Document k9oVV1gZOkpOpvN9e5GNKQjEB
\>v
Page 2 FACTORY STANDARD #311
.IS'-
n>v V
October 21, 1963
CombinIn^: , . ,Dep^.? 19
// jjf The assembled sheets of five layers are combined y1/' \ on Machine #2913, using induction heating with an j>yy J output of 50%, to a final gauge of .060"/.065" f/ with an aim gauge of .062".
&
Blanking: Coating;
Dept. 17
Inspection:
The combined sheets'
recalendered to .055"/
.060" on the three..,roi$f?ubber calender (Machine
#1433).
....
"K .
V/.,
As per Analysis, Card*.
The blanked gaskets are, roller, coated, witiy-Material #6 using the Franc'is .two ..^,11 coater and
dried in the #5 or #6 PrecotfeOveh^o^ "t-
The final gauge aftef^oat Should be .055"/.060". '
inspected for Analysi*=eari
^ :he, gaskets skets Shp.uld'V^y requirernes
Materials Development
Compiled by;
/J. Larsen //
/
Approved by: J^S
;
; / /`- / .
V. Labrecque
Copies to:
B. R. Basile
R. S. McGranahan
I.--*- -^l^.ft^-p-rPacK--Rljotgfy IBDimki and for CPunt?of (tiilessen
. j.,,R. Derpack. , ' E. Novak ' and State of Illinois do hereby rtilftjlurcganp tand. qphMna
James H. Larsen
M. F -Hill -ev-ftr-^ing-y-
A. R. Smith 8trvice
S. Hi LiiliS
i,nud.uu9s.t.riaial ' Engr.
acknowledged this page of laboratory Records opOctober 21. 1963
Inspection Dept. Material Control Quality Control ;
Dept. 01 Dept. 05 Dept. 06 Dept. 17
TV 1. 1 ft