Document k9qQZ75Zj3m79EJDY40rQ3E1D
1N7.1 @ATST
Ju;.6 17, 1974
Mr. G. M. Wilkening, Head Environmental Safety and Health Department Dell Telephone Laboratories 600 Mountain Avenue Murray Mill, New Jersey 07974
American Telephone and Teleomph Company 195 Broadway New York, N. Y. 10007
Phone (212) 393-9000
Dear George;
The Dell System Practices section covering the placement of fiber-cement (transite) conduit is due for revision. Since the material contains some asbestos, we would like to determine the appropriate precautions, if any, that should be followed when cutting the duct during work operations as per 0SHA standard on exposure to asbestos fiber.
In order for us to determine if any precautions are necessary, we would appreciate your initiating a program to determine:
1. The level of airborne asbestos fibers that employees could be . , exposed to when the duct is cut with a regular saw while it is
dry;
2. if the level of asbestos is high in (1) above,
(a) does Y/etting the duct significantly reduce this level?
(b) what is the level of exposure when the duct is cut with a circular device like a pipe cutter?
It is important tliat these tests be conducted in an open atmosphere, closely resembling the actual working environment.
Mr. R. Callahan, who can be reached on 212-393-4753, will be glad to answer any questions you may have on this request.
Very truly yours,
t*r' Manager - Safety and Supplies
'/ /V
Engineering Manager - Outside Plant / / Methods arid Materials
cc: C. Harmon -'Practice Writer - Winctc lem Dr. R. W. Stone - Medical Director - .u&T G. R. Crimp - Assistant Engineering Manager - AT&T
M.TiV:mm
003662
Service Common Inetslletlon Engineering
f;f
WLagw-lJ/
Western Electric
3600 Goi I Hoad Rolling Moodowi, HI. 00006 312 950-2000
JUN 05 1973
MR. W. PFERO, Head Telephone Buildings Planning Department
Whippany
Re: Transite Cable Hole Covers
File: I.E. 30
This Ls in reference to a phone conversation on May 10, 1973 be tween Mr. C. Bendersky of your organization and Mr. A. Skirpstunas of CIE, concerning airborne concentrations of asbestos fibers In Central Offices generated from cutting of transite cable hole covers.
In order to minimize any adverse affects upon the Installer when working with asbestos, installation practices require that the In staller handling asbestos, mineral wool or rock wool wear plastic safety goggles, leather palmed canvas gloves and a respirator to protect the nose and mouth.
The airborne concentration in a Central Office of asbestos fibers generated from the transits cutting process is presently unknown. However, we have been advised that we may be in violation of OSHA, when working with transite cable hole covers in new Central Offices or on additions.
We have requested Vestem Electric Headquarters to clarify the cor porate stand in regard to a periodic physical examination for persons being exposed to airborne asbestos particles. We have also requested them to assist us in evaluating what the airborne asbestos particle concentration level is while the Installer cuts asbestos.
In view of the fact that your organization is actively engaged in testing and evaluation of the present cable hole concept, we feel that this condition has an impact on your studies and requires im mediate attention.
t
CONFIDENTIAL
003665.
Transite Cable Hole Cover Klates - Case 20233-3
Beil Laboratories
Whipptny Road Wiippany, New Jersey 07981 Phone (201) 386-3000
MAR 2 1 RECD March 18, 1974
m
Mr. J. Glowacki
Assistant Manager
Common Installation Engineering and Services
WE - Rolling Meadows
- .
i` . '
Re: Letter of June 5* 1973* concerning use of transite cable hole covers .
The health problems associated with the generation of asbestos particles in the field use of transite cable hole cover plates are fully understood by the Buildings and Power Laboratory. My department has completed a test program evaluating the fire resistance of cable holes packed v.lth KS-5048 bags and is near ing completion of a similar evaluation program on the cable hole closure filled to 25 percent by volume with communication cable. A report is currently being issued on tne first program and the report on the second group of tests will be issued shortly thereafter.
Based on the results from these two programs, it Is our opinion that a steel cover plate, comparable to the present ceiling plate, should be used as an interim measure to replace the transite cover plate. It should be cut and handled identically to the ceiling plate. Several alternative materials are being considered for possible future use but will require test evaluation to determine their compatibility with closure design requirements. We shall Keep you informed as to progress in this area.
%
WH-2431-CS-bfg
/'- W. Pf'rd Head Telephone 3uilding Planning Department
Copy to Messrs. ?.. J. finn-orty - AT&T - 195 Broadway
n
J n. j . C. vk i
f
c
CONFIDENTIAL
003664