Document k9XGkemLwmj1qkGJ5Ow8mKyGb
EQUIPMENT R-72 D-72 E-72 E-2E E-3E
REACTIVE POTENTIAL 1. LIQUID CHLORINE
2. VAPOR PHASE REACTION
FUNCTION
DIRECT CHLORINATED EDC POST REACTOR. REACTS EXCESS ETHYL
ENE.
EDC POST REACTOR LIQUID BED
DRUM.
'
BED CIRCULATION COOLER.
D-72 VENT CONDENSER.
POST REACTOR PROPYLENE CONDEN SER.
SOLUTION
A. ALL CHLORINE STEAM TRACED.
LINES
ARE
B. CHLORINE LIQUEFACTION TEM PERATURE IS CALCULATED FROM PRESSURE AT R-72 METER RUN.
C. LOW CHLORINE TEMPERATURE ALARM.
D. REACTOR SHUTDOWN PROCEDURE WITH DIRECT INTERCOM TO CHLORINE PLANT.
A. HIGH
TEMPERATURE
ALARM
(90'C) AND HIGH TEMPERATURE
SHUTDOWN (93*C) AT D-72
TOP.
B. HIGH
TEMPERATURE
ALARM
(90*C) AND HIGH TEMPERATURE
SHUTDOWN (93"C) AT E-2E
INLET.
C. TEMPERATURE MONITOR AND ALARM ( + 10) E-3E VENT OUT LET.
D. TEMPERATURE MONITOR AND ALARM ON VENT TO FI RETUBE BOILER.
E. LOW D-72 LEVEL SHUTDOWN.
00 07538? CONFTDFNTTAl
REACTIVE POTENTIAL 3. REACTOR BALANCE
4. LOSS OF AIR 5. LOSS OF POWER
SOLUTION
A. CHLORINE FLOW IS SET BY ON-STREAM ANALYZER TO MAIN TAIN 3% EXCESS CHLORINE IN THE VENT TO THE FIRETUBE BOILER.
B. ETHYLENE ANALYZER SAMPLES VENT FLOW.
CHLORINE CONTROL VALVE SPRING LOADED TO CLOSE.
IS
THE TRIP SCHEME WILL ACTIVATE TO SHUT THE CHLORINE CONTROL VALVE.
00 075383 confidential