Periodic Industrial Hygiene Survey
A periodic industrial hygiene survey of the Trenton Chemical Plant was conducted by A. H. Gomez and the writer during the period of December 4 through December 6, 1967. Concentrations of air-borne dust, toluene, methyl ethyl ketone and monochlorobenzene vapors
and carbon monoxide gas were determined. Exhaust ventilation sys tems were evaluated. The data pertinent to the recommendations listed below appear on the attached data sheets. Other data retained in our files and is available upon request.
Summary and Recommendations
1. Air-borne Dust - Excessive concentrations of air-borne asbestos dust were measured in the breaching zone of the employees who work on the balcony in the Brake Lining Building. It was under stood from Plant Personnel that a project has been initiated which will result in the revamping of this operation. The fol lowing are recommendations irrespective of the completion of the Drooosed oroject:
(a) The employees on the balcony should wear approved type respiratory protection until the project has been completed and the air-borne dust concentrations determined.
(b) The transferring and weighing of reclaimed asbestos should
be done under an enclosed type exhaust ventilated hood with a minimum exhaust volume of 75 cubic feet per minute (efm) per square foot of hood opening.
(c) The balcony floor and mixers should be cleaned daily with an industrial type vacuum cleaner.
2. Solvent Vapor - Excessive solvent vapors were measured at the brake lining extruders, brake lining adhesive application, and at the drum-off area for the new paint mixers in the Process Building. The following recommendations are therefore made:
(a) An exhaust ventilated drying hood should be installed be tween the two brake lining adhesive application operations.
(b) The doors on the brake lining drying hoods must be kept in a closed position so the exhaust system will capture the solvent vapor. If enforcement is not possible, metal sheets
4* 1*0-7*7* MCV. t-l
-2-
The exhaust ventilation systems discussed under Recommendation 3c do not provide an effective capture velocity. In most instances the capture velocity is zero. The low capture velocities are due to changes in the method or process without corresponding changes in the ventilation system, insufficient air volumes, crimped or broken flexible duct work or poorly designed systems. Toxic mate rials such as lead and zinc chromate are poured from the balcony
into the mixers on the main floor. It is imperative that the ex
haust systems provide effective control at locations where the
materials can become air-borne. Therefore, it is recotmnended that
a capture velocity of 100 fpm be provided at the operations in question.
Carbon Monoxide - The State of Michigan Division of Occupational
Health has established the limit for carbon monoxide at 50 ppm.
The limit was consistently exceeded in the shipping and receiving
area of the Brake Lining Building. Until the gasoline powered
lift trucks are replaced with battery operated trucks, the engines should be kept tuned as finely as possible. This will serve to
reduce exhaust emissions.
Para Sheet Asbestos Dust Concentration
Location
Concentrat ior. in mppcf**
Maximum Allowable Concentration
Balcony - Load Mixers
Repeat Sample Repeat Sample Repeat Sample
Dump Asbestos From Balcony To Downstairs Mixers
Brake Lining Grinding - Inspection - West Table East Man
Brake Lining Grinding - Inspection - East Table West Man
Number 1 Saw (General Air Sample)
Number 3 Saw (General Air Sample)
Number 4 Saw (General Air Sample)
15* 13* 13* 10*
1
less than 1
1.7
1.2 1.1 1.4
*Means the asbestos dust concentration was in excess of the maximum allowable concentration.
**Means millions of particles per cubic foot of air.
Samples were collected at breathing zone level with i Mine Safety Appliances Company Midget Impinger.
Para Sheet Solvent Vapors
Location
Concentration in Parts of Vapor Per Million Parts of Air_______
Threshold Limit
Threshold Limit Threshold Limit Threshold Limit
Value For Toluene
Value For Monochlorobenzene Value For Methyl Ethyl Ketone Value For Xylene
Transfer Brake Lining Material From Mixer To Carts
Shovel Brake Lining Material From Box Into Hopper
Transfer Linings From Extruder Into Drying Racks
Guide Brake Linings Into Adhesive Applicator
Unload Brake Lining From Adhesive Applicator
Between Adhesive Rack Being Loaded And Ovens Drum-off At Paint Tanks In Process Building
200 75 (a)
200 (b) 100 (c)
1400-1600
1000-17000
150-600
75-80 (b) 40-50 (a) l00-300(b) 75-100(a)
50-500(b)
100-400(c)
Solvent vapors were measured with a Johnson-Williams Aromatic Hydro carbon Indicator, Model SS-P.
1
Data Sheet Exhaust Ventilation
Location
Air Movement In Feet Per Minute
Brake Lining Building:
Balcony North Day Mixer #103019
Hycar Hopper
Asbestos Hopper
South Day Mixer
Hycar Hopper
Asbestos Hopper
New System - South Wall 3 Sided Hood Enclosure Scales For Large Barrels Scales For Weighing Pails
Hazardous Room Extruders - Wooden Boxes Extruders - Drying Racks
Adhesive Application - West Unit - East Unit
Adhesive Drying Racks
Baker & Perkins - Mix Asbestos & Solvent
Cutting Room Hoods Over Presses Cut Linings Into Two Pieces Cut Ends To Length
Grinding Area Packing Tables Grinding Hoods
50-75 0
50-75 30-50
500-700* 100 100
0 50 100-125 75-100
0
0
0 200-300 250-350
175-300 300-800*
Old Building:
Mill Room - (North West Room)
Mill Middle Mixer End Mixer (#3)
Balcony Over Baker-Perkins #2 - Chute - Hood For Small Containers
0 0 0
0 0
Data Sheet
Exhaust Ventilation (Page 2)
Location
Air Movement in Feet Per Minute
Over Baker Perkins #3 - Chute
Chute For Zinc Rich Primer
Ball Mill Room - (Middle Room) Chute In Middle Of Floor Chute At Side-Zinc Chromate Chute
Middle Room - North Wall Large Mixing Container Small Mixing Hood DiethylenetriamineHood
30-50 0
0 0-30
0 100 50-75
Bay D2 - Pouring and Weighing
Bay C2 - I^S Coating Placed In Chute
Bay B5 - Mills Adamson United Farrel Albert
Bay C4 - 2 Hoods For Containers #CW25l & CW524
Bay D3 - On Platform - Sidedraft Hood
100-150 0
0 0 0 0 0
Exhaust ventilation readings are in the form of capture velocities except for the readings with an * which indicates that the reading is a face velocity.
Air movement was measured with an Alnor Velometer, type 3002.
Data Sheet Carbon Monoxide Concentration
Location Threshold limit value
Brake Lining Building:
Concentration in Parts of Carbon Monoxide Per Million Parts of Air
50
General Area of Shipping And Receiving(12-4-67)
Repeat Sample
(12-4-67)
Repeat Sample
(12-5-67)
Repeat Sample
(12-6-67)
Repeat Sample
(12-6-67)
5U-75
100 100
125 75-100
Power House
less than 15
Carbon monoxide was determined with a Mine Safety Appliances Company Carbon Monoxide Indicator.
HAM(
D'*.
L.
N*U(
Eschelbach
OtPT
w
OlVISlOM
!r.CR COMPANY CORRESPONDENCE
coot
n.*NT 0**'CI
.
Industrial
DC*T
Hveiene
Personnel
OlVISlO*
Highland Park
9y^ANT
ZL>. .R_ Lombard___________ _ _ _ _ _ _ _ i______ Safety______________________Chemiral
__________T rpnrnn_________________
PERIODIC INDUSTRIAL HYGIENE SURVEY
The recommendations listed in the survey report have been reviewed. The action taken or planned is given below:
1. Air-borne Dust
A project 7605-68-29 for a revised mixing for brake linings has been approved. The installation of Littleford mixers, blenders, and related equipment bring under control the air borne asbestos dust problem.
(a) Until the installation is completed employees on the balcony are wearing an approved type of respiratory protection, and the exhaust hoods at the day mixers will be cleaned to improve the existing ventilation and restore the system to design capacity.
i i n
An enclosed type exhaust ventilated hood at the location of transferring and weighing of reclaimed asbestos will be designed to meet the minimum exhaust volume of 75
cubic feet per minute per square foot of hood opening. The drawings will be referred to your office for comment and if satisfactory after approval is received for the expenditure the hood will be installed.
(c) The balcony floor and mixers will be cleaned daily. An
industrial type vacuum cleaner is available and can be
used as soon as an air supply is installed.
.2 Solvent Vapor
. - rD:
: c>
. ____
j; V-
"U -f
^
(a) An exhaust ventilated drying hood will be designed, tnenp"''
reviewed with your office and installed when approved,
'
r--L*-(b) The doors on the brake lining drying hoods are kept in
-r
a closed position. This will require continuous policing
J-- for enforcement. If we are not successful your recommen
dation to install metal sheets on the sides of the racks
will be followed.
4. MO* 7*7* KIV 1WM
(c) A canopy hood which provides a capture velocity of 100 feet per minute has been installed at the paint
drum off station.
3. Exhaust Ventilation
r.-'^Ca) The brake lining adhesive drying hoods will be increased in number to provide effective capture of the solvent vapor.
(b) As indicated in 1. (a) the ventilation at the mixing operations on the balcony of the Brake Lining Building
will be improved by cleaning and revision to restore the system to design capacity.
(c) The exhaust hoods or exhaust volume will be altered to
,, provide a capture velocity of 100 feet per minute at the locations you list as indicated below:
(1.) Canopy hoods for containers CW 251 and CW 524 < a project request will be prepared for approval
to obtain a new fan. The existing equipment is ,Vnot adequate and must be replaced.
(2.)
Canopy hoods for containers CW 301 and CW 302 these hoods will be connected into existing exhaust ventilation to provide the capture velocity required.
(3.) Side draft hoods for the two Baker Perkins mixers . in the northwest mill room present a real problem -
" ^ ' a new Pangborn dust collector system has been ordered
v ------ - and these hoods will be connected _to it. However, --' 'work will have to~5e'~abne~ to determine if it is
economically feasible and possible to engineer an exhaust hood to meet the capture velocity of 100 feet
per minute.
(4.)
Hockraeyer mixer in the middle room; hoppers on the balcony, which empty into the Baker Perkins mixers; and ball mill room - a new Pangborn dust collector system is on order for this area. The expected com pletion of this installation is August, 1968.
(5.)
Hopper on the platform at Bay D4 - the Pangborn dust collector at this unit will be cleaned which should restore the capture velocity as required.
-3-
(6.)
Zinc rich primer mixer - Che hood has been
connected to the Pangbom dust collector system. A test will be made to determine capture velocity when the Velometer equipment is received.
4. Carbon Monoxide Gas Concentration
The existing gasoline powered lift trucks will be maintained to reduce exhaust emissions. A new battery powered truck is
on order and all future truck replacement for use inside build ings will be battery operated units.
ERL/ph
CC: J. A. Acker W. F. Bavinger R. F. Bowers M. F. Bruton, M.D. W. T. Diehl S. C. Enders B. F. Hecht W. L. Knapp, M.D. F. E. Repucci N. A. Trombley
E. R. Lombard Safety Administrator
IN.tit COMPANY CORRESPONDENCE
D. L. Eschelbach
)M . MM(
E. R. Lombard
oe**
Industrial Hygiene
OC*Y
Safety Admin.
Division
coot
Personnel
OlVlSlON
Chemical
Oa tf
Julv
PVAMT OPPiCK
Highland
22. 196s Park
Trenton
Renly on ^ollow-l'p of Periodic Industrial Hygiene Survey Dec. 1967
Corrective action has been taken to improve the control of dust created by the brake lining mixing operations.
1. As I explained to you by phone there will be no additional hoods installed at the location of the transferring and weighing of reclaimed asbestos. There is another scale with existing exhaust ventilation in this same area vhere the transferring and weighing of reclaimed asbestos can be done with adequate ventilation. This will be satisfactory until the new system is installed.
2. The brake lining mixing area is being cleaned daily with an industrial type vacuum cleaner.