Kaiser Engineers Weekly Field Activity Report
August 1, 196? 0. A. Fins&nd
io.ddlet.cwn Constriction
Transmitted herewith la the subject report for the \ ending August 1, 1967
QAP/sec
Distribution
Armeo G. Osborne G. Kramer 1-f. Eames a. Foley R. Smith Cox S. Lots J. Delaney
Kaiser
\
R. J. Wolf (OaklandK|
W. F. Sort (Oakland)
D. A. Daly
F. X. East.
J. W. Irvin
V. L, Franksoa
A, L. Garden
H C,, Bcuehcr
KEN 004017
KAISER ENGINEERS
WEBKLT FIEID ACnVUI REPCKT Week Ending August 1, 1967
WEATHER:
Cloudy- and clear with heavy showers on Sundaynight.
Client:
Argso_StagI^Corporation
Location: MidoOgtomi.^Ohlo ....
Job Number: &&
TEKPEEATUEE: Ikndjmm - 92 degrees Igjttmnm - 57 degrees
JOB VISITORS
W. Burger, 7. Ignatov StM-IART FORCE REPORT
Kaiser Engineers Ersnafc. Non-Srygrr^
Management General Supervision Field Sigineerlng Warehouse & Material Cntrl. Survey
Office Service and Repro. Clerical Craft *
5 21 ia 3
2
...
3 2 30 10 25 9
1.719
TOTAL
a 1,798
Foothill Subcontractors Electric Total
19 26 7 56 12 16 100
1 14 2 29
9 30 22 32 999 & 3.181
1,049
710 3,630
* Average fear week of mm on payroll.
Average for week of Crafts is as follows:
Kaiser Engineers
Subcontractor* Foothill Electric
1*621
963 31ft
Total Crafts Working 2,919
KEN 004018
-4~
VJEEKLT rasa) ACTIVITY HEPQHP
Weak Ending August 1, 1967
PHOMLaS^^
1. ma - Hot.amg-MEtt
1.1 R^Avat4<yn and Backfill: 3,S3 cubic yards of excavation was made during tbs period fear a total to date of 1,103,160 cubio yards. 30? cubic yards of slag backfill and 350 cubic yards of other backfill was accomplished for a total to date of 362,623 cubic yards.
total to date of 204,051 cubic yards. Major caccrete pours were: the aisle slab-cm-grsde between Caban 4 and 7, the skip hoist top slab,
coil lay-down slab between Column 64 and 67 and the s&in mill aisle slabon-grade between Cofcnm 52 and 54.
1.3 Structural and Mispaijanerms Steal: Erection of bin platform steel and
catwalks ties continued during the period. This work is now 90# complete.
The Clarifier Building leaver frame installation is essentially complete.
Miscellaneous steel erection was continued at Beale Fits #1, 2 and 3 oil
stairways and platforms. Platforms sxd stairways throughout the main if
mill aisle were also being installed during the period.
|
1.4 9,640 square feet of Steelcx siding was installed at the Water Clarification Building during the period for an overall Hot Strip Kill total of 619,633 square feet.
1.5 Beating and Ventilating: Progress was aaiotained during the period on a majority of the fifteen (15) Hot Strip Mill Bag Houses. Bag House #8 Is structurally complete and nmlning work consists nainly of elsotrlcal connectlane and soma punch list itas. It la estimted that two (2) more
weeks will be required to ocopLarbe all construction activities for ibis house. Bag House #9 will require four (4) more weeks to couplets remain ing construction activities. Structural and electrical work was main tained during the period on Bag House S3 and it is anticipated that ibis house will complete by the first of September. A special interest is
established to Maintain nwriaw progress on all Bag Souse work in tomaet eohartulrd completion for these units. At the Switchgear
has been ccoplsted for tbs air conditioning oust, the air conditioning condenser has been set oal connections are now in progress. Ho progress
was aooaepllebed during the period on tbs Extractor Director Boca air
conditioning wit. Installation of diffusers la remaining. The B2 Director Boom unit, ad the Finishing Kill Director Boca unit likewise, are waiting on diffuser Installations to complete the system. At the Dowpcoilsr Director Boon, the air conditioning unit and the duct work has been completed. Benaining work consists mainly of piping cod elec trical connections. At the Finishing 1011 Office Complex progress was continued on final instrumentation of this unit in order to have it
operable by -toe middle of August. At the Boiler House Control Boom, the air conditioning unit was set in place during the period and related duct work is now in progress.
KEN 004019
WEEEX FZEID ACTIVE?? HSPCHT Week Ending August 1, 1967
1.6 Kegggjggj^ Eichleay Corporation5s progress on mechanical work was extensively affected, fay the electrical workers walkout which continued from July 25 through 27 inclusive. In addition, twenty (20) Sichleey ironworkers did net report for work on Wednesday and Thursday of this period. x-Iinwrjgfat work, harever, wa3 maintained during the period on table installation and main mill equipment including the coil con veyors and furnace pushers. Furnace Pusher #1 is installed and remaining work for this unit consists mainly of piping and electrical con nections before check cut and testing can commence, By the dose of this period, Eichleay1 a work feree was in a position to resume good
progress with crans service restored and the ironworkers back cn the job.
Coupled testa were made during the period at R-3 and E-5 for the third time to satisfy correction requirements. Coupled teats were also accomplished at the vertical 3calabreaker for adjustment of current Halts and breaker trips.
1.7 Pining* During the period, progress was maintained on all Hot Strip
Kill piping systems. The period quantity was 4,385 linear feet of
pipe including instrumentation piping for & total to date of 206,189
linear fast. The remaining quantity to cccplets Is now estimated at
137,544 linear feet. Hajar systems worked on during the period were:
grease system. Hydraulic 12, Hydxeulis 13, atU.1 high pressure water,
natural gas, plant air, steam, chodeal systems and instrumentation.
Hydro pressor# testing was completed on Lube Oil #10 during the period.
Hydro pressure tasting of Lube Oil #4 is presently in progress.
Pickling and Hushing has been completed on Hydraulic System 13 and
14 and oil has been Installed in Kydraalia System 14 Tank. Grease
Systems 6 through 16 have been ccqplaied. Hydro testing of the furnace
cooling water system is now in progress between the Pump House to the
Furnaces and to the ail cellar* Delta Pipeline installed 600 feat of
pips dozing the period cm natural
oxygen and plant air in the
main mill aisle along Column Line S and D. Delta presently has a
work fares of 27 am an these systems. This is considerable below
sebe^fttzaqpizaiNntsand installation is slipping behind schedule.
1.8 gtafjBNtfl* Foothill Electric Corporation installed 1,100# of embedded canSdjNnrlng the period fbr a total to date of 1,487,000#* 19,600# of sapsMdeonduit was installed for a total to date of 1,079,200# or 89% complete, 40 terminations were accomplished cn the 2,4 SF power
for a total to data of 390 or 94% cocplste. 40,500 fest of low voltage cable was installed for a total to date of 1,600,000 feet or 68% ocaplsts. 1,400 low voltage terminations were accomplished for a total to date of 18,600 or 49% complete. 95,000 feet of control cable was installed for a total to data of 1,258,700 fest or 73% complete. 2.200 central terminations ware accomplishod for a total to date of 26.200 or 45% cceplete. 34,300 feet of computer cable was installed for a total to date of 362,900 feet or 45% complete. 700 computer terminations were made for a total to date of 7,300 or 26% complete.
KEN 004020
-6-
V/SEKLSr FIELD AG2TJI2I REPORT Week Swing August 1967
1,300$ of lighting conduit and 100 feet of lighting wire waa installed during the period. 200# of grounding was accomplished far a total to data 125,500#. The electrical -workers did not report far work cn Tuesday, 'Wednesday, and Thursday. 50# of the work fores returned Friday and by tha dose of the period the total force was at 546 men.
Miacellanflous Subcontracts; Bay Construction Company continued painting of the Clarifier Tanks. All tanks have been sand blasted, pxlmed and final painting has been ccapiatad to date on Tanks #1, 2, 4 and 6. Tank painting is scheduled to complete on August 15, 1967. The Harley Company is nor 90# complete w&h the Clarification Cooling Tower and 9# com plete with the Furnace Cooling Tower. Remaining work on these towere consist mlnly of fan cylinder erection. Thia work is scheduled to complete cn August 15* 1967. Chicago Bridge and Iron continued with painting of the fuel oil storage tanks during the period. This paint ing Is scheduled to complete next porled. C.B, St I. plan to pressure test and complete the painting of the surge tank nest period. Stuart Painting initiated progross this period on the painting of mechanical equipment in the Hob Strip Mill. Arrangements are being made to begins painting of piping systems in the oil cellar as well,
*v
Salem-Broaius installed fine damper equipment supports far Furnace &Lr Refractory installation continued cn Furnace $1 up-take and waste gas breeching. The Furnace #3 refractory installation was maintained on the lower section walls. The refractory force is now at six (6) men because of workers leaving for ether jobs. Furnace piping was con tinued during the period. The cooling water piping to the dampers for Unit $1 is now 60# complete. Combustion air piping for the three (3) furnaces is 99# ecaplete. Ccoprasaed air piping for Furnace #1 is 20# complete. Setting of furnace control panels in tbs control room t&s completed during the period. Three (3) local panels were also installed during the period and conduit wok was continued throughout the Furnace Area.
Baboock and Wiloax continued with progress on the Boiler House flues, duets sad vwtllating system. The #2 induced draft fan house has been set iit plaes sad the waste gas stack is 90# erected. The ffl forced draflfcfttt bearing pedestals were installed. Combustion air duct void ing tfj||iSfc #2 and 3 was continued during the period. This contract is couplets. The combustion air jurisdictional dispute has
The Mo Piping- (Contractor for the Waste Heat Boiler
and over piping)
is nor 74# oomplcte. During the period, progress was E&lxrtalned on
steam lines, condensate, blow-down lines, gas headers arwl ikel oil
piping to the fuel oil heaters.
KEN 004021
rassKur fisid Acrnirr he?oht Week Snding August 1, 1967
' v.
Horn Woolley (Contractor for the Waste Heat Boxlsr 2n and under piping) is experiencing difficulty in obtaining qualified welders to support hia piping installation work. Progress dazing the period consisted mainly of 2 air header pipe at HLevafeicaa 166, boiler feed water to the Treatment Tanks, fuel oil piping below Elevation 154, and the 2" pilot gas header at Elevation 173.
Mirmeapolia-Honeytrell continued ;jth installation of trays and tray support at Boiler #1 and 2 and in the n&in control roaa. This subcon tractor appears to be maintaining follcw-up progress adequately at the present tine*
Owens-Coming Fiberglas Ccsmany continued during the period with insu lation of the 165# steam system in the main mill aisle and the Boll Shop. During the period, about 1,000 feet of pipe for this system was insulated* Tank insulation in the Waste Heat Boiler Area is now 6o complete. Pipe insulation to date totals approximately 7,500 feet of pipeline. The fire protection system by Grinnel mill bs delivered to the job site on August 15 for Systems #1, 2 and 3* Remaining systems mill be delivered to the job site in September*
Ohio Vbllqr Riggers have cceg&sted 332 of the flocculator equipment in the Clarifier Tanks to date. This subcontractor mill continue with installation of mixers and filters in thin area on a change order to hia present flocculator installation contract*
2* 71A6 - SLAB KH&
2.1 Excavation and Backfills 2,763 cubic yards of on-site backfill and 2,431 cabin yards of purchased backfill were placed for a total to date of 127,342 cable yards*
2*2 Concretes 233 cable yard* of concrete mas placed for a total to date of 33,932 table yards* Kajor ecnerete pours ware* pipe tunnel alafr to B-Liae, transfer car #2 walls, motor room fill concrete for meter gmsietor bason and mill office grade beams.
2*3 Oaring the period, Eichlesy Corporation continued with wtepSSinAcr installation. Two (2) additional units mere grouted durlngpBla period* Alignment and leveling cf ingot receiving tables and mul approaeh tables is in progress. Soleplates were grouted in place for the vertical and horizontal mill bed plates* The bed plates for the horiscntal mill are now at the job site and installation mill begin next period* 109 tens of Mesta equipment mas received during the period for a total to date cf 1,544 tons or 20% complete* Items received this period were: slab pushers, horizontal nrm, bed plate3, end ingot receiving table rolls.
KEN 004022
8
* WEEKLY PUUD ACTIVIST EEPOHT Week Bading August 1, 1967
2.7 Pigjflg||rHunter (Pipe Contractor for the Slab Mill Piping) during the perlodScntiiraert '^ith fabrication of Lube Oil and Hydraulic Systems for tbs oil oellar. Hunter is experiencing serious man power shortages and Is unable to maintain a balanced working force with the main eqphaaia placed on a shortage of qualified welders*
2.8 Electrical* Foothill Electric Corporation installed 7*430# of embedded
conduit for a total to date of 537,000# or 85? complete. 300# of ex
posed conduit was installed for a total to date of 4,00C# or 3? ccnplste.
500# of copper grounding was Installed for a total to date of 9,600# or
79? ccnplste* 700 Test of tray
installed for a total to date of
9,000 feet or 64? complete. 3,500# of lighting conduit and 4,700 feet
of wiring was installed during the period* Focthill Electric are
presently experiencing a shortage of men power in this area*
2.9 Miscellaneous Subcontracts* Motor room block work is now 90? complete.
3. 7143 -. SOASBIQ PITS =nr
3
3*1 Excavation and Backfill* 627 cubic yards of concrete was placed for tfftotal to date of 24,560 cubic yards* Major concrete poors during the period were* the ingot buggy track slab between Column 6,5 and 9.5, t Battery #2 top lift on the east side, the suspended slab between
Column 9*5 and 10.5 at Z-Line and the ingot buggy drive house*
3-4 Hoofing and
1,610 square feet of SteeLcoc adding was Installed
for a total to date of 47,587 square feet* Roofing tor the lean-to
structure is scheduled to begin on August 15*
3*5 Heating ntf
Raring the period, progress continued cn
installation cf ridge ventilator frames and aheating* This ventilator
is now 45? ocmplete.
3*6 Mechanical* Loftws Ssginserdng continued during the peeled with pre-
fabrication of piping in their south area fabrication shop* Oocd
progress woe mln&aineri during the period on furnace binding steel
at Baetty #5 end 6* Final bo3t-*ip of steel at Battery #6 and sees
fbr Pit #21 remains to be completed* Flue steel at
sufficiently to allow bride work to coooance.
work is now 95% ocmplete mod Stack #3 refractory
_____ eoaplste. Arches for Battery #6 fines are now 50? cou
ples m Pits
and 23* Wall refractory far Pits #21 end 22 is now
80? complete* No progress was accomplished cn Crons 357 end 35& during the period*
Electrical* 100# of embedded conduit was installed during the period
for a total to date of 50,100# or 65? ocmplete. 900# of high lay lighting conduit Me installed for a total to date of 11,300#. 40#
of structural grounding was installed for a total to date of 2,070# or 37? complete.
KEN 004023
UEEKET FIELD ACTIVITY HEFOBT Week 3odlng August I, 1967
4. 7123 -BfcggS QHtgM SHOP
4.1 fofAvafefry and Backfill: 6,422 cubic yards of eanavaticn vaa node fear a total to data of 122,941 cubic yards overall, 264 cubic yards of slag backfill and 1,767 cubic yards of local backfill was made for a
total to date of 31,457 cubie yards,
4.2 Coneretei 1,102 cubic yards of concrete was placed for a total to date
of 10,0o3 cubic yards overall, Major concrete pours during the period
wares emergency reladling pit walls. Furnace fl pile cap, pilo cap
E-26 and 29 and footings H-9 through &14,
4.3 Structural and Hiscell^^me
113 tons of structural steel was
erected at the Ibid Yard &tilding for a total to date of 862 tons.
All colusns have been erected between Cduan 24 and 1 and two (2)
trusses are erected at the east end,
5. 7145 - STRIFPBB No progress was acccnpllshad at this project during the period,
^
6. 7ie 7irt. 7i2?,
'
6.1 flj] ftyjWHn? Dragline exsavstion ccntlrmed along J-Linc of the Pickle Storage Building down to Elevation 71 during the period. Ewavoticn for the actor roas at the Gbreen Ccdl Storage Building was completed during the period. Progress was continued on backfill along A-Idne of the coil, conveyor.
6.2 Ccnsretet 63 pubic yards of concrete was placed during the period at the #4 Pickle line Aide foundation. 203 eubie yards of concrete was placed on J-Tine foofclnge. The south lean-to footings and grade beams are now complete to Coliaei Line 14,5*
6.3 atvoetmefl. rf maa^npypM steal* 232 tens of structural steel was tracted st^tha,Qroan Ccdl storage Building for a total to date of
10,320 square feet of Steelax siding was installed of 50,596 square feet. 2,640 square feet of roofing total to date of 20,332 square feat.
6,3 Electrical! The #1 Electrical Manhole is now complete to Elevation 106 and fanting of walls is in progress at #2 Manhole, 47*033 fast of conduit has been Installed at $4 Pickle Idas to date. Crane #405 girders ware erected during the period at the Pickle line Building*
KEN 004024
USBII FIELD KiStimi HEP02T Ueek Ending Atiguafc 1, 1967
7#
Punch list itcos continued during the period on the nain underground steaa line betwean Boiler House #2 and the Hot Strip Mill. A final inspection is re-scheduled for next period if ecspatihle dates can he established for all concerned.
7109 - Water - ttoric Order brKcCrwf- Water Treataanfc Plant i At the Water Troatasnt Plant, pipe and instruaentation work is now complete. Progress during ths period by KeQraw was nataly related to punch list ltens, cheek out and testing of qrsteal. Ths cheek out sal teating work is now 50% couplets. Insulation of the sedi--itatloo tank was initiated during the period. The sir compressor installation was cca pleted during ths period and pending acceptance.
7109 - Pipage Wnvitt ProgreM was reamed by the Delta Pipeline on the 24* ooke own gas line at the west end of the Soaking Pits. 275 feet of 2" hydrogen piping, 200 feet of 10* plant air piping and 150 feet of 10" nitrogen piping was installed during ths period east of * ths Hot Strip Kill.
im ,7 frwi.Ptortlattra *H*
c
tico and ths bass slab for Tower #20. Sheet piling ibr Tower #19 was *
in progrese during the period. These towers will support ths 23.3 OT
power lines to ths sill area substation. At ths Cold Finishing Sub
station, two (2) ground wells were drilled during ths period. Progress
continued on Tzensfomar #21. Stringing of the 132 XT lines to ths
Cold Finishing Substation was reauasd during ths period. Progress on
the cable trench for tbs ecoaunicaticn lins was temporarily aispandad
for the period sad mooting la being established before work is
Tin Sanitewr s<--bm 693 cubic yards of dtag fill was aads for a
total to data of 45,553 sable yards. AH piping and tmnhnlss for tbs original aubooctraot has been completed. During ths period, progress was aalntained on underground piping went of Keabeie #501 on a change carder to the original contrast. Ths City of Idddlatown impacted and
nr runs, suholss and tap-ins for this work.
and? Site Derrelopaenti 15,491 cubic yards of eonawetlon ________ M*,total to date of 401,633 cubic yards. 21,561 cubis yards <^-<IWBKIaykfllT was aoonwpl iahed for a total to data of 717,016
DHB Corporation laid 1,634 feet of track and eight (3) Scale Pit #2 and 4 on ths east kids of tbs Hot Strip Kill during ths period. All related ballast for this track was installed. Total traetafurk acoospHehed to data la 63,969 fast.
KEN 004025
WEffilff FIELD ACTITOPT REPOST Week Ending August 1, 1967
7134 - Looker Hocana* David L, Smith Construction Company progressed with sttb^floaa* heating and ventilating duct work at the south area locker room during the period* The structural steel'erection is scheduled for nest period* At the Steel.making Area, excavation for underground air ducts, drain lines and building footings *as consisted. Forawark for footings is now in progress* Prepared bgrs
0* A. Finsand OAF/sec
KEN 004026