Document kDkBnNKDxerV17Jz7v878L3pV
Monsanto
'> -NAME & iCCA'iC.NI C. F. Navarrete - 0-10A
August 17, 1982
JiECr SAC Minutes - 8/10/82
``MNCE
3 J. A. Glass D. E. Kaldenberg S. G. Pappas
i
cc. PMSB
1. Quarterly Inspection Program
Reviewed SHAC's proposal for a competitive quarterly inspection scheme. See attached for recommended changes.
2. PMSB Minutes
SAC was asked to consider the publication of ABRIDGED PMSB minutes to
plantwide distribution. It is our opinion this wider distribution
will serve to improve communciations on plant safety policy and high
light the management concern for safety. It is proposed that LP&S will
prepare summary minutes to be issued through the safety organization
(Hourly Safety Committee and Unit/Craft Contact Supervisors) for review
at the meetings of the safety organizations, and further distribution
or discussion with hourly groups through this network.
'
These minutes should be approved by the Superintendent of Personnel before issue.
3. Old Business
The following items of unfinished business were briefly discussed. Detailed status will be reported in September.
a) Flame Retardant Tarps (JAG) b) Guide to Accident Prevention (JAG) c) Communication Procedures for HCN & Emergency Alarms (JAG) d) Breaking into Process Equipment Procedure (CFN) e) Passengers on Drott Crane (JAG) f) AN Walkway (CFN) g) Revision to P-0117 (Permits) (JAG)
/ob Enclosure
sc 13320
C. F. Navarrete
LAM014536
STG 2430289
(
QUARTERLY INSPECTIONS
OBJECTIVES
SHAC
Promote competition Recognize achievement/needs Improve quality of inspection and feedback
ADDED BY PMSB & SAC
Simple and credible ranking criteria Consistency
Inspection ratings Application of Safety Procedures/Programs 0 Promote continuing improvement Visibility of management concern
CFN/ob 8-17-82
sc 13321
LAM014537
STG 2430290
QUARTERLY INSPECTION
RECOMMENDATION
Adopt SHAC's recommended scheme with these exceptions:
1. Rating Criteria
A. Simplify Rating
- Non-Numerical Best/Good/Unsatisfactory/Skunk (later)
- Inspection team to assign rating
B. Basis for Rating
Three Parts
Pre-Judged Two Groups Improving Not Improving
Inspection
Inspection
1. Safety Performance of Unit
Pre-ranked as proposed BUI SHAC to review at PMSB prior to inspection.
Bases: - Recordable record (as proposed)
- Total Injury TREND for each unit (rather than absolute frequency)
2. Housekeeping Level of Unit
As proposed - non-numerical value judgment.
3. Unit Safety Improvement Program
Two components:
Use of plantwide programs (STOP, Safety Mtgs., U/C SPT, etc.)
Unit programs
2. Inspection Teams
Adopt as proposed except for manufacturing units.
Change to:
Two teams vs. three (everyone has a chance to be a hero or a skunk.)
Plan 6-hour tour for each team. More involvement of unit supervisor Rotate all of PMSB through these two mfg. unit teams as well
as all the others.
CFN/ob 8-17-82
13322
SC
LAM014538
STG 2430291