Document k9Y0kK9ZjwZeGekb6o0NJGBMy

INTERNAL CORRESPONDENCE UNION CARBIDE CORPORATION iechmcai. center PO BDX B3B1. SOOTH CHAPLLS TON. \ w. L. Browning J. W. Perry, Jr. Institute Plant ., October 20, 1981 C. W. Carman M. L. Mills L. R. Noble D. R. Paugh R. E. Peele H. H. Frazier R. J. Sexton, M.D. F. Williams : ,- Asbestos Monitoring in Shop, 512 Construction Gentlemen: Attached are the results of the area and personal exposure monitoring done for asbestos in the Gasket Shop - laundry. Building 3 of the Construction Department, Institute Plant. This monitoring was done by the Institute Plant Industrial Hygiene group on October and 9, 1981. 2, The gasket cutting is done infrequently and it would generally last for a short period of time. The results of the survey indicate that the asbestos exposure in excess of the permissible limit of 2 fibers per centimeter cube of air did not occur. The workers wore a respiratory protective device while working with the gasket material. It is emphasized that all workers continue to follow this practice while working in the area during gasket cut ting. Please notify the monitored workers of their exposure results. If I can be of further assistance, please give me a call at extension 3750. Very truly yours, x.'QjJl MAP/sc Attachment Manhar A. Patel UCC 024509 ASBESTOS MONITORING CONSTRUCTION GASXET SHOP INSTITUTE PLANT Name/Area Monitored Date Sampling Time Minutes Asbestos Cone. Fibers 1 F. M. Hatfield 10/2/81 18 < 0.1 2 3 Feet from cutting 10/2/81 17 blade < 0.1 3 F. M. Hatfield 10/9/81 15 0.4 4 3 Feet from cutting blade 10/9/81 15 0.2 UCC 024510 AUDIT REPORT NO. FILE NO. ATTENTION This document has been identified as one which may relate to the manufacture, use, sale or health effects of asbestos or asbestos-containing products in connection with Union Carbide's defense of asbestos litigation. The document may be reproduced as needed, but should not be destroyed. If it is judged to be of no further value to this file, the document should be sent to the Danbury office, attention of S. D. Conner. The File No. and Audit Report No. must accompany the document Likewise, if the address of the document is changed, S. D. Conner should be notified. The File No. and Audit Report No. must be included in the correspondence. UCC 024511