Document kDdZ8rMzxLpg4bEZoz3887pvq

'"sALCS^EPi^ENTATIVE'S REPORT j FRICTION PRODUCTS GROUP - ----- Typed 7/18/^9, customer / | FRUEHAUF DIVISION^/ " ADDRESS \0900 Harper-Ave. ; p.O. Box 238 TYPE OF CALL Received 7/13/79 REPRESENTATIVE L. E. B_ CITY Detroit, MI OFFICIALS INTERVIEWED A. Schaible - Mgr. Aftermarket & Accessories Purchasing J. P. Silk -V.P. Material (vacation) W. P. Connors - Mgr. Central Purchasing (vacation) G. Bobo - Dir. Parts & Accessories Sales comments Walker - Regional Sales Mgr. - Parts & Accessories A. Przepiora - Dir. Product Development (vacation) RESPONSE REQUESTED DATE 7/12/79 REPORT No 8069 STATE/ZIP 48232 ` PHONE 257-1000 Mr. Schaible is looking for an answer to his letter dated June 21, regarding their request to purchase dynamometer time for testing of a 12 1/4 " x 8" brake. This letter was forwarded on June 25 to Mahwah, the attention of D. E. Steis. Mr. Schaible is preparing another letter stating their requested annual FES 74 test and semi-annual 121 test (5) on 20,000 pound axle material. The writer has tried to discourage this approach, however, not with too much success. More and more of their branches are becoming involved with Abex material both in lined shoes and also boxed sets. The four branch test program seems to be running reasonably well, we should be getting additional replacement orders on boxed sets soon. All branches have been notified via letter that costs for lined shoes of 4515 or 4602 part numbers with either Abex or Carlisle materials are priced at $13.50 each. It was noted that Fruehauf makes less money by $1.00 by putting Abex material on the shoes than the Carlisle material. The McLean program is running very well and because of McLean's purchase of ONC (west coast operation with 5800 tractor trailer units), they want the same program in the west coast that they are presently getting on the east. West coast, six branches will be serviced out of our Hayward warehouse. The Atlanta warehouse will become involved in servicing the Texas operation. The Matlack program is also going well. Effective July 23, 1979, they have switched to 50% of the Matlack operations (all east and Birmingham, Alabama) to Abex. The rest of the Matlack program will come on one at a time. Mr. Walker states that the minimum, maximum set up for his program at the plant will help greatly and that within the last 30 days an additional 1,000 sets have been ordered for his relined shoe program. These all consist of 693-551C in 4515 and 693-551D m 4602. The writer has confirmed with Mr. Frank Cappucci the situation at Roadway wherein they want to ship material to a brake foundation manufacturer at Abex expense SCF-ABEX-2270 S-FTS-220 S-CC-220 OBR ' ABEX-198 04776 "' i^ Report No. 8069 Page 2 July 12, 1979 ($1500) and let them test. We are apparently still waiting a letter from Roadway. Also noted that m view of the fact that we would not supply them material on a direct basis as did World Bestos, that they then want to call the shots on the distributors they would use to get Abex material. Mr. Walker continues to work on this program. . No problems were reported from the Engineering group at this time. The lot or batch number which we applied to the Fruehauf blocks is not utilized in any way for a recall situation. They do not take this number and apply it to the shoe assembly and/or the axles. The only thing they can determine is that an axle by number was shipped with Abex and/or Carlisle material and to what customer. If problems arise with the lining, they are not in a position to determine whether it was for the last month, four months, or six months that the material may or may not have been bad. Indications are that we could not remove this number from the blocks, although they do not utilize it. L. Earle Bretz, Jr. RLCutler/AFSchmaltz/file RENelson ADIndelicato BIwars son OBR 04777