Document kD0ozb3NL9opdq4q6NB1Qo2kn

et>: Rossi Harris Clark 4 George Karr, Safety Engineer I Otto Toung, Safety Engineer Assistant 'Ovens-Corning Piberglas Corporation Jackson Road Berlin, Nev Jersey July 15, 1970 Please be advised that a visit vas cade to the subject location on June 10, 1970, accompanied by the following: .. Kr. George Karr, Safety Engineer I Anthony J. Rossi, Chief, Safety Inspection Section J. Taylor, Industrial Hygienist, Department of Health A visual inspection vas made of the following locations: 1. Hold cleaning area where steel molds are sand blasted clean. 2. Iron chromite and asbestos storage area. 3. Eatch rising area - asbestos, clay, ii. Product control laboratory. 5. Autoclave area - drying - 17 auto claves. 6. Pouring and mold release area (dust). 7. Molded Pipe trim saw area (dust), 6. Packing area (dust). 9. Kev molded pipe trim saw area. 10. Packing area. 11. Dowtherm storage, heating and filtering area. Made vapotester sampling of Dowtherm vapors in Dowtherm heating and storage area. No results. Company uses approximately 2000 gallons of Dowtherm per year. Results of survey pending results of dust samples collected by Department of Health. EKGIN.f : i'G sectiok It Prtt*i Lettei_ Initial ( Pass _ Submit Rtport_ Siva Comments Other yl _tisu 0r9er_ _Fitl8 Insfc. _ 'set W.t " o*i< C Chiel S*tty En*t. Otto Tonng