Document k9VjDQLQjx83gV0NZJrz1e3qD

SAFE JOB PROCEDURE page 1 of 3 V ) DEPARTMENT: METHANES V- JOB TITLE: INITIAL LINE UP AND START UP R-1300 REACTOR (MOD V) MAJOR HAZARDS: CHLORINE, Ml, M2, HOT LINES SAFETY EQUIPMENT REQUIRED: HARD HAT, MONOGOGGLES,RESPIRATOR,SAFETY GLASSES AND HEARING PROTECTION. SPECIAL PROVISIONS: HAVE AREA CLEARED OF PERSONEL BEFORE START-UP THE FOLLOWING ITEMS MUST BE CHECKED (YES) AND INITIALED PRIOR TO R-1300 BEING STARTED UP. NOTE: MAKE SURE ALL CONTROL VALVES ARE IN THEIR PROPER POSITION BEFORE *. - . LINING CONTROL VALVES UP. (MOD V) (BOARDMAN) . NOTE: THIS CHECK DOESN'T HAVE TO BE FILLED OUT UNLESS WE HAVE BEEN DOWN FOR AN EXTENDED PERIOD OF. TIME. (SUPERVISOR APPROVAL) ' . ;" CHECK/ INITIAL C. IS DISTILLATION UP AND IN SPEC D. ARE CRUDE TANK LEVELS AT 30% OR LESS (BOARDMAN) E. ARE S-1300 AND S-1301 LEVELS OK.(NOT IN ALARM) F. HAVE ALL RED TAG MASTERS BEEN CLEARED AND TAGS PULLED. (OUTSIDE OS/SOS) G. MAKE SURE THAT THE ELECTRIC TRACING ON THE Ml, M1/M2, AND CL2 LINES ARE LINED UP AND WORKING. (OUTSIDE OS/SOS) H. IS E-1300 LINED UP AND RUNNING ON MOD. I. IS THE Ml HEADER PRESSURE AT LEAST 100 PSI * ENSURE THAT THE FOLLOWING INSTRUMENTATION IS LINED UP PROPERLY E-1302 - Mi SUPER HEATER AI(120 ) INLET PRESSURE D0"m?860 CONFTDFNTTAl.