the Law in all aspects. However, as mentioned previously, the . scope of the law is so broad and its effects so far reaching, that it is. virtually impossible for a company of our size to effect overnight total compliance. Accordingly, we have pursued a rather informal plan thus far which has consisted of taking the immediate necessary steps to bring about compliance in our operations, partic ularly in areas that have been well publicized and are the more obvious items. For the longer range, we are beginning to develop specific policies in certain areas such as environmental testing, personnel training, and facilities modifications. Also required will be reminders of the importance of certain items which need to be followed on a day-to-day basis, and tend to be forgotten with the passage gf time. As we continue to approach complete compliance
-3-
f
44
with the existing law, we will also need to implement the new standards as promulgated by the Federal Government and State Agencies.
One of the most publicized problems with the new law has been the difficulty of small companies, and companies the size of Thorpe to familiarize themselves with the many facets of the law arid bring about compliance. We feel this is a very real problem and have exerted considerable effort toward this end. Where the % real problem exists in our organization to a greater degree is in our branch office locations and subsidiary company locations. To combat this problem, we will endeavor to keep the supervisory personnel in those locations abreast of new developments and policies as they are available.
III. Actions Taken To Date To Bring About Compliance With The Law
This section of our report will consist of a listing of most of the more significant things done thus far, with a following elaboration on certain Items and examples.
1. Program of Memorandums 2. Supervisors Meeting 3. Review of physical facilities
-4-
*J
September 16,1964
J. T. Thorp* Corporation Houston, Texas
Attn: Mr. Collin*
Subject: Fireproofing - Vessels
In line with our conversation, we are attaching hereto vessel sketches and OOF Specification #338 as required for sub* Jeet vessels.
For your information and convenience, w tabulate below vessel number and sketch number of items for consideration in your quotation*.
quotations are to be addressed to H. H. Harding, Furchasing Agent, Southwestern Oil & Refining Company.
It is anticipated that Southwestern Oil & Refining Company will furnish and install the necessary standoff brackets and wire nesh required for the application of your Gunnita material.
8277-301-Rav. 2 8277-301-Rev. 6 8277-301-Rev. 3 8277-301-Rav. 2 8277-301-lav. 1 8277-301-lav. 4 8277-301-Rev. 3 8277-301-Rav. 2 8277-301-lev. 2
8277-301-lev. 1 8277-301-lav. 1
Feed Dryers, A-VIA & A-V1B Acid Storage Drum, A-V3 Acid Miasr-Settler, A-V4 Acid Regenerator, A-V5 Polymer Surge Drum, A-V6 Isoatripper Column, A-V7 Depropaniser, A-V10 H.F. Stripper Column, A-V12 Fropaae BOH Treater, A-V13 Relief Gas Scrubber A-V15,Relief Header A-V14 Butane BOH Treater, A-V17
OOF Spec. 338, lev. 1 June 29, 1962 - Fireproofing
Very.-tsuly., your* ,
DW:ph cc: H. H. Harding
Doyle mi llw, Construction Froject Engineer
U.O.P. CO.
U OP SPEC. 338
UOP SPECIFICATION 338
REV. I JUNE 29, 1962
FIREPROOFING
PROPRIETARY CEMENT MANUAL APPLICATION
UNIVERSAL OIL PRODUCTS COMPANY
OES PLAINES, ILLINOIS, U.S.A.
U.O.P. SPEC. 338 PAGE I OF 6
I. GENERAL
A. SCOPS
1. This specification is for manually applied light weight, hydraulic setting proprietary fireproofing canent on steel supports for process equipment and piping in hydrocarbon service.
2. The thickness of fireproofing shall be suitable for a 3 hour fire resistance rating.
B. REFERENCES (Latest Editions)
1. ASTM Specifications.
2. AWS-ASTM Joint Specifications for Welding Electrodes.
II. REQUIREMENTS
A. STRUCTURAL STEEL
1. All structural steelwork, including all bracing, supporting process equipment within the battery limits shall be completely fireproofed up to a minimum height of 35' above grade.
2. Platform, runway or stairway supports need not be fireproofed.
3. Structures outside the battery limits shall be fireproofed as above if any adjacent process equipment would be endangered by the failure of the equipment supported.
B. PIPE RACKS
1. Pipe rack bents supporting process piping within the battery limits shall be completely fireproofed except for the top flange of pipe bearing beams and knee braces. (The use of knee braces shall be minimized).
2. Pipe rack bents outside the battery limits need be fireproofed as above only if adjacent to process equipment.
C. EQUIPMENT SUPPORTS
1. All lugs, brackets and legs supporting process equipment located within the battery limits and below a minimum height of 35' shall be completely fireproofed.
2. Saddles supporting process equipment and measuring more than 1* in height at their lowest points shall be fireproofed within the above limits.
3.^Ihe outside of skirts supporting process vessels shall be fireproofed within the-above limits.
U.O.P SPEC. 338 PAGE 2 OF 6
u. The inside_of skirts over. IiJ-O" indjamater and the bottom.heads of uxiiraulated jressels _on _skirts over Tj'-O" in diameter shall also be fireproofed within the above limits.
5. The inside of skirts lt*-0" or less in diameter and the bottom heads of uninsulated vessels on skirts it * --0rt or less in diameter shall be fireproofed within the above limits only when access opening in skirt is over 16" in diameter or when there is more than one access opening.
6. Skirts on process vessels with a design temperature of 850*F. or over which require insulation to maintain a temperature gradient shall be fireproofed on the uninsulated portions only.
D. HEATERS
1. Main supports and bracing on fired heaters in all locations shall be fireproofed up to the firing floor level*
2. Members supporting heavy convection tube banks or stacks shall also be fireproofed when construction permits.
3. For UOP type heaters where casing plate extends to the foundation near grade, no fireproofing is required,
III ANCHORS
A. MATERIALS
1. 3/8" rib metal lath, 3.1* lbs. per sq. yd. , painted.
2. 26 gage galvanized steel expansion corner beads (2-5/8" wing).
3. lA" diameter reinforcing bars in accordance with ASTM Specification A lf>, intermediate grade.
U. Galvanized electric welded wire fabric beam wrapper, 2" x 2" x 12 gage x 12 gage.
5. 16 gage soft galvanized wire.
6. 3A" steel nuts, square or hexagonal.
7. Covered welding electrodes in accordance with Joint Specification AW5 A5.1, ASTM A 233, Classification 3S0XX-15 or E60XX-16.
B. PREPARATION
1. Steel surfaces covered by the rib lath are to be painted.
2. All surfaces to be in contact with the fireproofing cement ,--'shall be cleaned of all oil, loose rust or mill scale and
other foreign matter by wire brushing or by sandblasting.
U.O.P SPEC. 338 PAGE 3 OF 6
C. INSTALLATION
1. Attach the rib lath firmly in place on structural steel members as shown in Fig. 338-1. Exposed ends of members shall also be covered with rib lath securely tied.
2. Attach the beam wrapper firmly in place on vessel skirts and other equipment supports as shown in Fig. 338-2. The beam wrapper shall be tied to the nuts so that it is held 3A" to 1" from the face of support.
APPLICATION
A. MATERIALS
1. Fireproofing cement shall be a proprietary formulation of high temperature aggregates, fibers and hydraulic binders, blended to a uniform dry mixture that is ready for application after mixing with water. It shall provide a hard, durable, weather resistant and light weight fire-retardant covering for steel supports,be able to withstand high pressure water streams and have a continuous service rating of 2000*F. It shall have a 3 hour classification for l-3/li" thickness applied as outlined in this specification, confirmed by tests made in accordance with ASTM Specification E 119 and certified by Underwriters Laboratories, Inc.
2. Water shall be fresh, clean and cool.
3. Weatherproof coating consisting of a fibrated mastic material in ready mixed form, non-flammable when cured, durable Tinder extreme weather conditions and suitable for temperatures to 250*F.
B. MIXING
1. Thoroughly mix the proprietary cement with water in proportions recommended by the supplier. Mixing time shall not exceed that recommended by the supplier.
2. Do not mix more cement than can be applied In 2 hours, or in a lesser time if recommended by the supplier.
3. Do not mix cement at temperatures under UO*F or when the temperature may be expected to fall below hO#F within 8 hours after application.
C. PLACING
1. For structural beams and angles, trowel the cement mixture thoroughly into the rib lath for good anchorage, and build the cement up to a full _1-3A" coverage over the rib lath as the work progresses to avoid laminations. Use a screed so that the minimum thickness is obtained, trowel the surfaces and chamfer the corners uniformly.
U.O.P SPEC. 338 PAGE 4 OF 6
2. For structural columns, apply a first coat approximately 3/b" thick, troweling the cement thoroughly into the rib lath for good anchorage. Scratch the entire surface and allow to set for 8 hours or more. Support and hold the comer beads away from the first coat by gobs of cement spaced about 2' centers and tie them securely as indicated in Fig, 338-1 so as to obtain a
1-3A" minimum coverage of the lath. Fill the space between the
wings with cement by hand, and trowel the final coat flush with the beads as the filling progresses. The upper portion of tall columns may be covered in the same manner as beams above the 8' elevation measured from finished grade,
3. For vessel skirts, trowel the cement into the wire fabric to full contact with the steel surface. Build the cement up to the full 2" thickness as the application progresses, starting at the bottom and spiraling upward to completion without undue inter ruption, Trowel to a uniform surface; no further finishing is required,
L. Unless specified by the cement manufacturer, the curing of the cement by continuous wetting is not required for applications up to 2" thick. Under normal drying conditions allow 3 days for firm setting and drying,
5. The top edges of the fireproofing shall be flashed with a mastic weatherproof coating when not otherwise shielded.
N O T E T M It O ATA l T H I PH O PC ftTV 0 9 TH E U N IV K ftV A l. O IlL P P Q O U C T * C O M P A N Y . C H IC A O O . U .O .A . A N O H A L L N O T T ftA C K b . P H O T O G P A P H K O . PH O TO O TATKO ON R C P N O D g c U )
IN ANY M AM NCM NON UOKO POP ANY P U A P O S f W N A T N O (V |N K1C KPT Y W R ITTE N P C R N IO O IO N OP U N IV C R R A L O IL PRO O UCTE C O M P A N Y .
U.O P. SPEC. 338 PAGE 5 OF 6
CHAMFER
FIREPROOFING CEMENT RIB LATH - RIB IN
*16 GA. W 12 " CTRS
ROD-TACK WELDED * APPROX. 18'* CTRS-
STEEL BEAM-s^l OR CHANNEL TM
STEEL BEAM-, OR CHANNEL !
BEAM DETAIL
RIB LATH -RIB IN ~j STEEL COLUMN
r~ 16 GA. TIE WIRE X 12 "CTRS. MAX.
MASTIC FLASHING-
6 GA TIE WIRE - 12'
CTRS. MAX.
FIREPROOFING CEMENT
RIB LATH- RIB IN
BEAM DETAIL-TOP BARE
EXPANSION CORNER BEAD
16 GA. TIE WIRE 12" CTRS. MAX
16 GA. TIE WIRE- 24" CTRS. MAX.
STEEL ANGLE
FIREPROOFING
ECONO COAT
CEMENT
RIB LATH-RIB IN
FIREPROOFING
O COLUMN DETAIL
o
CEMENT
a' 6
NOTE . MINIMUM COVERAGE OF ALL RIB LATH SHALL BE 1-3/4" OF FIREPROOFING CEMENT
ANGLE DETAIL
FIG. 338-1 FIREPROOFING DETAILS FOR STEEL STRUCTURES
U.O.P. SPEC. 338 PAGE 6 OF 6
VESSEL tangent LINE-a
MASTIC FLASHING
WEATHERPROOFING s
INSlOE OF VESSEL
INSULATION
NUTS AND TIE WIRES, 12 " CENTERS, TWO WAYS. SEE detail "a"
beam wrapper
3/4" TO l" FROM FACE OF SUPPORT
ACCESS OR OTHER REINFORCED OPENING
INSERT SHEET
metal SLEEVE IN UNREINFORCED
VENT OPENINGS VERTICAL SECTION INSULATED VESSEL
balance of details same as
FOR UNINSULATED VESSEL
NUTS, TACK
WELDED, ANO
TIE WIRES SEE DETAIL "A'
CEMENT
VESSEL SKIRT
WRAPPER
VESSEL SKIRT
PLAN SECTION
BEAM WRAPPER
TACK WELD
r-- F OU NDATI ON
WIRE
BEND I N WARD
NUT SUPPORT
VERTICAL SECTION UNINSULATED VESSEL
DETAIL A METHOD OF ATTACHMENT
FIG. 338-2 FIREPROOFING DETAILS FOR VESSEL SKIRTS
-P'5
J, l /f^ - ^
**//
/)<&J / OJ < Qs, //M
yXs g.
An
^J t/
A/^
sJt~?>'^7'
ojLdh / o // ^ 6</ *" J/////&-- J //M
JL'J
< /
fd'k /Pc/^f/C /&*/?
t>j ^ <jj * ^ Ms/
-/ /5p/^.
Au,*^/
l< fe-s
uj/ J^r/
//& </(f _--
77/ 'ft
? Z/, / /O
L)& yd //^dy
do /*# d>
j*j d*~
y^xf
A/
/0-i6/
ifOdd
j
^
~/s
A:>*~ <fe
/Ys~j/*
0"
s
7L
o /*&</(?
f/t>/ /ff cJqA
.
zzj a/ cp&r / $/t.
a z/y///>^
u c*/% /Z&JLZ
;A. f~~
^Z/i j/ti/ -/Z*---- s? q*~1
/*ji$ (w
/f/> -
-w
&~J
JoLt**
-T74 */j
,, rA^se
A~J
<r/Iai
/j i<.
~7^r ^/ Ajc
*-
/A
Z
Ao C+// ~fCs \/ft)
/r/sJ(Lo~~*/ ^ fl Za/Lj /t~Z ih-u trdtfybJ
**
f /&(/-
C&-- <^c cfdh- '
/
c/ic . \//s (L /
A// CL /
KA.--.Jhy
/q
n hi//// //t'Kf -. --
3'--
*SUD!L PRODUCTS COKRPUIIV
UtOfjoWt)>H MOAO
:iV:%|'i?':; *feOJECT
> t>* _*<*.'L.|MI. *J, VA
SPECIFICATION
*. Jy .-\ ' "no. SZ 77 - 301
nvr;-- -1 >
mct
or
. ' -*'.' OATS''
'% -r- ^-,V -4
: - V*'
**v. ~s
827 7 - 3oi ^