Cooperative) due to power purchases during Winter Storm Uri from the ERCOT market.
76. The following Tables compile of all of the harms identified herein that Minnkota will suffer due to the Final Rule.
Table A: MRY 1 and 2 Mercury Compliance Costs
Activity
MRY Unit 2 Capital Costs:
Future mercury testing to determine lowest achievable rate Inlet Hg Monitor
Cost S600,000 $150,000
WFGD Additive Dosing system $750,000
WFGD Oxidizing Reduction Potential (ORP) Monitoring System
Mercury New PAC Silo and injection equipment capital cost to reach the lowest achievable rate
$7,500 55,000,000
MRY Unit 2 Operating & Maintenance (O&M) Costs:
WFGD Additive costs (based on annual operation)
$1,412,000
Mercury control additional PAC costs (based on annual operation)
$1,300,000
Notes
This is a minimum value.
'I'o track coal quality
'I'o attempt to reduce mercury emissions further For WFGD dosing system feedback
Based on industry data from similar projects; This is the total project cost without financing costs.
Based on MRY usage rate and supplier pricing Based on EPA hypothetical 5.0 lb/MMacf injection rate for 800 MW unit
-35-
Sierra Club FOIA 2025-EPA-04883
ED_018388_00000327-00087 SC_EVERSPLIT0006396