Document kDqg83j7N9Ld2MX3ajREK4aD0
Monsanto
P- >
K.4 (NAME 4 LOCATION) F. Webb - Texas City
.../
DATE December 15, 1976
SUBJECT IEFEKENCC
Action Taken on Safety Suggestions from Safety Contact 1976 Program
TO W. H. Triplett
cc G. T. Ryan -Plant Manager's Safety Board AN-5 Supervision
Proble m Action
Target Date
Potential hazard from low beams in inhibitor mixing areas.
Survey AN-5 plant for low cross beams, etc. Correct if possible. If not, paint black/yellow stripes on beams.
January 15, 1977.
Problem
- Vent area around 51 Cl's should be roped off to prevent hot condensate from burning someone.
Action
- RV vent pipes didn't have drain holes. Warm up vent lines have drain pipes. Vent lines on RV's were drilled to pro vide drain. All other steam RV vent lines being checked for drain and corrected if needed.
Target Date - January 1, 1977.
Problem
No effect seen to improve housekeeping in Badger Construction Area.
Action
- Instructed Badger to start cleaning up. Areas are cleaned up before acceptance by Manufacturing. After acceptance and final exceptions completed, very thorough clean-up will be done.
Target Date
February 1, 1977.
Problem
Action Target Date
Craft leadmen should initial fire permits in addition to chief operator, maintenance foremen and manufacturing fore men.
Recommend this be reviewed by SHAC.
By February 1, 1977.
PLAINTIFF'S EXHIBIT
SC 14469
MQN-1060
LAM015061
W. H. Triplett
-2- December 15, 1976
Problem
- How would we handle a large LPG spill?
Action
- There is very little that can be done in the case of an . LPG spill except stop the spill, spray water on top of LPG, and keep ignition sources away if possible until the LPG vaporizes and dissipates. LPG is not soluble in water. The vapor is normally heavier than air. This is a real potential with no known solution.
Target Date - None.
Problem
- Demonstrated safety system (WOB flash back protection) in other plants, but not yet in Texas City.
Action
- This system will be checked out for correct functional operation during our water batch procedure prior to start-up.
Target Date - January 15, 1977.
KFW/ob
)^ Ken Webb
SC 144 70
LAM015062