Document kDoeXj325KEMVmJMRErkqMD9q
||8|
:
i
To - Research Committee International Conference of Building Officials
Gentlemen:
This Is written in support of the enclosed notarized application that the Modified Cedar-Asbestos Roof System be recognized as equivalent to Class C roofings.
Attached please find 10 copies of "Fire Tests on Cedar Shake Roof Decks" as prepared by B. C. Research, a division of the British Columbia Research Council, which Is highly regarded In the technical community as a competent non-profit industrial organization.
This report summarizes results of tests on several different types of roofing assemblies. However, this Research Committee application relates to construction described as 1A. By extension, it applies also to Assemblies IB and 1C. The only difference between these two Assemblies and 1A is of no consequence Insofar as the fire test results are concerned; namely, the glass fibres in !B and 1C were extended in both directions Whereas the fibres in 1A extended in one direction. There is no difference In the fire performance of the two felts.
Your attention Is directed, therefore, to the results of Tests 2, 4, 6 and 7. and to the conclusions on pages 8 and 9 of the report.
As mentioned in the report, a 16mm motion picture record of the tests was made, and It would be our pleasure to show this movie to members of the Research Committee, individually or collectively.
We respectfully request that the Modified Cedar-Asbestos Roof System be granted an equivalency to fire-retardant Class C roofing as defined in 3203(e)5 on page 436 of the Uniform Building Code, 1970 Edition.
Sincerely,
RED CEDAR SHINGLE 6 HANDSPUT SHAKE BUREAU
Virgil G. Peterson
5> Secretary-Manager
vgp/r
/
BIRD 013736
fiov w* <3 i International Conference of Building Officials
5360 SOUTH WORKMAN MILL ROAD * WHITTIER, CALIFORNIA 90601 * (213) 699-0541
APPLICATION FOR RESE XRCH COMMITTEE RECOMMENDATION ON ALTERNATE MATERIAL! Of? METHODS OF CONSTRUCTION AND PREFABRICATED CONSTRUCTION SYSTEMS
Data December Ik, 19?,2
For Conference Use
Research Repnrt Nn,
2860
NAME OF APPLICANT (FIRM)__ Red . Cedar Shingle & Handsplit Phak*> Fnrpan
PRODUCT A ngw fire-retardant roofing assembly utilizing cedar shakes anti
(Explain the scope of use for which recognition is requested.)
asbestos felt interlay.
Mailing Address $510 "bit a -Bid g-.Address
Check whether application is for:
New Request jp
..Seattle. City
Re-examination of prei/ious recommendation
V.rash. 9R101 State
DATA SUBMITTED Enclosed
Under separate cover
Please indicate
Please list data submitted. Note that 10 copies of all data are required unless application is for re-examina tion without change.
1. Letter of submittal.______________________________ ...... .
______
2. "Fire Tpsts on Cpdar Shake poof Decks11 by E. C. Research
Applicant agrees to abide by the requirements of the Uniform Building Code and the current rules of proce dure of the Committee (the rules are incorporated by reference in this application) and any conditions at tached to the approval of this application.
Red Cedar Shingle & Handsplit Shake Eureau
(Please Type or PrinJ);
____ _
Name of Applicant
State of
?&shington
County of. King.
City of___ Seattle. Subscribed and swom to before me this
.Tilth____day of___Dacaaber.
&Cft
Segrq.tary-Mana
M
,i\itt tlia a '\
(y Notary Public
(NEW APPLICATIONS WILL NOT BE PROCESSED UNTIL CHECK OR MONEY ORDER IS RECEIVED)._____
Bj Check or money order enclosed.
lJS\ A C.-
Bill us.
`'
Revised 2/6/70
CHECK RUMBEH-
Signature
'<9
m
BIRD 013737
; j* / ; .
mT*T"+?
nlsrnational Conference of Building 'Officials P.
'ifJloUTH WORKMAN MILL KOAD WHITTIER, CALIFORNIA 90601.
-T-E---L-E--P- HTMOrN~E -(-2--1--3-) 6--9--9---0--5--1--1' *
':
'
NR
REPORT OF THE TECHNICAL. DIRECTOR TO THE RESEARCH COMMITTEE
SUBJECT COMPANY NAME ADDRESS
FIRE RETARDANT CEDAR SHAKE ROOF
: REPORT NO
COVERING
2860
RED CEDAR SHINGLE AND HANDSPLIT
. . DATE
SHAKE BUREAU
- -
: V'i. January 11, 1973
V. G. Petersen
,
V;-. ^..v. r~ r i' > S
Secretary-Manager
.V-7
5510 White Building. -..'V/' `/'
* )? -. /
Seattle, Washington
. .-.''.v''"/
/?,
I. The following report on the subject noted above is sub-
2. mitted by the Technical Director and shall not be con-
3. sidered as an approved recommendation until final action
4..
ill 5*
"" ! 6.
of the Research Committee'.
I. INTRODUCTION :
.
' '
' sv.
At the request of the Red Cedar Shingle and Handsplit
7. Shake Bureau, Seattle,Washington, the Research Com
8. mittee of the International Conference of Building
.8 . Officials has made ah examination of the data submitted
10. in connection with the use of cedar shakes and asbestos.
11. felt interlay fire retardant roof covering.
.12 II. DESCRIPTION:
13. General: The roof consists of a minimum 1/2-inch thick '
14. exterior grade solid plywood sheathing, asbestos felt
15. with glass fibers, and red cedar shakes. The plywood
16. complies with Chapter 25 of the Code. The asbestos felt
17. is No. 4ll construction felt with glass strand reinforce
ment as manufactured by Nicolet Industries, Inc. (weight
IS. 12 pounds per square). The shakes are-No. 1 grade hand-
20. split and resawn red cedar shakes 24 inches loDg with the
BIRD 013738
REPORT OF THE TECHNICAL. DIRECTORT'O THE RESEARCH COMMITTEE REPORT NO.
. PAGE 2
21. butt end 1-ljA inches thick and top end 3/^-inches thick
22. vith various widths, and shall meet the requirements of
23.
U.B.C. Standard 32-8.
:
-. '
-. '
24. ' Installation: The plywood shall be installed as.set 25. - forth in Chapter 25 with all joints backed with minimum*
26. nominal `2 inch by inch wood battens. The asbestos!..;
27. felt underlay is installed at the first course of the
28. shakes and is interlayed from the butt of each overlying-
**
29.. course of shakes.' The shakes shall be installed as .set
30. forth in Section 3203-(d) "8 except- that the asbestos felt
with glass fibers is used, in lieu of the asphalt felt.
' 32. 33. 34.
35.
i
f HI. .f
Identification: (Proponent is to furnish the means .-by
.'
t
which all material is tb.be identified in the field.) .
'
EVIDENCE SUBMITTED: -
. . .-
' "'.v-.--
Tests to determine the fire retardency for Class C roofing
36. in accordance vith U.B.C. Standard 32-7 and Underwriters'
37. Laboratories No. 790-1969 are submitted. 38. IV. DISCUSSION:
V -V.
39. A review of the data submitted indicates that a clari40. fication of the following items should be furnished;
41. 1. The method in which the shakes were fastened to the
42.
43.
.41.
45.
sheathing in the test, including type of fasteners
and number.
'
2. Koof slope in the test.
3. Method of fastening the asbestos felt to sheathing
'
THIS IS NOT AN APPROVAL
BIRD 013739
*xt.
r* REPORT OF THE TECHNICAL. DIRECTOR TO THE RESEARCH COMMITTER
REPORT NO.
2860
PACE 3
46. 47. 46. 49. 50. 5t. 52.
53. 54. 55.
57. 58. 59. 60. 61.
.62
63. 64.
65.
66.
67.
68.
.' .and shakes in" test, including- type of fasteners and-
number. .
.
}` .
4.` The test report indicates that spread of flame'tests
were not conducted.
j." i: 7. .v.
Flying brand tests are indicated in the'-report . vhiclT
implies that treated shakes-were used.,. 6. If treated shakes were used, rain and outside"
'
weathering tests should he provided unless previously"
submitted under other research recommendation.. '
7. Since varying widths of asbestos felt were used in' '
. the test, clarification is.needed as to what-.is ! intended,
for the. approved installation.
:
8. The intended method of field installation must "comply
' with Part II of this report. Any deviation contemplated'
. . ,` * * '
must be resolved prior to approval of this report'.
RECOMMENDATION:
`- \
'
That this report be held for further study pending clari
fication and furnishing data requested in Part II and-IV
" s.
(
of this report.
.\
DRW:VFM:pr
D. R. Watson Technical Director
70.
THIS i3 NOT AN APPROVAL
BIRD 013740
INTBCDU3TI0S :
Th1 enclosed report from 3.0. Research contains fire tests on seven different
panels , and only those psnsix tests marked 1-A, 1-B and 1-C ore relevant to ft
th Research, report and tests 2A-- 2-3- 2-0- and 2--D are not to be considered
in the deliberations of this research requefit. All teats were conducted on
roof slopes of 5/12,
While the spread of flame test does not appear as tested in this .report such
spread of flame test was* conducted and paesed prior to this teat report. '
The problem of getting a 15 ft. test deck in place was insurmountable so it
was decided by th obo attending and conducting the testB that the flying brand
test under U/L 790 - 1969 waa a much more severe teat and if the fire did not
spread upward in this test as defined under the spread of flame test it would
not be necessary to conduct the spread of flame teat. .
DSSCRIPTIOI-: t
The roof deck iB to be 1/2" T & G plywood sheathing with an exterior glue line.
Thel plywood ia to comply with Chapter 25 of the Uniform Building Code. The
square edges of the plywocd shall rest on a 2 .x- 4 wood- block or roof structural
member of not leas than a wood
block covering not less than 1/2 of the
2 width. The plywood shall be nailed to the roof members in accordance with
Chapter 25.
Ons sheet of 5*5" asbestos felt shall be laid over the deck starting at the
leading edge of the roof and tacked or stapled before the first course of shakes
ere applied. Wood shakes shall be 01 a mxnisxa tnominal 5/4 to 5/4 butt thickness
24" in lepgth end of '/1 grade. Shakes will then be applied as in Section 5205
Subsection 6, except that in the case of the felt shingled between each course
such felt shall be an a sbestos felt as in Standard 52-14. And such felt shall be
26" wide extending from the butt of tne shake passing over the tip of the snake
onto the sheathing and tacked or stapled in place.
--folt--tsaybe---white---or--hicmL-i:
in-GTTtOTT
BIRD 013741
:ds:.tifioation;
identification for the shakes is to he as stated in Chapter J203 and the felt as in
J3D Standard 32-l4 with the exception that the felt may be colored brown
~,o approximate the color, of the wood shakes. Shakes are not to be dipped or
%
wessure treated in any manner,
3VID5K3B S-J3y.ITTD :
COKCLOSIQKs
4*
BIRD 013742