Document k9NNkxXLj32QkwwrYoLE9koK0

MANUAL NUMBER 1 copy ISSUED TO: R. p. Little Bldg. 32-713 This manual is the property of Union Carbide Chemicals Company and must be returned on demand. Reproduction in whole or in part re quires the permission of the Works Engineer ing Department. Changes in mailing address or manual distri bution should be sent to Works Engineering Central Files. DESIGN AND CONSTRUCTION UNION CARBIDE CHEMICALS COMPANY Division of UNION CARBIDE CORPORATION SPECIFICATIONS For Thermal Insulation Material and Application J uly 1 961 J. F. Malloy M U . Dorsey S. H. Smith W. C. Turner SOUTH CHARLESTON WEST VIRGINIA V- K \ \ \ ------------ ------------------------ THERMAL INSULATION PROPERTIES cpcr i NO |MATEHIAL MFG. TRADE NAME FORM a USE 1^- TEMPERATURE *F -100 0 500 1000 1500 RIGIO BOARD J PIPE 8 7 7ZZ. iO cellular P C. RCA^aAs INSUL. - VAPOR RES. TO V class FABRICATES WELL <0 ' .36 ,U2 8 .55 .62 .68 .7U 1l CfLLJLAR SILICA p.c. FOAMSIL RIGID 30ARD i PIPE INSUL. - VAPOR RES. EAT 3O0< RES. r 12 Y TO ^ (U ' i i i i rr ZZZZZZcZZZZL, .. . . * .57 6^ .66 . 71 .77 . 83 . 90 . 97 I.0UI.I2 120 127 135 |.*j 222Z'222ZZZZZZZZZ 1/.51//1/5,9 1.67 1.75 I.R4 HEAVY DENSITY SEMI - RIGID BOARD 6.5 15 GLASS o.c. SECT KM. 4 PIPE INSULATION- TO FIBER PIPE INSUL. LOW MEOL STRENGTH 7.5 2000 o.c. L10*T DENSITY RESILIENT PIPE 3 16 GLASS e 1 PER G.B. Snap - on INSULATION TO J.M micro - LOK for bldg, piping u GLASS pi ec.R BLANKET O.C. DUCT LINER G.B. ULTRALlTE J.M. "ICROTEX For LINING air 0X3. DUCT - NOISE t, THERMAL INSUL. TO A 17 aAss fiber O.C. RIGID DUCT G.B. G.B. BOARD EXTERIOR INSUL. for oucts - 6 TO BOARD J.M. SPINTEX LOW MECM. STRENGTH 9 O.C. kaylo RIGID BOARO 4 PIPE J.M. ^epobestos INSULATION - STAnOAPO B.E h thermasil FABRICATES WELL - !0 20 CALC ILH RUB. calsilite NIO* OPPRESSIVE TO SILICATE Dflp caltewp STRENGTH - 14 K-M vatp-eph VERY ABSORBANT "JN TOi - CALITE little vap. pes. '////////////// /////////// '77, K .38 .U2 .U7 .51 .56 .62 .69 .77 .87 ?l AS8ESTCS FieERS Ufl. LMiBESTOS -OL. CAPOSlTE RIGID BOARD K PIPE tu INSULATION - mo* TO TENSILE STRENGTH 18 BODED RIGID CCARO \ PIPE 9.5 22 EXPANDED CAR. careytemp iNSLLr-uATER RES. TO SILICA SAFE POP OXIDE SER ' '2 hy^ROUS o c Ikaylo :o RIGID CCARC a PIPE II. 5 ?5 CALCIL SILICATE 11600 CALSILI TE 'NSUL. -9-RINKAGE TO SHALL AT hio TLMP 11 par ?D**E 0 REFLECTIVE "IQ MIRROR RREFORP'O. PIPE i EXI. INSLL. -REUSf ^N-ABSORBAST. 4 TO 9 12 CP91 NAT 1 ON HYO. CAL. SIL for FIRE PROTECT t, STC. CAL-S11 ION OF EX IP. OR CEL. GLASS ANO PIPE 8 TO IU X)CR | R. w. j "'EL'CDR CUTER CXOUIT " CFO.nO i Dm 5OE*SEALE0 r0R ANY CXXJiT ! ka. |r>0 iNSULATlp ENDE PGR * D. 1 ! 11 e.'LN.Nous a g-Igilsxate fill \ 1 ' 1NSiJl-r,L r l LL INFLATION r0R *OT LNOGROlXD LINES ---------------------------------- 1 CORK DIRECT APliED on Filled VI -C-i Tvor "C* INS >L. '`AST 1 C =>VA A$TIC RED <E CCND. 1C *5 -- O zzzzzzzzzzzzzZCv .,<* .37 . U2 ,U7 .52 .57 [/ y;;/ > .39 .JU .50 . 55 . 60 . 65 . 70 . 75 . 81 .87 1r 6.U5 ,U9 .53 .53 .63 .68 .73 .78 .63 .87 .93 100 107 I 16 XTE flCQ.6 * .u* .U9 .52 .56 .60 ,6U .68! irOiviDjau 'NSuguiCN LI5TTD 18066 -JpIVIOuau I INSULMION tI LISTED j 19CW6 <*.62 55 .61 -A^jPiC'LOES: -G * amER'CAn 3-lSCWi T arw = =i(_CwiN - C-^CT Car tw o-<1i p c:scy c X * XanT :=> xs';* - s>a:cn KX. * -CL"E5 fOLfCRY 61 = 611 SLR <.u = 6E1S86 i-.o uiTTISCN "N = "iriCCT C3=6 611 = "111755 ;>r5iv.; - I -J SUL F ' L MIR MIRROR INSULATION J.M. JCH6S - M1NVILLE O.C.6 CwENS - OWNING FI5ERGLAS P18 * F l BERBOARO PIPER - PiflCO P.C.- RlTT'a'ROX - CC=MING RU0 * RO8ER0ID PM * RIC - MIL u 8 * LNICN ASBESTOS V I VI MASCO UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS FOREWORD A. General These Specifications describe the essential requirements for the purchase and application of thermal insulation mate* rials. They consist of two major parts: I - General Specifications, and II - Individual Specifications. Each Specification is divided into two parts: (A) Materials, and (8) Application. Individual Specifications are identified by a two-digit num ber, followed by a letter. The applicable Individual Specification and the thickness of insulation to be used shall be indicated in an Insulation De sign Schedule. The General Specification constitutes an integral part of all the Individual Specifications. B. Definitions Where the following terms are found in the General and the Individual Specifications, they shall have meaning and sig nificance as defined: 1. Blanket . . . . Insulating material consisting of organic or inorganic fibers, suitably felted, woven, stitched, bonded, or reinforced, into flexible form. 2. By Others .... Purchase or installation, or both, of subject material will be made by other than Insulation Con tractor or insulation mechanics. 3. Curved Segment .... Block insulation of uniform thickness, formed to fit contour of curved surfaces and with longitudinal edges radially beveled. 4. Finish .... Material applied to surface of insulation for protection and/or appearance. 5. Firmly.................. A section of pipe insulation, when secured in the specified manner to a vertical pipe of corre sponding dimension, shall remain at that elevation unsupported except by friction. 6. Fitting Cover..................Block and pipe insulation patterned to fit on flanges, valves, and other fittings, furnished in convenient and matching sections. 7. Lagging.................. Relatively narrow, flat block insulation, rectangular in shape, of uniform thickness, and with longitudinal edges radially beveled. 8. Loose Fill.................. Thermal insulating material in loose fibrous or powderv form, for application within enclosed s pace s. 9. Molded-Type Pipe Insulation ... A rigidor semi-rigid thermal insulating material, preformedin semi-cylindrical or segmental sections, or both, usually 3 ft in length; for application on pipe or tubing, furnished with or without finish or attachments .... (ASTM Standard C 168.) 10. Preformed Thermal Insulating Block.................. A rigid or semi-rigid thermal insulating material, either flat or segmental, for application as received, and excluding brick of the 9-in. series . . . (A5TM Standard C 168.) 11. Sectional Pipe Insulation .... Two semi-cylinders or pipe insulation combined to form a complete circumference. 12. Segmental Pipe Insulation..................Curved segments of pipe insulation of less than one-hali circumference which, when grouped and combined with an odd width, where necessary, form a complete circumference. 13. Shaped Head Segment .... Block insulation patterned to fit on spherical, flanged and dished, or other types of vessel heads, usually with but a single radius - furnished in convenient and matching sections. 14. Staggered a. Pipe insulation shall be in a staggered position when, upon application, the end joint between two abutting half sections occurs at least one-third, but preferably one-hali, the length of a section, from either end of the opposing half-section. b. 31ock (curved segments, lagging) insulation shall be in a staggered position when the abutting joint between two blocks occurs, upon application, at least one-third the length of a section from joints of adjacent blocks. c. Multi-layer insulation shalL be considered broken joint whenapplied so that no two joints coincide except where they cross at right angles. -I- B. contd 15. Thermal Insulating Cement . . . . A prepared composition, in dry form, comprising granular, flaky, fibrous, or powdery materials, which, when mixed with a suitable proportion of water to develop a plastic consistency, and applied and dried in place, forms a coherent covering that affords substantial resistance to heat trans mission . . . (ASTM Standard C 168.) 16. Weather-Barrier (Weatherproofing) .... Finish applied for protection from moisture and weather. 17. A5TM..................American Society for Testing Materials. These letters, followed by another letter and a number (example: ASTM C 163), indicate the latest revision of a standard specification or other standard published by ASTM . C. Letter Designations Letters following numbers in designations of individual thermal insulation specifications (example: H in Specification No. 10-H) indicate that the specified insulation is intended for a particular use, as follows: B . . . . Building construction. H . . . . Equipment and piping operating at high temperatures (70 Fand above). J . . . . Equipment and piping operating at cyclic temperatures* L . . . . Equipment and piping operating at low temperatures (below 70 F). The letter M added to the designation of an individual specification (example: 10-HM) indicates that the insulation shall have a weather-barrier consisting of a metal jacket, as specified in the GENERAL SPECIFICATIONS, Part I. B. 18. - 2- UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS I. GENERAL SPECIFICATIONS ScoDe These Specifications describe the essential requir nts for the purchc and application of thermal insulation mate rials. They aiso constitute an integral part of the Individual Specifications. A. MATERIAL 1. Types and Dimensions a. Material furnished under these Specifications shall be of type and thickness listed on Insulation Design Schedules, Insulation Equipment and/or Line Lists, or as otherwise prescribed by the Department of De sign and Construction. b. Pipe insulation shall be furnished in conventional lengths, plus or minus not more than 3/32 inch, with ends cut square. Inside diameter shall fit firmly on specified pipe size and outside diameter shall correspond to an Iron Pipe Size. 2. Sampling and Testing Where vendor is unavle to provide acceptable test or performance data, to meet the requirements of these Specifications, representative samples of insulating and accessory materials shall be submitted to the Depart ment of Design and Construction in sizes and amounts required for testing. In all instances these samples, which shall be supplied without cost to purchaser, shall be shipped by vendor within seven days following re ceipt of written request. 3. Packaging Unless otherwise agreed, material shall be packed in substantial containers, so constructed as to ensure safe delivery of material, in a condition satisfactory to the purchaser, by common and other approved carrier. 4. Marking and Identification Unless otherwise specified, shipping containers shall be legibly markedwith name of material, size, type, and quantity contained therein; name of Insulation Contractor, if any, and purchase order number under which ship ment is made. In addition, where required, container shall bear the work order number, the Item Number (if any) for which material is intended, and its relative position and sequence of application. 5. Attachments a. Standard lacquered or brass bands, customarily furnished by the manufacturer of pipe insulation, will not be required. b. Canvas or other factory-applied surfacing, where required with insulating material, shall be as called for on bills of material or other purchase requisitions. 6. Approved Alternates .Alternate insulating and/or accessory materials may be approved bv the Department of Design and Construction, but only where clearly shown that properties involved satisfy all requirements which this Specification prescribes . 7. Reiections a. Insulating and/ or accessory material will be rejected by purchaser, before or afte r delive rv, where physical and other properties do not meet the requirements specified and no exemption has been granted bv the De partment of Design and Construction. b. Ail costs in connection with rejected material shall be borne by the vendor. B. APPLICATION l. .Ail fittings, such as valve, flange, eli, and tee covers, and shapes such as curved segments and head covers, shall be shop prefabricated in accordance with Elmens ionalStandaras Fabrication Manual or ASTM ^commended Fabrication Practice C450 , latest revision. Thickness Schedule Unless otherwise specified, insulation m excess of 2-1/2 inches total thickness shall be applied in multi-layer construction in accordance with the following table: GS- 1 I. B. Z conrd Total Scheduled Thickness" 3 3-1/2 4 4-1/2 5 5-1/2 6 6-1/2 7 7-1/2 8 8-1/2 9 Inne r Layer Thickness" Middle Layer Thickness" 1-1/2 1-1/2 2 2 2-1/2 1-1/2 2 2 2 2-1/2 2-1/2 2-1/2 3 None None None None None 2 2 2 2-1/2 2-1/2 2-1/2 3 3 Outer Layer Thickness" 1-1/2 2 2 2-1/2 2-1/2 2 2 2-1/2 2-1/2 2-1/2 3 3 3 3. Condition of Material Insulating materials, other than cements and mastics, may be applied only when dry. 4. Condition of Surfaces a. Insulating material shall be applied to clean, dry surfaces only. b. Where insulation is applied to piping and equipment operating in the temperature range of 0 F to 180 F, the metal surfaces of said piping and equipment shall be coated, in accordance with UCCC Coating Specifica tions, by others, prior to application of insulation. c. Voids behind name plates and tank leg9 shall be filled and caulked, in accordance with UCCC Coating Specifications, by others, prior to application of insulation. 5. Insulation Supports a. Insulation on vertical equipment, exceeding l'-3" in diameter and 10f-Q" in height, shall be supported by metal supports installed approximately every IZ'-O" and above each vessel flange, in accordance with UCCC Standard IS-- 31- Length of horizontal leg or support angle shall be 1 fz inch less than total applied thickness of insulation. b. Insulation on horizontal equipment, 4'-0" diameter and larger, shall be supported by metal supports in stalled in accordance with UCCC Standard IS-36. c. Insulation applied to bottom head, or inside of skirt, on skirt supported vessels, shall be supported on metal supports installed in accordance with UCCC Standard IS-4Z, d. Insulation on dished heads of vertical equipment shall be supported by metal supports in accordance with UCCC Standard 15-31. e. Where necessary to prevent entrance of moisture, uppermost support shall be replaced with a metal pro tective piate, as described in section 1.3.12, entitled "Protective Cover". {. Insulation on 3 inch IPS and larger vertical pipe 9hall be supported by stainless steel insulation supports bolted to pipe near bottom of run. Additional supports shall be installed on pipe at intervals of Zl feet of vertical run. 6. Securement a. Tie-Wire Anchors Blank nuts, angle ciios, and other approved attachments shall be used for insulation tie wire anchors, where shape of vessel prevents normal methods of securement of preformed insulating materials. Blank nuts, wnere required, shall be attached, standing-edge to vessel surface, by light fillet welds. Installa tion shall be done bv the Insulation Contractor, before application of insulation. b. Wire (1) Wire shall be aoplied to insulation at proper intervals by looping about the circumierence, twisting ends tigntly together to provide proper securement, and depressing wire ends against insulation to prevent projections. (Z) Where shaoe of vessel prevents complete encirclement, securement shall be made to other tie-wires, *ire cables, or other anchors approved for this purpose. GS-Z I. B. 6. contd c. Insulation Strap (1) All pipe insulation on traced lines shall be secured with stainless steel insulation strap. (2) Strap shall be applied to cylindrical insulation at proper intervals by looping strap about the circum ference, stretching to suitable tightness with an approved banding machine, and clamping in place at joint. Strap joint shall consist of one double-. ng clip, or two clirj furnished without prongs. Clips shall be located on the vertical side of pipe insulation. (3) Where shape of vessel prevents complete encirclement of strap, securement shall be made to tie wires, wire cables, or other devices approved for this purpose. (4) Insulation strap shall be divided into lengths based on one strap joint for the first 15 feet of vessel circumference and one strap joint for each additional 10 feet, or part thereof. These joints shall be spaced at equal distances around the vessel. Vessels over 12 feet in diameter shall be equipped with vertical strap anchor angles spaced as shown on the Supplement to UCCC Standard 15-31. d. Spacing of Strap and Wire (1) Spacing of insulation strap and wire over equipment and pipe insulation shall be based on length of block or section. Where 36-inch lengths of insulation are applied in staggered arrangement, four loops will be required at average 9-inch intervals, so that no loop is located more than 4-l/2 inches from any end joint. Where 13-inch lengths are applied in staggered arrangement, only two loops per length will be required. (2) Spacing of strap and wire on pipe insulation shall correspond to Figures GA-1 and GA-2. I. 3. 6. d. contd 7 . Name Plate Clips Insulation mechanics shall cooperate with others in the placement of name plates and name plate clips. 8. Junction of Thermal Insulation with Fire-Resistant Materials a. Insulation thickness on tank legs, and similar equipment supports, shall be not less than adjoining fireresistant materials. Where thickness of thermal insulation exceeds that of fire-resistant materials, sur face of insulation shall be neatly and uniformly finished with a wide bevel, and feathered to provide the appearance of a continuous surface and eliminate a definite surface joint. b. Junction of insulation with fire-resistant materials shall be sealed with weather-barrier coating. 9 ,, Flashing a. Ail nozzles on top of insulated equipment shall be provided with flashing as shown in Figure GA-3. G5-4 I. B. 9. contd NOTE* COMPLETE WEATHER-BARRIER OVER INSULATION BEFORE INSTALLATION OF FLASHING FLASHING ON TOP NOZZLES OF EQUIPMENT FIG GA-3 b. Where a vertical vessel such as a column is insulated for gradient temperatures, with the low temperature above, a flashing shall be installed between different thicknesses of insulation where noted in schedule, to prevent condensate from entering the insulation on the lower side of the joint. Flashing material shall be Lexsuco F62 Flexible Flashing, as manufactured by Lexsuco, Inc, or approved alternate. It shall be se cured to the vesseland the outside of the insulation with l/2-inch by 0.0 157-inch Type 304 stainless steel straps. All voids at longitudinal seams and other projections shall be caulked ana sealed with vinyl asphalt joint cement. Typical installation is shown in Figure GA-3A. SEAL WITH VINTAL ASPHALT JOINT CEMENT ^LASHING VESSEL STAINLESS STEEL STRAP NOTE ALL VOlOS AT LONGlTUC'NAL SEAMS ANO OTHEP PROJECTIONS SHALL SE CAULKEO ANO SEALED WiTH VINYL ASPHALT JOINT CEMENT I FLASHING at butt joints of different thicknesses of insulation F(5 GA-3 A Lo - o I. B . contd lU. Protection of Flammable Surfacings When applying sheeting jacket, flammable surfacings shall be stopped at least 6 inches from brackets, hangers, and other hot projections, to avoid possibility of scorching or ignition. Where located indoors, such areas shall be surfaced with insulating cement to provide drainage. For other locations, a minimum l/l6-inch thick coat of heat resistant sealer shall be applied. 11. Painting Painting of bare and insulated surfaces, where required, will be done by others. 12. Protection from Abuse a. Insulation subject to mechanical abuse, such as abrasion or crushing, or where otherwise required, as designated by the Department of Design and Construction, shall be protected with a covering jacket of not thinner than No. 26 gage sheet metal, or other approved media, as per UCCC Standard M-100. Jacket shall be secured firmly in place with insulation strap, spaced not greater than 10 inches on centers, or sheet metal screws where use of strap is impracticable. Sheet metal screws shall not be used on jackets over low temperature insulation where possibility exists of piercing weather-vapor barrier membrane. b. Corners of insulated ducts, breechings, and other flat-surfaced equipment shall be reinforced by installa tion of expanded metal lath corner bead, or corner inserts, when approved. Bead and inserts shall be provied by the Insulation Contractor and installed by insulation mechanics, following application of insu lation block securing them firmly to block tie wires. Cement shall be forced through lath flange to provide proper key. i3. Protective Cover Insulation terminating at an intermediate point on the side of a vessel shall be protected from physical abuse and moisture penetration by installation of a continuous metal plate attached to vessel by means of a contin uous weld immediately above insulation. This protection will be provided by the Owner. 14. Appearance Lapoed joints, selvage ends, and other irregularities of surfacing materials shall be concealed from general view wherever possible. 1 5 . Insulation for Safety a. Where it is required to insulate piping or equipment for safety, only that portion shall be insulated which is located not more than 6'-O'* above operating levels, or where there exists possibility of human contact. Piping in trenches, unless otnerwise specified, shall not be insulated for safety below grating level. Ex posed ends of insulation shall be beveled to provide proper seal and drainage. b. Where specified, thermal insulation shall be omitted and protection provided by erection of a suitable safety guard. This guard will be provided by the Owner. 16. Steam or Electrical Traced Installations* 1 a. Air Convection Tracing System (1) Accessories, - Pressed steel spacers shall be of No. 16 Gage (.0constructed according to UCCC Standard P-844., as manuxacti red bv A. J. Gerrard. These spacers shall be furnished by the Insulation Contractor. (2) Assembly - Tvpe and size of tracer lines, methods of clamping, hanging and supporting them, and size of pipe insulation to be applied, shall be in accordance with UCCC Standards P-84. P-34A and CA-4, supplemented by Insulation Design Schedules, where required. In addition to assembly direc tions contained in Stanaards P-84 and P-84 A, pressed steel spacers (and pressed steel clamps, where installed) shall be spaced on 13-iuch centers for copper tracer lines. Temporary installation of assembly .vill be none by others. G3-6 I. B. 16. a. contd INSULATION STRAP -PIPE INSULATION r THICKNESS T, AS SPECIFIED \< * \ V// /,/ ./ l[ ,, \ \ \ \ \ W'V S /\ !jQ K 1 ! =^r-------^---------------- tU=t I 'k STEAM TRACER line installed / AS PER STANOARO R-84-/ -SPACER. AS PER STO P-84-a ON 18'CENTERS. -SPACERS SHALL BE LOCATED AT CIRCUMFERENTIAL BUTT JOINT NOTE: STEAM TRACED PIPING SHOULO 8E SUPPORTED SO THAT ITS WEIGHT OOES NOT FALL ON TRACER OR ON INSULATION. APPLICATION OF INSULATION TO STEAM TRACED LINES FIG GA-4 (3) Pipe insulation shall be applied in required sizes and carefully fitted to heated companion lines in manner prescribed in these Specifications and in the Individual Specifications. Tracer assembly shall be firmly and permanently secured in place by insulation mechanic during application of insu lation, adding or relocating spacers where required to insure firmness of contact. (4) Protective Wrapping - When aluminum piping is to be steam traced, or where elsewnere required, aluminum piping shall be separated from tracer assemblv by insertion of not less than :.vo wrappings of Mystik Adhesive 7000 G or approved altemate glass fiber tape. Care shall be exercised that tracer line does not contact aluminum line at any point. Where tracer may touch, the aluminum line shall be wrapped with glass tape at the point of contact. b. High Conductivity Compound Tracing System (1) Accessories - High conductivity non-metallic plastic compound, Thermon, as manufactured by the Thermon Manufacturing Co. , or approved alternate. (2) Surface Preparation - Surface of pipe (or equipment) to which high conductivity compound 13 to be applied shall be cleaned of dirt, rust, scale, oil, or varnish film. Galvanized or aluminum sur faces shall be coated with Thermon ALP Primer, or approved alternate, alter cleaning. (3) Type and size of tracer lines, size and thickness of insulation to be applied shail be as scheduled. Tracers shall be secured to process lines with insulation strapping on 12 inch centers. If high con ductivity compound is to be applied to galvanized or aluminum surfaces, Thermon ALP aluminum primer shall be applied to the surface prior to the installation of the tracer of compound. When aluminum piping is to be traced (or where elsewhere required), insulation strapping shall be sepa rated from the aluminum by not less than two wrappings of glass fiber tape - Hi-Low Temperature Glass Cloth Tape, 7000 G, as manufactured by Mystik Adhesive Products, Inc. , or approved alter nate. Care snail be exercised that tracer does not contact aluminum line at any point. Where tracer may touch, the aluminum oipe shall be wrapped with glass tape at the point of contact. (4) Application - High conductivity compound shall be applied over tracer to thickness of approximately l/4 inch and into void between tracer and process pioe (or equipment). Care shall be exercised to force the compound under the tracer to ensure maximum surface contact. Area of surface contact to process oioe shall be aoproximatelv 3-l/2 times the diameter of the tracer. Over irregular sur:aces (pumns. valves, etc.), and where tracers are closely spaced, compound may be trowelled over tracers m solid layer, covering tracer by about l/4 inch. If thickness m excess of 3/4 inch is re quired, high conductivity compound should be installed in two layers. Tlv* tirst Inver rihould be cured before the second layer is apolied. Application details are shown in Figure CA-4A. 3. lo. b. contd LARGE PROCESS LINE application of high conductivity compound Fio CA-4A (5) Caring - Alter application the high conductivity compound shall be allowed to air set for a minimum of 3 hours before heat curing. Air setting time may be several weeks without detrimental effects to the compound. Heat curing shall be accomplished by gradually raising temperature of tracer to be tween 200 and 225 F. This temperature shall be maintained for a minimum of 8 hours. Examina tion of the high conductivity compound to determine its dryness will indicate when curing incomplete. (a) Steam system curing procedure is: Open trap end of tracers to atmosphere, then open valve at steam header just sufficiently to allow condensate, but not steam to enter the tracing system. (b) Electric tracing system curing procedure is: Set thermostat at 200 F. (6) Weather Protection - High conductivity compound is soluble in water; therefore, it must be protected from rain, snow, and water by temporary jackets, or other means, until the insulation and its weather barrier is applied. High conductivitv compound shall not be installed and allowed to freeze before curing. In cola weather it may be necessary to neat the lines and equipment in order to aoply. It is aiso necessary to keep the material warm before application. Wherever high conductivitv com pound 16 used, and is not covered bv insulation, it shall be coated, after heat curing, with a weatherburner coating m accordance with Part I. B. 17. 1 7 . Weather-Barrie r Coating a. Insulation shall bo coated with a weather-barrier at time of installation. b. Coating shall not be Applied when atmospheric temoerature is below 3 2 F, and/or wnen temperature is expected to oe less than 25 F within the next 24 hours after application. c. Where sprayed weather-barrier is to be aopiied. adjacent areas not to be coated, suer, uo valve stems, handles, gauge clashes, .r.^ruments, and other adjacent equipment or structures, *r. di be masked or otherwise protected. d. A heavy fillet of caulking mastic shall be apohed at all inside corners of insulation, and at ail junctions _>i insulation and metal, before application of wenther-barrier coating. e. Weathe r-bar rie r membrane shall be carried out 6 inches onto metal, beyond termination of insulation at cuoports, shirts or -tuor o rejections , and sealed to the metal. .ul vr it he r - bar r ' e r coding-, snail :rv v.-: ;-d to insulation surface and r-.-iruu rceu with iiu->s tioer cioth thorougnl,* umouun-.-n -.-to the ,.Uif * coating. Joints of reinforcing cloth -.nail be unuorm in width Co - 6 3 . 17. f. c ontd and have a smooth unbroken surface. Care shall be taken that openings in weave of cloth are completely sealed. g. Where flame-re sistant, modified polyvinyl acetate emulsion weather-barrier is specified, it shall be ap plied by either cold spray, palming or troweling. h. The combined thickness of the weathc inch wnen dry. arrier coating anr' -einforcing cloth shall be not less than 1 /16 i. Unless otherwise specified, weather-barrier coating shall be the same for indoor and outdoor service. j. All outside corners of insulation shall be rounded and the weather-barrier coating provided with a double layer of reinforcing cloth, as shown in Figure GA-5. glass-fiber reinforcing cloth overlapped AT LEAST 6* EACH OlRCCTION application OF WEATHER - BARRIER COATING AT CORNERS FIG GA-S k. Or. outside installations, insulation of flat surfaces, j.nd at outside corners, where n>cessarv, shall be beveled before application of coating, to provide drainage. I 3. Metai Jackets a. The letter M added to the regular designation of an application specification (examples: 10-HM, 10-JM, etc.) indicates that tne weather-barrier shall consist of a metal jacket furnished and installed as speci fied in this part. '.Veather-oarner coatings described in such specifications shall be disregarded except where thev are used as supplements to the metal jackets. b. Weather-Barrier Jacket - Austenitic stainless steel, not less than 0.008 inch m thickness, supplied m coil form at least jo inches wide, or applied to the insulation at the factory. c. Sheet Metal Screws - Austenitic stainless steel, tvoe A, oan head, gimlet point, -.clf-tapping, .do. 7 bv >/3 ir.cn. Tor outdoor service, all screws shall be furnished with neoprene washers attached. <i. Heat Resistant Coating - Beniamin Foster No. 57X50 or approved alternate. . vc 11oment (!) On vertical vessels, jacketing snail be installed working from bottom up, and sufficient stainless te 1 i elms shall be placed around each circumferential joint to prevent slippage. Laps of cir imierep.ii.ii and v. rticol joints shall be o.t least <i and 3 inches, respectively. Vertical joints shall or -ecureu witn metal -.crews on o-mcn centers. : J: i ir.ejnt.il \ .** > j . 1O3 of c i r cumi e r entiai and he n /.ontal joints -.h.ill be at least and 3 inches. I. 3. L6 e. contd respectively. Jacketing shall be secured by stainless steel bands placed directly over circumferen tial joints of jacketing, and at the mid-points between the joints {approximately 16 inches on centers). (3) All vertical and circumferential joints shall be sealed with the specified heat-resistant coating. Screws shall be eliminated on a circumferential expansion joint where so designated by the Resident Associate. (4) All outlets, cutouts, etc. , shall be flashed with a 3/32-inch thick (minimum) layerof weather-barrier coating reinforced with glass fabric reinforcing cloth. Piping (1) Insulation with Factory-Applied Jacketing (a) On straight horizontal or vertical piping, circumferential joints shall be made with special stainless steel joint closures and bands furnished with the jacketed insulation. The inside sur face of the closure is coated with sealer protected by paper backing. Care shall be exercised to ensure that the paper is removed before the closure is installed. (b) Longitudinal joints of jacketed insulation are of the preformed Z type, and shall be fastened by snapping the ends into place. Longitudinal joints on horizontal piping shall be located on the lower half of the pipe, with the open side of the joint pointed down to ensure run-off of water. Heat-resistant coating is not required for these joints. (2) Field-Applied Jacketing (a) On straight horizontal or vertical, piping, circumferential and longitudinal joints shall be lapped a minimum of 2 inches. (b) On horizontal piping, longitudinal joints shall be located on the lower half of the pipe, and so overlapped as to ensure run-off of water. (c) On vertical piping, jacketing shall be installed working from bottom up. Stainless steel S clips shall be placed at each circumferential joint to prevent slippage. (d) Jackets shall be secured with one band at each circumferential joint, and one band at each mid point between the joints. (e) Lapped longitudinal joints shall be fastened with stainless steel sheet metal screws on 6-inch centers. (f) All lapped joints shall be sealed with the specified heat resistant coating. (g) Jackets shall be cut back from pipe insulation where flange, ell, tee, and valve covers fit over the pipe insulation. (h) Flange covers shall be protected from weather by stainles s steel jacketing, installed in a manne r similar to that specified for piping. Side openings shall be sealed with weather-barrier coating having a minimum thickness of l/1 6 inch, reinforced with glass fabric reinforcing cloth. This barrier shall be carried over fillet of caulking compound and a minimum of 3 inches over adja cent metal pipe jacket, and a minimum of 3 inches over top metal jacket flange cover. \0 Fils, valve covers, and other irregular shapes shall be protected trom weather as specified in Fart I. 3. 17. Go- 10 c. 9 FT. MAX 9 FT MAX CO co c 33 -0 >TJ m u 2 rn i> oO co 6 -I > 2: wj o t> 70 0 > CO O 1 r~OJ m co rv -- O ->l U> < i' ' rn -- O i to i1 < -H --1 woo |l! cmo cn .-W r\) II CO Im 0,-1- I r~ oo i H co -n O O ' 02 ~ -nx m -- -i O m > C -fc> m r- C> rn -n o z 70 P m0 o -n -- t> 70 Z rn o <=> m co o m m >ro CO AJ : I | JSl *O?o 5*5- till tfl ** uC. **If "* ccoo l; ; . 3< s-v> * 8 If 2 s i xlg =i u?5 fXeu si oc J 55 OIc C<S - u< :*< }Q iu y L i -J UJ <s> tn LU > S hfe if-^ 8>Jr t islss i=lU ?iS's f> z s ` h ! W F 5 tr< o <oi t oi ^ { Ss i H r :5 Ic xu co 1 I t 0.5 51 5j "W J ir i`> X o 51 j* < 5*1 W, oi IS-36! Z\L< Ho -- ui Uo2i X=U. *O gw-1 " JJ j r U5 N_V>l if! *uiJ !o JOOJ 1111 *2So!y*, co4t. 5g u a 2 2; -o IS. 3 *3:u< * UeI :i CV| CO to P* Q_ xo (- irgi^g: "J |M3 5*9 is|3 J a g I j 3 i i i i \ ) i i i 3 i PRESSED STEEL CLAMP j FOR PROCESS LINES 7/8" OP AND SMALLER PRESSED STEEL SPACER i i i iiOTE; | MATERIAL SHALL eE ASTM A7 CARBON STEEL. i j I i i i i j REVISED: 8 - 3 ~53 THIS STANDARD IS MANDATORY ONLY WHEN INCORPORATED, WHOLLY OR WITH EXCEPTIONS, INTO DESIGN REPORTS, DESIGN DRAWINGS OR OTHER DESIGN DATA, OR INTO olLLS-OF-MATERIAL OR PURCHASE ORDERS. ) ! Carbide and Carbon Chemicals Company i * I UNION CARBIDE AND CARBON CORPORATION SOUTH CHARLESTON. WEST VIRGINIA STA N DA R D CLAMPS AND SPACERS FOR N- P-R4A STEAM TRACED LINES l1 ^ j CLASSIFICATION: H2B| SPOMSOB: APPROVED: DETAIL 9T7> te: 2/7/53 | 3ATE: 4-/7-47\ UNION carbide: chemicals company DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS n. SPECIFICATION 10-B Cellular Glass Scone This Specification describes the essential requirements for the purchase and application of preformed cellular glass insulation for use in building roofs, walls, ceilings and floors. A. MATERIAL 1. Composition Material shall be composed of glass, completely inorganic, processed and molded at temperatures sufficient to produce a rigid, cellular thermal insulation* 2. Properties Cellular glass insulation shall have the following properties: Alkalinity........................... pH shall be between 6.9 and 7.5 Capillarity...................... After 7 days on wet surface, gain in weight shall be 0%. Coefficient of Expansion Shall average 4.6 x 10"^ per degree F Combustibility. . . . . . , . Shall be incombustible. Compressive Strength . . . . Shall be not less than 100 psi when tested in accordance with ASTM C 240, latest revision. Density .............................. . . . . Shall be not less than 8 lb per cu ft, nor more than 11 lb per cu ft, when tested in accordance with ASTM C 303, latest revision. Flexural Strength * . . . . Shall be not less than 75 psi when tested in accordance with ASTM C 203, latest revision. Hygroscopicity . . . . . . Two-inch cubes dried at 220 F to constant weight, then exposed to air at 70 F and 90% relative humidity for 14 da vs, shall not gain any weight. Resistance to Acids . . . . Shall be impervious to common acids and fumes except nvdroflaoric and hot phosphoric. Shear Strength . . . . . . . Shall be not less than 65 psi. Specific Heat . . . . . . . Shall average 0.20 Btu per lb per degree F. Temperature Limit . . . . Maximum temperature without mechanical, thermal, or chemical failure shall be not less than 300F. Tensile Strength . . Thermal Conductivity latest revision, the thermal conductivity at the eiven mean temoe r=itures shall not exceed the following values: Mean Temp, 3tu/inch, hr, *F sq ft, F 0 0.36 100 .0.42 200 0.48 300 0.56 400 0.63 600 0.74 Thermal Diffusivntv Water Absorption * Vapor Transmission Shall average 0.42 sq ft per day. After 24-hour submersion, shall not exceed 0.2% bv volume (sarface oniv). 'When tested in accordance `with ASTM C 355 , latest revision, shall have a WVT of zero grains per sq ft per nour. 10-B- 1 IX. A. contd 3. Thickness and Sizes of Insulation a. Cellular glass block insulation shall be 2, 2-1 /2, 3, 3-l/2, 4, 4-l/2, or 5-inch thick, as specified, and either 12-inch by 18-inch or 24-inch by 18-inch size. b. Cellular glass board shall be l-l/2 inch thick and 24-inch by 48-inch size, with factory-attached Kraft paper on both sides. Thickness to be 1-1/2 inch, or a multiple of 1 l/2 inch, as specified. 4. ccessory Materials a. Adhesive Cement - Pittsburgh Coming Ptttcote 300 Trowel Grade, or approved equal. b. Vapor Barrier - Philip Carey Fire-Chex Vapor Barrier Sheet, or approved equal. c. Fire-Resistant Adhesive - Philip Carey Fire-Chex No. 400, or approved.equal. d. Asphalt - Philip Carey Steep Manco Asphalt, or approved equal. Roofing Felt-15-lb Asphalt Saturated - Philip Carey Feitex, or approved equal. Joint Sealer - Philip Carey Joint Sealer, or approved equal. 3- Flashing Cement - Philip Carey C-5 Flashing Cementtor approved equal. h. Rosin-Sized Paper - Philip Carey Red Rosin Dry Sheet, or approved equal. i. Bead Mastic - Pittsburgh-Coming P. C. Mastic 100, or approved equal. j- Asphalt Emulsion - Pittsburgh Coming P. C. Asphalt Emulsion, or approved, equal. k. Wire Mesh - Keystone Wire and Wheel Company MKeymesh", or approved equal. Lath Clips - Pittsburgh Corning P. C. Metal Lath Clips, or approved equal. m. Angle Pins - Pittsburgh Corning P. C. Angle Pins, or approved equal. n. Ceiling Cement - Minnesota Mining and Manufacturing Company CTA- l l Soft Rubber Based Adhesive, or approved equal. o. Anti-Adhering Solution - one part starch, 24 parts calcium chloride, 91 parts water (by volume). 3. APPLICATION 1 . Roof Insulation on Metal Deck a. Deck shall be plane, dry, clean, and free from holes. Any holes or open joints shall be covered with 6-inch wide strips of asphalt felt Laid in flashing cement, or sealed with joint sealer. b. If metal deck has a slope greater than L-l/2 inch per foot, nailing strips of treated wood equal in height to the thickness of insulation shall be secured to the deck to hold the insulation in place. These strips shall be spaced so that each 4-foot wide course is held in place. A space of l/4 inch shall be allowed between ends of strips. c. Fire-resistant adhesive shall be applied to deck in ribbons approximately 6 inches on centers and l/4 inch in diameter, at a rate of approximately 0.4 gal per 100 sq ft. d. Cellular glass insulation shall be immediately embedded in the fire resistant adhesive in parallel courses with staggered end joints. .All joints shall be tightly butted. e . If more than one layer of cellular insulation is specified, the second laver shall be aoplied to the first by firmly and immediately embedding it in molten hot mopped steep roof asphalt. Joints shall be tightly butted and shall be staggered with reLation to tne layer beneath. t Underwriters' Laboratories Class "A" built-up roofing shall be applied over clean, drv cellular glass insulation. 2- Installation o.nall be as shown in Figure 10-B-l, '.0-3-2 II. B. I contd -SLAG ON GNAVCL SPEC1FIEO THICKNESS OF CELLULAN GL ' *>S INSULATION CM8CD0CD IN nfl-NESiSTANT AOHEStVE / -CLASS 'A* / / QUILT UP NOOF k/:rwy?yTAymy7r//77, IF WIOTN OF CHANNEL IS l-*F?*ON NONE LEVEL OECK WITH FOUNEO GTFSUM----------- STEEL OECK METAL ROOF DECK FIG IO-8-I 2. Roof Insulation on Monolithic Concrete or Gypsum.or Precast Slabs of Concrete or Gypsum a. Deck shall be plane, dry, and free from holes. b. Joints of precast slab shall be covered with 6-inch wide 15-lb felt laid in flashing cement. c. Cellular glass insulation shall be installed in accordance with Parts II. B. I . c, d, e. and f, and as shown in Figure 10-B-2. 10-B-3 II. B. contd 3. Roof Insulation on Wood Deck a. Deck shall be plane, dry, and tree from holes. b. Any knotholes shall be covered with metal. c. The deck shall be covered with rosin-sized paper lapped at least 2 inches, and secured to the deck with 1-inch roofing nails through tin caps. d. If the humidity ,,f the interior is excessive, two plies of 15-lb felt shall be applied with mopping of hot steep roof asphalt. Felt shall be applied by lapping each sheet 19 inches, leaving 17 inches exposed, and mopping hot steep roof asphalt between felts so that at no place shall felt touch felt. e. Insulation shall be applied by embedding it in hot mopped steep roof asphalt, in parallel courses with staggered end joints. Ail joints shall be tightly butted. f. If more than one layer of insulation is specified, the second layer shall be applied to the first layer by firmly and immediately embedding it in molten hot mopped steep roof asphalt. Joints shall be staggered with relation to layer beneath. g. Underwriters' Laboratories Class "A" built-up roofing shall be applied over clean dry cellular glass in sulation. h. Installation shall be as shown in Figure 10-B-3. SHEET VINYL VAPOR BARRIER r SLAG / OR GRAVEL .-CLASS "A* ' built up poop \\ w/7 y SPECIFIED THICKNESS OP CELLULAR GLASS INSULATION EUBEDOEO 1N HOT STEEP HOOP / ASPHALT' WOOO DECK - NAILING STRIP \ \, NOTE- ALL RESINOUS SPOTS OR AREAS SHALL BE COVERED with ONE *1* OP OSiN S'ZEO PAPER BE TORE APPLYING VAPOR BARRIER WOOO ROOF DECK P >G I0-B-3 4. Insulation for Core Walls a. Inner masonrv walls shall be plumb, straight, and true to dimensions, with full mortar joint to provide x smooth surface for installation of insulation. Wall ties shall be properly spaced to permit proper tie vith outer wall. b. Cellular glass insulation snail oe installed by use of four gobs of adhesive coment located near corners of tne back face ol the block, and a l/8-inch thick trowel coat of the adhesive on the edges. D ich block ->nall oe laid true and piumo, with sufficient manual pressure to ensure tight joints and good contact with masonrv wall. Points wnere wall ties extend through the insulation shall be sealed oif with autiosive ce ment . c. Cuter wail shall be erected with a l/4-inch space between it and the insulation. Weep holes shall be provided at the base. d. Installation shall be as shown m Figure 10-B-4. 10-3-4 II. 3. 4. contd. 5. Insulation for Masonry Wall Lining a. Masonry wall shall be plumb, straight, smooth, and clean. b. A uniform l/8-inch thick coat of adhesive shall be applied to the back face of each block of cellular glass insulation, and to edges of blocks in contact. c. Each block shall be laid true and plumb with sufficient manual pressure to ensure tight joints and good con tact with masonry wall. d. Installation shall be as shown in Figure 10-B-5. application of cellular glass insulation for wall lining 10-B-5 I Insulation for Existing Concrete Ceilings a. Concrete ceiling shall be plane, smooth, dry, and clean. b. A full coat of ceiling cement shall be applied with a l/8-inch square-cut serrated trowel. c. A uniform l/8-inch thick coat of adhesive shall be applied to edges of each block of cellular glass insu lation, where the edges are in contact. d. Blocks of cellular glass insulation shall be installed in staggered joint construction, with sufficient manual pressure to ensure good contact with the ceiling. All joints shall be tightly butted. Insulation for New Concrete Ceilings a. Forms for conrete slabs shall be constructed to allow for thickness of the cellular glass insulation. b. Forms shall be coated with anti-adhering solution. c. While anti-adhering solution is still wet, blocks of cellular glass insulation, in parallel courses with staggered end joints, shall be placed in the form. The top surface of the insulation shall be immediately flood-mopped with hot asphalt. d. After reinforcing rods are placed, angle pins shall be inserted into the insulation at a 45-degree angle. At least three pins shall be used on each 12-inch by 18-inch block, and at least four pins on each 24-inch by 18-inch block. Bent end of pin shall protrude at least 2 inches. Installation shall be as shown in Figure 10-B-6. ANGLE pins at as* with SENT END PRQTRuOlNG t* AT LEAST S ANGLE PiNS SHALL BE INSEftTEO IN ;2` * iB* SLOCK, ANQ A HI N I MU N Of 4 * EACH 24* X 36* BLOCK HOT AS*ALT CELLULAR GLASS INSU.ATN ANTI ADHERING SOLUTION application of cellular glass insulation for CONCRETE PLACED ON THE INSULATION e. Concrete shall then be placed over the insulation. Wall and Ceiling Finish a. Exposed surface of cellular glass insulation shall be given a brush coat of asphalt emulsion. b. W*.re mesh shall be fastened to insulation with lath clips on 13-inch staggered centers on the walls and on 1 2-inch staggerea centers on the ceiLing. Inside corners shall be reinforced with strip lath, and out side corners with corner bead. c. Gvpsum plaster, mixed on thejob, shall be applied to the wire mesh in two coats having a maximum total thickness of l/2 inch. d. Pair.t snail be vinyl emulsion as specified m the Design and Construction Coating Specificutions. .0-3-6 II. B. contd 9. Concrete Floor Slabs a. Foundation Wall Method (1} Where specified, insulation shall be appLied to foundation walls, as shown in Fizure 10-B-7. INSULATED FOUNDATION WALL tO-S-T (2) Insulation shall be installed in inside surface of foundation wall with thin layer of asphalt emulsion. (3) A layer of roofing felt, cut to the thickness of the floor slab, shall be applied to the insulation to prevent concrete from bonding to the insulation. b. Slab-Border Method (1) Where specified, insulation shall be applied to foundation walls as shown in Figure 10-3-8. 10-B-7 II. B. 9. b. could rASPHALT CMU.SI04 INSULATED FLOOR SLAB no 10 U) Insulation surfaces around the perimeter shall be separated from the slab edge and foundation with a layer of roofing felt cemented to the insulation block with hot asphalt. (3) A layer of sand approximately 1 inch thick shall be applied over gravel before applying insulation. Insulation shall extend inward from foundation wall a minimum of 14 inches, or under complete slab, as specified. (4) Blocks shall be installed with all joints tightly butted. (5) After insulation is installed as specified, the entire surface shall be flood-mopped with a l/lo-inch thick (minimum) coat of hot asphalt before placing floor slab. Asphalt shall be heated to a tem perature not exceeding 360 F. '. 0 - B - 3 UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS n. specification io-h 10-HSS (For Stainless Steel) Cellular Class Scope Tins Specification describes the essential requirements for the purchase and application of preformed cellular glass In sulation, for use on equipment and piping normally operating at temperatures above 70 F and up to 600 F. It is applicable to both Indoor and outdoor service. The second designation, 10-HSS, indicates that this Specification shall be used for stainless steel equipment and piping. However, this Specification shall be subject to the use of accessory materials specified for stainless steel. Procedures outlined in the GENERAL SPECIFICATIONS are applicable to and constitute an integral part of this Specifi cation. A. MATERIAL 1. Composition Material shall be composed of glass, completely Inorganic, processed and molded at temperatures sufficient to produce a rigid, cellular thermal insulation. 2. Prope rties Alkalinity ................................ pH shall be between 6.9 and 7.5. Capillarity................................ After 7 days on wet surface, gain in weight shall be 0%. Coefficient of Expansion . Shall average 4.6 x 10" per degree F. Combustibility........................... Shall be incombustible. Compressive Strength . . Shall be not less than 100 psi when tested in accordance with ASTM C 240, latest revision. Density ..................................... Shall be not less than 8 lb per cu ft, nor more than 11 lb per cu ft, when tested in accordance with ASTM C 303, latest revision. Flexural Strength . . . . Shall be not less than 75 psi when tested in accordance with ASTM C 203, latest revision. Hygroscopicity..................... Two-inch cubes dried at 220 F to constant weight, then exposed to air at 70 F and 90% relative humidity for 14 days, shall not gain any weight. Resistance To Acids . . Shall be impervious to common acids and fumes except hydrofluoric and hot phos phoric. Shear Strength..................... Shall be not less than 65 psi. Specific Heat ..................... Shall average 0.20 Btu per lb per degree F. Temperature Limit . . . Maximum temperature without mechanical, thermal, or chemical failure shall be not less than 800 F. Tensile Strength Shall be not less than 75 psi. Thermal Conductivity . . When tested in accordance with ASTM C 177. latest revision, or ASTM C 335, latest revision, the thermal conductivity at the given mean temperatures shall not exceed the following values: Mean Temp, Btu/inch, Hr, *F sq ft. 0 100 200 300 400 600 0. 36 0.42 0.48 0.56 0.63 0.74 Thermal Diffusivity . . Shall average 0.42 sq ft per day. 10-H-l H. A. 2. contd Water Absorption* .... After 24-hour submersion, shall not exceed 0.2% by volume (surface only). Vapor Transmission * When tested in accordance with ASTM C 355. latest revision, shall have a WVT of zero grains per sq ft per hour. 3. Accessory Materials - Soecification 10-H a. Cushioning Material: Equipment - TWL Fiberglas glass wool blanket 1 inch thick. Pipine 350 r and below - Ultralite, Super fine, Mono-Kover, 1/2 inch thick. Piping above 350 F - TWL Fiberglas glass wool blanket 1 inch thick. b. Stainless Steel Wire - 0.0475-inch diameter, Type 304, cold drawn, bright annealed, 18 gage. c. Stainless Steel Insulation Strap - l/2-inch by 0.020-inch, Type 304 or approved equal. d. Stainless Steel Clips - Double-pronged, Type 304, A. J. Garrard, Techalloy double-pronged seal, or ap proved equal. e. Strapping Tape - Glass filament, vinyl backed, Dutch Brand No. 400 or approved equal. f. Strap Anchor Clip - A. J. Gerrard's strap hanger. g. Pipe Insulation Support - Techalloy insulation support strap or approved equal. h. Anti-Abrasion Coating - Keene's Cement or approved equal. i. Weather-Barrier Coating (Color as specified) - PVA-Vlmasco No. WC-1, Pitts burgh-Corning Pittcote 500C, or approved equal. j. Reinforcing Cloth - Glass fabric, 10 by 10 thread count, Perma-Glas Mesh, Glass Mesh 10S, Benjamin Foster Open Weave No. 10, or approved equal. k. Staples - 5/8-inch by l/2-inch, stainless steel, A. J. Gerrard or approved equal. l. Adhesive Cement - Miracle Adhesive Type H or approved equal. m. Fabricating Cement - Miracle Adhesive RT-100Q P or approved equal, a. Heat-Resistant Sealer - Benjamin Foster No. 30-43 or approved equal. o. Glass Wool Metal Mesh Blanket - White glass wool, expanded metal lath on one side - Fiberglas Metal Mesh Blanket TWL Style 1, or approved equal. p. Insulating Cement - Hydraulic setting - Baldwin-Ehret-Hill Powerhouse, Eagle-Picher One Coat, Detrick Utility, or approved equal. 4. Accessory Materials - Specification 10-HS5 Accessory materials for Specification 10-HS5 shall be the same as those listed in Part II. A. 3. , wi th the following exceptions: Cushioning Material for Equipment and Piping - 2-l/2 lb per cu ft density TWL Fiberglas or approved equal wrute glass wool blanket 1 inch thick. .Anti-Abrasion Coating - Dampney No. 70 Black. B. APPLICATION - SPECIFICATIONS 10-H and 10-HSS 1. Equi pment a. Insulation Supports Equipment shall be provided with Insulation supports as called for in the GENERAL SPECIFICATIONS, Part I. 3. 5. b. Thickness Schedule Unless otherwise specified, insulation in excess of 2-l/2 Inches total thickness shall be applied in multiple layers is specified in the GENERAL SPECIFICATIONS, Part I. B. 2. c. Cushioning Blanket (1) On vertical equipment, except stainless steel, two layers of the specified cushioning blanket shall be applied over the top head and compressed to 1-lnch thickness, and one layer to the sides and bottom head and compre s sed to l/2-Inch thicknes s .before application of the cellular glass insulation. Blanket LO-H-2 II. B. 1. c. (1) contd shall be secured in place with a minimum amount of stainless steel wire. Cellular glass insulation shall then be applied over the blanket in the manner described in this Specification. Cushioning blanket shall not be considered as part of the specified insulation thickness. (2) On horizontal equipment, except stainless steel, one layer of the specified cushioning blanket shall be applied over the entire surface and compressed to l/2-inch thickness, and secured in the same manner as that called for in Part II. B. 1. c. (1). (3) On stainless steel vertical or horizontal equipment, the specified white glass wool blanket shall be applied in the same manner as that called for in Part II. B. 1. c. (1) or (2). d. Curved Surfaces (1) Cellular glass block insulation for sides and bottom heads of vertical vessels shall be shop fabricated and fitted to allow a l/2-inch space for cushioning blanket between block and vessel. (2) Cellular glass block insulation for top heads of vertical vessels shall be shop fabricated and fitted to allow a 1-inch space for cushioning blanket between block and vessel. (3) Block insulation shall be applied over cushioning blanket on all equipment with all joints tightly butted. Multiple layers shall be applied so that the butt joints of one layer do not coincide with those of any other layer. Typical installation is shown in Figure 10-H-l. niLC# BLOCK OF CCLLtfLA* CLASS APPLICATION OF CELLULAR GLASS INSULATION TO VESSEL HEAP a NOZZLE *IS 10- e . Flat Surface s Flat block shall be applied to flat surfaces in the same manner as previously specified for curved surfaces when operating temperature of equipment is in excess of 150 F. When operating temperature of equipment is 150 F or below, cushioning material shall be omitted and block applied directly to metal surfaces. Securement shall be as specified in the Insulation Design Schedule and/or Line List. f. Securement (1) Where contour of vessel permits firm and effective attachment, .ill layers of cellular glass insulation shall be secured in place with stainless steel insulation strap. Insulation applied to irregular surfaces where use of insulation strap is impracticable, shall be secured with stainless steel wire. (2) Inner layer or layers of cellular glass insulation on bottom heads of vertical equipment or heads ci horizontal equipment shall be held in place with specified stainless steel strap secured to support as shown in UCCC Standards IS-2L, IS-36, and 15-42. Outer layer of ceLlular glass insulation on bottom heads of vertical equipment or heads of horizontal equipment snail be secured with insulation ->trap as shown in Figure 10-H-2. 10-H-3 II. B. 1. f. U) contd (3) Where specified, block shall be applied directly* to metal surfaces, such as duct work, with adhesive or other approved securement. Where block is specified to be secured with adhesive, it shall be em bedded firmly in a surface coat. g. Expansion Joints (I) Cellular glass applications shall be provided with expansion joints at vessel flanges, constructed as shown in Figure 10-H-3. 10-H-4 II. B. I. g. contd (2) Longitudinal expansion of vessels shall be provided for by installing expansion Joints at the insulation supports, as shown in Figure 10-H-4. When more than one thickness is specified for a vesael, an insulation support shall be provided at the junction of two different thicknesses and insulated in a manner similar to that shown in Figure 10-H-4. NOTE' lf INSULATION SUPPORT IS LOCATEO OlRECTLY ABOVE BOTTOM HEAO. SLIP JOINT NOT REQUIRED APPLICATION OF CELLULAR GLASS INSULATION TO EXPANSION JOINT ____________ FIG IQ-H-4__________________________________________________________________ (3) One Inch of cushioning material shall be packed around nozzles and projections where they extend through the insulation, to prevent crushing of the insulation by contraction and expansion of the vessel Typical application is shown in Figure 10-H-5. CUSHIONING BLANKET APPLICATION OF CELLULAR GLASS INSULATION TO NOZZLE F`G tO-M-S 10-H-5 (4) Corrugated mechanical expansion joints on piping (usually listed as equipment items) where cellular glass products are specified shall be insulated as shown in Figure 10-H-6. INNER BORE OF JOINT TO BE COATE0 WITH ANTI* ABRASION COATING A NO ALLOWED TO DRV BEFORE INSTALLATION -SHEET METAL JACKET TO BE SECURCO WITH INSULATION STRAPPING ANO ANCHQRCQ AT ONE tNO ONLY HEAVY FILLET OF CAULKING MASTIC CELLULAR GLASS MOCOCQ RIPE INSULATION----- - ZZZZg2jI|FU NOT LESS THAN TWICE INSULATION THICKNESS NOR LESS THAN S* WEATHER BARRIER, AS SPECIFIED- it Ifc.rfr * J1Q INSULATION BETWEEN SHEET; METAL jacket b expansion JOINT *-- EXTENO FITTING WEATHER 8ARR1ER NOT LESS THAN 6* OVER PIPE INSULATION WEATHER BARRIER APPLICATION OF CELLULAR GLASS INSULATION TO A MECHANICAL EXPANSION JOINT FIG. IO-H-* (5) Expansion joints in flat surfaces or cylindrical vessels shall be insulated with flexible blanket insula tion to permit movement of the expansion joint. Typical installation is shown in Figure 10-H-7. GLASS WOOL METAL MESH BLANKET OF specified Sickness faced outside wit* CXPANOCO METAL LATN- -- . \ ,-- THICKNESS T AS SPECiFiEO CENTERS STAGGEREO - NOTE VO'.QS OF CXPANOCO METAL LATh T? *F F>ul0 with H'CRAuliC 5EfT nG CfMEHT TPQWELEO FLUSH WITH SURFACE ,f i_AfH APPLICATION OF BLANKET INSULATION TO EXPANSION JOINTS ON FLAT SURFACE FiG lO-H-T 10-H-6 H. B. 1. contd h. Flat Heads (l) Insulation on top of flat heads of vertical equipment shall be applied in the same manner as previously described In this Specification. Water pockets shall be eliminated and proper drainage provided as shown in Figure 1Q-H-3. (2) All nozzles on top of insulated equipnient shall be provide with flashing as shown in Figure GA-3 of the GENERAL SPECIFICATIONS. i. Vessel Legs (L) Vessel legs shall be insulated with block which shall extend over channel flanges and down channel legs to junction with any fire-resistant material. Thickness shall be l/Z that specified for body of vessel. Body Insulation shall be brought up to and butted firmly against tank leg flange. (2) Re-entrant space between channel flangesand overchannel flanges between body insulation shall be filled with block cemented in place with the specified adhesive cement. Surface of fireproofing material abut ting tank leg Insulation shall be coated with the specified weather-barrier coating. Installation shall be as shown in Figure 10-H-9. 10-H-7 U, B. 1. 1. contd APPLICATION OF CELLULAR GLASS INSULATION TO EQUIPMENT LEG W 1C 10-M-t j. Ves sel Skirts Skirts supporting vertical equipment shall be insulated outside. Insulation shall extend downward, from junction of skirt with bottom head, a distance of not less than four times the specified thicknes s or to con crete pad, whichever is nearer. Where specified, entire surface of skirt shall be insulated. Thickness shall be as specified for body of vessel. An insulation support shall be provided for securement of bottom head insulation in accordance with UCCC Standard IS-42. Installation shall be as shown in Figure 10-H-10. APPLICATION of cellular glass insulation to equipment skirt F G (O-H-iO 10-H-d II. B. 1. cortfd k. Weather-Barrier (1) Weather-barrier coating shall be applied in accordance with the GENERAL. SPECIFICATIONS, Parts I. B . 9 and 17 . (2) Weather-barrier consisting of sta: is steel jacketing, if required, shall be applied in accordance with the GENERAL. SPECIFICATIONS, Part I. B. 18. Thir -equirement is indicated by the addition of the letter M to the specification designations, thus; 10-HM, 1Q-HSSM. (3) Weather-barrier coating shall be completed and allowed to cure before the system is put in hot service. (4) Weather-barrier membrane shall be carried out 3 inches onto any metal, beyond termination of insula tion. Where operating temperatures are above 300 F, the portion of the weather-barrier in contact with metal shall consist of reinforcing cloth embedded in heat-resistant sealer instead of the weatherbarrier coating. A second application of the heat-resistant sealer shall then be applied over the rein forcing cloth and, while still tacky, the weather-barrier membrane shall be secured with strap where practicable. Securement shall then be coated with heat-resistant sealer. Typical installation is shown Ln Figure 10-H-ll. APPLICATION OF CELLULAR GLASS INSULATION ARQUNO UNINSULATED FLANGES fig io-h.ii 2. Piping a. Pipe Insulation (1) Pipe Insulation shall be supported as specified in the GENERAL SPECIFICATIONS, Part I. B. 5. (2) Insulation In excess of 2-l/2 inches total thickness shall be applied in multiple layers, as specified ln the GENERAL SPECIFICATIONS, Parti. B. 2. (3) Pipe insulation shall be appLied to piping in a staggered position in accordance with Figures GA-l and GA-2 of the GENERAL SPECIFICATIONS. (4) Piping operating at temperatures of 350 F and below, except stainless steel, shall have l/2-inch thick preformed cushioning material applied before application of cellular glass insulation and secured with a minimum of four staples per 3-foot section. Piping, operating at temperatures above 350 F (excepx stainless steel), or where preformed cushioning material Is not available, shall have 1-incn thick cushioning blanket secured with stainless steel wire and compressed to approximately l/2-inch thick ness, applied before application of cellular glass insulation. Cushioning material shall not be con sidered as part of the specified insulation thickness. LO-H-9 H. B. 2. a. conld (5) All stainless steel piping shall have 1-inch thick white glass wool cushioning blanket, as specified for stainless steel, secured with stainless steel wire and compressed to approximately l/2-inch thickness, applied before application of cellular glass insulation. (6) Insulation shall be applied with all Joints tightly butted and fitted, to eliminate voids. Large voids shall not be filled with weather-barrier coating, but eliminated by either refitting or-replacing insulation. Any rounded corners on the Insulation surfaces to be butted shall be trued before application . (7) Butt edges and ends of all inner layers shall be given a smoot i brusn or spray coat of the specified anti-abrasion coating and allowed to dry for a minimum of 4 hours before application. Care shall be exercised to obtain a thin, even coat of sufficient thickness only to cover and fill the cut cells of the in sulation. b. Fitting, Flange, and Valve Covers (1) Welded fitting covers shall be fabricated to an inside diameter 1 inch greater than the outside diameter of the welded fitting to allow for cushioning material. (2) Fitting, flange, and valve covers shall be shop fabricated In accordance with the UCCC Dimensional Standards Fabrication Manual or ASTM Recommended Practice C 450, latest revision. Installations of typical fittings and valves are shown in Figures 10-H-12, 10-H-13, 10-H-14, 10-H-15, and 10-H-16. CtLLULAB GLASS INSULATION 4HERC CUSHIONING BLANKET is useo. PIPE CANNOT SC SUPPORTED OuTSlOC INSULATION application of cellular glass insulation to welded ell 10-H-10 II. B. Z. b. (2) contd APPLICATION OF CELLULAR GLASS INSULATION TO WELDED TEE fig iq-H-ij THICKNESS t, AS SPECIFIED WEaThER BARRIER AS SPCCiPlCO --* Si Jm v .Eft- CELLULAR CLASS INSULATION----------/ f A -L CUSHIONING BLANKET- '4 j Jf ? _____ U j -r>k ROUND OUTSIOC CONNERS HEAVY FILLET OF CAULKING LAST'C - thickness t, as specified SURFACES SHALL BE COATED WITH ANTI-ABRASION COATING AhO ALLOWEO TO ORT BEFORE INSTALLATION APPLICATION OF CELLULAR GLASS INSULATION TO LINE FLANGE FiC. I0-H-I4 iO-H-l l n. b 2. b 12) contd I APPLICATION OF CELLULAR GLASS INSULATION TO FLANGED VALVE f 14 10 IO-H-1 2 H. B. 2. b. contd (3) All valves shall be packed and filled around valve stem and packing gland assembly with heat-resistant sealer to avoid water pockets. (4) Cementing of shop assemblies shall be done with specified fabricating cement. In all cases the joints shall be as thin as possible with just sufficient cement to obtain good adhesion and complete closure. In no case will wide cement joints* or voids and holes plugged with ccime* be permitted. c. Expansion and Contraction Joints (1) Expansion and contraction joints shall be installed as shown in Figure 10-H-17 or 10-H-I8, in both horizontal and vertical straight run piping* at intervals as follows: Up to 2-l/2-inch thick insulation - one for each 60 feet 3-inch to 5-inch thick insulation - one for each 45 feet 5.l/2-inch to 7-l/2 inch thick insulation - one for each 30 feet (2) Where flanged fittings or valves occur within these units, expansion shall be provided for in the flaage cover, and expansion-contraction joints in the insulation will not be required. CELLULAN CLASS INSULATION r~irM/T * INNCN AMO OUTCN 80 Of SLIP JOINTS COATED WITH NON-SCTTlNO SCALES CUSHIONING 8LANKCT ~'////y////A r /////////a / N\\\\sa EATMCft-SARNtC* AS SSCClClCD ONE LAYER INSULATION APPLICATION OF CELLULAR GLASS INSULATION TO EXPANSION 8 CONTRACTION JOINT IN HORIZONTAL PIPING EIG I0-H-I7 10-H-13 H. B. 2. c. (2) contd d. Securement (1) All inner layers, and outer layers larger than 4-1 fl Inches in outside diameter, of cellular glass pipe insulation shall be secured with insulation strap. (2) Outer layers 4-1/2 inches and less in outside diameter shall be secured with strapping tape. (3) Location of strap and tape shall be as described in the GENERAL SPECIFICATIONS, Part I. B. 6. e. Weather-Barrier (1) Weather-barrier coating shall be applied in accordance with the GENERAL SPECIFICATIONS, Part I. B. 17. (2) Weather-barrier consisting of stainless steel jacketing, if required, shall be applied in accordance with the GENERAL SPECIFICATIONS, Parti. B. IS. This requirement is indicated by the addition of the letter M to the specification designations, thus: 10-HM, LQ-HSSM. (3) Weather-barrier coating shall be completed and allowed to cure before the system Is put in hot service. 10-H-14 UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS H. SPECIFICATION 10-J 10-JSS (For Stainless Steel) Cellular Glas 9 This Specification describes the essential requirements for the purchase and application of preformed cellular-glass in sulation, for use on equipment and piping normally operating at temps ratures above 50 F and up to 400 F. It is applicable to both indoor and outdoor service. Procedures outlined in the GENERAL SPECIFICATIONS are applicable to and constitute an integral part of this Specifi cation. A. MATERIAL 1 . Composition Material shall be composed of glass, completely inorganic, processed and molded at temoeratures sufficient to produce a rigid, cellular thermal insulation. 2. Prooerties Cellular glass insulation shall have the following properties: Alkalinity..................................... pH shall be between 6.9 and 7.5. Capillarity..................................... After 7 days on wet surface, gain in weight shall be 0%. Coefficient of Expansion Shall average 4.6 x 10 0 per degree F. Combustibility...........................Shall be incombustible. Compressive Strength Shall be not less than 100 psi when tested in accordance with ASTM C 340, latest revision. Density ..................................... Shall be not less Chan 8 lb per cu ft, nor more than 11 lb per cu ft, when tested in accordance with ASTM C 30 3, latest revision. Flexural Strength..................... Shall be not less than 75 psi when tested in accordance with ASTM C 20 3, latest revision. Hygroscopicity.......................... Two-inch cubes dried at 220 F to constant weight, then exposed to air at 70 F and 907a relative humidity lor 14 days, shall not gain any weight. Resistance to Acids Shall be impervious to common acids and fumes except hydrofluoric and hot phos phoric. Shear Strength.......................... Shall be not less than 65 psi. Specific Heat .......................... Shall average 0.20 Btu per lb per degree F. Temperature Limit * Maximum temperature without mechanical, thermal, or chemical failure *hail be not less than 800 F. Tensile Strength.....................Shall be not less than 75 psi. Thermal Conductivity When tested in accordance with ASTM C 177. latest revision, or .ASTM C 3 35, latest revision, the thermal conductivity at the given mean temperatures shall not exceed the following values: Mean Temp, Btu/inch, hr, ' F sq ft, 0 0.36 100 0.42 oo 0 . 48 300 0.56 400 600 0. ->3 0.74 Thermal Diffusivity . Shall average 0.42 sq ft per day. Wate r Abso rption . . . After 24 hour subversion, shall not exceed 0 . 2-Tj by v olume i surface oui v j . 10-J-i II. A. Z. contd Vapor Transmission .... When tested in accordance with ASTM C 355, latest revision, shall have a WVT of zero grains per sq ft per hour. 3. Accessory Materials a. Stainless Steel Wire - 0.0475-inch diameter, Type 304, cold drawn, bright annealed, 18-gage. b. Stainless Steel Insulation Strap - l/2-inch by O.OZO-inch, Type 304, or approved equal. c. Stainless Steel Clips - Double-pronged, Type 304, A. J. Gerrard, Techalloy double-pronged seal, or ap proved equal. d. Strapping Tape - Glass filament, vinyl-backed, Dutch Brand No. 400 or approved equal. e. Strap Anchor Clip - A. J. Gerrard's strap hanger. f. Pipe Insulation Support - Techalloy insulation support strap or approved equal. S* .Anti-Abrasion Coating - Dampney No. 70 Black. h. Weather-Barrier Coating - (color as specified) - Vimasco WC-1, Pittsburgh-Corning Pittcote 500C, or ap proved equal. i. Reinforcing Cloth - Glass fabric, 10 by 10 thread count, Perma-Glas Mesh, Glass Mesh 10s, Benjamin Poster Open Weave No. 10, or approved equal. j* Adhesive Cement - Miracle Adhesive Type H or approved equal. k. Fabricating Cement - Miracle Adhesive RT-1000P or approved equal. 1. Heat-Resistant Sealer - Benjamin Foster No. 30-43 or approved equal. m. Glass Wool Meatl Mesh Blanket - White glass wool, expanded metal lath on one side - Fiberglas Metal Mesh Blanket TWL Style 1, or approved equal. n. Insulating Cement - Hydraulic setting - Baldwin-Ehret-Hill Powerhouse, Eagle-Picher One Coat, Detrick Utility, or approved equal. 3. APPLICATION L. Equioment a. Insulation Supports Equipment shall be provided with insulation supports as called for in the GENERAL SPECIFICATIONS, Part I. B. 5. b. Thickness Schedule Unless otherwise specified, insulation in excess of 2-\/l Inches total thickness shall be applied in multiple layers as specified in the GENERAL SPECIFICATIONS, Part I. 3. Z. c. Carved Surfaces (1) Cellular glass block insulation (curved segments or shaped head segments) shall be shoo fabricated to lit the diameter oi the vessel to which it is applied. Block InsuLation shail be applied to equipment with ail joints tightly butted. Multiple layers of insulation shall be so applied that the butt joints of one layer do not coincide with those of any othe r laye r. T ypical installation is shown m Figure 10-J-l. LO-J-2 II. B. 1. c. (1) contd APPLICATION OF CELLULAR GLASS INSULATION TO VESSEL HEAD a NOZZLE rt*. 10- j-1 (2) Inner surface of vessel insulation shall be coated with the specified anti-abra9ion coating, of just sufficient thickness to fill half cells, and allowed to dry before installation. d. Flat Surfaces Flat block shall be applied to flat surfaces in the same manner as previously specified for curvc surfaces. e. Securement (1) Where contour of vessel permits firm and effective attachment, all layers of cellular glass insulation shall be secured in place with stainless steel insulation strap. Insulation applied to irregular surfaces, where use of insulation strap is impracticable, 3hall be secured with stainless steel wire. (2) Inner layer or layers of cellular glass insulation on bottom heads of vertical equipment, or heads of horizontal equipment, shall be held in place with stainless steel wire secured to support as shown in UCCC Standards IS-- 31 r IS-36, and IS-42. Outer layer of cellular glass insulation on bottom heads of vertical equipment, or heads of horizontal equipment, shall be secured with insulation strap an shown in Figure 1Q-J-2. 10-;.3 H. B. 1. e. (2) contd f. Expansion Joints (1) Cellular glass applications snail be provided with expansion joints at vessel flanges, constructed as shown in Figure 10-J-3. APPLICATION OF CELLULAR GLASS INSULATION TO EQUIPMENT FLANGE F1. 10-J-3 O-J-4 a. b. i f. contd (2) Longitudinal expansion of vessels shall be provided for by installing expansion joints at the insula tion suDports as shown in Figure 10-J-4. When more than one thickness is specified for a vessel, an insulation support shall be provided at the junction of two different thicknesses and insulated in a man ner similar to that shown in Figure 10-J-4. MOTE* INSULATION SUPPOBT 'S LOCATED OlilfCTLV ABOVE BOTTOM HCAO, SLIP JOINT NOT BCOUiftCO APPLICATION OF CELLULAR GLASS INSULATION TO EXPANSION JOINT f t S IO-J*A (3) Where nozzles and projections extend through the insulation, they shall be insulated a s shown 1: Figure 10-J-5. CELL'JLAA G*.A$S INSULATION APPLICATION OF CELLULAR GLASS INSULATION TO NOZZLE IC-J-5 nc IO-J-S n. b i f. contd (4) Corrugated mechanical expansion joints on piping (usually listed as equipment item) where cellular glass products are speciiied shall be insulated as shown in Figure IQ-J-6. APPLICATION OF CELLULAR GLASS INSULATION TO A MECHANICAL EXPANSION JOINT ri. io-j g. Flat Heads (W Insulation on top of flat heads of vertical equipment shall be applied in the same manner as previously described in this Specification, Water pockets shall be eliminated and proper drainage provided as shown in Figure 10-J-7. II. 3. 1. g. contd (2) All nozzles on top of insulated equipment shall be provided with flashing as shown in Figure GA-3 of the GENERAL SPECIFICATIONS. h. Vessel Legs (I) Vessel legs shall be insulated with block which shall extend over channel flanges and down channel legs to junction with any fire resistant material. Thickness shall be l/Z that specified for body of vessel. Body insulation shall be brought up to and butted firmly against tank leg flange. (Z) Re-entrant space between channel flanges and over channel flanges between body insulation shall be filled with block cemented in place with the specified adhesive cement. Surface of fireproofing mate rial abutting tank leg insulation shall be coated with specified weather-barrier coating. Installation shall be as shown in Figure 10-J-8. i. Vessel Skirts Skirts supporting vertical equipment shall be insulated outside. Insulation snail extend aown-varo, :'r' junction of sxirt with bottom head, a distance of not less than four times the specified thickness or to c o Crete pad, whichever is nearer. '.Vhcre specified, entire surface oi ^kirt <*nall oe insulated. Thicknshall be as specified for body of vessel. An insulation support shall be oroviced for >ecurerr.er.t of oottc head insulation in accordance with UCCC Standard IS-42. Installation snail be as nown in Figure 10-J- - 10 -- J - 7 II. B. 1. i. coned APPLICATION OF CELLULAR GLASS INSULATION TO EQUIPMENT SKIRT * no. io-j-s j. Weather-Barrier (1) Weather-barrier coating shall be applied as specified in the GENERAL SPECIFICATIONS, Parts I. B . 9. and 17. (2) Weather-barrier consisting of stainless steel jacketing, if required, shall be aoplied as specified in the GENERAL SPECIFICATIONS, Part I. B. IS. This requirement is indicated by the addition of the letter M to the specification designations, thus: 10-JM, 10-JSSM. (3) Weather-barrier coating shall be completed and allowed to cure before the system is put in hot ser vice. (4} Weather-barrier membrane shall be carried out 3 inches onto any metal, beyond termination of in sulation. Where operating temperatures are above 300 F, the portion of the weather-barrier in con tact with metal shall consist of reinforcing cloth embedded in heat-resistant sealer instead of the weather-coating. A second application of the heat-resistant sealer shall then be aoplied over the reinforcing cloth and, wnile still tacky, the weather-oarrier membrane shall be secured with strap where practicable. Securement shall then be coated with heat-resistant sealer. Tvpical installation is shown in Figure 10--J --10. i'3-J-d El. B. I. J. contd APPLICATION OF CELLULAR GLASS INSULATION AROUND UNINSULATED FLANGES* 1 2. Piping a. Pipe Insolation (1) Pipe insolation, shall be supported as specified in the GENERAL SPECIFICATIONS, Part I. 3. 5. (2) Insulation thicknesses in excess of 2-l/2 inches shall be applied in multiple layers as specified in the GENERAL SPECIFICATIONS, Parti. B. 2. (3) Pipe insulation shall be applied to piping in a staggered position in accordance with Figures GA-l and GA-2 of the GENERAL SPECIFICATIONS. (4) Insulation shall be aoolied with ail joints tightly butted and fitted, to eliminate voids. Large voids shall ruae be filled with weather-barrier coating, but eliminated either by refitting or replacing insulation. Any rounded corners on the insulation surfaces to be butted snail be trued before appli cation. (5) Butt edges, ends, and bore of all inner lavers snail be giver, a smooth brush or spr.iv coat o: tr.e specified anti-abrasion coating anc' allowed to drv for a minimum of 4 hours, before ippi; cation. Care shall be exercised to obtain a thin, even coat of sufficient thickness onlv to cover and till the cut cells of the insulation. b. Fitting, Flange, and Valve Covers (1) Fitting, flange, and valve covers shall be shop fabricated in accordance with the UCCC Dimensional Standards Fabrication Manual or ASTM Recommended Practice C 450. l-test revision. Installation of tv*p: cal fitting s ar.a valve s is shown in Figures I0-J-1 l, 1 0 - J - . 10-j -1 3, 1 0-j-l4, and 1 0 - J - l 3 . n. b 2. t>. (l) contd APPLICATION OF CELLULAR GLASS INSULATION TO WELDED ELL f>6. JO-J-M APPLICATION OF CELLULAR GLASS INSULATION TO WELDED TEE LO-J-IO II. 3. 2 b. (1) conEd WCATHEN SANNICft AS SNECtFlEO cclujlan class insulation THICKNESS T, *s SFCCIFieo wm. T NOUNO OUTSIDE CONNENS HEAVY FILLET OF CA4JLKINQ WASTlC ^ *---------------thickness t, as specified APPLICATION OF CELLULAR GLASS INSULATION TO LINE FLANGE FIG. IO-J *15 r CELLULAN CLASS------ -------------------- INSULATION THICKNESS T, AS SPECIFIED NOUMO OUTHOC CONNENS MEATMEN BANNiCN AS SAECIFlCO / I I APPLICATION OF CELLULAR GLASS INSULATION TO FLANGEO ELL FiC.lO-J-H 10-J-ll n. B. 2. b. (1) 1 APPLICATION OF CELLULAR GLASS INSULATION TO FLANGED VALVE t\O. 10-J-JS (2) Ail valves shall be packed and filled around valve stem and packing gland assembly with heat-resistant sealer to avoid water pockets. (3) Cementing of shop assemblies shall be done with specified fabricating cement. In ail cases the joints shall be as chin as possible with just sufficient cement to obtain good adhesion and complete closure. In no case will wide cement joints, or voids and holes plugged with cement, be permitted. c. Expansion and Contraction Joints (1) Expansion and contraction joints shall be installed as shown in Figure 10-J-lb or 17. in both hori zontal and vertical straight run piping, at intervals as follows: Up to 2 l/2-inch thick insulation-one for each 60 feet 3-inch to 5-inch thick insulation - one for each 45 feet 5 -- 1 /2 inch to 7-l/2 inch thick insulation - one for each 30 feet (2) Where flanged fittings or valves occur within these limits, expansion and contraction shall be pro vided for in the flange co/er, and expansion-contraction joints in insulation will not be reauired. -11 n. B. 2. c. (2) contd APPLICATION OF CELLULAR GLASS INSULATION TO VERTICAL EXPANSION ANO CONTRACTION JOINT 110. lO*J*7 CELLULAR CLASS INSULATION--. / / / / -1 -INNER ANO OUTER BORE OF SLlRjOINTS COATE0 with non-setting SEALER ________ I'WWXl_________________ Y/y/A'ss/s/* &/// ///77?\ f------------- ----------- =r / / WEATHER BARRIER AS SPECIFIED KvnVvVL V SPACE F'LLCO with Cushioning blanket APPLICATION OF CELLULAR GLASS INSULATION TO EXPANSION ANO CONTRACTION JOINT IN HORIZONTAL PIPING FiG 10 - J-1 1 0-J- l 3 IX. B. 2. contd d. Securement All inner layers, and outer layers larger than 4-l/2 inches in outside diameter, of ceLlular glass pipe insulation shall be secured with insulation strap. (2) Outer layers 4-l/2 Inches and less in outside diameter shall be secured with strapping tape. (3) Location of strap and tape shall be as described in the GENERAL SPECIFICATIONS, Part I. B. 6. iO-j-14 UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS II. SPECIFICATION 10-L 10-LSS (For Stainless Steel) Cellular Glass Scope This Specification describes the essential requirements for the purchase and application of preformed cellular glass thermal Insulation, for use on equipment and piping normally operating at temperatures below 70 F, and including cycle operating and thawout service up to 400 F. It is applicable to both indoor and outdoor service. The second designation, 10-LSS, indicates that this Specification shall be used for stainless steel equipment and piping. However, this Specification shall be subject to the use of accessory materials specified for stainless steel. Procedures outlined in the GENERAL SPECIFICATIONS are applicable to and constitute an integral part of this Speci fication. A. MATERIAL L. Composition Material shall be composed of glass, completely inorganic, processed and molded at temperatures sufficient to produce a rigid, cellular thermal insulation. 2. Properties Cellular glass insulation shall have the following properties: Alkalinity...................................... pH shall be between 6.9 and 7.5. Capillarity...................................... After 7 days on wet surface, gain in weight shall be 0%. Coefficient of Expansion* * Shall average 4.6 x 10"^ per degree F. Combustibility...........................Shall be incombustible. Compressive Strength. Shall be not less than 100 psi when tested in accordance with A5TM C 240, latest revision. Density ..................................... Shall be not less than 3 lb per cu ft, nor more than 11 lb per cu ft, when tested in accordance with ASTM C 303, latest revision. Flexural Strength* .... Shall be not less than 75 psi when tested in accordance with ASTM C 203, latest revision. Hygroscopicity...........................Two-inch cubes dried at 220 F to constant weight, then exposed to air at 70 F and 90% relative humidity for 14 days, shall not gain any weight. Resistance to A:ids Shall be impervious to common acids and fumes except hvdroiluoric ur.d hot ohosphoric. Shear Strength...........................Shall be not less than 65 psi. Specific Heat...........................Shall average 0.20 Btu per lb per degree F. Temperature Limit. * Maximum temperature without mechanical, thermal, or chemical failure shall be not less than 800F. Tensile Strength..................... Shall be not less than 75 psi. The rmal Conductivity . . . '.Vhen tested inaccordance with ASTM C 177, latest revision, or ASTM C 3 35, latest revision, tne thermal conductivity at the given mean temperatures shall not exceed the following values. Mean Temp. Btu/inch, ' F salt, J F 0 100 200 300 400 600 0. 36 0.42 0.48 0.56 0. o 3 0.74 Thermal Diffusivity Shall average 0.42 sq it per dav. 10-L-l i~t. a. .. contd Water Absorption .... After 24-hour submersion, shall not exceed 0.2% by volume (surface only). Vapor Transmission . . . When tested in accordance with ASTM C 355, latest revision shall have a WVT of zero grains per sq ft per hour. 3. Accessory Materials - Soecification 10-L a. Cushioning Blanket - 3-lb density. Fine Fyber Felt, UltraUte, Superfine, or approved equal, l/2 inch thick. b. Glass Wool Blanket - TWL Fiberglas glass wool blanket 1 inch thick. c. Stainless Steel Wire - 0.0475-Inch diameter, Type 304, cold drawn, bright annealed. Id gage, steel wire. d. Stainless Steel Insulation Strap - l/2-inch by 0.020-inch, Type 304, or approved equal. e. Stainless Steel Clips - Double-pronged, Type 304, A. J. Gerrard, Techalloy double-pronged seal, or ap proved equal. f. Strapping Tape - Glass filament, vinyl-backed, Dutch Brand No. 400 or approved equal. g. Strap Anchor Clip - A. J. Gerrard's strap hanger. h. Pipe Insulation Support - Techalloy insulation support strap or approved equal. i. Anti-Abrasion Coating - Dampney No. 70 Black. j. Vinyl Asphalt Joint Sealer - Vimasco 49 or approved equal. k. Weather-Barrier Coating (Color as specified) - PVA - Vimasco No. WC-l, Pittsbur g h-Corning Pittcote 500 C, or approved equal. l. Reinforcing Cloth - Glass fabric, 10 by 10 thread count, Perma-Glas Mesh, Glass Mesh 10S, Benjamin Foster Open Weave No. 10, or approved equal. m. Adhesive Cement - Miracle Adhesive Type H or approved equal. n. Caulking Mastic - Vimasco Caulking Compound or approved equal. o. Fabricating Cement - Hot (180 F) Asphalt or approved equal. p. Prefabricated Vegetable Cork - 16 to 20 lb per cu ft - National Cork, Mundet, or approved equal. q. Non-setting Sealer - Benjamin Foster 30-94 or aoproved equal. 4. Accessory Materials - Specification 10L-SS Accessory materials for Specification 10L-SS shall be the same as those listed in Part II. A. 3, with the follow ing exceptions: Cushioning Blanket and Glass Wool Blanket - Z-l/Z lb per cu ft density TWL Fiberglas or approved equal white glass wool blanket 1 inch thick. Joint Sealer - Dampney No. 70 Black. B. APPLICATION - SPECIFICATIONS 10-L and 10-LSS 1. Equipment a. Insulation Supports Equipment shall be provided with insulation supports as specified in the GENERAL. SPECIFICATIONS, Part I. B . 5 . b. Thickness Schedule Unless otherwise specified, insulation in excess of 2-1/2 inches total thickness shall be applied Inmultiple layers as specified in the GENERAL SPECIFICATIONS, Part I, 3. 2. c. Cushioning Blanket (l) On all equipment operating below 350 F, except stainless steel, a l/2-inch thick cushioning blanket 3 h al 1 be applied over the entire surface as a cushioning material before application of thecellular glass Insulation. Blanket shall be held m place with a minimum amount of stainless steel wire. Cellular glass insulation shall then be aoplied over the blanket in the manner described In this Specification. Cusniorung material shall not be considered as part of the specified insulation thickness. I 0- L- 2 II. B. 1. c. contd (2) On all equipment which has a top operating temperature above 350 F, except stainless steel, a 1-inch thick glass wool cushioning blanket shall be applied over the entire surface, compressed to l/2-inch thickness, and secured in the same manner as that called for in Part II. B. 1. c. (l). (3) On all stainless steel equipment, a 1-inch thick white glass wool cushioning blanket, as specified for stainless steel, shall be applie ' over the entire surface, compressed to l/2-inch thickness, and se cured in the same manner as thai called for in Part II. B. 1. c. (1). d. Curved Surfaces (1) Cellular glass block insulation shall be shop fabricated and fitted to allow a l/2-inch space for cushion ing blanket between block and vessel. Block insulation shall be applied over cushioning material on all equipment, with all joints tightly butted. Multiple layers of insulation shall be applied so that the butt joints of one layer do not coincide with those of any other layer. (2) All butt edges and ends of insulation fabricated for inner layer or layers shall be given a smooch brush or spray coat of the specified anti-abrasion coating and allowed to dry fora minimum of 4 hours before application of insulation to equipment. (3) On stainless steel equipment, all butt edges and ends of Insulation fabricated for inner laver or layers shall be given a smooth coat of anti-abrasion coating in the same manner as that called for in Part II. B. 1. d. (2). (4) All butt edges and ends of outermost layer (or single layer) of formed insulation shall be sealed with a buttered coat of the specified joint sealer. This coating shall be of sufficient thickness to provide proper adhesion, seal, and cushion between the individual pieces of insulation. Typical installation is shown in Figure 10-L-l. FILLER SLOCK OF CELLULAR CLASS LEVEL WITH TOR OF STUD ---------------- APPLICATION OF CELLULAR GLASS INSULATION TO VESSEL HEAP AND NOZZLE Fig io-l-i e . Flat Surface s Block shall be applied to flat surfaces in the same manner as 'jpecified for curved surfaces, except where it is specified to be applied directly to metal surfaces with adhesive or other approved ^ecuremeut. f. Securement (1) Where contour of vessel permits firm and effective attachment, all layers of cellular glass msuLuticn naLl be secured m place w ith stainless steel insulation ^trap. Insulation applied to i r regular suriaces, where use of insulation strap is impracticable, shall be secured with stainless %teel wire. (2) Inner laver or livers of cellular glass insulation or. bottom heaas oi vertical equipment, or neaus of horizontal equipment, shall be held in place with specified stainless steel strap secured to insulation supoorij, as shown in UCCC Standards 13-31, 15-36, and 13-42. Outer laver ot cellular glass insula10-L-i n. B. 1. f. (2) contd tion on bottom heads of vertical equipment, or heads of horizontal equipment, shall be secured with insulation strap, as shown in Figure iO-L-2. (3) Where specified, block shall be applied directly to metal surfaces, such as ductwork, with adhesive or other approved securement. Where blockis specified to be secured with adhesive, it shall be embedded firmly in a surface coat. g. Expansion Joints (1) Cellular glass applications shall be provided with expans ion-contraction joints at vessel flanges, con structed as shown in Figure 10-L-3. Where movement is likely to occur, non-setting sealer shall be applied to surfaces of insulation, as shown, to provide proper slip joint. 10-L-4 n. b 1 g. (1) contd (2) Longitudinal contraction of vessels shall be provided for by installing expansion-contraction joints at the insulation supports, as shown in Figure LO-L-4. Where more than one thickness of insulation is specified for a vessel, an insulation support shall be provided at the junction of two different thick nesses, and insulated in a manner similar to that shown in Figure 10-L-4. Non-setting sealer shall be applied to surfaces of insulation to provide proper slip joint where movement is likely to occur. 1 0- L-5 n. B. 1. g. contd (3) A 1-inch space shall be provided around nozzles and projections where they extend through the insula tion, as shown in Figure 10-L-5. Where movement is likely to occur, non-setting sealer shall be applied to surfaces of insulation to provide proper slip joint. h. Mechanical Expansion Joints Corrugated mechanical expansion joints in piping (usually listed as equipment items) shall be insulated as shown in Figure 10-L-6. Where movement is likely to occur, non-setting sealer shall be applied to surfaces of insulation to provide proper slip joint. 10-L-6 II. B. 1. contd i. Flat Heads (1) Insulation on top of flat heads of vertical equipment shall be applied in the same manner as pre viously described in this specification. Water -sockets shall be eliminated and proper drainage provided as shown in Figure 10-L-7. (2) All top nozzles on insulated equipment shall be provided with flashing as shown in Figure CA-3 of the GENERAL SPECIFICATIONS. j. Vessel Legs (1) Vessel legs shall be insulated with block which shall extend over channel flanges and down chanru. to the junction with any fire-resistant material, or a distance of four times insulation thickness not less than Z4 inches. Thickness shall be as specified for body of vessel but not less than 2 \ Body insulation shall be butted firmly against tank leg flange. (2) Re-entrant space between channel flanges shall be filled with block cemented in place with the s: adhesive cement. Surface of fire-resistant m terial abutting tank leg insulation shall be coatee weather-barrier coating. Installation shall be as shown in Figure 10-L-S. 10- L- II. B. I. j. (2) contd k. Vessel Skirts Skirts supporting vertical equipment shall be insulated inside and outside. Insulation shall extend down ward, from junction of inside of skirt with insulated bottom head, a distance of not less than four times the thickness of insulation, but never less than l foot. Thickness of insulation over skirts shall be as specified for body of vessel, but not less than 2 inches. Insulating material shall be secured to inside of skirt with adhesive cement. Support for inside skirt insulation and bottom head insulation shall be in accordance with UCCC Standard IS-42. Installation shall be as shown in Figure LO-L-9. IO-L-3 II. B l. k. conf.d CELLULAN CLASS INSULATION HEAVY FILLET CF VAPO* SEAL COATING AT ALL INSIOE COPNERS SUPPORT ANGLE IN ACCOPOANCE WITH uC.CC. STO. IS-42 OETAIL A APPLICATION OF CELLULAR GLASS INSULATION TO EQUIPMENT SKIRT* I. FIG IO-L-S I. Equipment Supports 0) Where equipment is supported on cradles vessel Insulation shall extend over cradles as shown ir. Figure 10-L-10. 10-L-9 Q. 3. 1. 1. cootd (2) Where equipment is supported by* structural steel members, insulation shall extend not les9 than four times the specified insulation thickness in each direction, measured from junction of vessel with insu lated support lug. Thickness of insulation over steel supports shall be not less than 1 /2 that specified for body of vessel. Thickness of insulation over support lugs shall be the same as that of body insula tion. Installation shall be as shown in Figure 10-L-ll. m. Weather-Barrier (1) Weather-barrier coating shall be applied in accordance with the GENERAL SPECIFICATIONS, Parts I. B. 9- and 17. (2) Weather-barrier consisting of stainless steel jacketing, If required, shall be applied in accordance with the GENERAL SPECIFICATIONS. Part I. B. 18. This requirement is indicated by the addition of the letter M to the specification designations, thus: LO-LM, IQ-LSSM. Piping a. Pipe Insulation (1) Pipe Insulation shall be supported as specified in the GENERAL SPECIFICATIONS, Part I. B. 5. (2) Insulation thickness in excess of 2-1/2 inches shall be applied in multiple lavers as specified in the GENERAL SPECIFICATIONS, Parti. B. 2. (3) Pipe Insulation shall be applied In staggered position, in accordance with figures Ga-1 and G.A-2 of the GENERAL SPECIFICATIONS. (4) .All butt edges and ends of single layer insulation, and outer layer of multiple layer applications, shall be buttered with joint sealer before application. The joints shall be drawn together when insulation is applied, so that only a very thin, vapor-tight, vapor-seal coat separates the sections of insulation. (5) Insulation shall be applied with all Joints tightly butted and fitted, to eliminate voids. Large voids shall not be filled with joint sealer, but eliminated either by refitting or replacing Insulation. .Any rounded corners on the insulation surfaces to be butted shall be trued before application. (6) Butt edges and ends of all Inner layers of insulation shall be given a smooth brush or spray coat of anti-abrasion coating and aliowed to dry for a minimum of 4 hours before aoplication. Care shall be exercised to obtain a thin, *vcn coat of sufficient thickness only to cover and fill the cut cells of the in sulation. 10-L-l0 II. B 2. a., contd (7) When scheduled for installations where severe vibration is expected, entire surface area shall be coated with anti-abrasion coating as called for in Part II. 3. 2. a. (6) or (7), (8) When scheduled for installations where thermal shock is expected, a cushioning material, as specified, shall be applied to bare pipe before application of cellular glass insulation. b. Fitting, Flange, and Valve Cover? (1) Fitting, flange, and valve covers shall be shop fabricated in accordance with the UCCC Dimensional Standards Fabrication Manual, or ASTM Recommended Practice C 450, latest revision, using hot (180 F) asphalt as a fabricating cement. (2) Welded fitting covers shall be fabricated to fit snugly on the pipe. The two halves of the cover shall be cemented together with joint sealer applied to the outermost 2-l/2 inches (approx) of the faces of the joint. The adjacent pipe insulation shall be fitted tightly to the butt ends of the fitting cover and sealed as specified for piping. Typical fitting covers are shown in Figures 10-L-12 and 10-L-13. APPLICATION OF CELLULAR GLASS INSULATION TQ WELDED LL rio i o -1. * * 2 1 0-L- i l II. B. 2. b. (2) contd (3) Flange, flanged fitting, and flanged valve covers shall be fabricated and fitted to extend over adjacent pipe insulation so as to provide a close-fitting slip joint at each end. The two halves of the cover shall be cemented together with joint sealer applied to the outermost 2-1/2 inches (approx) of the faces of the joint. (4) All valves shall be packed and filled around valve stem and packing gland assembly with joint sealer, to avoid water pockets. (5) Installations of typical fittings and valves are shown in Figures 1Q-L-14, 10-L-15, and 10-L-16. 10-L-i2 TABLE II RESISTANCE TO ACIDS, AIKALIES, AND SALTS SAMPLE CONDITION SAMPLE CONDITION AFTER 96 L. -RS AFTER TEST ACIDS COMPLETE FREQUENT COMPLETE VAPOR IMMERSION SPILLAGE IMMERSION EFFECT H. C. H. c. H. C. H. C.- ACETIC 5w ACETIC 50G CHROMIC 5-1 CHROMIC 50v CITRIC 25^ HYDROCHLORIC 5w HYDROCHLORIC 351 "lactic-^ lactic a5;i nitric 55NITRIC 40-5, PHOSPHORIC 5s PHOSPHORIC $>% SULFURIC % SULFURIC 50;S TARTARIC ICtfr CP G-D P G CP-SS F t p-ss i p-ss 1P iG |P CP !? F P F-SS P G F-SS G G P-SS G P E P-SS G ? G E P E P E E F G F G P E P ill P G GG E FP P G P F-D P P-D F-D E2 E Gs E Ep G EF G FP P EP G P? P FE pP P EG E FP P ETX?J p Jli EE Gp GG FG EE E-*"i Hi GE EE GG qi C-D pF G 7 ill GG EE GG EE AIXALIES SODIUM HYDROXIDE 25p CALCIUM HYDROXIDE 1GG AIMONIUM HYDROXIDE lb\i SALTS p iE i3 1 P-SS G T? F E qi Hi V P-D -rp T? EE P E G GG E qi 2 T? AMMONIUM TARTRATE (sat.) T? E E Hi G G E POTASSIUM SULFATE (sat.) E 2 ET I? xj -*p Hi *-1 qi SODIUM SULFATE (sat.) E E E qi E p E q Zj AMMONIUM SULFATE ( sat.) l 0 E Zj qi XJ E qi EZj SODIUM CARBONATE (sat.) E |G Zj E T? --J 2 E -- Key H = Hot + 125 S'* C = Cold + 75 ?. E = Excellent, No Attack G = Good F = Fair, Usable Sonetines ? = Poor, Not Recommended S3 = Slight Swelling 7S3 Very Slight Swelling D = Discoicraoion Ko-j-4 GENERAL ATMOSPHERIC CONDITIONS E G G G VSD E E E E G G VSD F E G E G E G E E E --1 2i 2 E 3 TABLE I RESISTANCE TO ORGANIC CHEMICALS SAMPLE CONDITION AFTER 96 HOURS SAMPLE CONDITION AFTER TEST KETONES ACETONE METHYL ETHYL METHYL ISOBUTYL ALCOHOLS METHYL ETHYL ISOPROPYL GLYCOLS ETHYLENE PROPYLENE CHLORINATED HYDCBNS. CARBON TETRACHLORIDE TRICHLORETHYLENE ARO. HYDROCARBONS TOLUOL XYOL ALFH. HYDROCARBONS GASOLINE MINERAL SPIRITS STODDARD SOLVENT KEROSENE LUBRICATING OILS Key E = Excellent, No Attack G - Good F = Fair, Usable Sometimes P = Poor, Not Recommended SS = Slight Swelling 7SS=Very Slight Swelling COMPLETE FREQUENT COMPLETE VAPOR IMMERSION SPILLAGE IMMERSION EFFECT P-SS P-SS P-SS G F F PG PF PF PF PF FG PG PG FG EE EE EE EE P-SS P-SS P-SS P-VSS F-VSS E F V E G !G FG 1 1 1 FF GF EG EG GF EE EE E E F F E E G E E 0 CO <WM Kg 3K3 M 020 < G F F G G G E E E E F G E E G E 2 LO-J-3 II. B. 3. coned b. Where lines insulated with bituminous fill enter a manhole or building wall, an asbestos rope or Lead packing shall be applied between the pipes and the sleeves. c. Before installation, the outer surface of the galvanized steel jacket U be cleaned of all dirt, mud, oil, grease, and other foreign matter, and coated with two coats of the specified corrosion-resistant coating, appu. 1 by brush or spray. Coating shall be allowed to dry thoroughly before the jacket Is installed. 39-H-4 II. 3. Z. a. contd APPLICATION OF BIT1M1NOUS FILL INSULATION TO UNDERGROUND EXPANSION LOOPS *rG 39-H-2 3. Transition and Termination a. Where the bituminous insulation system emerges above the surface, a transition consisting of a 2C '-gage galvanized steel jacket shall be provided to the type of insulation specified for portion above surface . The junction of the bituminous fill insulation and the above-ground insulation shall be sealed with the sp^tcified weather-barrier coating. Installation shall be as shown in Figure 39-H-3. UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS II. SPECIFIC ATTON 40-J Cork-Filled Polyvinyl Acetate Ma9tie Scope This Specification dsecribes the essential requirements for the purchase and application of cork-filled polyvinyl acetate insulating mastic for use on equipment and piping normally operating at temperatures from 34 F up to and including l 80 F. A. MATERIAL l. Composition Material shall be composed of inert fillers, 5 K asbestos fibers having a maximum length of l/8 inch, 40 per cent by weight of cork granules, and a polyvinyl acetate binder of the copolymer type; Vimasco WC-l, Type C, or approved equal. 2. Properties Cork-filled polyvinyl acetate insulating mastic shall have the following properties Alkalinity............................................... . . pH shall be not less than 6.3 nor more than 7. 3. Combustibility................................... . . When tested in accordance with MIL-B-19564A, material shall be rated as s elf-extinguishing. Density ............................................... . . Shall be not less than 20.5 per cu ft, nor more than 23.5 lb per cu ft. Elasticity............................................... . . Dried sample 1 inch wide by 3 inches long by l/8 inch thick shall have mini* mums of 50% elongation and 20% recovery. Flexibility............................................... . . Dried sample l inch wide by 3 inches long by 1 /8 inch thick, at 68 F sample and ambient temperature, shall not crack when bent around a l/2-inch man drel, then returned, in 5 seconds. Hygroscopicity................................... . . When oven-dried to constant weight, then exposed to air at 70 F and L4% relative humidity for 14 days, shall gain not more than 10% of the original weight. Resistance to Chemicals . . . See Tables I and II. Shore Hardness (Burm A) . . . . Shall not exceed 65, Shrinkage............................................... . . Shall be not more than 45% from wet state to drv state. Specific Gravity................................... . . 0.725 to 0.864, wet state. Temperature Limits........................ . . Shall be suitable for use from 34 F to 130 F without mechanical, thermal or chemical failure. Tensile Strength................................... . . Shall be not less than 1000 psi. Thermal Shock................................... . . Shall not spall, chip, crack, or otherwise fail when heated to 130 F and then quenched with water. Total Solids ................................... . . Shall be not less than 5 5%. Weight per Gallon............................. . . 7.20 lb 40-J- l a. B. APPLICATION 1. Preparation of Surface The surface to be insukted shall be dry, and cleaned by thorough wire brushing to remove all ruat, grease paint, loose mill scale, or other foreign matter. Surface shall then be wiped down with a volatile solvent, such as coal tar naphtha, to remove any oil or grease remaining. 2. Priming a. Primer shall be Amercoat 86, Porter Paint Company No. 3078B Heavy Duty Chromate Prime r. or approved equal. b. All steel surfaces to be insulated shall be coated with the specified corrosion-inhibitive, moisture-resistant primer before insulation is applied. 3. Methods of Application Insulation may be applied in one coat by palming, troweling, or spraying. The following apparatus is required for application by spraying: a. Grayco Mogul Type Pump, 8 to 1 ratio, equipped with follow-plate and Evenflo regulators, or approved equal. b. 1-inch material hose; l/2-inch air hose. c. Grayco or approved equal mastic gun equipped with l/4-inch minimum tip. Spraying is recommended only for equipment or pipe not less than 24 inches in diameter. Required thickness of insulation shall be obtained by multiple passes. 4. Surface Temperature The temperature of the surface to be insulated shall not exceed 180 F. If insulation is to be applied to operating equipment or piping, application should be done, when possible, while equipment, or piping, or both, is shut down, or during the high-temperature portion of a cycle period. Insulation should never be aoplied to a surface at a temperature below the dew point, or when the surface temperature is expected to be below the dew point before the insulation is dried and cured. 5. Drying A minimum drying period of 24 hours shall be allowed for each l/S-inch thickness of insulation, and an addi tional 24-hour curing period before equipment, or piping, or both, is put in operation. 6. Thickness and Coverage a. Thickness of insulation shall be as specified in the Insulation Schedule. b. Coverage shall be as follows: l/8-inch thickness: 8-1/2 to 10 Gal per 100 sq ft. l/4-inch thickness: 17 to 20 gal per 100 sq ft. 40-J-2 II. B. Z. a. contd APPLICATION OF BiTlMINOUS FILL INSULATION TO UNDERGROUND EXPANSION LOOPS *iG 39- H - 2 3. Transition and Termination Where the bituminous insulation system emerges above the surface, a transition consisting of a 20 -gage galvanized steel jacket shall be provided to the type of insulation specified for portion above surface, The junction, of the bituminous fill insulation and the above-ground insulation shall be sealed with the spe cixied weather-barrier coating. Installation shall be as shown in Figure 39-K-3. - ri - v H. B . 3. contd / b. Where lines insulated with bituminous fill enter a manhole or building wall, an asbestos rope or lead pack ing shall be applied between the pipes and the sleeves. c. Before installation, the outer surface of the galvanized steel jacket shall be cleaned of all dirt, mud, oil, grease, and other foreign matter, and coated with two coats of the specified corrosion-resistant coating, applied by brush or spray. Coating shall be allowed to dry thoroughly before the jacket is installed. UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS II. SPECIFICATION 39-H Underground Bituminous Fill s-po Thi^ Specification describes the purchase and application of a bituminous insulation for use on underground piping normallyoperating at temperatures from 220 F up to and including 520 F. A. MATERIAL 1. Composition Material shall be composed of granulated bitumen, or volcanic rock mixed with a bitumen, which when applied as loose fill and with heat applied within the pipe, produces a waterproof Thermal Insulation. 2. Properties Bituminous fill insulation shall have the following properties. Capillarity......................................... Water resistant. Composition................................... Pure bitumen, bitumen with volcanic rock, or approved equal. Density ....................................25 to 41 lb per cu ft. Specific Heat................................... 300 F: 500 F: 0.52 Btu per lb 0.61 Btu per lb Resistance to Acids Not affected by most common acids. Resistance to Caustics Not affected by most common caustics. Temperature Limits .... 220 F to 520 F Thermal Conductivity . . . Shall not exceed the following value at the given mean temperature: Mean Temp, Conductivity *F 3tu/hr/sq it 300 0.54 Make ......................................... .American Gilsonite Company Gilsuiate, Miracle Adhesive Insulfil, or ap proved equal. Grade ......................................... As required by temperatures. 3. Accessory Materials a. Corrosion-Resistant Coating (For ambient temperatures from 40 F to 120 F) - Roskote 612XM or approved equal. b. Cor rosion-Re si stant Coating (For ambient temperatures below 40 F) - Roskote olZXP or approved equal. c. Weather-Barrier Coating (Color as specified) - Vimasco '.VC-1, Pittsburgh-Coming Pittcote 500 C, or ap proved equal. B. APPLICATION 1 . Piping a. Unless otherwise specified, insulation thickness shall be not less than that shown in Figure 59-H-1 . Where the piping passes under areas supporting heavy IoaQs, thickness ot insulation on top side o: pipe shall be increased 3 inches. ) t j t j i 3-H- l II. B. 1. contd s APPLICATION OF BITUMINOUS FILL INSULATION TO UNOERGRQUNO PIPING PIG 5S-h-i b. The trench sha.ll be dewatered, and shall be kept free from water, until the installation is completed and the insulating material has cured. c. Process lines shall be supported, welded and tested, and loose paint, dirt, rust, scale, wax, and other extraneous materials removed before the insulating material is applied. d. The bituminous insulation fill shall be poured into the trench and then, tamped around the lines with one 10-inch stroke of an 8-inch by 8-inch by l/4-inch steel plate per 8-inch by 3-inch area. The fill shall then be covered with the bags in which the insulation was shipped. e. Ins ulating mate rial shall be kept free of soil orother foreign matter before and during the pouring procedure. f. Where the width of the trench is greater than required, a leapfrog form shall be used for the side walls. The insulation material shall be applied and sides backfilled before forms are moved to the next position. g. The curing of the bituminous insulation shall be not less tnan the time and temperature soecified bv the manufacture r for the material supplied. h. Trench shall be backfilled only after curing is completed, unless the installation is being made in dry soil. i. A minimum of 11 Inches of backfill shall be placed over the top of the bituminous insulation, as shown in Figure 39-H-l . Expansion Looos The insulation material shall be applied to expansion loops as shown in Figure * S-H - H. B. 3. coned d. The asphalt shall be poured into the joint, at a temperature between 400 F and 450 F, in the fol lowing stages: 1. Fill to top of insulation and let cool for one hour. 2. Fill to within l/2" of the top and let cool for one hour. 3. Fill until asphalt is level with top of metal jacket. ** Conduit Terminals a. When the insulation conduit terminates at a building, manhole, or pit, it shall extend through the con crete to the inner face. A weather seal shall be applied between the conduit and the concrete. b. A water seal shall be applied to the conduit end, and the remainder of the line insulated as specified in the Insulation Line and Equipment List. 5. Backfill a. Boulders and concrete debris shall not be used as a portion of the backfilling materials. b. The soil shall be carefully deposited in uniform layers not over 6 inches thick, carefully and solidly tamped so as not to injure or disturb the conduit. c. Backfilling shall be done on both sides of the conduit simultaneously. -rl - 5 UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS II. SPECIFICATION 37-H Insulated Conduit Scope This Spe< `"ication describes ihe essential insulation requirements for the installation of insulated conduit used on underground systems normally operating at temperatures up to and including 750 F. A. MATERIAL 1. Composition a. The insulated conduit is an insulated prefabricated pipe system, encased in a corrosion protected metal jacket. b. Insulation material for use in conduit wiLl be specified in Insulation Line and Equipment List. 2. Accessory Materials a. Insulated Conduit-Ric-wil Hel-cor, Durant Pre-Sealed, Kaiser Ebko, or approved equal. b. The insulated conduit piping system shall be purchased as a package unit, in accordance with the piping drawings and piping specifications, with all necessary accessories and installation instructions furnished by the conduit manufacturer. S. APPLICATION \. Trench Preparation a. Lines shall be installed in accordance with piping drawings. b. The bottom of the trench shall be made smooth and uniform before the installation of conduit. 2. Process Pipe a. After process Line has been welded and tested, insulation shall be applied to uninsulated joints. b. All loose paint, dirt, grease, rust, scale, wax, and other extraneous materials shall be removed from the exposed ends of the pipe before the conduit connections are made. c. Insulation of the type specified for conduit shall be applied to the area of the pipe left bare for field welding, and joints and cracks filled with insulating cement. 3. Field Connections (1) Field Welded Conduit Connections (Fig. 37-H-l) a. An asbestos felt jacket shall be applied over the insulation and secured with wire. b. The cylindrical conduit closure supplied by the manufacturer shall be installed at the joint, and the circumferential and longitudinal jc.nts welded. c. The system shall be required to withstard air test at 15 psig without leaks. d. The welds shall be smoothed and cleaned, and an industrial tape applied around each circumfer ential weld. Entire connection shall then be wrapped continuously with tape. '1. 3 . 3 . c ontd -- neto Af>ueo insulation PREFABRICATED INSULATED PIPE CONDUIT TYPICAL WELDED FIELD CONNECTION flG 37-H-l f 2) Mechanical Conduit Connections (Fig. 37-H-2) a. Entire area of exposed insulation shall be thoroughly covered with PVA mastic and glass fabric. b. The outer metal jacket, furnished by manufacturer, shall be installed over-lapDing the conduit jacket at both ends, and sealed with insulating cement before securing with stainless steel insula tion strap. c. A 2-inch bv 3-inch pour hole shall be cut in the top center of the connection jacket if the oipe is level. The pour hole shall be located at the highest point. -asphalt POu* -OLE / -P'tLO APPLifO INSULATION ,-- METlc CONOuiT / __ t____________________ _ ! I | PVA MASTIC ANO "* V- T*---g Glass 7A8*iC wctal ,,acer 5ECjE3 pf C* *TL STAP ----------------- - r g<_0 P0u*0 aG^-alt------ PREFABRICATED INSULATED PIPE CONDUIT TYPICAL MECHANICAL FIELD CONNECTION *': j' h-2 U. B. 2. contd f. Weather-Barrier (1) Weather-barrier coating shall be applied in accordance with the GENERAL SPECIFICATIONS, Part I. B. 17. (2) Weather-barrier consisting of stainless steel jacketing, if required, shall be applied in accordance with the GENERAL SPECIFIr VTIONS, Part I. B. 18. This requirement is indicated by the addition of the letter M to the specific-..on designations, thus: 32-LM, 32-LSSM. g. Traced Installations Traced lines, where specified, shall be installed and insulated in accordance with the GENERAL SPECIFI CATIONS, Parti. B. 16. 32-L-17 d. General (1) Care shall be taken in the application to prevent crushing or other abuse of the insulation, and to preserve the factory finish of the outer shell. (2) Where any field cutting or fitting around supports or nozzles is required, care shall be exercised : insure good workmanship, and to seal the individual air chambers in the insulation. (3) Where equipment or piping is located outd^ s, or where otherwise required, joints or openings in outer shell of the insulation shall be caulked or flashed to form a watershed. Where caulking mastic is impractical to use for sealing joints or openings, as in the case of removable units, aluminum tape as specified, shall be used. (4) Provision shall be made in the assembly of the insulation units to allow for expansion and contrac tion of the surfaces insulated, without damage to the insulation. (5) Traced lines, where specified, shall be installed and insulated in accordance with the GENERA SPECIFICATIONS, Parti. B. 16. il-H-5 UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS II. SPECIFICATION 32-H Hydrous Calcium Silicate Scope This Specification describes the essential requirements for the purchase and application of preformed hydrous cal cium silicate insulation for use on equipment and piping, operating above 70 F, specified to be protected from fire exposure. Procedures outlined in the GENERAL SPECIFICATIONS are applicable to and constitute an integral part of this Speci fication, with exceptions as noted herein. A. MATERIAL 1. Composition Material shall be composed of hydrous calcium silicate blended with asbestos fibers in suitable proportion with or without inorganic filler added. 2. Prope rties Hydrous calcium silicate insulation shall have the following properties: Alkalinity......................................... Coefficient of Expansion . pH shall be not below 10 and not above 13. 3 x 10-6 on reheat to 1200 F. Combustibility............................. Shall be incombustible. Compressive Strength . . When tested in accordance with ASTM C 165, latest revision, the percentage of deformation produced by loading shall not exceed the following: Deformation, % Load, psi Z 50 5 130 Density ............................................. Shall be not less than 1 l. 5 lb per cu ft, or more than 13.5 lb per cu ft, when tested in accordance with .ASTM C 303, latest revision. Flexural Strength .... Shall be not less than 55 psi when tested in accordance with ASTM C 203, latest revision. Hardness............................................. A l/8-inch ball point under a 1-kg load shall produce a maximum penetration of 0.35 mm. Hvgroscopicity................................ When oven-dried to constant weight, then exoosed to air at 70 F and Q0'r9 rela tive humidity for 14 days, shall gain a maximum of 10^ of the original weight. Resistance to Abrasion . When subjected to the Navy Tumbling Tost, shall lose not more tnir. T7* of original weight after first 10-minute run. and not more than 1 oTo after second 10-minute run. ?*esistance to Acids and Caustics.......................... Shall be resistant to most common caustics (not considere i an acid-resisting material). Shrinkage When tested m accordance with ASTM C 356 tne given temperatures shall not exceed the T emp. F Shrinkage 1 200 0.4 1300 1 . -1 1 dOO 1.9 latest revision, the allowing percentage hrinkage at Spe cit :c He at................................ 0. 20 to 0. 26 Btu per lb per degree F at 400 F. Temperature Limit- Maximum temperature without mechanical, thermal, or c.V-mjca 1 failure sn.ill be not less tnar. IdOO F. 1 H. A. 2. contd Thermal Conductivity . . . When tested in accordance with ASTM C 177, latest revision, or ASTM C 3 35, latest revision, the thermal conductivity at the given mean temperatures shall not exceed the following values: Mean Temp Btu/inch, hr, T aq ft, *F 100 200 300 400 600 800 0.41 0.45 0.49 0.53 0.63 0.73 Thermal Diffusivity . . . Shall average 0. 25 to 0.28 sq ft per day. Thermal Shook Resistance. Shall not spall, chip, crack, or otherwise fail when heated to 1300 F and then quenched with water. Water Absorption .... After 24-hour submersion, shall gain not more than 450% of the original weight. Make . ................................................Kaylo No. 20 or approved equal. 3. Accessory Materials a. Stainless Steel Wire - 0.0475-inch diameter, Type 304, cold drawn, bright annealed, 18 gage. b. Insulation Strap - Stainless steel, l/2-inch by 0.020-inch, Type 304, or approved equal. c. Clips - Stainless steel, l/2-inch double-pronged, Type 304, A. J. Gerrard or approved equal. d. Weather-Barrier Coating (Color as specified)- PVA-Vimasco No. WC-1, Pittsburgh-Coming Pittcote 500 C, or approved equal. e. Reinforcing Cloth - Glass fabric, 10 by 10 thread count, Perma Glas Mesh, Glasfab, Benjamin Foster Open Weave No. 10, or approved equal. f. Fabricating Cement - Philip Carey Careytemp, Refractory and Insulation Block Stick, or approved equal. g. Wire Netting - One-inch hexagonal mesh, 20-gage, stainless steel or monel. h. Insulating Cement - Hydraulic setting, Baldwin-Ehret-Hill Powerhouse, Eagle Picher One Coat, or ap proved equal. i. Mineral Wool Blanket - Black, spun rock wool, hexagonal netting on one side, expnaded metal lath on the othe r side. 3. APPLICATION l. Equipment a. Equipment shall be provided with insulation supports as called for in the GENERAL SPECIFICATIONS, Part I. B. 5. b. Thickness Schedule Unless other-wise specified, insulation in excess of l-l/2-inch total thickness snail be aopiied in two la' ers In accordance with thickness schedule shown in Part II. 3. 2. a. (1) of this Specification, nxcept that outer layer shall be calcium silicate insulation per Specification 20-H. c. Curved Surfaces On all equipment, insulation block snail be cut into curved segments to fit vessel surrace, .i r. d applied to vessel sides and heads in staggered position with all joints tightly butted. Block shall be lopiied to vessel sices with linear dimension parallel to axis of vessel. Tvpical installation is shown in Ficure 5 2 - H - 1 . 3 2-H - II. B. 1. c. contd INSULATION SLOCK HTTC0 TO HtAO application of hydrous calcium silicate insulation to vessel ri6. 32-H-I d. Flat Surfaces Block insulation shall be applied to flat surfaces in staggered position with all joints tightly bitted. It shall be secured with wire attached to blank nuts, or other approved securement. On rectangular equip ment, the blank nuts or other approved securements shall be placed on 12-inch centers, staggered, for bottom surfaces and on 24-inch centers, staggered, for side and top surfaces. Typical installation is shown in Figure 32-H-2. -- vZ'Blan* NuT$ 39 O'HfS SiCjKf MC*TS :;ii>D os .2' cjn r5 *s A*. 3 2* CCNTCKS S'AOwtKCO r-/N 5.JC isO SuN^ACES . j APPLICATION OF HYDROUS CALCIUM SILICATE 'NSULATlQN TQ FLAT SURFACE r JZ - * z (1) All lavers of insulation shall be secured with insulation strap where contour of vessel permits firm and effective attachment. Insulation applied to irregular surfaces, where strap is imprac ticable, shall be secured with wire, drawn taut, ends twisted and embedded in insulation. (2) All layers of insulation on bottom heads oi vertical equipment 12 ft and less in diameter, and heads of horizontal equipment shall be secured in place with insulation strap attached to insulation support as specified in UCCC Standard IS-31 and Figure 32-H-3. Expansion Joints xpansion joints in flat surfaces or cvlindrical vessels shall be insulated with flexible blanket insulation, vpical installation is shown in Figure 32-H-4. H t'l X B 1. f. contd mineral wooi siANxcr or srccfnco THtCKNCSS paced outsioe with eapanoeo METAL k*TH ANO ON THE INSiOC WITH APPLICATION OF BLANKET INSULATION TO EXPANSION JOINTS ON FLAT SURFACE Pi$ 52-H-4 g. Mechanical. Expansion Joints Corrugated mechanical expansion joints in piping (usually listed as equipment items) shall be insulated as shown in Figure 32-H-5. '.There movement is likely to occur in the insulation, non-setting sealer shall be applied to surfaces ot insulation to provide proper slip joint. APPLICATION Of HYDROUS CALCIUM SILICATE INSULAmQN TO EXPANSION JOINTS ' 6 n- I. 3. I. coned h. Insulated Vessel Flanges Vessel flanges shall be insulated with block in the same manner as specified for body of vessel. An insulation support shall be provided immediately above vessel flange. The top of projecting flange in sulation shall be sloped to shed water. Typical installation is shown in Figure 32-H-6. V* 5 seL Nozzles Vessel nozzles shall be insulated as shown in Figure 32-H-7. iNSUU*riQH MITC* CUT AMO FITTCO. 0(WCHSK)*S SHAVV. SC IN ACC3DANCC WITH FABRICATION OATA FOR FITTING-. COVtRS--v v \ tits NOZfl,S euwo nozzle APPLICATION OF HYDROUS calcium SILICATE to vessel nozzles `m: 32 - Ii-6 n. B. 1. contd j. Vessel Legs (1) Vessel legs shall be insulated with block which shall extend over channel flanges and down legs to the standard fireproofing on legs. Insulation thickness on legs shall be equal to that of vessel. (2) Vessel Insulation shall be h "`ted firmly against tank leg flange. Re-entrant space between channel flanges and over channel between 1 dy insulation shall be filled with block. Installation 9hall be as shown in Figure 32-H-8. 1/2' STRAP ANCHOR FOR 5ECUREMCNT OR LEO INSULATION. STRAP LACCO VERTICALLY UNDER CIRCUMFERENTIAL STRAPS ANO U* APPLICATION OF HYDROUS CALCIUM SILICATE INSULATION TO VESSEL LEGS f. 6 S2-M-R k. Vessel Skirts Skirts supporting vertical equipment shall have their outer surfaces insulated. Unless otherwise speci fied. insulation shall extend from junction of skirt with bottom head to standard fireproofing or to foun dation as shown in Figure 32-H-9. Thickness shall be as specified tor body of vessel. II. B. I. contd 90TT0M MC*0 INSULATION SECuREO with ri wi*cs ATT*CMCO TO SPLIT RING SUPPORT AS PER UCCC STD. IS -42 APPLICATION OF HYDROUS CALCIUM SILICATE INSULATION TO VESSEL SKIRT FIG 32 - H - 9 I. Surface Finish When specified thickness of Insulation has been applied, any small cracks or depressions shall be pointed up with insulation cement troweled flush with surface of Insulation. m. Weather-Barrier (1) Weather-barrier coating shall be applied in accordance with the GENERAL SPECIFICATIONS, Parts I. B. 9 and 17. (2) Weather-barrte r consisting of stainless steel jacketing, if required, shall be applied in accordance with the GENERAL SPECIFICATIONS, Part I. B. 13, This requirement is indicated by the addition of Che letter M to the specification designation, thus: 32-HM. 2. Piping a. Pipe Insulation (1) Thickness Schedule Unless otherwise specified, pip* insulation in excess of l-l/2-inch total thickness shall be applied in accordance with the following table: Total Scheduled Inner Outer Thickness, Inches 2 2-1/2 3 3-1/2 4 Layer, Inches 1 1 1-1/2 1-1/2 2 Laver, inches 1 1-1/2 1-1/2 2 2 32-H-a II. B. 2. a. contd (2) Securement All layers of insulation shall be secured with stainless steel insulation strap spaced in accordanc with the GENERAL SPECIFICATIONS, Parts T. B. 5. c. and d. b. Fittings, Flanges, and Valves (1) All sizes of fittings, flanges, and valves shall be Insulated with prefabricated fitting covers in ac cordance with the Dimensional Standard Fabrication Data. Where impractical to shop fabricate, an with the approval of the representative of the Department of Design and Construction, fitting cover may be field fabricated provided work, is in accordance with the Dimensional Standard Fabricatior Data. Segments shall be carefully fitted to insure tight joints. (2) Cement of shop fabricated assemblies shall be done with specified fabricating cement. In all case the joints shall be as thin as possible, with just sufficient cement to obtain good adhesion and complex closure. In no case will wide cement joints, or voids and holes filled with fabrication cement, bpe rmitted. Typical installations are shown in Figure 32-H -10, 3 2-H-11, 32-H -1 2 and 32-H-1 3. EL'. CCVCRS Shall BE cl 8RlCAT0 IN ACCORDANCE *TH O'VIENSlONAL ST A HOARD FABRICATION DATA - NO. 2t CA 5HCCT METAL HOT* SL1* JOINT SMALL Bt PROVIDED S NClE '.AVER APPLICATIONS CC SE EXCEEDS 30 -0* IN anO TO* mulTiPLE Lire* APPLICATIONS WHERE *l$E* CICEEOS IS -0* APPLICATION OF HYDROUS CALCIUM SILICATE INSULATION TO WELDING ELL EiG-32 -h. .0 Q LL B. Z. b. contd note: fiance cover fabricated IN ACCORDANCE *ITH OlWCNSIONAL STANDARD FABRICATION OATA -THICKNESS T, AS SPECIFIED APPLICATION OF HYDROUS CALCIUM SILICATE INSULATION TO LINE FLANGE no si-h-m thickness t A$ SPtC.FlfO *i BLOCKS TO O PE TO SUPPORT C. t 510E CCvE FINISH AS SPECIFIED NOTE- FlANGEO ELL COvER FALCATED IN ACCOCANCC iTh OiMENStONAL STANOARO FABRICATION OAT* APPLICATION Of HYDROUS CALCIUM SILICATE INSULATION TO FLANGEO ELL FIG S2-M-I2 32-H-10 II. B. 2. b. contd APPLICATION OF HYDROUS CALCIUM SILICATE INSULATION TO FLANGED VALVE FIG 52-H-tJ (3) Surface Finish (a) Small cracks and depressions, where present, shall be filled and smoothed with insulating cement. (b) Where specifically noted, fittings, flanges and valves shall be given a skin coat only of specified hard surface finishing cement before application of coating. c. Polyethylene Conduit, Junction Boxes and Copper Tubing (1) Where specified on Insulation Design Schedule and/or Line List, polyethylene tubing (placed in metal conduit) and copper tubing (for a minimum distance of b'-Q") from the junction boxes shall be insulated for fire protection. (2) Unless otherwise specified, insulation shall be a minimum of one inch thickness. (3) Insulation shall be applied to conduit and junction boxes in staggered position, where possible, and with all joints tightly butted. (4) Insulation on conduit and copper tubing shall be secured with stainless steel insulation strap. (5) Insulation on junction boxes shall be secured with stainless steel wire and blank nuts. If welding on junction boxes and covers is prohibited, stick clip fasteners shall be used. (6) The bodv of the junction boxes shall be insulated separately from the removable covers. Tvpical in stallation is shown in Figure 32-H-14. -H- 1 1 H. B. 2. c. contd INSULATEO JUNCTION BOX ^00e 32 **' d. Weather-Barrier (1) Weather-barrier coating shall be applied in accordance with the GENERAL. SPECIFICATIONS, Part r. b. 17. (2) Weather-barrier consisting of stainless steel jacketing, if required, shall be applied in accordance with the GENERAL- SPECIFICATIONS, Part l. 3. 18. This requirement is indicated bv the addition of the letter M to the specification designation, thus: 32-HM. 32-K-l 2 UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS II. SPECIFICATION 32-L 32-LSS (For Stainless Steel) Hydrous Calcium Silicate and Cellular Glass Scope This Specification describes the essential requirements for the purchase and application of hydrous calcium silicate and cellular glass insulation to low temperature equipment and piping, normally operating below 70 F, to be protected from fire exposure. The second designation, 32-LSS, indicates that this Specification shall be used for stainless steel equipment and piping. However, this Specification shall be subject to the use of accessory materials specified for stainless steel. Procedures outlined in the GENERAL SPECIFICATIONS are applicable to and constitute an integral part of this Specifi cation. A. MATERIAL l. Hydrous Calcium Silicate a. Composition Material shall be composed of hydrous calcium silicate blended with asbestos fibers in suitable propor tion, with or without inorganic filler added. b. Properties Hydrous calcium silicate insulation shall have the following properties: Alkalinity............................. pH shall be not more than 10.0. Capillarity*....................... When placed on wet surface, absorption after l/2 hour shall be less than 100%, and after 7 days less than 300% of Its original weight. Coefficient of Expansion After being heated to 1800 F, then cooled, expansion upon reheating shall not exceed 4 x 10" per degree F. Coefficient of Shrinkage * When heated from 70 F to 1300 F (not reheated), linear shrinkage shall be less than 2%. Combustibility....................... Shall be incombustible. Compressive Strength The percentage of deformation produced by loading shall be less than the follow ing: Deformation, % Load, psi 2 20 6 60 10 100 Density ...................................10 to 14 lb per cu ft. Flexural Strength Shall be not less than 40 psi. Hygroscooicity....................... When oven-dried at 200 F to 230 F, then exposed to air at 70 F and < 0% rela tive humidity for 14 days, shall gain a maximum of 10% of the original weight. Modulus of Elasticity Shall be not less than 35,000 psi. Modulus of Rupture- Shall be above 50 psi. Resistanceto Abrasion 'When placed in Rotap on 20-mesh, a 3-inch bv j-ir.cn bv l-l/2-ir.ch samole shall lose not more than 25% of original weight after 10-mmute run. r.or more than 40% after 20-minute run. Resistance to Acids or Cau stic s................................ Shall be resistant to most common caus Cs {not considered an acid-resisting material). Specific Gravitv 0.15 to 0. 23 Specific Heat- 0.20 to 0.30 Btu per lb per degree F. 32-L-l A. 1. contd Temperature Limits . . Shall be suitable for use at temperatures from 0 F to 1800 F without mechani cal, thermal, or chemical failure. Thermal Conductivity .. Shall not exceed the {allowing values at the given mean temperatures: Mean Temp, Btu/lnoh, hr, *F sqft, *F 100 0.43 400 0.58 800 0.78 1200 1.09 Thermal DUfusivity . ,t Shall not exceed 0. 325 sq ft per day. Thermal Shock Resistance ... . Shall not spall, chip, crack, or otherwise fail when, heated to 1800 F and then quenched with water. Water Absorption * After 24-hour submersion, shall gain not more than 93% of volume. Make....................................... Kaylo No. 20 or approved equal. 2. Cellular glass insulation shall have the following properties: Alkalinity.......................................... pH shall be 7.5. Capillarity.............................. Coefficient of Expansion After 7 days on wet surface, gain in weight shall be 0%. 4 x 10 ^ per degree F. Combustibility........................ Shall be incombustible. Composition........................ A true glass; completely inorganic. Compressive Strength* 100 psi Density ....... 9 lb per cu ft. Flexural Strength* 100 psi Hygro 3Copicity........................ Modulus of Elasticity* * No increase in weight in 246 days in air at 90% relative humidity. 200,000 psi Resistance to Acids Shall be impervious to common acids and fumes except hydrofluoric and hot phosphoric. Shear Strength........................ 64 psi Specific Gravity .... 0. 16 Specific Heat........................ 0. 20 Btu per lb. Temperature Limits Shall be suitable for use at temperatures from minus 350 F to dIus oOO F with out mechanical, thermal, or chemical failure. Tensile Strength* * 34 psi Thermal Conductivity* Shall not exceed the following values at the given mean temperatures: Mean Temp, Btu/inch, hr, *F sqft, 'F 50 0.40 3Q0 0.55 Thermal Diffusivity 0.40 sq ft per day Water Absorption . . . Make .................................. 0. 2Ta by volume on a 2-inch by l 2-inch by i 3-inch bloc k (all on surface only). Foarr.glas or approved equal. J2-L-2 II, A. contd 3. Accessory Materials - Specification 32-L a. Stainless Steel Insulation Strap - l/2-inch by 0.020-inch, Type 304, or approved equal. b. Stainless Steel Wire - 0.0475-inch diameter. Type 304, cold drawn, bright annealed, 18 gage, or approved equal. c. Stainless Steel Clips - Double-pronged, Type 304, A. J. Gerrard, Techalloy double-pronged seal, or ap proved equal d. Strapping Tape - Glass filament, vinyl-backed, Dutch Brand No. 400 or approved equal. e. Fabricating Cement {for use with calcium silicate) - Philip Carey Careytemp, Refractory and Insulation Block Stick, or approved equal. f. Fabricating Cement (for use with cellular glass) - Miracle RT-1000. or approved equal. g. Cushioning Blanket - 3-lb density, l/2-inch thick glass fiber insulation, or approved equal. h. Weather-Barrier Coating (Color as specified) - PVA-Vimasco No. WC-1, Pittsburgh-Corning Pittcote 500C, or approved equal. i. Reinforcing cloth - Glass fabric, 10 by 10 thread count, with starch binder. Glass Mesh, Inc, Benjamin Foster Open Weave No. 10, or approved equal. j. Anti-Abrasion Coating - Dampney No. 70 Black. k. Vinyl Asphalt Joint Sealer - Vimasco 49, or approved equal. l. Non-setting Sealer - Benjamin Foster 30-73, or approved equal. m. Adhesive Cement - Miracle Adhesive Type H or approved equal. 4. Accessory Materials - Specification 32-LSS* 1 Accessory materials for Specification 32-LSS shall be the same as those listed in Part II. A. 3, with the follow ing exceptions: Cushioning Blanket - 2-l/2 lb per cu ft density TWL Fiberglas or approved equal white glass wool blanket 1 inch thick. Joint Sealer - Dampney No. 70 Black. B. APPLICATION - SPECIFICATIONS 32-L and 32-LSS l. Equipment a. Equipment shall be provided with insulation supports as called for in the GENERAL SPECIFICATIONS, Part I. B.' 5. b. Thickness Schedule Second layer, or inner Layers, as specified in the GENERAL SPECIFICATIONS, Part I. B. 2, shall be re quired thickness of cellular glass, but not less than l-l/2inch thick. Outer Laver shall be l - l/ 2 -inch thick hydrous calcium silicate insulation. c. Cushioning Blanket (1) On all equipment except stainless steel, a l/2-inch thick cushioning blanket snail be applied over the entire surface before the application of the cellular glass insulation. 31anket shall be held in place with a minimum amount of stainless steel wire. Cellular glass insulation snail then be aoolied over the blanket in the following manner. Cushioning blanket snail not be considered as part of the soecified insulation thickness. (2) On all stainless steel equipment, a l-inch thick white glass wool cushioning blanket, as specified for 3tainles3 steel, shall be applied ove r the enu re surface , compre s sed to l/2-:ncn ::u ckne s s , and s ecu red in the ame manner as tnat specified in part II. 3. 1. c. (i). d. Curved Surfaces (1) Cellular glass block insulation shall be shop fabricated and fitted to allo w a l /2-inch space for cushion ing blanket between oloc* ana vessel. 31ock insulation shall be applied over cusnionmg material on ail ecuioment, with ail loints tightly butted. Multiple layers of insulation snail be applied so that the but t joints of one layer uo not coincide with those of any other Laver. (2) ,U1 butt edges and ends of insulation fabricated for inner laver, or lavers, -shall be given j, smooth brusn or soray coat of the soecified anti-aorasion coating and alLowed to urv :ora minimum ui *t hours before application of insulation to equipment. 32-L-3 II. A. 1. d. contd (3) All butt edges and ends of outermost layer (or single layer) of cellular glass formed insulation shall be sealed with a buttered coat of the specified joint sealer. This coating shall be only of sufficient thick ness to provide proper adhesion, seal, and cushion between the individual pieces of insulation. Typical installation is shown in Figure 32-L-l. (4) Calcium silicate block shall be properly cut into curved segments to fit the outside surface of the cellu lar glass insulation, and applied to insulated sides and heads of vessel in staggered position, with all joints tightly butted. Block shall be applied to vessel sides with linear dimension oaralleling axis of vessel. e. Securement (1) All layers of cellular glass and calcium silicate insulation shall be secured in place with stainless steel insulation strap where contour of vessel permits firm and effective attachment. Insulation shall be se cured to irregular surfaces with stainless steel wire. (2) Inner layer or layers of cellular glass insulation on bottom heads of vertical equipment, or heads of horizontal equipment, snail be held m place with specified stainless steel insulation strap secured to insulation supports as shown in UCCC Standards 15-31, 15-36, and IS-42. Outer layer of cellular glass insulation on bottom heaas of vertical equipment, or heads of horizontal eouiomcnt, snail be secured with insulation strap, as shown in Figure 32-L-2. J2-L-4 U. A. 1. e. contd f. Expansion Joints (l) Cellular glass-calcium silicate applications shall be provided with expansion-contraction joints at vessel flanges, constructed as shown, in Figure 32-L-3. Where movement is likely to occur, the speci fied non-setting sealer shall be applied to surfaces of insulation, as shown, to provide proper slip joint. MVDPOUS CALCIUM SILICATE-CELLULAR GLASS IMSULAT'CN ON LOW TEMPERATURE VESSEL FLANGE ______________________________________________* ^ ? 2 L S_____________________________________________ 2-L-5 II. B. I i. contd (2) Longitudinal contraction of vessels shall be provided for by installing expansion-contraction joints at the insulation supports, as shown in Figure 32-L-4. Where more than one total thickness is specified for a vessel, an insulation support shall be provided at the junction of two different thick nesses. and insulated in a manner similar to that shown in Figure 32-L.-4. Where movement is likely to occur, non-setting sealer shall be applied to c jrfacca of insulation to provide proper slip Joint. (3) A l-inch space shall be left around nozzles and projections where they extend tnrougn the insulation, as shown in Figure 32-L-5. Where movement is likely to occur, non-setting sealer shall be applied to surfaces of insulation to provide proper slip joint. 32-L-o n. b 1. f. COntd Cushioning giankct HYDROUS CALCIUM SILICATE - CELLULAR GLASS INSULATION OF NOZZLE ON LOW TEMPERATURE VESSEL r. 12.1-S g. Mechanical Expansion Joints Corrugated mechanical expansion joints in piping (usually listed as equipment items) shall be insulated as shown in Figure 32-L-6. Where movement is likely to occur, non-setting sealer shall be applied to surfaces of insulation to provide proper slip joint. <*etal -acct sic REO at center Es'End Fitting rmi NiN & OVER OiO IIN SUL A TlON FINISH CUTER LAYER euTT .'O'NTS \ Of CELLULAR GLASS COATED WITH jO*NT SEALER--------------- -c* kAflQN--------- , Y////////M///////A, \Vs. 'Cs.S.V.vvV >VVX>\\ ,nnER layer Butt ----. 0 NTS COAYEO WITH AN',l. ABRASION CCAT1NC and 4LL0t0 *C CRY 9EFORE jSTALLAriON ` nnep eoRE df wOinr I ::^R TO 8E COATED I W,T h ANTI- ABRASION I C CAT NG A NO AllC-EO i 'I CRT BEFORE ; installation / `// /// y /, >/__/____/_y___ y /y . 1/1 '/>'/ / y / //y y // / /-s* s;rt 1 ^'PE .NS'.LAT-CN is vk cAT^er.barrier AS SREC FiCO , NO -.SUL A TlON RE t n C E N \ S-.FFT *AE*AL ANO E-iRANSON \ ^'r `r- ;N'V, /.orMrK .V X rif ^ - T *'i L ClE-R 'l AN,tS INSTALL ' , N r Ml Apt A____n- LA'iS'Oi^.ARSA N'NiNltN '* R '' AND . S'jM-l'fST T * ' Nfc SS HiCK COATr OoFf NON-SCETT NGO SEAlEER--- - '0 -OvOE NFCESNAWY llE ..nance 1HYP~ R~O0US CcaAlLcCilUuImn Osi^li^c^aIUte-^-Lc.eUlLl.u^Ll.a^r' glass .I.NwSwULATION ON. I L. OW rTnEM.nPEiTRiAiTriUinREr rE- XPnA* NSION Ji/ONI/N< TT _ II. B. 1. contd K. Flat Heads (l) Insulation on top of flat heads of vertical equipment shall be applied in the same manner as previously described in this Specification. Water pockets shall be eliminated and proper drainage provided as shown in Figure 32-L-7. (2) .\11 top nozzles on insulated equipment shall be provided with flashing as shown in Figure GA-3 of the GENERAL SPECIFICATIONS. i. V e ssei Leg s (1} Vessel legs shall be insulated with block which shall extend over channel flanges and down channel Legs to junction with fire-resistant material. Thickness shall be as specified for body of vessel. Body insulation shall be brought up to and butted firmly against tank leg flange. (1) Re-entrant space between channel flanges shall be filled with block cemented In place with tne speci fied adhesive cement. Surface of fire-resistant material abutting tank leg insulation shall be coated with weather-barrier coating. Installation shall be as shown in Figure 32-L-d. 32-L-3 II. 3. I. d. contd e. Securement (1) All layers of insulation shall be secured with insulation strap where contour of vessel permits firm and effective attachment. Insulation applied to irregular surfaces, where strap is imprac ticable, shall be secured with wire, drawn taut, ends twisted and embedded in insulation. (Z) All layers of insulation on bottom heads of vertical equipment and heads of horizontal equipment shall be secured in place with wire attached to blank nuts, or with insulation strap attached to in sulation support, as specified in UCCC Standard IS-- 31 and Figure 2Q-H-3. MOrC A FLOATING AtNG SHALL SC ("STALLCO ANOu*0 BOTTOM NOZZlC TO PftOviOC ANCnO* FO* STAAP SECUREMENT OF CALCIUM SILICATE INSULATION ON VESSEL HEAD 20-H-4 II. B. 1. c. contd APPLICATION OF CALCIUM SILICATE INSULATION TO VESSEL n**c to-M-1 d. Flat Surfaces (1) Block insulation shall be applied to flat surfaces in staggered position with all joints tightly- butted. It shall be secured with wire attached to blank nuts or other approved securement. On rectangular equipment, the blank nuts, or other approved securements, shall be placed on 12-inch centers, staggered, for bottom surfaces, and on 24-inch centers, staggered, for side and top surfaces. Where specified in the Insulation Design Schedule, block may be applied to flat surfaces with an approved adhesive. (2) When specified thickness of insulation has been applied, reinforcing netting shall be stretched tightly over block and secured with tie wires or other approved securement. Entire surface shall be given a l/2 -inch thick, smooth and uniformly applied trowel coat of hydraulic setting insulating cement. Typical installation is shown in Figure 20-H-2. 20-H-3 II. A. 2. contd Thermal Conductivity . When tested in accordance with ASTM C 177, latest revision, or ASTM C 3 3 5 , latest revision, the thermal conductivity at the given mean temperatures shall not exceed the following values: Mean Temp, *F i jO 200 300 400 600 Btu/inch, hr, sq ft, *F 0.36 0.40 0.45 0.51 0.63 Thermal Diffusivity . . . Shall average 0.11 to 0.25 sq ft per day. Thermal Shock Resistance . Shall not spall, chip, crack, or otherwise fail when heated to 1 200 F and then quenched with water. Water Absorption . . . -Alter 24-hour submersion, shall gain not more than 400% of the original weight. 3. Accessory Materials a. Stainless Steel Wire - 0.0475-inch diameter. Type 304, cold drawn, bright annealed, 18 gage. b. Insulation Strap - Stainless steel, l/2-inch bv 0.020-inch, Type 304, or approved equal. c. Clips - Stainless steel, l/2-inch double-pronged, Type 304, A. J. Gerrard, Techailoy double-pronged seal, or approved equal. d. Insulating Cement - Hydraulic setting, Baldwi n - Ehret-Hill Powe rhouse. Eagle - Richer One Coat De trick Utility, or approved equal. e. Finishing Cement - Hard su rface, Eagle-Picher No. 106, Johns-Manville 678, Detrick T-60, or approved equal. f. Mineral Wool Blanket - Black, spun rock wool, hexagonal wire netting on both sides. g. Mineral Wool Blanket - Black,spun rock wool, hexagonal wire netting on one side, expanded metal lath on the other side. h. Heat Resistant Sealer - Benjamin Foster No. 30-43 or approved equal. i. Weather-Barrier Coating (Color as specified)-PV A - Vimasco No. WC-1, Pittsburgh-Corning Pitt cote 500C, or approved equal. j. Reinforcing Cloth - Glass fabric, 10 by 10 thread count, Perma-Glas Mesh, Glasfab, Benjamin Foster Open Weave No. 10, or approved equal. k. Fabricating Cement - A. P. Green Insulation Adhesive, Philip Carey Careytemp, Refractory and Insulation Block Stick, or approved equal. l. Wire Netting - One-inch, hexagonal mesh, 20-gage, stainless steel, Type 304, or approved equal. 3. .APPLICATION 1. Equipment a. Insulation Supports Equipment shall be provided with insulation supports as called for in the GENERAL SPECIFICATIONS, Part I. B. 5. b. Thickness Schedule Unless otherwise specified, insulation in excess of 2-l/2 Inches total thickness shall be applied in multi layer construction, as specified in the GENERAL SPECIFICATIONS, Part I. 3. 2. c. Curved Surfaces On ail equipment, insulation hlock 3hall be properly miter cut to fit vessel surface and applied to vessel sides and heads in staggered position, witn all joints tigntly butted. Block snail be applied to vessel sides a ith linear airmens ion paralleling axis of vessel. Typical installation is shown in Figure 20-H-l. 20-H-Z * UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS II. SPECIFICATION 20-H Calcium Silic This Specification describes the essential requirements for the purchase and application of preformed calcium silic insulation for use on equipment and piping normally oper ting a.. temperatures from 70 F up to and including 750 F. Procedures outlined in the GENERAL SPECIFICATIONS are applicable to and constitute an integral part of this Spe fication. A. MATERIAL 1. Composition Material shall be composed of hydrous calcium silicate blended with asbestos fibers in suitable proport: with or without inorganic filler added. 2. Properties Calcium Silicate Insulation shall have the following properties: Alkalinity...............................................pH shall be not below 8 and not above 13. Breaking Strength........................Not less than 20 psi when testing a specimen 6 inches wide by 1 inch thick o\ a 10-inch span. Coefficient of Expansion . . 2 x 10 ^ average on reheat to 1200 F. Combustibility............................. Shall be incombustible. Compressive Strength When tested in accordance with ASTM C 165, latest revision, the percentagedeformation produced by loading shall not exceed the following: Deformation, % Load, Psi 2 45 5 105 , 10 130 Density ...............................................Shall be not less than 10 lb per cu ft, or more than 15 lb per cu ft, when tes: in accordance with ASTM C 303, latest revision. Flexural Strength........................Shall be not less than 45 psi when tested in accordance with .ASTM C 203, la` revision. Hardness...............................................A l/3-inch ball point under a 1-kg load shall produce a maximum penetratio: 0.85 mm. Hygroscopicity................................... When oven-dried to constant weight, then exposed to air at 70 F and 90% rela: humidity for 14 days, shall gain a maximum of 10% of the original weight. Resistance to Abrasion When subjected to the Navy Tumbling Test, shall lose not more than 30% of o Lnal weight after first 10-minute run, and not more than 55% after aecona minute run. Resistance to Acids and Caustics.........................................Shall be resistant to most common caustics (not considered an acid-resist. material). Shrinkage .........................................Shall be not mo re than 2% at l 200 F when tested in accordance with ASTM C ; latest revision. Specific Heat...................................0. 21 to 0. 30 Btu per lb per degree F at 400 F. Temperature Limit........................Maximum temperature without mechanical, thermal, or chemical failure sh be not less than 1200 F. Tensile Strength............................. Shall be not less than 10 psi. 23-H-l $ I APPLICATION of preformed fibrous glass coated RIGlO INSULATION TO INTERIOR OF DUCT fig 17-RY-3 II. 3. 2. e. contd CELLULAR GLASS INSULATION---------- WEATNER-BARRtER AS SPEClUEO --------- JU i-ll/ INNER AND OUTER SORE Of SLIP JOINTS COATCO WITH NON-SETTING SCAlCR r -- I V MYOROUS CALCIUM SILICATE INSULATION A/ ItZL^fei LOW TEMPERATURE PIPE 4 ONE LAYER INSULATION HYDROUS CALCIUM SILICATE-CELLULAR GLASS INSULATION EXPANSION a CONTRACTION JOINT FOR HORIZONTAL PIPING fiG 32-1-18 (4) Where It is necessary to install expansion-contraction joints in insulation on vertical piping, an Insulation support shall be provided. Installation shall be as shown in Figure 32-L-19. HYDROUS CALCIUM SILICATE-CELLULAR GLASS INSULATION VERTICAL EXPANSION AND CONTRACTION JOINT CN LOW TEMPERATURE PIPING _______________ _______________________ns 12 l -is_______ _________________________ II. 5. 2. d. contd TWO HALVES Q PREFABRICATED ELL COVER SHALL, it JOINED TOGCT**CR WITH JOINT SEALER applieo to the outermost 2 1/2" (APPRO*-) OF The joint FACES-7 I 1 * ' HYDROUS CALCIUM^ SILICATE INSULATION x / ? anger roo I 4 HTOROUS CALCIUM SILICATE INSULAT. ION TO POINT OF ROO ATTACHMENT COAT INNER BORE OF INSULATION WITH ANTI.ABRASION COATING ANO ALLOW TQ ORY BEFORE INSTALLATION CUSHIONING BLANKET MIN ft T ------------t-heavy fillet of caulkino I--1 MASTIC AT ALL INSIDE CORNERS r r /J.v.'.WM L i * * i. \ BUTT JOINTS OF FITTING COVER ANO AOJACENT CELLULAR GLASS INSULATION TO BE COATCO WITH JOINT SEALER APPLlCO TO Th OUTER NOS T 2 */* ' (APPROX)OP THE JOINT FACES YA''V-fr '-'i </.y^ Pa~t / /,hv.v v////yW *' ** ---------------- 1-------------------- L- ` L THICKNESS t, AS SPECIFICO INNER LAVER BUTT JOINTS COATCO WITH ANTI.ABRASION! COATING ANO ALLOWEO TO ; DRY BEFORE INSTALLATION SECTION HYDROUS CALCIUM SILICATE -CELLULAR GLASS INSULATION ON HANGER CONNECTED DIRECTLY TO LOW TEMPERATURE PIPE FIG. St-L-IT* 1 2 e. Expansion-Contraction Joints (1) Expansion and contraction joints shall be installed, as per Figure 32-L-18, in both horizontal and vertical straight run piping, at intervals as follows. Up to 2-l/2 inches thick insulation - one for each 45 feet 3 inches to 5 Inches thick insulation - one for each 33 feet 5- l / 2 inches to 7 -- 1/2 inches thick insulation - one for each 21 feet (2) Where flanged joints occur within these limits, expansion and contraction shall be provided for in the flange cover, and expansion-contraction joints in insulation will not be required. J2-L-15 H. B. 2. b. coned ROUND OUT5<Oe CORNERS - SURFACES COATED WITH ROWSETTING SCALER - -EXTEND VAPOR SEAL COATING OVER METAL -.HEAVY FILLET OF CAULKING MASTIC vv?-inr>^ i Qt>!^3 OUTER LAYER 8UTT JOINTS -- OF CELLULAR GLASS COATEO WITH JOINT SEALER ss //// U\L v js s s \ s \ -lV THICK HYOROUS CALCIUM SILICATE w HYDROUS CALCIUM SILICATE-CELLULAR GLASS INSULATION ON LOW TEMPERATURE FLANGED VALVE 'IG 52 - L - IS (6) All fittings shall be fitted and assembled with very thin, tight joints. Cellular glass fittings shall be cemented with the specified fabricating cement. In all cases the joints shall be thin, with just suffi cient cement to obtain good adhesion and complete closure. Wide cement joints, voids, or holes plugged with, fabricating cement, will not be permitted. c. Securement .Ml layers oi cellular glass and calcium silicate pipe insulation shall be secured in place with stainless steel insulation strap, as specified in the GENERAL. SPECIFICATIONS. Parts I. B. 6. c and d. d. Supports and Hangers (1) Where horizontal low-temperature piping is supported on the outside of insulation surfaces, in accord ance with UCCC Standard P-82, insulation (cellular glass) shall be complete with weather-barrier ap plied before piping is placed in cradles. UCCC Standard P-82 is a guide to the maximum horizontal span of pipe that may be supported on the outside of insulation. (2) Hangers attached directly to piping shall be Insulated as shown in Figure 32-L-17. 32-L-14 H. 8. 2. b. contd (4) All valves shall be packed aad filled around valve stem and packing gland assembly with joint sealer to avoid water pockets. (5) Installations of typical fittings and valves are shown in Figures 32-L-14, 32-L-15, and 32-L-16. THE TWO HALVES OF THE CELLULAR CLASS INSULATION SHALL SE CEMENTCO TOGETHER with JOINT SCALER ARLlEO TO Tm OUTER* MOST 2 l/2'URARO* I or CELLULAR GLASS NSULATION Or THE JOINT rACES orOUTER LAYER SUIT JOINTS CELLULAR CLASS COATEO NlT> JOINT SEALER CCLLULA GLASS IN SULATIO V THICK MVOROUS CALCIUM SILICATE INSULATION ROUNO OUTSlOE CORNERS lEAVT riLLET or CAULKING MASTIC SURFACES COATEO WITH NON-SET TING SEALER -inner later but JOINTS COATEO VI ANTI - ABRASION COAT INC ANO ALLOWED TO I ORT BCrORE (NSTACCA. TiON .L I 2* MIN. THICKNESS T. S SPCCIFICO HYDROUS CALCIUM SILICATE-CELLULAR GLASS INSULATION ON LOW TEMPERATURE LINE FLANGE FIG JZ-C-I* 3i-L-l3 II. B. Z. b. contd --wo halves or tme cellular GLASS INSULATION CEMENTCO TOGETHER WITH JOINT SEALER ARRLlEO TO THC OUTERMOST 2'i tARRRO*> OF The CELLULAR GLASS Qf TNC JOINT FACES ANTI.ABRASION COATING allowed TO OUT BEFORE installation -CELLULAR GLASS INSULATION THICK HYDROUS CALCIUM SILICATE j:*n MV* / * />/ A/* * f WEATHER BARRIER AS SPECIFIED 'mm* BUTT JOINTS OF FITTING COVER ANO AOJACCNT RIFE INSULATION TO BE COATED WITH JOINT SCALE* ARRLlEO TO TNC OUTERMOST Z *i*(ARRROK.) OF THE JOINT FACES WEATHER-RARRIER AS sRECiFlCO ELLUL** GLASS MITERCO RlRC NSULATION OUTER LAVER OF CELLULAR GLASS BUTT JOINTS COATEO WITH JOINT SEALER I '?* THICK HYOROUS CALCIUM SILICATE INSULATION CELLULAR GLASS RIPE INSULATION THICKNESS. T AS SRECIFICO HYDROUS CALCIUM SILICATE CELLULAR GLASS INSULATION ON LOW TEMPERATURE WELDED ELL Fig 32-l-iZ HYDROUS CALCIUM SILICATE-CELLULAR GLASS INSULATION ON LOW TEMPERATURE WELOED TEE * > !2 l i 2-L-.2 II. B. I. contd 1. Weather-Barrier {1} Weather-barrier coating shall be applied in accordance with the GENERAL SPECIFICATIONS, Parts I. B. 9 and 17. (Z) Weather-barrier consisting of stainless steel jacketing, if required, shall be applied in accordance with the GENERAL. SPECIFICATIONS, Part I. B. 18. This requirement is Indicated by the addition of the letter M to the specification designatic is, th-a: 32-LM, 32-L5SM. Piping a. Pipe Insulation {1} Unless otherwise specified, insulation shall be applied in multiple layers. Inner layer, or layers, shall be the required thickness of cellular glass insulation. The outer layer shall be hydrous calcium silicate insulation a minimum of 1-l/Z inch thick. (Z) Cellular glass Insulation thicknesses in excess of 2-l/Z inches shall be applied in multiple layers as specified in the GENERAL SPECIFICATIONS, Parti. B. 2. (3) Pipe insulation shall be applied in staggered position, in accordance with Figures GA-l and GA-Z of the GENERAL SPECIFICATIONS. (4) All butt edges and ends of single layer cellular glass insulation, and outer layer of multiple layer cellular glass applications shall be buttered with the specified joine sealer before application. Joints shall be drawn together, when insulation is applied, so that only a very thin, vapor-tight, vapor-seal coat separates the sections of insulaeion. (5} Insulation shall be applied with all joints tightly butted and fitted, to eliminate voids. Large voids shall not be filled with joint sealer, but eliminated either by refitting or replacing insulation. Any rounded corners on the insulation surfaces to be butted shall be trued before application. (6) Butt edges and ends of all inner layers of cellular glass shall be given a smooth brush or spray coat f anti-abrasion coating and allowed to dryfor a minimum of 4 hours before application. Care shall be exercised to obtain a thin, even coat of only sufficient thickness to cover and fill the cut cells of the insulation. (7) When scheduled for installations where thermal shock is expected, a cushioning blanket, as specified, shall be applied to bare pipe before application of cellular glass insulation. b. Fitting, Flange, and Valve Covers (l) Fitting, flange, and valve covers shall be shop fabricated in accordance with the UCCC Dimensional Standards Fabrication Manual or ASTM Recommended Practice C 450, latest revision. (Z) Fitting, flange, and valve covers shall be fabricated in two layers. Inside layer shall be the specified thickness of cellular glass insulation. Outside layer shall be 1-l/Z-inch thick hydrous calcium sili cate insulation. (3) Welded fitting covers shall be fabricated to fit snugly on the pipe. The two halves of the cover shall be cemented together with joint sealer applied to the outermost 2-l/2 inches (approx) of the inner layers of cellular glass. The adjacent pipe insulation shall be fitted *,ightly to the butt ends of the fitting cover and sealed as specified for piping. Typical fitting covers are shown in Figures 32-L-12 and 3Z-L-13. 32-L-l l n. b 1 contd k. Equipment Supports (1) VThere equipment is supported on cradles, vessel insulation shall extend over cradles as shown in Figure 32-L-10. (2) Where equipment is supported by structural steel members, insulation shall be extended not less than lour times the specified Insulation thickness in each direction, measured from junction of vessel with insulated support lug. Thickness of insulation over steel supports shall be not less than i/2that specified for body of vessel. Thickness of insulation over support lugs shall be the same as body insulation. Installation shall be as shown in Figure 32-L-ll. 32-L-10 IL B 1. i. canid j. Vessel Skirts (1) Both interior and exterior surfaces of skirts supporting vertical equipment shall be insulated. In sulation shall extend downward, from junction of skirt with bottom head, to junction with fire-re sistant material or to concrete pad. Thickness of insulation over skirt shall be as specified for body of vessel. Insulating material shall be secured to Inside of skirt with adhesive cement. (2) Support for insulation inside skirts and support for securement of bottom head insulation shall be in accordance with UCCC Standard IS-42. Installation shall be as shown in Figure 32-L-9. 32-L-9 n. 3 1 contd f. Expansion Joints Expansion joints in flat surfaces or cylindrical vessels shall be insulated with flexible blanket insulation Typical installation is shown in Figure 20-H-4. MINERAL WOOL SLANRCT OR SPECIFIED THICKNESS FACED OUTSIOC WITH EXPANOCO l CEMENT TROWtLCO FLUSH WITH SURFACE OF LATH APPLICATION Of BLANKET INSULATION TO EXPANSION JOINTS ON FLAT SURFACE FIS. EO-H-4 g Corrugated mechanical expansion joints on piping (usually listed as equipment items) shall be insulated as shown in Figure 20-H-5. HO 2* CA 5HCIT fTAL JACKET FiTT|0 OVER EXPANSION JOINTS AHOCITEhOED. OVER 40JACENT RIFE INSULATION. SECURE WITH STRAP AT CENTER qnlt I , ____ "0 INSUtATlON BETWEEN SHEET METAL ANO EXPANSION JOINT THICKNESS T, AS SPECIF ' ^777^^m yrujj? ^7^7, I\ '^/./Tzra^y b AAJfWlFZZZZZ - - -i--- -- T FINISH AS SPECiFlEO MIN T' APPLICATION OF CALCIUM SILICATE INSULATION TO EXPANSION JOINTS FIG. 20-1 20-H-5 II. B. 1 . contd h. Insulated Vessel Flanges Vessel flanges shall be insulated with block in the same manner as specified for body of vessel. An in sulation support shall be provided Immediately above vessel flange. The top of projecting flange insula tion shall be sloped to shed water. Typical installation is shown in Figure 20-H-6. APPLICATION OF CALCIUM SILICATE INSULATION TO VESSEL FLANGE ri. 20-h- i. Uninsulated Vessel Flanges Where vessel flanges are located outdoors and specified to be left uninsulated, the reinforcing cloth of the weather-barrier, on the adjacent vessel insulation, shall be extended to metal of vessel body, coated with weather-barrier coating, and banded while coating is still tacky. A second application of weatherbarrier coating shall then be applied over the reinforcing cloth and securement. Typical installation is shown in Figure 20-H-7. fiWiSH AS SC1H0 -wCATMCM-BAftftlCft C0AT1N0 WQTf OUTQOOa A>uCATiQOm.t. WEATHER SEALING OF CALCIUM SIUCATE VESSEL INSULATION AT UNINSULATED FLANGES r<6U*E 20- N - 7 II. B. 1. contd j. Vessei Nozzles Vessel nozzles shall be insulated as shown in Figure 20-H-8. IWSULATlOW MITCH CUT AMO AITTCO. OIMCNSIOMS SKACL 1C IN ACC0M04NCC WITH CAMlCATlOM OATA COM FlTTlA\ LINE NOZZLE 8UNO NOZZLE APPLICATION OF CALCIUM SILICATE INSULATION TO VESSEL NOZZLES ficuac lo-M-s f I k. Vessel Legs t (D Vessel legs shall be insulated with block which shall extend over channel flanges and down channel legs to fireproofing. Thickness shall be a minimum of one-half that specified for body of vessel. (2) Vessel insulation shall be butted firmly against tank leg flange. Re-entrant space between channel flanges and over channel flanges between body insulation shall be filled with block. Installation shall be as shown in Figure 20-H-9. i i ? <s i f 1 k, \ X i 20-H H. B. 1. contd 1. Vessel Skirts Skirts supporting vertical equipment shall have their outer surfaces insulated. Unless otherwise specified, insulation shall extend downward, from junction of skirt with bottom head, a minimum of four times the specified thiclaiese, but not less than 12 Inches, or to bottom of skirt if that distance is less than 12 inches. Thickness shall be as specified for body of vessel. The bottom head Insulation shall be supported in accord ance with UCCC Standard IS-42. Installation shall be as shown in i igure 20-H-10. i SOTTCM MCAO INSULATION SECURCO WITH TIE RISES ATTACHED TO SPLIT RING SUPPORT AS PER UC-CC STQ IS-A2 INSIOE OP SHIRT NOT INSULATEO UNLESS SPECIFICALLY NOTEOi APPLICATION OF CALCIUM SILICATE INSULATION TO VESSEL SKIRT PIG 20-H-iO m. Surface Finish When specified thickness of insulation has been applied, any small cracks or depressions shall be pointed up with insulation cement trowelled flush with surface of insulation. n. Weather-Barrier (1) Weather-barrier coating shall be applied in accordance with the GENERAL SPECIFICATIONS, Parts I. B. 9. and 17. (2) Weather-barrier consisting of stainless steel jacketing, if required, shall be applied in accordance with the GENERAL SPECIFICATIONS, Part I. B. 18. This requirement is indicated by the addition of the letter M to the specification designation, thus: 20-HM. 20-H-S a. b. 2. Piping a. Pipe Insulation (1) Thickness Schedule Unless otherwise specified. Insulation in excess of Z-l/Z inches total thickness shall be applied in multi-layer construction as specified in ; GENERAL SPECIFICATIONS, Part I. B. Z. (2) Securement (a) Insulation shall be applied to piping in accordance with the GENERAL. SPECIFICATIONS, Parts I. B. 5, 6, 7, and 8. (b) All Inner layers of sectional pipe insulation shall be secured with stainless steel wire. (c) All sectional pipe insulation 6-5/8 inches and less in outside diameter shall be secured with stainless steel wire. (d) All pipe insulation larger than 6-5/8 inches in outside diameter shall be secured with stainless steel insulation strap. (e) Location of strap and wire shall be as described in the GENERAL SPECIFICATIONS, Part I. B. 6. b. Fitting, Flange, and Valve Covers (1) Fitting insulation shall be secured with specified wire or strap as required. (2) Insulation for all fittings shall be fitted and assembled with tight joints. Cementing of shop fabri cated assemblies shall be done with specified fabricating cement. In all cases the joints shall be as thin as possible, with Just sufficient cement to obtain good adhesion and complete closure. In no case will wide cement joints, or voids, and holes filled with fabricating cement, be permitted. Typical installations are shown in Figures 20-H-ll, 20-H-12, and 20-H-13. i r* } i 1c I APPLICATION OF CALCIUM SILICATE INSULATION TO WELDING ELL fit 20-H-tl 20-H-9 II. B. Z. b. contd APPLICATION OF CALCIUM SILICATE INSULATION TO UN FLANGE FIG. 20 - H - 12 APPLICATION OF CALCIUM SILICATE INSULATION TO FLANGED VALVE r 20- 3 20-H-10 II. B. 2. b. contd (3) Fittings, flanges and valves shall be insulated with prefabricated fitting covers (preferred method) in accordance with the (JCCC Dimensional Standards Fabrication Manual. (4) Fitting, flange and valve covers may be field fabricated provided work is in accordance with the UCCC Dimensional Standards Fabrication Manual, and approved by the Field Representative of the Department of Design and Construction. Segments shall be carefully fitted to insure tight joints. c. 'Expansion Joints (1) Expansion slip joints shall be provided in the insulation for multiple layer applications. An expan sion joint shall be installed in each 21 ft of straight piping not interrupted by flanges, valves, or fittings. Typical installation is shown in Figure 20-H-14:. NOTE" EXPANSION JOINT SHALL SC INSTALLCO IN EACH 2t'-o'or straight hung, not interrupted bt flanges. VALVES ON r IT TINGS. FOR VERTICAL PIPING. EXPANSION JOINT SHALL SC INSTALLCO AT INSULATION SUPPORTS. expansion joint for single layer application OF CALCIUM SILICATE INSULATION no 20-N-I4 (2) The expansion slip joints shall be installed at the insulation support in vertical piping. Care shall be exercised to place the slip joint so that movement occurs at the bottom in order to shed water. (3) Expansion slip joints snail be provided at junction of fitting covers and pipe insulation located at the tops of risers, where riser exceeds 30 ft in height for single layer applications, and where riser exceeds 15 ft in height for multiple layer applications. Typical installation is shown in Figure. 20H-15. a'SC* iCECOS 50 -0 m *0* WytTiH.E L A T E B I RiSE" CXCECOS APPLICATION OF CALCIUM SILICATE INSULATION TO WELDING ELL FiG JO 20-H-i l II. B. 2. c. contd (4) Insulation supports shall be installed at the bottoms of all risers. d. Traced Installations Traced lines, where specified, shall be installed and insulated in accordance with the GENERAL SPECIFY CATIONS, Parti. B. 16. e. Surface Finish Where present small cracks and depressions shall be filled and smoothed with insulating cement before application of weather-barrier. f. Weather-Barrier (1) Weather-barrier coating shall be applied in accordance with the GENERAL. SPECIFICATIONS, Part I. B. 17. (2) Weather-barrier consisting of stainless steel jacketing, if required, shall be applied in accordance with the GENERAL SPECIFICATIONS, Part I. B. 18. This requirement is indicated by the addition of the letter M to the specification designation, thus: 20-HM. 20-H-12 W -\ ''W y -M ik ri UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS H. SPECIFICATION 21-H Asbestos Fiber Scot. This Specification covers the application of preformed asbestos fiber insulation for use on piping normally operating at temperatures from 70 F up to and Including 750 F. Procedures outlined in the GENERAL SPECIFICATIONS are applicable to and constitute an integral part of this Specifi cation. a. material 1. Composition Material shall be composed of asbestos fibers blended with suitable inorganic binder, processed and molded at sufficient temperatures to produce a rigid, homogeneous thermal Insulation. 2. Properties Asbestos Fiber Insulation shall have the following properties: Absorptivity............................. Not over 85% of volume after 24 hours submersion. Alkalinity ....... pH shall be 10.L Coefficient of Expansion. . (or Volume and Linear Shrinkage) Shrinkage shall be less than 0.7% when heated to 750 F. Combustibility........................ Shall be incombustible. Compressive Strength. . . When tested in accordance with ASTM C 165, latest revision, the percentage of deformation produced by loading shall not exceed the following: Deformation, % 2 5 10 Load, psi 5.5 11.0 17.0 Density ............................. Shall be not less than 14 nor more than 1 3 lb per cu ft. Flexural Strength....................Shall be not less than 100 psi when tested in accordance with ASTM C 203, latest revisi on. Hardness A l/8-inch ball point under a 1-kg load shall produce a maximum penetration oi 0.40 mm. Hygroscopicity........................ Two-inch cubes oven-dried to constant weight, then exposed to air at 70 F, and ?0% relative humidity for 14 days, shall gain a maximum of 12. 1% of the original weight. Resistance to Acids and Caustics ........................ Solutions or vapors of those commonly used in industry have negligible effect on physical characteristics. Shrinkage ............................. Shall be not more than 0.25% when tested at 1200 F in accordance with A5TM C 356, latest revision. Specific Heat............................. Shall be not less than 0.22, nor more than 0.24, Btu per lb per degree F. Temperature Limit. . . . Maximum temperature without mechanical, thermal, or chemical failure shall be not less than 1200 F. 21-H-l II. A. 2. contd Thermal Conductivity When tested in accordance with A5TM C 177, latest revision, or ASTM C 355, latest revision, the thermal conductivity at the given mean temperatures shall not exceed the following values: Meaji^Tsmp 100 200 300 400 600 Btu/inch, hr, sqft. 0.32 0.37 0.42 0.47 0.57 ,, Thermal Dlffusivity . . . Shall be approximately 0.197 ft per day. Thermal Shock Resistance . Material shall not spall, chip, crack, or otherwise fail when heated to 750 F and then quenched with water. Make ........................................Unibestos, or approved equal. 3. Accessory Materials a. Stainless Steel Wire - 0.0475-inch diameter, Type 304, cold drawn, bright annealed, 18 gage. b. Insulation Strap - Stainless steel, l/2-lnch by 0.020-inch, Type 304 or approved equal. c. Clips - Stainless steel, l/2-inch double-pronged, Type 304, A. J. Gerrard or approved equal. d. Insulating Cement - Hydraulic setting, Baldwin-Ehret-Hlll Powerhouse, Eagle-Picher One Coat or approved equal. e. Finishing Cement - Hard surface, Eagle Picher No. 106, Johns Manville 678, or approved equal. f. Heat Resistant Sealer - Benjamin Foster No. 30-43 or approved equal. g. Weather Barrier Coating (Color as specified) - PVA-Vimaaco No. WC-1, Pittaburgh-Corning Pittcoto 500 C, or approved equal. h. Reinforcing Cloth - Glass fabric, 10 by 10 thread count. Perma-Glas Mesh, Benjamin Foster Open Weave No. 10, Glasfab, or approved equal. i. Fabricating Cement - A. P. Green Insulation Adhesive, Philip Carey Careytemp, Refractory and Insulation Block Stick, or approved equal. B. APPLICATION l. Piping a. Pipe Insulation (1) Unless otherwise specified, insulation in excess of 2-l/2 inches total thickness shall be applied in multiple layers as specified in the GENERAL SPECIFICATIONS, Part I. B. 2. (2) Insulation shall be applied to piping in staggered position in accordance with the GENERAL SPECI FICATIONS, Parts I. B. 5, 6, 7, and 8, with all joints tightly butted and factory attached sheeting jacket, where furnished, removed. (3) Small cracks and depressions, where present, shall be pointed up with insulating cement troweled smooth with insulation surface. b. Fittings, Flanges and Valves (1) Fittings, flanges and valves shall be insulated with prefabricated insulation covers fabricated in ac cordance with the UCCC Dimensional Standard Fabrication Manual. (2) Subject to the approval of the representative of the Department of Design and Construction, fitting covers may be field fabricated, provided work is in accordance with the UCCC Dimensional Stand ard Fabrication Manual. Segments shall be carefully fitted to insure tight joints. (3) Fabricated assemblies shall be cemented with specified fabricating cement. In all cases the joints shall be as tfcinas possible, with Just sufficient cement to obtain good adhesion and complete closure. In no case will wide fabricating cement joints, or voids and holes filled with fabricating cement, be permitted. Tvpical installations are shown in Figures 21-H-l, 21-H-2, 21-H-3, and 21-H-4. 21-H-2 H. S 1. b. comtd THICKNESS T, AS SPECIFIEO APPLICATION OF ASBESTOS FIBER INSULATION TO WELDING ELL FIG. 21 - H - I PIPE INSULATION ri. trnote: flange cover small be fabricated in accordance with fabrication oata FOR FITTING COVERS APPLICATION OF ASBESTOS FIBER INSULATION TO LINE FLANGE FIG. 21- H - 2 21-H-3 *'" V - 'fe w * n. b 1 b. contd APPLICATION OF ASBESTOS FIBER INSULATION TO FLANGED ELL FIG. 2I-H- 3 APPLICATION OF ASBESTOS FIBER INSULATION TO FLANGED VALVE F I G. 21- H-4 21-H-4 3. B. 1. contd c. Sccuremant (1) Application and so cure meat of pipe insulation shall be as shown in Figures GA-l and GA-2 of the GENERAL. SPECIFICATIONS. (2) All inner layers, and outer layers of sectional oipe insulation 6*5/8 inches and less in outside diameter, shall be secured with stainless steel wire. (3) All pipe insulation larger han 6 5/ 8 Inches in outside diameter shall be secured with stainless steel Insulation strap. (4) Fitting, flange and valve covers shall be secured with specified insulation strap as required. (5) Location of strap and wire shall be as described in the GENERAL SPECIFICATIONS, Part I. B. 6. d. Expansion Joints (l) Expansion slip joints shall be provided in the insulation for multiple layer applications. An expansion Joint shall be Installed in each 21 ft of straight piping not interrupted by flanges, valves, or fittings. Typical installation is shown in Figure 21-H-5. riMDM P SLIP JOINT coves SMALL NOT CONTlNUe OVCS -I ore: seexpansion joint small installeo IMCJCM 2 1-0* OP 1TNAJANT PIPttM.ffOT INTIS* unto rr PLANSES.vALvcsoN prrriNs. po* yemCAL PIPING, EXPANSION JOINT SMALL M INSTALLCO AT INSULATION SUPPONTS. EXPANSION JOINT FOR MULTIPLE LATER APPLICATION Of AS8EST0S FI BCR INSULATION 9 IS, El- M - S (2) The expansion 9lip joints shall be installed at the insulation support in vertical piping. Care shail be exercised to place slip joint so that movement occurs at the bottom in order to shed water. (3) Expansion slip joints shali be provided at junction of fitting covers and pipe insulation located at the top of risers, where riser exceeds 30 ft in height for single layer applications and where riser ex ceeds 15 ft in height for multiple layer applications. Typical Installation is shown in Figure 21-H-o. 21 - H - 5 n. b l. d. (3) conid non: SLIP JOINT SMALL St PNOVIOCO POM SIMPLE LATER APPLICATIONS MERE RISER EXCEEDS SO -O' in M*AMT AMO TOR MULTIPLE LATER APPLICATIONS WHERE RISER EXCEEDS IS -0* APPLICATION OF MULTIPLE LAYER ASBESTOS FIBER INSULATION TO WELDING ELL PIS. tl-M-S (4) Insulation supports shall bo installed at the bottoms of all risers. (5) Corrugated mechanical expansion Joints in piping (usually listed as equipment items) shall be ins laied as shown in, Figure 21-H-7. APPLICATION OF ASBESTOS FIBER INSULATION TO EXPANSION JOINTS PIS H-H-7 21-H-6 II. 3. 1, contd e. Traced Installations Traced lines, where specified, shall be installed and insulated in accordance with the GENERAL SPECIFI CATIONS, Part I. B. 16. f. Weather-Barrier (1) Weather-barrier coating shall be applied ir accordance with the GENERAL SPECIFICATIONS, Part I. B. 17. (Z) Weather-barrier consisting of stainless steel jacketing shall be applied In accordance with the GEN ERAL SPECIFICATIONS. Part I. B. 13. This requirement is indicated by the addition of the letter M to the specification designation, thus: Zl-HM. z:-H-7 \ UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS n. SPECIFICATION 22-H Scone Bonded Expanded Silica Thi-' Specification describee the essential requirements for the purchase and application of preformed bonded and rein* forced expanded silica (perlite) Insulation foruseon equipment and piping normally* operating at temperatures from 70 F up to and including 1600 F. Procedures outlined in the GENERAL SPECIFICATIONS are applicable to and constitute an integral part of this Speci fication. A. MATERIAL 1. Composition Material shall be composed of expanded silica (perlite), reinforced with asbestos and glass fibers in suitable proportion, and with other binding fillers added to provide proper structural strength. 2. Prope rtles Bonded expanded silica insulation shall have the following properties: Alkalinity.........................* pH shall be not below 8.0 and not above 8.6. Capillarity............................. After 7 days on wet surface, gain in weight shall be 0%. Combustibility........................ Shall be incombustible. Compressive Strength. The percentage of deformation produced by loading shall be less than the following: Deformation, % Load, psi. 2 70 5 70 Density ............................. Shall be not less than 9.5 lb per cu ft, nor more than 11.5 lb per cuft, when tested in accordance with ASTM C 303, latest revision. Flexural Strength....................Shall be not less than 70 psi when tested in accordance with ASTM C 203, latest revision. Hygroscopicity........................ Two-inch cubes, oven-dried to constant weight, then exposed to air at 70 F and 90% relative humidity, shall gain a maximum of 6% of the original weight. Resistance to Abrasion . When subjected to the Navy Tumbling Test, shall lose not more than 40% of orig inal weight after first 10-minute run, and not more than 70% after second 10minute run. Resistance to Acids. . * Excellent; when immersed in sulfuric acid, hydrochloric acid, or aqua regia, no damage in 100 hours. Resistance to Caustics > Good for most common caustics. Shrinkage ............................. When tested in accordance with ASTM C 356, latest revision, shall be not more than 0. 80% at 1 200 F, and not more than 1. 85% at 1500 F. Temperature Limit .... Maximum temperature without mechanical, thermal, or chemical failure shall be not less than 1600 F. Thermal Conductivity Shall not exceed the following values at the given mean temperatures: Mean Temp, Btu/lnch, hr, F sq ft, *F 100 0. 34 200 0.39 300 0.44 400 0.50 600 0.60 1000 0.81 Thermal Diifuslvity . . . Shall not exceed 0. 33 sq ft per day. Water Absorption . . After 24-hour submersion, shall gain not more than 25% of the original weight. Make ........................................ Philip Carey Manufacturing Company ''Careytemp1' 22-H- l IX. A. contd 3. Accessory Materials a. Stainless Steel Wire - 0.0475-Inch diameter. Typo 304, cold drawn* bright annealed, 18 gage. b. Insulation Strap - Stainless Steel, l/2-Inch, by 0.020-inch, Type 304, or approved equal. c. Clips - Stainless steel, l/2-inch double-pronged, Type 304, A. J. Gerrard, Techalloy double-pronged seal, or approved equal. d. Insulating Cement - Careytemp Asbestos Cement. e. Mineral Wool Blanket - Black,spun rock wool, hexagonal wire netting on both sides. f. Mineral Wool Blanket - Black, spun rock wool, hexagonal wire netting on one side, expanded metal lath on the other side. g. Heat-Resistant Sealer - Benjamin Foster No. 30-43 or approved equal. h. Weather-Barrier Coating (Color as specified) - PVA-Vlmasco No. WC-l, Pittsburgh-Coming Pittcote 500 C, or approved equal. i. Reinforcing Cloth - Glass fabric, 10 by 10 thread count, Perma-Glas Mesh, Glasfab, Benjamin Foster Open Weave No. 10, or approved equal. j. Fabricating Cement - Careytemp Adhesive or approved equal. k. Wire Netting - One-inch Hexagonal Mesh, 20 gage. Type 304 stainless steel, or approved equal. n. B. APPLICATION 1. Equipment a. Insulation Supports Equipment shall be provided with insulation supports as called for In the GENERAL SPECIFICATIONS, Part I. B. 5. b. Thickness Schedule Unless otherwise specified, insulation in excess of 2-1 /2 inches total thickness shall be applied In multi layer construction, as specified in the GENERAL SPECIFICATIONS, Part I. B. 2. c. Curved Surfaces On all equipment, insulation block shall be properly miter cut to fit vessel surface and applied to vessel sides and heads in staggered position, with all joints tightly butted. Block shall be applied to vessel sides with linear dimension paralleling axis of vessel. Typical installation is shown In Figure 22-H-l. 22-H-2 u. a. i. c. coord d. Flat Surfaces (1) Block insulation shall be applied to flat surfaces in staggered position with all joints tightly butted. It shall be secured with wire attached to blank nuts or other approved securement. On rectangular equipment, the blank nuts, or other approved securements, shall be placed on 12-inch centers, staggered, for bottom surfaces, and on 24-inch centers, staggered, for side and top surfaces. Where specified in the Insulation Design Schedule, block may be applied to flat surfaces with anapproved ad hesive. (2) When specified thickness of Insulation has been applied, reinforcing netting shall be stretched tightly over block and secured with tie wires or other approved securement. Entire surface shall be given a l/2-inch thick, smooth and uniformly applied trowel coat of hydraulic setting insulating cement Typical installation is shown in Figure 22-H-2. 22-H-3 Securement (1) All layers of insulation shall be secured with insulation strap where contour of vessel permits firm and effective attachment. Insulation, applied to irregular surfaces, where strap is impracticable, shall be secured with wire, drawn taut, ends twisted and embedded in insulation. (2) All layers of Insulation on bottom heads of vertical equipment and heads of horizontal equipment sh. ~ be secured in place with wire attached to blank nuts, or with insulation strap attached to insulation support, as specified in UCCC Standard 1S-31 and Figure 22-H-3. SECUREMENT OF BONDED EXPANQED INSULATION ON VESSEL HEAD P'G 22-H-S Expansion Joints Expansion joints in flat surfaces or cylindrical vessels shall be insulated with flexible blanket insulation. Typical installation is shown in Figure 22-H-4. IX. B. 1. f. contd MINERAL WOOL BLANKET 0? S>- - iC .CXNCSS FACCO OUTSlOE with expanoeo metal lath anO ON The INSIOE WITH I* HEX WIRE NETTING--, EXPANOCO METAL lath EXTENOCO OVEN BLOCK A MINIMUM OF * ANO SECUNEO *iTM TIE WIRES--- BLOCK INSULATION - </2* BLANK NUTS ON OTHER APPROVED SECUREMENT ON 12* CENTERS STAGGCREO - thickness r, as secrieo FINISH AS SPCCIFiEO thickness t, as specifieo NQTf: VOIDS OF EXPANDED METAL LATH "TO BE FILLED WITH nyORAUL'C SETTING CEMENT TROWELCO FLUSH WITH SURFACE OF LATH APPLICATION OF BLANKET INSULATION TO EXPANSION JOINTS ON FLAT SURFACE FIG-22*H- g. Corrugated mechanical expansion joints on piping (usually listed as equipment items) shall be insulated as shown in Figure 22-H-5. NO 2S GA SHEET METAL JACKET FlTTCO OVER EXPANSION JOINTS ANO CxTENOCD OVER AOJACENT PIPE INSULATION SECURE WITH STRAP AT CENTER ONLY-------------- - j -------- NO INSULATION BETWEEN SHEET ! METAL ANO EXPANSION JOINT APPLICATION OF BONDED FXPANQED SILICA INSULATION TQ EXPANSION JOINTS F.G 22-*-S II. 3. I . contd *o h. Insulated Vessel Flanges Vessel flanges shall be insulated with block in the same manner as specified for body* of vessel. An insu lation support shall be provided immediately'above vessel flange. The top of projecting flange insulation shall be sloped to shed water. Typical installation is shown in Figure 22-H-6. CEMENT ANO CAULKING MASTIC APPLICATION OF 8QN0E0 EXPANOEO SIUCA INSULATION TO VESSEL FLANGE FIG 22-M-*1 1. Uninsulated Vessel Flanges '.Vhere vessel flanges are located outdoors and specified to be left uninsulated, the reinforcing cloth of the weather-barrier, on the adjacent vessel insulation, shall be extended to metal of vessel body, coated with weather-barrier coating, and banded while coating is still tacky. A second application of weather-barrier coating shall then be applied over the reinforcing cloth and securement. Typical installation is shown in Figure 22-H-7. 22-H-o II. B. 1. i. contd riNOH AS SPEC.' CD WEATHER* BARRIER COATING NOTE OUTDOOR APPLICATION ONLY weather sealing of bonded expanded silica vessel insulation AT UNINSULATED FLANGES CIO. 22'H-T j. Vessel Nozzles Vessel nozzles shall be insulated as shown in Figure 22-H-8. .INSULATION MITER CUT AND FiTTCO 0'MCNSIONS SHAU. St IN ACCORDANCE WITH fASRiCATlCN QATA fOR FITTING COVERSv I<P'V\r'' fsr OLlV \ y,n ~_L'--.11 Si lO1 *7?ft' SI 4 '-------l I Si ^ E --lit F`LL WITH SCRAP bloc*- -TH'CANESS T, as SPECIFIED LINE NOZZLE --fir* \At4 ji 'l V \ \ V >'TV 'v'in A 3u V< ^ ** vAi? J'!/\ , VESSEL wall BLIND NOZZLE iPPt ICATION OF SONDEO EXPANDED SILICA INSULATION TQ VESSEL. NOZZLES FIGURE E2-H-* 2:-h- II. B. 1. contd k. Vessel Legs (1) Vessel legs shall be insulated with block which shall extend over channel flanges and down channel legs to fireproofing. Thickness shall be a minimum of one-half that specified for body of vessel. (2) Vessel insulation shall be butted firmly against tank leg flange. Re-entrant space between channel flanges and over channel flanges between body insul ition _..all be filled with block. Installation shall be as shown in Figure 22-H-9.1 1. Vessel Skirts Skirts supporting vertical equipment shall have their outer surfaces insulated. Unless otherwise specified insulation shall extend downward, from junction of skirt with bottom head, a minimum of four times the specified thickness, but not less than 12 inches, or to bottom of skirt if that distance is less than 12 inches. Thickness shall be as specified for body of vessel. The bottom head insulation shall be supported in ac cordance with UCCC Standard IS-42. Installation shall be as shown in Figure 22-H-1Q. 22-H-3 . 3. 1. I. contd BOTTOM HCAO INSULATION SECURED WITH Tit WIRES ATTACHtO TO SRUT RinQ SUPPORT AS PtR OCC.C. STO. IS-AJ fNSlOC Of SKIRT NOT i$uLATtO UNLESS SPECIFICALLY NOTE 0. APPLICATION OF BONDED EXPANDED SILICA INSULATION TO VESSEL SKIRT no 21-h-io m. Surface Finish When specified thickness of insulation has been applied, any small cracks or depressions shall be pointed up with insulation cement trowelled flush with surface of insulation. n. Weather-Barrier (1) Weather-barrier coating shall be applied in accordance with the GENERAL SPECIFICATIONS, Parts I. B. 9 and 17. (2) Weather-barrier consisting of stainless steel jacketing, if required, shall be applied in accordance with the GENERAL SPECIFICATIONS, Part I. 3. 18. This requirement is indicated by the addition of the letter M to the specification designation, thus: 22-HM. a. Pipe Insulation (1) Thickness Schedule Unless otherwise specified, insulation in excess of 2-l/2 `nches total thickness shall be applied in multi-layer construction as specified in the GENERAL SPECIFICATIONS, Part I. 3. 2. (2) Securement (a) Insulation shall be applied to piping in accordance with the GENERAL SPECIFICATIONS, Parts I. 3. 5, 6, 7, and 8. (b) All inner layers of sectional pipe insulation shall be secured with stainless steel wire. (c) Ail sectional pipe insulation 6-5/3 inches and less in outside diameter shall be secured with stainless steel wire. (d) All pipe insulation larger than 6-3/8 inches in outside diameter shall be secured with stainless steel insulation strap. 22-H-9 contd b. Fitting, Flange, and Valve Covers (1) Fitting insulation shall be secured with specified wire or strap as required. (2) Insulation for all fittings shall be fitted and assembled with tight joints. Cementing of shop fabr; ated assemblies shall be done with specified fabricating cement. In all cases the joints shall be as min as possible, with just sufficient cement to obtain good adhesion and complete closure. In no case will wide cement joints, or voids and holes filled with fabricating cement, be permitted. Typical ira tallations are shown in Figures 22-H-I1, 22-H-12, and 22-H-13. APPLICATION OF BONDED EXPANOED SILICA INSULATION TO WELDING ELL Fid 22 M - It StPE INSULATION- -FlNISH AS SOECIF'CO 7/'/ ?///*** ; ijr . u. VyS^Jd4---LL Ssi NOTE 'LANGE COVER 'A99(CArtO IN ACCOftOANCt *iTh riSHlCATlQN OATA fQA fi(t.NG COVfcNS Nr i / S / f s is APPLICATION of bonded expanded silica insulation to LINE flange Eli 22-M-I2 Zl-H- 10 II. B. 2. b. contd APPLICATION OF BONDED EXPANDED SILICA INSULATION TO FLANGED VALVE MG (3) Fittings, flanges, and valves shall be insulated with prefabricated fitting covers {preferred method) in accordance with the UCCC Dimensional Standards Fabrication Manual. (4) Fitting, flange, and valve covers may" be field fabricated provided work is in accordance with the UCCC Dimensional Standards Fabrication Manual, and approved by the Field Representative of the Department of Design and Construction. Segments shall be carefully fitted to insure tight joints. Expansion Joints (1) Expansion slip joints shall be provided in the insulation for multiple layer applications. An expansion joint shall be installed in each 21 ft of straight piping not interrupted by flanges, valves, or fittings. Typical installation is shown in Figure 22-H-14. E'NiSH or SL'R jC'NT cover :a^u not continue over ADJACENT P<P INSULATION --^ UlN T UlN T -INNER ANO OUTER BORE OF , Sl.P jO.NTS CCATED RTh NON-SETTING SCALER / riN'SH AS SPECIFIED ---------------- v V / * / X iX X X X* ^ \ \ % si. s N \ N V *i - - - - --- ~ -- -------- 1 ' -* J~' > %X \ ,T \ \ \ ^ /2/ / / / / ' / / / / y* "/ i j \ l' ` NOTE EjpanSON jONT Shall 3 INSTALLED n Each j.-o`of sTA.<;,,r *lanlcs. , A L / E 5 OR P'TT'SGS FOR VERTICAL P'P'NO. E PAfSlON JOINT S-All installed at isolation SUPPORTS i j EXPANSION vOINT cC'R MULTIPLE LAYER APPLICATION CF 3QN0ED EXPANDEO SILICA INSULATION r.Z 2 2-H-.4 H. 3. 2. c. contd {Z) The expansion slip joints shall be installed at the insulation support in vertical piping. Care shall be exercised to place the slip joint so that movement occurs at the bottom in order to shed water. (3) Expansion slip joints shall be provided at junction of fitting covers and pipe insulation located at the tops of risers, where riser exceeds 30 ft in height for single layer applications, and where riser ex ceeds 15 ft in height for multiple layer applications. Typical installation is shown in Figure 22-H-Ic SINGLE APPLICATIONS ** *0i*iWfULCT'PCL0CS LJAO'-CO* 'NAPP-CLIiGCAHTTIO4NNS0 WHCPC DISC CEC5 ij -0 APPLICATION OF BONOEO EXPANDED StUCA INSULATION Tp SVEL01NG ELI f'C 22-n-iS* I. 14) Insulation supports shall be installed at the bottoms of ail risers, d. Traced Installations Traced lines, where specified, snail be installed and insulatec in accordance with tne GENERAL SPECI FICATIONS. Part I. B. 16. e . Surface Fini sh `.Vhere present, small cracks and depressions shall be filled and smooched with insulating cement before application of weather-barrier. f. Weathe r - 3a rrier (1) Weather-barrier coating shall be applied in accordance with the GENERAL 5PECTFICATIONS, Part I. 3. 17. (2) Weather-barrier consisting of stainless steel jacketing. If required, shall be applied in accordance with the GENERAL SPECIFICATIONS, Part I. B. 13. This requirement ia inuic itecl Sv t ie addition of the letter M to the specification designation, tnus: 22-iI.M. UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS SPECIFICATION 25-H Hydrous Calcium Silicate Scope This Specification describes the essential requirements for the purchase and application of preformed calcium silicate insulation for use on equipment and piping normally operating at temperatures from 750 F up to and including 1200 F. Procedures outlined in the GENERAL SPECIFICATIONS are applicable to and constitute an integral part of this Speci fication. A. MATERIAL 1. Composition Material shall be composed of hydrous calcium silicate blended with asbestos fibers in suitable proportion, with or without inorganic filler added. 2. Properties Calcium Silicate Insulation shall have the following properties: Alkalinity.......................................pH shall be not below 10 and not above 13. Coefficient of Expansion . . 3 x 10"^ average on reheat to 1200 F. Combustibility.............................Shall be incombustible. Compressive Strength When tested in accordance with ASTM C 165, latest revision, the percentage of deformation produced by loading shall not exceed the following: Deformation, % Load, psi 2 50 5 130 Density .......................................Shall be not less than 11. 5 lb per cu ft, or more than 13.5 lb per cu ft, when tested in accordance with ASTM C 303, latest revision. Flexural Strength................... Shall be not less than 55 psi when tested in accordance with ASTM C 203, latest revision. Hardness.......................................A l/8-mch ball point under a 1-kg load shall produce a maximum penetration of 0.85 mm. Hygroscopicity........................ When oven-dried to constant weight, then exposed to air at 70 F and 90% relative humidity for 14 days, shall gain a maximum of 10% of the original weight. Resistance to Abrasion When subjected to the Navy Tumbling Test, shall lose not more than 7% of orig inal weight after first 10-minute run, and not more than 15% after second 10minute run. Resistance to Acids and Caustics .... Shall be resistant to most common caustics (not considered an acid-resistir.r material). Shrinkage Specific Heat When tested in accordance with ASTM C 356. latest revision, the shrinkage at the given temperatures shall not exceed the following percentages: Temp *F Shrinkage, % 1200 0.4 1500 1.4 loOO 1.9 0.20 to 0. 2o Btu per lb per degree F at 400 F. Temperature Limit. . . . Maximum temperature without mechanical, thermal, or cherrucil f.ulure shall be not less than 1300 F. H- i II. A.. 2. contd Thermal Conductivity* . . When tested in accordance with ASTM C 177, latest revision, or ASTM C 335, latest revision, the thermal conductivity at the given mean temperatures shall not exceed the following values: Mean Temp, Btu/inch, F sq ft, *F LOO 0.41 200 0.45 300 0.49 400 0.53 600 0.63 300 0.73 Thermal Diffusivity . . . Shall average 0. 25 to 0.28 sq ft per day. Thermal Shock Resistance. Shall not spall, chip, crack, or otherwisefail whenheated quenched with water. to1800 F and then Water Absorption ....After 24-hour submersion, shall not Make . Kaylo No. 20 or approved equal. 3. Accessorv Materials a. Calcium Silicate Insulation - per Specification 20-H. gain not more than 450%of theoriginal weight. b. Stainless Steel Wire - O.Q475-inch diameter. Type 304, cold drawn, bright annealed, 18 gage. c. Insulation Strap - Stainless steel, l/2-inch by 0.020-inch, Type 304, or approved equal. d. Clips - Stainless Steel, i/2-inch double-pronged, Type 304, A. J, Gerrard or approved equal. e. Insulating Cement - Hydraulic setting, Baldwin-Ehret-Hill Powerhouse, Eagle-Picher One Coat, or ap proved equal. f. Mineral Wool Blanket - Black, spun rock wool, hexagonal wire netting on both sides. g. Mineral Wool Blanket - Black, spun rock wool, hexagonal wire netting on one side, expanded metal lath on the other side. h. Heat Resistant Sealer - Benjamin Foster No. 30-43 or approved equal. i. Weather-Barrier Coating (Color as specified) - PVA-Vimasco No. WC-I , Pittsburgh-Cornlng Pittcote 500 C, or approved equal. j. Reinforcing Cloth - Glass fabric, 10 by 10 thread count, Perma-Glas Mesh, Glasfab, or approved equal. k. Fabricating Cement - A. P. Green Insulation Adhesive, Philip Carey Careytemp, Refractory and Insulation Block Stick, or approved equal. l. Wire Netting - Cne-inch, hexagonal mesh, 20-gage, stainless steel, Type 304, or approved equal. m. Curly Cushion Blanket - Minera. wool blanket 'with 1-inch wire mesh on both sides, Baldwin-Ehret-Hiil, M. H. Detrick, or approved equal. 3. APPLICATION l. Equipment a. Insulation Supports Equipment shall be provided with insulation supports as called for in the GENERAL SPECIFICATIONS, Part I. 3. 5. b, Thickness Schedule Unless otherwise specified, insulation in excess of 2-l/2 inches total thickness shall be applied in multi layer construction as specified in the GENERAL SPECIFICATIONS, Part I. 3. Z, except that outer layer shall be calcium silicate insulation per Specification 20-H. 25-H-2 II. B. 1. contd c. Curved Surfaces (l) On all equipment, insulation block shall be properly miter cut to fit vessel surface and applied to vessel sides and heads in staggered position, with all joints tightly batted. Block shall be applied to vessel sides with linear dimension paralleling axis of vessel, and using broken joint construction. Typical installation is shown in Figure 25-H-I. {2} A curly cushion blanket shall be Installed on all cylindrical vessels operating above 600 F. before the application of the hydrous calcium silicate insulation. d. Flat Surfaces (1) Block insulation shall be applied to flat surfaces in staggered position with all joints tightly butted. It shall be secured with wire attached to blank nuts or other approved securement. On rectangular equipment, the blank nuts, or other approved securements, shall be placed on 12-inch centers, stag gered, for bottom surfaces and on 24-inch centers, staggered.for side and top surfaces. (2) When specified thickness of insulation has been applied, reinforcing netting shall be stretched tightly over block and secured with tie wires or other approved securement. Entire surface shall be given a l/2-inch thick, smooth and uniformly applied trowel coat of hydraulic setting insulating cement. Typical installation is shown in Figure 23-H-2. H-3 II. B. 1 . d. coned APPLICATION OF HYOROUS CALCIUM SILICATE INSULATION TO FLAT SURFACE f tG 23 H . I e. Securement (1) All layers of insulation shall be secured with insulation strap where contour of vessel permits firm and effective attachment. Insulation applied to irregular surfaces, where strap is impracticable, shall be secured with wire, drawn taut, end3 twisted and embedded in insulation. (2) All layers of insulation on bottom heads of vertical equipment and heads of horizontal equipment shall be secured in place with wire attached to blank nuts, or with insulation strap attached to insu lation support, as specified in UCCC Standard IS-31 and Figure 25-K-3. SECUREMENT CF HYQRCUS CALCIUM SILICATE INSULATION CM VESSEL HEAD j 25-H-4 E. B. 1. contd f. Expansion Joints (1) Expansion joints in flat surfaces or cylindrical vessels shall be insulated with flexible blanket insulaiion. Typical installation is shown in Figure 25-H-4. U) Corrugated mechanical expansion joints on piping (usually listed as equipment items) shall be insu lated as shown in Figure 25-H-5. NO 24 GA SHEET METAL JACKET PtTTEO OVER expansion joints and E*tn0E0 OVER ADJACENT PIPE INSULATON SECURE OiTN STRAP AT CENTER 0N|. NO 'NSUUATtON BETWEEN -SHEET nct4l ano expansion ^oint TNICXNESS T,____ AS SPEC >r< EO | - -I* m ' I. < N > f . H. r * ' f TTTi'l fV1 i :1 ,i , -- NSUL A T >3 N VI ;T-.- -(--------- I ] I > n -v s a ! T; v * 7~~iw7 i--?r--T*7_1 -C- -- 1* >- "rS ;r t ' '.-4 f'RlJH AS____ / SPECIFIED U.N *; f~" APPLICATION OF HYDROUS CALCIUM SILICATE INSULATION TO EXPANSION ^OiNTS i | Ml ZJ-H.j - 3 -H- 5 II. 8. 1. contd g. Insulated Vessel Flanges Vessel flanges shall be insulated with block in the same manner as specified for body of vessel. An insu lation support shall be provided immediately above vessel flange. The top of projecting flange insulation shall be sloped to shed water. Typical installation is shown in Figure 25-H-6. h. Vessel Nozzles Vessel nozzles shall be insulated as shown in Figure 25-H-7. INSULATION MITt* CUT ANO F>TTC0. O'MENSONS SHALL 8C ACCORDANCE WITH FABRICATION OATA FQ( FITTING COVERS ; ,______I ol. 1 -4 'v\ VT i \?7--- fill hith j SCRAP 8L0Ct~^ //< ' \t; " \Vi - -i-w?* I ' ^ thicfhcss r. AS SPEClFiD------ A --{***., ' ,----- VESSEL WALL / ,r ft- -VESSEL wall L.NC NOZZLE 9UN3 NOZZLE APPLICATION OF HYDROUS calcium silicate to vessel nozzles 25-H-6 Vessel Legs (1) Vessel legs shall be insulated with block which shall extend over channel flanges and down channel legs to fireproofing. Thickness shall be a minimum of one-half that specified for body of vessel. (2) Vessel insulation shall be butted firmly against tank leg flange. Re-entrant space between channel flanges and over channel flanges between body insulation shall be filled with block. Installation shall be as shown in Figure 25-H-8. j. Vessel Skirts Skirts supporting vertical equipment shall have their outer surfaces insulated. Unless otherwise specified, insulation shall extend downward, from junction of skirt with bottom head, a minimum of four times the specified thickness, but not less than 12 inches, or to bottom of skirt, if that distance is less than 12 inches. Thickness shall be as specified for body o: vessel. The bottom head insulation shall be supported in accordance with UCCC Standard IS-42. Installation snail be as shown in Figure 25-H-9. APPLICATION OF HYDROUS CALCIUM PLICATE INSULATION TO VESSEL 5KI9T f 'O 2 3 h - -> II. B . i. ccntd k. Surface Finish When specified thickness of insulation has been applied, any small cracks or depressions shall be pointed up with insulating cement, troweled flush with surface of insulation, l. Weather - Barrier (1) Weather-barrier coating shall be applied in accordance with the GENERAL SPECIFICATIONS, Parts I. B. 9, and 17. (2) Weather-barrier consisting of stainless steel jacketing, tf required, shall be applied in accordance with the GENERAL SPECIFICATIONS, Part I. B. 18. This requirement is indicated by the addition of the letter M to the specification designation, thus: 25-HM. 2. Piping a. Pipe Insulation (1) Insulation shall be applied to piping in accordance with the GENERAL SPECIFICATIONS, Parts I. B. 5 , b, 7, and 8. (2) Unless otherwise specified, insulation in excess of 2-l/2 inches total thickness shall be applied in multi-layer construction as specified in the GENERAL SPECIFICATIONS, Part I, B 2. b. Fittings, Flanges, and Valves (1) Fittings, flanges, and valves shall be insulated with prefabricated fitting covers (preferred method) in accordance with the UCCC Dimensional Standards Fabrication Manual. (2) Fitting, flajige and valve covers may be field fabricated provided work is in accordance with the UCCC Dimensional Standards Fabrication Manual, and approved by the Field Representative of the Department of Design and Construction. Segments shall be carefully fitted to insure tight joints. (3) Insulation for all fittings shall be fitted and assembled with tight joints. Cementing of shop fabri cated assemblies shall be done with specified fabricating cement. In all cases the joints shall be as thin as possible, with just sufficient cement to obtain good adhesion and complete closure. In no case will wide cement joints, or voids, and holes filled with fabricating cement, be permitted. Typical installations are shown in Figures 25-H-lG, 25-H-ll, 25-H-L2, and 25-H-13. rl q THiCUHtSS T, AS SPCCiFlfO- A?PUCAT'QN OF HVOROUS CALCIUM SILICATE INSULATION TO WELDING ELL iO 25-H-a II. B. 2. b coned pipe insulation--> \ ------ FINISH AS SPECIFlEO / / NOTE; FLANGE COVER FABRICATED IN ACCOROANCE WITH OIMENSIONAl STANOARO FABRICATION DATA. APPLICATION OF HYDROUS CALCIUM SILICATE INSULATION TO LINE FLANGE Ff 25 - N- II APPLICATION OP HYDROUS CALCIUM SILICATE INSULATION TO FLANGED ELL FIG 25 * M . 12 H. B. Z. b. contd APPLICATION OF HYDROUS CALCIUM SILICATE INSULATION TO FLANGED VALVE no. 2S. H-.3 (4) Fitting insulation shall be secured with specified wire or strap as required. (5) If any fracturing of insulation occurs due to pipe expansion, the break shall be repaired bv covering it with a collar expansion flange cover. c. Traced Installations Traced lines, where specified, shall be installed and insulated in accordance with the GENERAL SPECIFI CATIONS, Part I. B. 16. d. Surface Finish Where present, small cracks and depressions shall be filled and smoothed flush with i n s u 1 a t i n g cement before application of weather-barrier. e . Weather-Barrie r (1) Weather-barrier coating shall be applied in accordance with the GENERAL SPECIFICATIONS, Part I. B. 17. (2) Weather-barrier consisting of stainless steel Jacketing, if required, shall be applied in accordance with the GENERAL SPECIFICATIONS, Part I. B. 13. This requirement is indicated by the addition of the letter M to the specification designation, thus: 25-HM. 25-H-iO UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS II. SPECIFICATION 31 -H Scone Prefabricated Stainless-Cased Aluminum This Specification describes the essential requirements for the purchase and application of prefabricated stainless-cased aluminum reflective insulation for use on piping and equipment normally operating at temperatures from 33 F up to and including 1000 F. Procedures outlined in the GENERAL SPECIFICATIONS are applicable to and constitute an integral part of this Speci fication. A. MATERIAL l. Composition Insulation shall consist of prefabricated units of all-metal construction comprised, in general, of a rigidized Type 3Q2stainiess steel outer shell, enclosing aluminum sheets properly spaced and reinforced with Type 302 stainless steel supports (separators), arranged so as to form isolated air chambers. Units shall be equipped with means of securement. 2. Prope rtie s a. Properties shall be as listed in the following table: Errissivity........................ Shall be approximately 0.03. Reflectivity........................ Shall be approximately 95%. Temperature Limits . . Shall be suitable for use from 33 F to 1000 F without deterioratio: parts. cr?cking of Make................................... Mirror Insulation Company "SC-MIRROR" insulation, or approved equal. b. Forms Prefabricated stainless-cased aluminum reflective insulation shall be furnished in units, which can be easily handled, in the following forms: (l) Sectional Pipe Insulation (a) Standard units shall be made of the following sheet materials: Sheet Location Outer shell: Over 17-inch diameter 17-inch diameter andunder Inner Sheets Material Type 302 SS Type 30 2 SS .Aluminum Alloy Minimum Thickness of Sheet, in. 0.012 (Rigidized) 0.010 (Rigidized) 0.00b (b) Units shall be available in pipe sizes of l/2 inch to 24 inches, made in half sections. One cir cumferential edge of each unit and the longitudinal edges of one half section shall be extended to provide overlap and watershed. Units shall be fabricated to fit snugly together along joints to form effective thermal insulation. (c) Inner sheets shall have longitudinal edges flanged inward to provide reinforcement and a tight joint with opposing sheets upon closure. (d) Units shall be furnished with stainless steel fasteners, or ocher fastening devices where author ized. (2) Fitting covers shall be prefabricated, and of the same general composition and construction as sec tional pipe insulation, except that the outer shell shall be Tvpe o02 stainless steel 0.015 inchthick (minimum), the intermediate sheets shall be of light gage aluminum ailov suitable for forming, and the inner shell shall be Type 30 2 stainless steel 0.003 inch tmek {minimum). ( 3) Equipment panels and head sections, both flat and curved, shall be fabricated of the same general composition and construction as sectional pipe insulation. Sheet materials shall be as follows: Sheet Locution Mate rial Minimum. Thickness oi Sheet, in. Outer sneil Type 502 S3 0.012 ;Kigidizca) Intermediate sheets Aluminum alloy 0.06 Inner Shell Type 30 2 SS 0.03 H- l II. a. 2. b. contd (4) "Quick-Remove" units for piping, or equipment, or both, shall be prefabricated and of the same general composition and construction as sectional pipe insulation, except that the outer and inner shells shall be of gages recommended by the manufacturer for the particular service requirement. These units shall be of heavy-duty construction and shall be designed so as to be easily removed and reinstalled. To facilitate frequent removal and replacement, hinges and buckles shall be provided for securement. (5) Units shall be provided with cut-outs for supports, nozzles, and other projections through insulation, where shown on Purchaser's bid drawings. (6) The number of reflection surfaces and the spacing of the reflective sheets shall be in accordance with the manufacturer's standards. 3. Accessory Materials a. Stainless Steel Insulation Strap - 3/8-inch by 0.0 l 5-inch, Type 304, or approved equa b. Stainless Steel Sheet Metal Screws (minimum Size No. 12) c. Caulking Mastic - Suitable for temperature to which it will be subjected. d. Aluminum Pressure Sensitive Sealing Tape - Suitable for temperature to which it will be subjected. B. A-P PLICA XIQN 1. Equipment a. Supports Equipment shall be provided with insulation supports as specified in the GENERAL SPECIFICATIONS. b. Thickness Schedule Unless otherwise specified, insulation shall be applied in one layer. c. Curved Surfaces Panels fabricated for curved surfaces shall be applied with edges closelv abutting and with outer casing laps, or trim strips, arranged to shed water. Panels shall be secured to each other with sheet metal screws through the casing laps, or trim strips, over joints to form a continuous envelope over the sur face to be insulated, except at expansion joints, flanges, etc. Where required, panels shall be secured with insulation strap or special fasteners. d. Flat Surfaces Panels fabricated for flat surfaces shall be applied in the same manner as specified for curved surfaces. Where the span of surface to be insulated exceeds 30 inches, panels shall be secured to the surface by a method approved by the Owner. Z. Piping a. Pipe Insulation (1) Insulation supports, where required, shall be provided by the Contractor. (2) Unless otherwise specified, insulation shall be applied in one layer. (3) Insulation, shall be applied to piping with the flush separator end of each section inserted into over lapping end of abutting sections. The extended longitudinal edges of each section shall be lapped over flush edges of opposing half-section so that all joints are tightly butted. (4) Lapped edges of outer shell shall be placed so as to shed water. b. Fitting, Flar.ge, Valve and Pipe Bend Covers Fittings, flanges, valves and bent piping shall be insulated in a manner s milur to that for straight piping, The fitting covers shall be appLied with telescoping joint connections to the adjacent pipe i:\iuiation. in Cj.ses where the covers adjoin other types of insulation, the covers shall be designed to overlap the <_is'imiiar insulation. c . Socu r ernent iniuution 'hall be secured m place with insulation strap, or screws, furnished bv the manufacturer, us specified in tr.e Accessory Materials Section of this Specification. 31-H-2 UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS II. SPECIFICATION 15-H Preformed Fibrous Glass High Density (Over 6. 5 lb per cu ft) Scope This Specification describes the essential requirements for the purchase and application of preformed fibrous glass therm al insulation for use on equipment and piping normally operating at temperatures not more than 375 F nor less than 70 F. It is applicable to both indoor and outdoor service. Procedures outlined in the GENERAL SPECIFICATIONS are applicable to and constitute an integral part of this Specifi cation. A. MATERIAL 1 . Composition Material shall be composed of fibrous glass formed into molded pipe and block insulation with a modified phenolic type binder. Insulation for pipe shall have factory-applied fire-retardant jackets. 2. Properties Preformed fibrous glass insulation shall have the following properties: Alkalinity.................................. pH shall be between 7 and 10. Capillarity ....... After 7 days on wet surface, gain in weight shall be 0%. Density: Pipe Shall be not less than 6.5 nor more than 8.0 lb per cu ft. except that pipe smaller than t-l/2 by l may be up to 9 lb per cu ft. Board.................... Shall be not less than 8 nor more than 10 lb per cu ft. Hygro scopicity When exposed to air at 1 20 F and 95% relative humidity for 96 hours, shall be not less than 0.2% by volume. Loss on Ignition . . . Shall be not less than 6 nor more than 10% bv weight. Resistance to Acids. . Fairly good, except to hydrofluoric. Resistance to Alkalies Poor. Specific Gravity . . . Shall average 2. 6 true, 0.11 to 0. 16 apparent. Specific Heat .., Shall average 0.20 Btu per lb per degree F. Temperature Limits . . , Shall be suitable for use from minus 120 F to plus 375 F without mechanical, thermal, or chemical failure. The rmal Conductivity . . . When te sted in accordance with ASTM C 177, latest revision, or ASTM C 335 , latest revision, the thermal conductivity at the given mean temperatures shall not exceed the following values: Mean Temp. Btu/inch, hr, F sq ft, *F 0 0. 20 50 0.22 75 0.23 100 0. 24 0.31 oo Thermal Diffusivity at 75 F. 0.4 sq ft per day Water Absorption .... Percentage of volume is very high, due to open fibrous structure, but aoe not re* (by immersion) tain if water can run out. 15-H-1 II. A. Contd 3. Accessory Materials a. Butt Joint Strips - White Fire-Retardant Jacket material (designated White FRJ), same as factory-applied jacket. b. Welding Pins - 12 gage steel, KSM, Omark, or approved equal. Length shall be equal to insulation thick ness plus l/4 inch minimum. c. Stainless Steel Wire - 0.0475-inch diameter. Type 304, cold drawn, bright annealed, 18 gage. d. Stainless Steel Insulation Strap - l/2-lnch by 0.020-inch, Type 304, A. J. Gerrard, Techalloy, or approved equal. e. Strapping Tape - Glass filament, vinyl-backed, Dutch Brand 400, or approved equal. f. Pipe Insulation Support - Techalloy insulation support strap or approved equal. g- Vapor Seal Lap Cement - Benjamin Foster 31-99, Vimasco Vlny-Lag, or approved equal. h. Weather-Barrier Coating (Color as specified) - PVA - Vimasco No. WC-l, Pittsburgh-Coming Pittcote 500 C, or approved equal. i. Reinforcing Cloth - Glass fabric, 10 by 10 thread count. Perma-Glas, Twinsburg-Miller, Benjamin Foster Open Weave No. 10, or approved equal. j- Vapor Seal Adhesive Cement - Benjamin Foster 81-42W, Vimasco Viny-Lag W, Arabol 60-89-05, or ap proved equal. k. Wire Netting - 1-inch hexagonal mesh, 20-gage, Monel or Type 304 stainless steel. 1. Welded Steel Wire Fabric - 6 by 6 by 6. Fabric shall meet all requirements of ASTM A 185, latest revision. m. Insulating Cement - Hydraulic setting - Baldwin-Ehret-Hill Powerhouse, Eagle-Picher One Coat, Detrick Utility, or approved equal. n. Fabrication Cement - Vimasco "J'' seal "SM or approved equal. B. APPLICATION l. Equipment a. Insulation Supports Equipment shall be provided with insulation supports as specified in the GENERAL. SPECIFICATIONS, Part I. B. 5. b. Thickness Schedule Unless otherwise specified, insulation over 3 inches in total thickness shall be applied in multiple layers. c. Curved Surfaces (1) Insulation for equipment less than 3 feet ir diameter shall be preformed pipe insulation. Insulation for larger equipment shall be bent, and kt rfed where necessary, so as to fit vessel contour, and shall be held in place with stainless steel insulation strap on 9-inch centers. (2) Insulation on bottom heads of vertical equipment shall be secured in place with stainless steel insula tion strap attached to insulation supports, in accordance with UCCC Standard IS-31, (3) On multiple layers of insulation.joints of outer layer shall be staggered a minimum of 2 inches from joints immediately below. (4) Insulation shall be installed with all joints tightly butted, and circumferential butt joints staggered. d. Flat Surfaces (1) Block insulation shall be applied to flat surfaces in staggered position with all joints tightly batted. It shall be secured with wire attached to welded studs with speed nuts; welded blank nuts; welded eye bolt studs; or other approved securement. On rectangular equipment, the studs or nuts, or other ap proved securements, shall be spaced on 12-inch centers, staggered, on bottom surfaces, and on 24inch centers, staggered, on side and top surfaces. Typical installation is shown in Figure 15-H-l. L5-H-2 H. B. 1. d. (1) contd (2) When specified thickness has been applied, the specified wire netting shall be stretched over block and secured in place with tie wires or other approved securement. (3) Entire surface shall be given a smooth and uniformly applied coat of the specified hydraulic setting insulating cement l/2 inch thick. (4) Where stiffeners or other projections make insulation of flat surfaces impracticable, welded steel wire fabric shall be placed over the projections, and secured by spot welding or wire, as specified. Block shall then be secured to the welded wire fabric with wire, as specified in Part II. B. 1. d. (1). e. Weather-Barrier If specified, weather-barrier shall be installed in accordance with the GENERAL SPECIFICATIONS, Part I. B. 17. 2. Piping a. Pipe Insulation (1) Unless otherwise specified, insulation in excess of 2-l/2-inch total thickness shall be applied in multiple layers, as specified in the GENERAL SPECIFICATIONS, Parti. 3. 1. W h e. : e possible. Joints of outer layer shall be staggered a minimum of 2 inches from joints immediately below. (2) Insulation shall be applied to pipe in accordance with the GENERAL SPECIFICATIONS, Parts I. B. 5, 6, 7, and 8. Laps of factory-applied fire-retardant jackets shall be sealed with the specified vapor seal lap cement. All joints shall be tightly butted, and covered with the specified butt joint strips 4 inches wide, lapped the same as the jackets. The strips shall be attached to the jackets with the specified vapor seal adhesive cement, and strip laps sealed with vapor seal lap cement. b. Fitting, Flange, and Valve Covers (l) Fitting, flange, and valve covers may be factory-molded, or shop-fabricated in accordance with the UCCC Dimensional Standards Fabrication Manual, or ASTM Recommended Practice C 450, Latest re vision. Typical fitting covers are shown in Figures 15-H- 2 and l 5-H- 3. Covers for flange s , and other screwed or flanged fittings and valves, shall be similar to those shown. 13-H-3 II. B. Z. b. contd factor*- wouDeo coven NOTE: FABRICATED COVER A SLTAENRNAAPTPEROVEO -SURFACE REINFORCED WITH CLASS FABRIC CMSCDOEO .N VAPOR SEAL LAP CEMENT A NO IF SPECIFIED OVER CCATEO WITH WEATHER' BARRIER PIPE INSULATION APPLICATION OF FIBROUS GLASS INSULATION TO SCREWED ELL Fl IS-**-* VOTE '.<c'iCES CF faCTORv-molOED -3vfRS TO 9E ``E'NFORCEO *iTn Class fa8*`C embedoco is vapor seal a 'Event an0 'F SPEC'FlCD O^ER CC4TtO WITH nEaTmER - BARRIER CCAT SC C F VAPCR SEAL LAP ccateo *E aT"E - 6 ARR E R ,e *:: f eo FIBROUS GLASS SL^RORT BLOCKS EOt*-C<NESS \ 45 SPEC -ES'SE CEMENT LF .APOR SEA i?LICATION OF PREFORMED FIBROUS GLASS INSULATION TO FLANGEO r iG 15-H-4 n. B. Z. b. contd (2) Fitting, flange, and valve covers may be field-fabricated, provided work is in accordance with the UCCC Dimensional Standards Fabrication Manual, or ASTM C 450, latest revision, and approved by the Field Representative of the Department of Design and Construction. (3) The two halves of factory-molded covers shall be strapped together with stainless steel insulation strap for outside diameters larger than 8-5/8 inches and with the specified strapping tape for outside diameters 6-5/8 inches and less. (4) The two halves of fabric.*,-a coders shall be cemented together with vapor seal adhesive cement. In all cases the joints shall be as thin as possible, with just sufficient cement to obtain good adhesion and complete closure. In no case will wide cement joints, or voids and holes filled with cement, b e per mitted. (5) The pipe insulation adjacent to covers for screwed fittings and valves shall be fitted tightly to the butt ends of the cover, and the joints sealed as specified for piping. (6) The surfaces of factory-molded covers 9hall be coated with vapor seal lap cement, and reinforced with the specified glass fabric embedded in the cement. (7) The surfaces of fabricated covers shall be coated with vapor seal lap cement, c. Weather-Barrier If specified, weather-barrier shall be installed in accordance with the GENERAL. SPECIFICATIONS, Part I. B. 17. 15-H-5 UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS H. SPECIFICATION 15-L Scope Preformed Fibrous Glass High. Density (Over 6.5 lb per cu ft) This Specification describes the essential requirements for the purchase and application of preformed fibrous glass thermal insulation for use on equipment and piping normally operating at temperatures not more than 100 F nor less than 20 F. It is applicable to both indoor and outdoor service. Procedures outlined in the GENERAL SPECIFICATIONS are applicable to and constitute an integral part of this Specifi cation. A. MATERIAL 1. Composition Material shall be composed of fibrous glass formed into molded pipe and block insulation with a modified phenolic type binder. Insulation shall have factory-applied fire-retardant vapor barrier jackets. 2. Prooerties Preformed fibrous glass insulation shall have the following properties: Alkalinity.................................. pH shall be between 7 and 10. Capillarity............................. After 7 days on wet surface, gain in weight shall be 0%. Density: Pipe ............................. Shall be not less than 6.5 nor more than 9- 0 lb per cu ft. Block............................. Shall be not less than 8 nor more than 10 lb per cu ft. Hygroscopicity........................ When exposed to air at 120 F and 95% relative humidity for 96 hours, shall be less than 0.2% by volume. Loss on Ignition................... Shall be not less than 6 nor more than 10% by weight. Resistance to Acids . . . Fairly good, except to hydrofluoric. Resistance to Alkalies . . Poor Specific Gravity................... Shall average 2. 6 true, 0.11 to 0 . 16 apparent. Specific Heat........................ Shall average 0.20 Btu per lb per degree F. Temperature Limits . . . Shall be suitable for use from minus 120 F to plus 375 F without mechanical, thermal, or chemical failure. Thermal C inductivity. . . When tested In accordance with ASTM C 177. latest revision, or ASTM C 3 15, latest revision, the thermal conducitivty at the given mean temperatures shall not exceed the following values: Mean Temp. Btu/inch, hr. 'F sq ft, *F 0 0. 20 50 0. 22 75 0. 23 100 0. 24 200 0. 31 Thermal Diffusivity at 75 F 0.23to0.40 sqftper day Water Absorption .... Percentage of volume is very high, due to open fibrous structure, but does not re- (by immersion) tain if water can run out. 1 5-L- l II. A . contd 3. Accessory Materials a. Butt Joint Strips and Vapor-Barrier - White Fire-Retardant Jacket material (designated White FRJ), same as factory-applied jacket. b. Welding Pins - IZ gage steel, KSM, Omark, or approved equal. Length shall be equal to Insulation thickness plus l/4 inch minimum. c. Stainless Steel Wire - 0.0475-inch diameter. Type 304, cold drawn, bright annealed, lb gage. d. Stainless Steel Insulation Strap - l/Z-inch by O.OZO-inch, Type 304, A. J. Gerrard, Techalloy, or approved equal. e . Straoping Tape - Glass filament, vinyl-backed, Dutch Brand No. 400, or approved equal. f. Pipe Insulation Support - Techalloy insulation support strap or approved equal. g- Vapor Seal Lap Cement - Benjamin Foster 81-99, Vlmasco Viny-Lag, or approved equal. h. Fire-Resistant Mastic - Benjamin Foster 60-3QN or approved equal. i. Weather-Barrier Coating (Color as specified) - PVA - Vimasco No. WC-1, Pittsburgh-Cor n ing Pittcote 500 C, or approved equal. j- Reinforcing Cloth - Glass fabric, 10 by 10 thread count, Perma-Glas, Twinsburg-Miller, Benjamin Foster Open Weave No. 10, jr approved equal. k. Vapor Seal Adhesive Cement - Benjamin Foster 81-42W, Vimasco Viny-Lag W, Arabol 60-89-05, or ap proved equal. 1. Wire Netting - l-inch hexagonal mesh, 20-gage, Monel or Type 304 stainless steel. m. Welded Steel Wire Fabric - 6 by 6 by 6. Fabric shall meet all requirements of ASTM A 185, latest re vision . n. Fabrication Cement - Vimasco "J" seal MSM, or approved equal. 3. APPLICATION l . Equipment a. Insulation Supports Eouioment shall be provided with insulation suoports as specilied in the GEN'ER-AL SPECIFICATIONS, Part I. B. 5. b. Thickness Schedule Unless otherwise specified, insulation over 3 inches in total thickness shall be applied in multiple layers. c. Curved Surfaces (1) Insulatioa for equipment less than 3 feet in diameter shall be preformed pipe insulation. Insulation for larger equipment shall be bent, and kerfed where necessary so as to fit vessel contour, and shall be held ir. place witn stainless steel insulation strap on 9-inch centers. (2) Insulation shall be installed with all joints tightly butted, and circumferential butt joints staggered. (3) Each layer of insulation shall be vapor sealed as called for in Part II. B. 1. e. (4) On multiple layers of insulation, joints of outer layer shall be staggered a minimum of 2 Inches from joints immediately below. (5) Insulation on bottom heads of vertical equipment shall be secured in place with stainless steel insula tion strap attached to insulation supports, m accordance with UCCC Standard 13- 31 . d. Flat Surface s (l) Block insulation shall be applied to flat surfaces in staggered position with all joints tight!'/ butted. It shaLl be secured with wire attached to welded studs with speed nuts; welded bianx nuts; weined eye bolt studs; or other aooroved securement. On rectangular equipment, the studs or nuts, or other approved securement s, snail be soaced on 12-inch centers, staggered, on bottom surfaces, .tr.d or. 24-mch cen ters, staggered, or. side ana top surfaces. Typical installation: a shown in, Figure i 5 - L - i . 1 5 -L-2 I 3. B. 1 . d. (1) contd I (2) Where stiffeners or other projections make insulation of flat surfaces impracticable, welded steel wire fabric shall be placed over the projections, and secured bv spot welding or wire, as specified. Block insulation shall then be secured to the welded wire fabric with wire, as specified in Part II. B. 1. d. (1) and vapor sealed as specified in Part II. B. 1. e. e. Vapor-Barrier Where eauipment operating below 70 F is insulated with multiple layers of insulation, which does not have a factorv-aoplied vapor-barrier jacket, a vapor-barrier consisting os the specified jacket material shall be installed between each layer, using the specified vapor seal adhesive cement. All edges shall be lapped a minimum of 2 inches, and all laps sealed with the specified vapor seal lap cement. Vapor-barrier over the outer layer, and over single layer insulation not having the vapor-barrier jacket, shall consist of the speci fied jacket material applied in the same manner, except that laps shall be sealed with the specified fireresistant mastic. f. Projections Through Insulation All metal projections through the insulation shall be insulated with 1/2 the specified thickness of the insu lation for a minimum distance of four times the specified thickness. Vapor-barrier shall be installed as called for in Part II. B. 1. e. g. Weather-Barrier If specified, weather-barrier shall be installed in accordance with the GENERAL SPECIFICATIONS, Part I. B. 17. Piping a. Pipe Insulation (1) Unless otherwise specified, insulation in excess of 2-l/2-inch total thickness shill be applied in trvulttole layers, as soecified in the GENERAL SPECIFICATIONS, Part I. 3. 1. .'.here possible, joints of outer layer shall be staggered a minimum of 2 inches from joints immeciatelv below. b. Fitting, Flange, and Valve Covers (I) Fitting, flange, ^nd valve covers may be factory-molded, or shop-fabricated m accordance with the UCCC Dimensional Standards Fabrication Manual, or ASTM Recommended Practice C 450. latest revision. Tyoical fitting covers are shown in Figures 15-L-2 ar.d l 5 -- L - 3. Covers for flanges, and other screwed or flanged fittings and valves, shall be similar to those snown. 15-L-3 II. B. 2. b. contd FACTORY-APPLIED Fiat RETARDANT JACKET? wEATmR-8ARRIER IF SPECIFIED? -4* BUTT STRIP OF / / JACKET MATERIAL FAC TORY-mOLOEO COVER NOTE FABRICATED COVER S AM APPROVEO EwUAL SURFACE RCINFORCCO WITH GLASS FABRIC CV8C00C0 IN VAPOR SEAL LAP CEMENT AND IF SPECIFIED OVER COATEO witm WEATHER* Barrier PIPE INSULATION APPLICATION OF FIBROUS GLASS INSULATION TO SCREWED ELL I i A00 Jk a-no-I F' -V- !";[ DETAILS Cc INSULATED P;P CLAMP AND INSULATED ROD MANGER G S- * ' 5 - L - * m vm II. B. Z. b. contd (2) Fitting, flange, and valve covers may be field fabricated, provided work is in accordance with the UCCC Dimensional Standards Fabrication Manual, or ASTM C 450, latest revision, and approved by the Field Representative of the Department of Design and Construction. (3) The two halves of factory-molded covers shall be strapped together with stainless steel insulation strap for outside diameters larger than 3-5/8 inches, and with the specified strapping tape for outside I diameters 8-5/8 inches and '-ss. (4) The two halves of fabricated covers shall be cemented together with vapor seal adhesive cement. In all cases the joints shall be as thin as possible, with just sufficient cement to obtain good adhesion and complete closure. In no case will wide cement joints, or voids and holes filled with cement, be permitted. (5) The pipe insulation adjacent to ocvers for screwed fittings and valves shall be fitted tightly to the butt ends of the cover, and the joints sealed as specified for piping. (6) The surfaces of factory-molded covers shall be coated with vapor seal lap cement, and reinforced with the specified glass fabric embedded in the cement. (7) The surfaces of fabricated covers shall be coated with vapor seal lap cement, c. Pipe Hangers Pipe hangers and hanger rods shall be insulated as shown in Figure 15-L-4. NOTE SURFACES 0* FACTOR*MOLDED COVERS TO BE REINF0RCE0 WITH GLASS FABRIC EM8E00E0 IN VAPOR seal LAP cement ANO. IF SPECIFIED. OVER C0ATEQ WITH WEATHER-BARRIER APPLICATION of PREFORMED FiSPOUS GL&SS INSULATION TO FLANGED cLL F 1 '5 *L 3 d. Weather-Barrier If specified, weather-barrier snail be installed in accordance with the GENERAL oPECIr ICATION'5, Part I. 3. 17. 1 5-L-5 UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS 3. SPECIFICATION 16-H Preformed Fibrous Glass Low Density (More than 3 Ib/cu ft) S cone This Specification describes the essential requirements for the purchase and application of preformed glass fiber thermal insulation for use on piping normally operating at temperatures above 70 F and up to and including 350 F. It is applicable to both indoor and outdoor service. Procedures outlined in the GENERAL. SPECIFICATIONS are applicable to and constitute an integral part of this Specifi cation. A. MATERIAL l. Composition Material shall be composed of fibrous glass molded into pipe insulation with a modified phenolic type binder, and a factory-applied fire-resistant jacket. 2. Properties Preformed fibrous glass insulation shall have the following properties: Alkalinity.................................. pH shall be between 7 and 10. Capillarity............................. After 7 days on wet surface, gain in weight shall be 0%. Density .................................. Shall be greater than 3 and less than 5 lb per cu ft. Hygroscopicity....................... When exposed to air at 1 20 F and 95%relative humidity for 96 hours, shall be less than 0.2% by volume. Loss on Ignition.................. Shall be between 8 and 19% by weight. Resistance to Acids. . . . Fairly good, except to hydrofluoric. Resistance to Alkalies . . Poor. Specific Gravity Shall average 2.6 true, 0.047 to 0.071 apparent. Specific Heat ....................Shall average 0.20 Btu per lb per degree F. Temperature Limits . . . Shall be suitable for use from minus 120 F to plus 375 F without mechanical, thermal, or chemical failure. Thermal Conductivity. . When tested in accordance with ASTM C 177, latest revision, or ASTM C 335, latest revision, the thermal conductivity at the given mean temperatures shall not exceed the following values: Mean Temp. Btu/inch, 'F sq ft, aF 0 0. 20 5 0 0. 22 75 0. 23 100 0. 24 oo 0. n Thermal Diffusivity at 75 F- 0.46 sq ft per day (5 lb) 0.77 sq ft per day (3 lb) Water Absorption fbv immersion) .... Percentage of volume is very high, due to open fibrous structure, but does not retain if water can run out. 1 6-H- 1 H. A. contd 3. Accessory Materials a. Butt Joint Strips - White Fire-Retardant Jacket material {designated White FRJ), same as factory-applied jacket. b. Stainless Steel Wire - 0.0475-inch diameter, Type 304, cold drawn, bright annealed, 18 gage. c. Stainless Steel Insulation Strap - A. J. Gerrard, Techalloy, l/2-inch by 0.20-inch, Type 304, or approved equal. d. Strapping Tape - Glass filament, vinyl-backed, Dutch Brand No. 400, or approved equal. e. Pipe Insulation Support - Techalloy insulation support strap or approved equal. f. Vapor Seal Lap Cement - Benjamin Foster 81-99 Sealfas, Vimasco Viny-Lag, or approved equal. g. Weather-Barrier Coating (Color as specified) - PVA - Vimasco No. WC-l, Pittsburgh-Corning Pittcote 500 C, or approved equal. h. Reinforcing Cloth - Glass fabric, 10 by 10 thread count, Perma-Glas, Twinsburg-Miller, Benjamin Foster Open Weave No. 10, or approved equal. i. Vapor Seal Adhesive Cement - Benjamin Foster 81-42W, Vimasco Viny-Lag W, Arabol 60-89-05, or ap proved equal. j. Fabrication Cement - Vimasco "J" seal "S" or approved equal. B. APPLICATION l. Piping a. Pipe Insulation (1) Uales s otherwise specified, insulation in excess of 2-l/2-inch total thickness shall b e applied in multiple layers, as specified in the GENERAL SPECIFICATIONS, Part I. B. 1. Whe re possible, joints of outer layer shall be staggered a minimum of 2 inches from joints immediately below. (2) Insulation shall be applied to pipe in accordance with the GENERAL SPECIFICATIONS, Parts I. B. 5 . 6 . 7 , and 8. Laps of factory-applied fire-retardant jackets shali be sealed with the specifi e d vapor seal lap cement. All joints shall be tightly butted, and covered with the specified butt joint strips 4 inches wide, lapped the same as the jackets. The strips shall be attached to the jackets with the specified vapor seal adhesive cement, and strip laps sealed with vapor seal lap cement. b. Fitting, Flange, and Valve Covers (i) Fitting, flange, and valve covers shall be factory-molded, or shop-fabricated in accordance with the CCCC Dimensional Standards Fabrication Manual, or ASTM Recommended Practice C 450, latest re vision. Typical fitting covers are shown in Figures 16-H-l and 16-H-2. Covers for flanges, and other screwed or flanged fittings and valves, shall be similar to those shown. 1o-H-2 3. 1 b. (1) contd FACTORY-MOL060 COVER NOTE'- FA8RICATC0 COVCR S AN APPROVEO COUAi.. SURFACE RCINFORCEO WITH Cl.ASS FABRIC EM8E00E0 IN VAPOR SEAL CAP CEMENT ANO IF SPCClfiEO OVER COATEO WITH WEATHER* BARRIER. PIPE INSULATION APPLICATION OP FIBROUS GLASS INSULATION TO SCREWED ELL 1o-H-3 II. S. 1. b. contd (2\ Fitting, flange, and valve covers maybe field-fabricated, provided work ts in accordance with the UCCC Dimensional Standards Fabrication Manual, or A5TM C 450, latest revision, and approved by* the Field Representative of the Department of Design and Construction. (3) The two halves of factory-molded covers shall be strapped together with stainless steel insulation strap for outside diameters larger than 4-l/2 inches, and with the specified strapping tape for outside diameters 4-l/Z inches and less. (4) The two halves of fabricated covers shall be cemented together with vapor seal adhesive cement. In all cases the joints shall be as thin as possible, with just sufficient cement to obtain good adhesion and complete closure. In no case will wide cement joints, or voids and holes filled with cement, be permitted. (5) The pipe insulation adjacent to covers for screwed fittings and valves shall be fitted tightly to the butt ends of the cover, and the joints sealed as specified for piping. (6) The surfaces of factory-molded covers shall be coated with vapor seal lap cement, and reinforced with the specified glass fabric embedded in the cement. (7) The surfaces of fabricated covers shall be coated with vapor seal lap cement, c. Weather-Barrier If specified, weather-barrier shall be installed in accordance with the GENERAL SPECIFICATIONS, Part I. B. 17. I6-H-4 LI. B. 2. contd (2) Fitting, flange, and valve covers may be field fabricated, provided work is in accordance with the UCCC Dimensional Standards Fabrication Manual, or ASTM C 450, latest revision, and approved by the Field Representative of the Department of Design and Construction. (3) The two halves of factory-molded covers shall be strapped together with stainless steel insulation strap for outside diameters larger than 4-1/2 inches, and with the specified strapping tape for out side diameters 4-1/2 inches and less. (4) The two halves of fabricated covers shall be cemented together with vapor seal adhesive cement. In all cases the joints shall be as thin as possible, with just sufficient cement to obtain good adhesion and complete closure. In no case will wide cement joints, or voids and holes filled with cement, be permitted. l (5) The pipe insulation adjacent to covers for screwed fittings and valves shall be fitted tightly to the butt ends of the cover, and the joints sealed as specified for piping. (6) The surfaces of factory-molded covers shall be coated with vapor seal lap cement, an d reinforced with the specified glass fabric embedded in the cement. (7) The surfaces of fabricated covers shall be coated with vapor seal lap cement, c. Pipe Hangers Pipe hangers and hanger rods shall be insulated as shown in Figure 16-L-4. d. Weather-Bar ner If soeciiiec. weather-barrier shall be installed in accordance with the GENERAL SPECIFICATIONS, Part I. 3. 17. SPECIFICATION 16-L Scooe UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS Preformed Fibrous G2ass Pipe Insulation - from 3.0 to 5.0 lb/cuft Board - from 3.0 to 10.0 lb/cuft This Specification describes the essential requirements for the purchase and application of preformed i i b r o u s glass thermal insulation for use on equipment and piping normally operating at temperatures not more than 100 F nor less than 20 F. It is applicable to both indoor and outdoor service. Procedures outlined in the GENERAL SPECIFICATIONS are applicable to and constitute an integral part of this Specifi cation. A. MATERIAL i . Comoosition Material shall be composed of fibrous glass molded into pipe and board insulation with a modified phenolic type binder. Insulation shall have a factory-applied fire-retardant vapor barrier jacket. 2. Prooerties Preformed fibrous glass insulation shall have the following properties: Alkalinity................................... pH shall be between 7 and 10. Capillarity.............................. After 7 days on wet surface shall show no evidence of capillarity. Density: Pipe .............................. Shall be not less than 3.0 nor more than 5 lb per cu ft. 3oard .............................. Shall be not less than 3.0 nor more than 10.0 lb per cu ft. Hygroscopicity........................ When exposed to air at 1 20 F and 95% relative humidity for 96 hours, shall be less than 0.2% by volume. Loss on Ignition.................... Shall be not less than 6 nor more than 19% by weight. Resistance to Acids . . . Fairly good, except to hydrofluoric. Resistance to Alkalies . . Poor. Specific Gravity Specific Heat Temperature Limits Shall average 2.6 true, 0.047 to 0.16 apparent. Shall average 0. 20 BTU per lb per degree F. Shall be suitable for use from minus 120 F to plus 375 F without mechanical, therm al, or chemical tailure. The cmal Conductivity. . . When te sted in accordance with .45 TM C 177, latest revision, or ASTM C 3 3 5 , latest revision, the thermal conductivity at the given mean tempe rature s shall not exceed the following values: Mean Temp Btu/inch, hr. *F sq ft, *F 3 0. 20 50 0.22 75 0. 23 100 0. 24 20 0 0. 31 Thermal Diffusivitv at 75 F. 0.77 sq ft per day (3-lb) 0.23 sq ft per day {1 0-ib) Water Absorption (by mmsrsion) Percentage of volume is very high, due to open fibrous structure, but does not re tain if water can run out. 1 o- L- 1 _LI. A. contd 3 * Accessory Materials a. Butt Joint Strips - White Fire-Retardant Vapor Barrier Jacket material (designated White FRJ), same as factory-applied Jacket. b. Welding Pins - 1 2-gage-steel, KSM, Omark, or approved equal. Length shall be equal to insulation thickness plus i/4 Inch minimum. c. Stainless Steel Wire - 0.0475-inch diameter, Type 304, cold drawn, bright annealed, 18 gage. d. Stainless Steel Insulation Strap - l/2-lnch by 0.020-inch, Type 304, A. J. Gerrard, Tech&lloy, or approved equal. e. Strapping Tape - Glass filament, vinyl-backed, Dutch Brand No. 400, or approved alternate. f. Pipe Insulation Support - Techalloy insulation support strap or approved equal. g. Vapor Seal Lap Cement - Benjamin Foster 81-99, Vimasco Viny-Lag, or approved equal. h. Fire-Resistant Mastic - Benjamin Foster 6Q-30N or approved equal. 1. Weather-Barrier Coating (Color as specified} - PVA - Vimasco No. WC-l, Pittsburgh-Coming Plti'dote 500 C, or approved equal. j. Reinforcing Cloth - Glass fabric, 10 by 10 thread count, Perma-Glas, Twinsburg^Miller, Benjamin Foster Open Weave No. 10, or approved equal. k. Vapor Seal Adhesive Cement - Benjamin Foster 31-42W, Arabol 60-89-05, Vimasco Vtny-lag W, or ap proved equal. l. Wire Netting - 1-inch hexagonal mesh, 20-gage, Men el or Type 034 stainless steel. m. Welded Steel Wire Fabric - 6 by 6 by 6. Fabric shall meet all requirements of ASTM A 185, latest re vision. n. Fabrication Cement - Vimasco "J" seal MSn or approved equal. B. APPLICATION 1 . Eoui oment a. Insulation Supports Equipment shall be provided with Insulation supports as specified in the GENERAL. SPECIFICATIONS, Part I. B . 5. b. Thickness Schedule Unless otherwise specified, insulation over 3 inches in total thickness shall be applied in multiple layers. c. Curved Surfaces (1) Insulation for equipment Lisa than 3 feet in diameter shall be preformed pipe Insulation. Insulation for larger equipment shall be bent, and keried where necei sary, so as to fit vessel contour, and shall be held in place with itaialess steel insulation scrap on 3-inch centers. (2} Insulation shall be installed with all joints tightly butted, ar.d circumferential butt joints staggered. (3) Each layer of Insulation shall be vapor sealed as called for in Part LI. B. 1. . (4) On multiple layers of insulation, Joints of outer layers shall be staggered a minimum of 2 inches from joints Immediately below. (5} Insulation on bottom heads of vertical equipment shall be secured in place -with stainless steel Insula tion strap or stainless steel wire attached to insulation supports in accordance witrv UCCC Standard :s - 31. d . F1 at Surfaces M) 3oard insulation shall be applied to llat surfaces In staggered position with all Joints tightly butted. It shall oe secure i with stainless steel wire attached to welded studs with speed nuts; welded blanx -.'itH; welded eve ooit studs; or other approved securemer.t. On rectangular equipment, the studs or nuts, zr itr.er improved securements. .-.rull be soaced on 12-inch centers, staggered, on bottom sur faces. and on 24-mch centers, staggered, on side .and top surfaces. Tvpical installation Is shown in Figure ! o-L- l . 1 o- L- 2 3. 1. d. (1) contd r- i 1a t 1 l 1 APPLICATION OF PREFORMED FIBROUS GLASS INSULATION TO FLANGED ELL f'C l-L-5 (2) Where stiffeners or other projections make insulation of flat surfaces impracticable, welded steel wire fabric shall be placed over the projections and secured by spot welding or wire, as specified. Board insulation shall then be secured to the welded wire fabric with wire, as specified in Part II. B. 1. d. (1), and vapor sealed as specified in Part II. B. I. e. e. Vapor-Barrier 'Where eauipment operating below 70 F is insulated with multiple layers of insulation which does not have a factory-applied vapor-barrier jacket, a vapor-barrier consisting of the specified jacket material shall be applied to each layer before the next laver of insulation is installed, using the specified vapor seal adhesive cement. All edges shall be lapped a minimum of 2 inches, and all laps sealed wieh the specified vapor seal lap cement. Vapor-barrier over the outer laver, and over single layer insulation not having the v a p o r barrier jacket, shall consist of jacket material applied in the same manner, except that laps shall be sealed with the specified fire-resistant mastic. f. Projections Through Insulation .Ml metal projections through the insulation shall be insulated with l/2 the specified thickness of insulation, for a minimum distance of four times the specified thickness. Vapor-barrier shall be installed as called for in Part II. B. 1. e. g. Weather - Barrier If specified, weather-barrier shall be installed in accordance with the GENERAL SPECIFICATION5, Part I. 3. 17. Piping a. Pipe Insulation (1) Unless otherwise soecified, insulation in excess of 1 inches total thickness shaLl be applied in mul tiple iavers, as specified in the GENERAL SPECIFICATIONS, Part I. 3 . I . '-Vhe re posaible.joints of outer layer shall be staggered a minimum of 2 inches from joints immediately below. (2) Insulation shall be aoplied to pipe m accordance with the GENERAL SPECIFICATIONS, Parts I. 3. 5, 6, 7, and 8. Laps of factory-applied fire-retardant jackets snail be sealed with vapor seal lap cement. .Ail joints shall be tightly butted, and covered with the specified butt joint strips 4 inches wide, lapped the same as the jackets. The strips shall be adhered to tne jackets with vapor seal ad hesive cement, and strip laps sealed with vapor seal lap cement. Ib-L-3 H. B. contd b. Fitting, Flange, and Valve Covers (1) Fitting, flange, and valve covers may be factory-molded, or shop-fabricated In accordance with the UCCC Dimensional Standards Fabrication Manual, or A5TM Recommended Practice C 450, latest revision. Typical fitting covers are shown in Figures 16-L-Z and 16-L-3. Covers for flanges, and other screwed or flanged fittings and valves, shall be similar to t^ose shown. r r.OC S-4B04NT .AC**ET AT-.fc ^Aflo.ep - SPCCif 0 * ' 9uT T Z OF S*rBiAL -O'OH* '.'i'. ^ i ` CZ\~ f;0O!Ci*FO 'Cvt j -^ sugars *ith G^ASS -S69-C r%9EOOeO :M v-OB >?'*. . jp INVENT amo -F r :vt COAftC .viN .fi'-'ES 3A09liR srt rA6CA:gQ -;v\ES ro n c: 'p-o a -is CES*fNT AMO f - , r- - - .-3 v r H At *:-- 5 I , i- 1 1: PiE INSULATION LA! ^.N Of rigRQjS GLASS INSULATION TO SCREWED ELL c 0 6-L -2 A0'`.fS A-EflE * pc PO0.FCTS 9'-ACRRU|G0n ,'a.A:PCeBt 5-Ai.w 9E E!A*.ED If" LiS Ct'ilNr 1/: nuts a*li NO '*.s 09 OTmFQ aposovFO .:.."-S;F-A'CEL3S :-*!.0: .`4: j AVO FOB SURFACES \ " E - : C r AC GE-0 \'ES S^ACCt-EO 1 .** 00* f OM SiLt I APPLICATION CP P^SPQRMEO F'SRQUS GLASS INSULATION TO FLAT SURFACE 16-L-4 ;i, SPECIFICATION 17-FX UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS Fibrous Glass Flexible Duct Insulation Scooe This Specification describes the essential requirements for the purchase and application of glass fiber blanket insulation :or use on the exterior surfaces of heating, ventilating, and air conditioning ducts. A. MATERIAL 1, Composition Material shall be composed of fibrous glass with a modified phenolic resin binder, formed into a flexible blanket, and faced with a factory-applied fire-retardaait vapor barrier of kraft paper reinforced with 0.00 2-inch aluminum foil. 2. Propertie s Flexible fibrous glass insulation shall have the following properties*. Alkalinity................................................. pH shall be between 7 and 10. Capillarity............................................ After 7 days on wet surface, gain in weight shall be 0%. Density, average of 10 samples . Shall not be less than 0.9 lb per cu ft. fr Hygroscopicity........................ When oven-dried to constant weight, then exposed to air at 70 F and 90% relative humidity for 14 days, gain in weight shall be not more than 2%. Resistance to Acids........................ Fairly good, except to hydrofluoric. Resistance to Alkalies.................... Poor. Specific Heat....................................... Shall average 0.20 Btu per lb per cu ft. Temperature Limits........................ (Glass Core) Shall be suitable for use from minus 120 F to plus 375 F without mechanical, thermal, or chemical failure. Tensile Strength (Parting Strength, average) ........................ Thermal Conductivity........................ Shall be greater than 1.2 lb per gram of weight. When tested in accordance with ASTM C 177, latest revision, the thermal conductivity at the given mean temperatures shall not exceed the following values: Mean Temp Btu/inch, hr, F sq ft, *F 75 Q.26 100 Q.27 Thermal Diifusivity at 75 F . . . Water Absorption (by immersion) ........................ 2. 5 sq ft per day. Percentage of volume is very high, due to open fibrous structure, but does nit retain if water can run out. Accessory Materials a. Strapping Tape - Glass filament, vinyl backed, Dutch Brand No. 400 or approved equal. b. Fire-Resistant Adhesive - Benjamin Foster 81-99, Minnesota Mining and Manufacturing Company EC-390, Vimasco Viny-Lag, or approved equal. c. Reinforcing Cloth - Glass fabric, 10 by 10 thread count, Perma-Glas. Twinsburg-M'.ller, Benjamin Foster Open Weave No. 10, or approved equal. d. Exterior Paper Wrapping - Resin-sired or asbestos paper.' 17-FX-l II. A. 3. contd e. Weather-Barrier Coating (Color as specified) - PVA - Vlmasco No. WC-1, Pittsburgh-C o r n 1 a g Pittcote 500 C, or approved equal. f. Lagging Coating (Color as specified) - Resin base, Benjamin Poster Lagtone, Armstrong Insulcolor, Vlmasco Viny-Lag, or approved equal. g. Outer Covering - 8-oz canvas. B. APPLICATION l. Thickness of Insulation Thickness of insulation shall be as scheduled. 2. Concealed Indoor Ducts Insulation shall be adhered to ducts with the specified fire-resistant adhesive. All joints shall be tightly butted and sealed with the specified strapping tape adhered to the insulation with fire-resistant adhesive. Typical in stallation is shown in Figure 17-FX-l. Exposed Indoor Ducts Insulation shall be applied as specified in Part n. B. 1. The specified exterior paper wrapping shall be in stalled over the lasulation in such a manner that the wrapping is smooth and free from wrinkle s. The paper wrapping shall be secured, and all joints sealed, with the specified strapping tape. Canvas outer covering shall be adhered to the paper wrapping with the specified lagging coating. After drying, the canvas shall be given a second application of lagging coating in sufficient thickness to provide a smooth, evenly textured, and evenly colored surface. 4. Outdoor Ducts Insulation and exterior paper wrapping shall be applied as specified in Parts H. B. 1 and II. B. 2, respectively. Weather-barrier of the specified reinforcing cloth and weather-barrier coating shall be installed In accordance with the GENERAL SPECIFICATIONS, Parti. B. 17. 17-FX-2 Ii i i \ V union carbide chemicals company DEPARTMENT OF DESIGN AND CONSTRUCTION ACOUSTICAL AND/OR THERMAL DUCT LINER SPECIFICATIONS SPECIFICATION 17-FY Fibrous Glass Flexible Duct Insulation (More than 2 lb per cu ft) "cope "his Specification describes the essential requirements for the purchase and application of fibrous glass flexible duct liner acoustical and thermal insulation for use on supply and return air ducts, carrying both conditioned and warm air. A. MATERIAL 1. Comoosition Material shall be composed exclusively of long textile-type glass fibers bonded into an acoustical and thermal blanket with a modified phenolic type binder. Surface spray coating one side shall meet NBFU 90A and 90B bulletins and shall be clearly imprinted on surface face with density and thickness. 2. Properties Alkalinity.................................. pH shall be between 7 and 10. Capillarity.................................. After 7 days on wet surface there shall be no capillary action. Density .................................. Shall be not less than 2 lb per cu ft. Erosion Resistance .... Shall handle air velocities up to 7500 ft per minute with no air erosion. Friction Coefficient .... Shall not exceed 0.030. Hygroscopicity........................ When exposed to air at l 20 F and 95% relative humidity for 96 hours, shall be less than 0.2% by volume. Loss on Ignition........................ Shall not be less than 12 nor more than 20% by weight. Resistance to Alkalies . . . Poor Noise Reduction Coefficient. NRC shall be 0.75 or above. Specific Gravity........................ Shall average 2.5 true, 0.03 apparent. Specific Heat ........................ Shall average 0.20 Btu per lb per degree F. Temperature Limits .... Shall be suitable for use from minus 120 F to plus 250 F without mechanical, thermal, or chemical failure. Thermal Conductivity . . . When tested in accordance with ASTMC177, latest revision, or ASTM C335, latest revision, the thermal conductivity at the given mean ten peratures shall not exceed the following values: Mean Temp Btu/inch, hr, *F sq ft, *F 5$ 0.22 0.23 100 0.25 Thermal Diffusivity At 75F 1.2 sq ft per day. Water Absorption .... Percentage of volume is very high due to open fibrous structure, but does not re tain if water can run out. 3. Accessory Materials a. Adhesive - Quick-tacking rubber based, 3enjamin Foster 81-71, or approved equal. b. Sheet Metal screws and washers. c. Welding Pins - 12 gage steel, KSM, Omark, or approved equal. Length shall be equal to insulation thick ness plus l/4 inch minimum. d. Fasteners - Pin clips to lit pins. 17-FY-l n. b. B. APPLICATION 1. Thickness of Insulation Thickness of insolation shall be as scheduled. 2. Forming a. Forming Duct Liner with the Metal All ducts requiring insulation liner shall be lined by carefully adhering the Liner in a continuous piece to clean flat metal sheets with the specified adhesive and forming the liner with the metal through the brake. Coated side of the duct liner shall face the air stream. All exposed edges shall be coated with adhesive. In ducts over 24 inches in width or depth, the liner shall be additionally secured with sheet metal screws and washers, or stud welded pins and clips placed on not less than 13-inch centers. b. Cutting and Fitting Individual Pieces All ducts requiring insulation liner shall be lined by cutting pieces to fit snugly the interior of the duct sur faces. The liner shall be fastened to the duct with a heavy coat of adhesive spread over the entire duct sur face. The top and bottom pieces shall lap the side pieces, and all exposed edges of the insulation at the duct ends shall be coated with adhesive. The coated surface shall face the air stream. In ducts over 24 inche s In width or breadth, the liner shall be additionally secured with sheet metal screws and washers, or stud welded pins and clips placed on not less than 13-inch centers. 3. Typical Installation Typical installation of formed insulation is shown in Figure 17-FY-l. APPLICATION OF FIBROUS GLASS FLEX18LE OUCT INSULATION TO INTERIOR OF OUCT f'O. I L7-FY-2 UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS U SPECIFICATION 17-RX Preformed Fibrous Glass Vapor Seal Rigid-Faced Insulation Scope This Specification describes theessential requirements for the purchase and application of preformed fibrous glass vapor seal rigid-faced insulation for use on the exterior surfaces of heating, ventilating, and air conditioning ducts. A. MATERIAL 1. Composition Material shall be composed of fibrous glass with a modified phenolic resin binder, formed into a rigid board and faced with a factory-applied vapor barrier of 0.0025-inch aluminum foil. 2. Properties Rigid preformed fibrous glass duet insulation shall have the following properties: Alkalinity............................................ pH shall be between 7 and 10. Capillarity............................................ After 7 days on wet surface, gain in weight shall be 0%. Density, average of 10 samples . Shall be not less than 3.0 nor more than 6.5 lb per cu ft. Hygroscopicity.................................. When oven-dried to constant weight, then exposed to air at 70 F and 90% relative humidity for 14 days, the gain in weight shall be less than 2%. Resistance to Abrasion.................... When tested in accordance with ASTM C 421, latest revision, weight loss shall be less than the following: After first 10-minute run: 35% After second 10-minute run: 55% Resistance to Adds........................ Fairly good, exce** hydrofluoric. Resistance to Alkalies................... Poor. Specific Heat .................................. Shall average 0.20 Btu per lb per degree F. Temperature Limits, glass core Shall be suitable for use from minus 120 F to plus 375 F without mechani cal, thermal, or chemical failure. Thermal Conductivity '/Then tested in accordance with ASTM C 177, latest revision, the thermal conductivity at the given mean temperatures shall not exceed the following values: Mean Temp, Btu/inch, hr, #F sq ft, *F 75 0.26 100 0.27 200 0.28 Thermal Dlffusivity ................... Shall average not more than 0.77 sq ft per day. Water Absorption (by immersion) .................... Percentage of volume is very high, due to open fibrous structure, but does not retain if water can run. out. 3. Accessory Materials a. Welding Pins - 12 gage steel, KSM, Omark, or approved equal. Length shall be equal to insulation thick ness plus l/4 Inch minimum. b. Adhesive Type Pins - Stic-Klip Type N or approved equal; used with adhesive recommended by manuiac turer. c. Fasteners - For welding pins: pin clips to fit pins. For adhesive type pins: speed washers furnished with ptns. 17-RX-l H. A. 3. coutd d. Reinforcing Cloth - Glass fabric, 10 by 10 thread count,Perma-Glas, Twinsburg-Mlller, Benjamin Foster Open Weave No. 10, or approved equal. e. Fire-Resistant Adhesive - Benjamin Foster 81-99, Minnesota Mining and Manufacturing Company EC-890, Vlmasco Viny-Lag, or approved equal. {. Fire-Resistant Caulking Mastic - Benjamin Foster &0-3QN, or approved equal. g. Weather-Barrier Coating (Color as specified) - PVA-Vimasco No. WC-1, Pittsburgh-Coming Pittcote 500 C, or approved equal. h. Lagging Coating (Color as specified) - Resin base, Benjamin Foster Lagtone, Armstrong Insulcolor, Vl masco Viny-Lag, or approved equal. l. Outer Covering - 8-oz canvas. B. APPLICATION 1. Thickness of Insulation Thickness of insulation shall be as scheduled. Z. Concealed Indoor Ducts a. Joints Insulation shall be applied with all Joints tightly butted. b. Securement Where welding is pos sibla, insulation shall be attached to ducts with the specified w e 1 dl n g pins and pin clips. Where welding is impossible, attachment shall be made with the specified adhesive type pins and speed washers. Longitudinal spacing of pins shall be from 1Z to 18 inches. On sides 8 Inches and less In width, one row of fasteners is required. On sides more than 8 inches wide, one additional row is required for each multiple of 8 inches or fraction thereof. Pins shall be cut off l/i6 inch from outside of clips or washer. Typical installation is shown in Figure I7-RX-1. APPLICATION OF P9EF0RMED FIBROUS GLASS VAPOR SEAL RIGID-FACED INSULATION TQ EXTERIOR Or CUCT t>a it i -1 I7-RX-2 II. 3. 2 contd c. Vapor Barrier (1) All Joints, cracks, punctures, and breaks shall be sealed with the specified vapor barrier strips, so as to form a continuous vapor-tight envelope. The strips shall be adhered to the factory-a p p l i e d vapor barrier with the specified fire-re sistant adhesive. Where pins project through insulation, hiles shall be sealed with this adhesive. (?) An alternative method of sea*l.*g joints, cracks, p -tures, or breaks in insulation on concealed in door ducts is to apply 4-inch wide strips of fire-resistant caulking mastic. I. Exposed Indoor Ducts a. Insulation shall be applied to exposed indoor ducts in the manner specified for concealed indoor ducts, in Parts II. B. 2. a and b. b. Before application of lagging coating, cracks and depressions in the surface of the insulation shall be filled with the specified weather-barrier coating and troweled smooth. Canvas outer covering shall be ad hered to the surface with the specified lagging coating. After drying, the canvas shall be given a second application of lagging coating in sufficient thickness to provide a smooth, evenly textured, evenly colored surface. 4. Outdoor Ducts a. Insulation shall be applied to outdoor ducts in the manner specified for concealed indoor ducts, in Parts II. B. 2. a and b. b. Before application of weather-barrier, cracks and depressions in the surface of the insulation shall be filled with the specified weather-barrier coating and troweled smooth. Weather-barrier of the specified reinforcing cloth and weather-barrier coating shall be installed in accordance with the GENERAL, SPECI FICATIONS, Parti. B. 17. 17-RX-3 UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION Sg* THERMAL INSULATION SPECIFICATIONS & II. SPECIFICATION 17-RY Preformed Fibroue Glass Coated Rigid Insulation 5roo r- ~ This Specification describes the essential requirements for the purchase and application of glass fiber rigid insulation for use on the interior surfaces of heating, ventilating, and air conditioning ducts. A. MATERIAL 1. Composition Material shall be composed of fibrous glass with a modified phenolic resin binder, formed into a rigid board, and coated on one side with neoprene compound. 2. Properties Rigid fibrous glass insulation shall have the following properties: Alkalinity...................................................... pH shall be between 7 and 10. Capillarity................................................. After 7 days on wet surface, gain in weight shall be 0%. Density, average of 10 samples . . Shall be not less than 3.0 nor more than 6.5 lb per cu ft. Hygroscopicity....................................... When oven-dried to constant weight, then exposed to air at 70 F and 90% relative humidity for 14 days, gain in weight shall be less than 2%. Resistance to Acids............................. Fairly good, except to hydrofluoric. Resistance to Alkalies.........................Poor. Specific Heat ....................................... Shall average 0.20 Btu per lb per cu ft. Temperature Limits ....... Shall be suitable for use from minus 120 F to plus 250 F wicnout mechani cal, thermal, or chemical failure. Tensile Strength (Parting Strength, average) ............................. Shall be greater than 1.2 lb per gram of weight. Thermal Conductivity 'When tested in accordance with ASTM C 177, latest revision, the thermal conductivity at the given mean temperatures shall not exceed the following values: Mean Temp, Btu/inch, hr, *F sq ft, *F 75 0.26 100 0.27 Thermal Diffusivitv at 75 F . . . . 0.8 sq ft per day. Water Absorption (by immersion) ............................. Percentage of volume is very high, due to open fibrous structure, but does not retain if water can run out. 3. Accessory Materials a. Welding Pins - 12 gage steel, KSM, Omark, or approved equal. Length shall be equal to insulation thick ness plus l/4 inch minimum. b. AdhesiveTvpePins - Stic-KlipType N or approved equal; used with adhesive recommended by manufacturer. c. Fasteners - For welding pins: pin clips to fit pins. For adhesive type pins: speed washers furnished with pins. d. Fire-Resistant Adhesive - Benjamin Foster 31-99, Minnesota Mining and Manufacturing Company EC-390, Vimasco Viny-Lag or approved equal. e. F: re - Re si stant Caulking Mastic - Benjamin Foster 60-30N, Insul-Coustic Fire Resistive Caulking, or ap proved equal. 17-RY - 1 II. A. 3. contd *o f. Weather-Barrier Coating (Color as specified) - PYA-Vlmasco No. WC-1, Pittsburgh-Coming Pittcote 500 C, or approved equal. g. Lagging Coating (Color as specified) - Resin base, Benjamin Foster Lagtone, Armstrong Insulcolor, or ap proved equal. B. APPLICATION 1. Thickness of Insulation Thickness of Insulation shall be as scheduled. 2. Ducts Handling Air up to 3000 fpm a. Before insulation is applied, pins and fasteners of one of the specified types shall be installed on the in terior top and side surfaces of the duct where the width and height of the duct exceed 12 inches and 24 inches, respectively. The maximum spacing of the pins shall be 16 inches on centers. b. Insulation shall be applied with all joints tightly butted, and shall be adhered to the Interior surfaces of the duct with the specified fire-resistant adhesive, applied at a minimum coverage of 50 per cent, and with the specified pins and fasteners, if required. c. Ail joints shall be caulked with the specified fire-resistant caulking mastic. 3. Ducts Handling Air between 3000 and 4500 fpm Before insulation is applied, all edges shall be coated with a heavy coat (l/8 inch thick) of the specified fireresistant caulking mastic. The purpose of the mastic is to prevent air from getting behind the insulation or weakening the bond of the insulation to the metal surface. After coating has been completed, the insulation shall be applied as specified in Parts IL B.. 2. a, b, and c, with the following additions: a. Mechanical fasteners shall be installed on all four sides of the duct. b. Metal comers shall be installed on leading edges of insulation to protect them from damage. c. Caps of mechanical fasteners shall be coated with a brush coat of the specified weather-barrier coating. 4. Ducts Handling Air between 4500 and 6000 fpm Insulation shall be applied as specified in Parts H. B. 2. a, b, and c. In addition, a light brush coat (100 sq ft per gal) r>f the specified lagging coating shall be applied to all interior surfaces of the insulation, to reduce friction loss and improve absorption of low-frequency fan noise, 5. Tvnical Installation Typical installation is shown in Figure 17-RY-l. 17-RY-2 V v'-. 'V>- '> * S\>*M s'- V.-s*', -.- 1\. : . ggffgggVA' : : C"* * " *> ' .x _ - s.^-v<V^;V^ ;. : - :.; ': gg gg;5g'.!%g^'g "v; gg---;A: -gSfg ggig-^g' ^ ,t.l ')' ,V*'V ', ' 'V:':\'si-V'' ,-\.`~ ' . < V . 'V{ .'AV-vi,;'V. V, \ V- '-> * l N : 'A , -7V:, ilgg- ``vV; #!*;., ' -vi .' , . MiU'ii/s-\ ' V-^VA........ .. VtlV >** 1 VO* ' X* ' v` <.' `.V :"-5:^|^g^;^Tli^rmal Insulation : ' . -g''^'^'v 'Maiexial: and Application -A; ;.*'],', oN > '* ... .. ` :' ' .. , .<>, ;*' .*-%'* ' *' .V-<\ ...St'9,.:;" /.'* ' '.* * ",1 * k'-'t 1 Z/1 fir/ 1 ' i i' ( ./ Ai -* ' ' ' V, .l ''*. ./ - July I96i g:gMr1v-;g^^gggg'.:*g' . 1.; * i .' > ;.' <.' ''y, ' -..-A- . 'Vg g // ':, ',: \ i. ' '. . *. I* V,'1 I;:-:. S>,1 .s' s SOUTH CHARLESTON WEST VIRGINIA -. JV- ' II. B. Z. e. contd CELLULAR GLASS INSULATION r /M/2 T I/?4 INNER ANO OUTER GORE OF SLIP JOINTS COATED WITH NON-SETTING SEALER '///* s/////\ IX/// /X///A 3T weather barrier as specif'ieo- APPLICATION OF CELLULAR GLASS INSULATION TO EXPANSION AND CONTRACTION JOINT IN HORIZONTAL PIPING Fic IO-C CELLULAR glass INSULATION APPLICATION OF CELLULAR GLASS INSULATION TO VERTICAL EXPANSION AND CONTRACTION JOINT FlC JQ-L-19 10-L-15 H. 5. 2. contd f, Traced Installations Traced lines, where specified, shall be installed and insulated in accordance with the GENERAL SPECIFI CATIONS, Part I. B. 16. g. Weather-Barrier -' (1) Weather-barrier coating shall be applied in accordance with the GENERAL SPECIFICATIONS, Part I. B. 17. (2) Weather-barrier consisting of stainless steel jacketing, if required, shall be applied inaccordance with the GENERAL SPECIFICATIONS, Part I. B. 18. This requirement is indicated by the addition of the letter M to the specification designations, thus: 10-LM, 10-LSSM. LO-L- 16 n. b. b (5) contd APPLICATION OF CELLULAR GLASS INSULATION TO FLANGED ELL Fit tO-L-S -- TWO HALVES OF TmC COVER SHALL wEATh<*-BARI*iR AS SCifrtO application of cellular glass insulation to flangeo valve FIG IO-L-IS io-l- \ U. B. 2. b. (5) contd (6) Ail fittings shall be fitted and assembled with very thin, tight joints. Cementing of shop assemblies shall be done with hot (L80 F) asphalt. In all cases the joints shall be thin, with just sufficient asphalt to obtain good adhesion and complete closure. In no case will wide asphalt joints, voids, or holes plugged with asphalt, be permitted. c. Securement (0 ALL outer layers of cellular glass pipe insulation larger than 4-1, 2 incnes in outside diameter shall be secured with insulation strap. (2) All inner layers, and outer layers 4-l/2 inches and less in outside diameter, shall be secured with strapping tape. (3) Use and location of strap and tape shall be as described in the GENERAL. SPECIFICATIONS, Part I. 3. 6. d. Supports and Hangers (1) Where horizontal low temperature piping is supported on the outside of insulation surfaces, in accord ance with UCCC Standard P-82, insulation shall be complete with weather-barrier appLied before piping is placed in cradles. UCCC Standard P-82 is a guide to the maximum horizontal span of pipe which may be supported or\ the outside of insulation. (2) On horizontal tangents at the bottom of ail vertical piping where the operating temperature doe s not exceed 250 F, and where the tangents are supported on the outside of insulated surfaces in accordance with UCCC Standard P-82, the insulation between cradle and pipe shall be the specified prefabricated vegetable cork. (3) Hangers attached directly to piping shall be insulated as shown in Figure 10-L-17. Expansion and Contraction Joints (1) Expansion and contraction joints shall be installed, u.s per Figure 10-L-ld or l7. in both horizontal and vertical straight run piping, at intervals as follows: Up Co 2-l/2 inches thick insulation - one for each 60 feet. 3 inches to 5 inches thick insulation - one for each 45 feet. 5 -- 1 / 2 incnes to 7-1/2 inches truck insulation - one for each ;0 feet. (2) '.Vhere ilunged :::t:ngs or valves occur within these limits, expansion, vi_iu contraction shall oe provided for in tne flange cover, and expansion-contraction joints in insulation will not be rcq'urea. 1 J-L- 14 UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS II. SPECIFICATION 10-OX Cellular Glass Scone This Specification describes the essential requirements for the purchase and application of preformed cellular glass thermal insulation, for use on equipment and piping in oxygen service normally operating at temperatures below 70 F. It is applicable to both indoor and outdoor service. Procedures outlined in the GENERAL SPECIFICATIONS are applicable to and constitute an integral part of this Specifi cation. A. MATERIAL 1. Composition Material shall be composed of glass, completely inorganic, processed and molded at temperatures sufficient to produce a rigid, cellular thermal insulation. 2. Properties Cellular glass insulation shall have the following properties; Alkalinity................................. pH shall be between 6.9 and 7.5. Capillarity........................... Coefficient of Expansion After 7 days on wet surface, gain in weight shall be 0%. Shall average 4.6 x 10"^ per degree F. Combustibility* * Shall be incombustible. CompressiveStrength Shall be not less than 100 'psi when tested in accordance with ASTM C Z40, latest revision. Density ...................... Shall be not less than 8 lb per cu ft, nor more than 11 lb per cu ft, when tested in accordance with ASTM C 303, latest revision. Flexural Strength Shall be not less than 75 psi when tested in accordance with ASTM C 203, latest revision. Hygroscopicity* Two-inch cubes dried at 220 F to constant weight, then exposed to air at 70 F and 90% relative humidity for 14 days, shall not gain any weight. Resistance to Acids * Shall be impervious to common acids and fumes except hydrofluoric and hot phos phoric. Shear Strength . . . Shall be not less than 65 psi. Specific Heat ... Shall average 0. 20 BTU per lb per degree F. Temperature Limit Maximum temperature without mechanical, thermal, or chemical failure shall be not less than 300 F. Tensile Strength . . . Shall be not less than 75 psi. Thermal Conductivity When tested in accordance with ASTM C 177, latest revision, or .ASTM C 335, latest revision, the thermal conductivity at the given mean temperatures snail not exceed the following values: Mean Temperature Btu/inch, hr, "F sq it, *F 0 0. 56 100 0.42 200 0.43 300 0.56 400 0. o 3 600 0.74 Thermal Diffusivity . Shall average 0.42 sq ft per day. Water Absorption After 24 hour submersion, shall not exceed 0. 2% by volume (surface only). Vioor Transmission. When tested in accordance with ASTM C 353 , latest revision, shall have a WVT of zero grains per sq ft per dour. 10-OX-l II. A. contd 3. Accessory Materials a. Cushioning Material for Equipment and Piping - 2-l/2-lb per cu ft density TWL Fiberglas or approved equal white glass wool blanket 1 inch thick. b. Stainless Steel Wire - 0.0475-inch diameter. Type 304, cold drawn, bright annealed, 18 gage. c. Stainless Steel Insulation Strap - l/2-inch by 0.020-inch, Type 304, or approved equal. d. Stainless Steel Clips - Double-pronged, Type 304, A. J. Gerrard, Techalloy double-pronged seal, or approved equal. e. Strap Anchor Clip - A. J. Gerrard'a strap hanger. f. Pipe Insulation Support - As shown in Figure 10-OX-17. g. Anti-Abrasion Coating - Keene's cement or approved equal. h. Weather-Barrier Coating - PVA-VLmasco No. WC-l or approved equal. i. Reinforcing Cloth - Glass fabric, 10 by 10 thread count, Perma Glas Mesh, Glass Mesh 10-S, Benjamin Foster Open Weave No. 10, or approved equal. j. Fabricating Cement - Keene's cement or approved equal. k. Adhesive Cement - Vimasco "J" seal ''S"t or approved equal. l. Joint Sealer - Vimasco Lax-Seal F or approved equal. m. Neoprene - 1 /16 inch thick, U. S. Rubber No. M-3891, Hercules No. 765-N, or approved equal. B. APPLICATION 1. Equipment a. Insulation Supports Equipment shall be provided with insulation supports as specified in the GENERAL SPECIFICATIONS, Part I. B. 5. b. Thickness Schedule Unless otherwise specified, insulation in excess of 2-l/2 inches total thickness shall be applied in multiple layers as specified in the GENERAL SPECIFICATIONS, Part I. B. 2. c. Cushioning Blanket (1) On vertical equipment, two lavers of the specified cushioning blanket shall be applied over the top head and compressed to 1-inch thickness, and one layer to the sides and bottom head and compressed to l/2-inch thickness, before application of the cellular glass insulation. Blanket shall be secured in place with a minimum amount of stainless steeL wire. Cellular glass insulation shall then be applied over the blanket in the manner described in this Specification. Cushioning blanket shall not be con sidered as part of the specified insulation thickness. {!) On horizontal equipment, one layer of the specified cushioning blanket shall be applied over the entire surface and compressed to l/2-inch thickness, and secured in the same manner as that called for in Part 11. 3. t. c. (1). d. Curved Surfaces 11) Cellular glass block insulation for sides and bottom heads of vertical vessels shall be shop fabricated and fitted to allow a l/2-inch space for cushioning blanket between block and vessel, (2) Cellular glass block insulation for top heads of vertical vessels shall be fabricated and fitted to allow a 1-inch space for cushioning blanket between block and vessel. (3) 3lock insulation shall be applied over cushioning blanket on all equipment with all joints tightly butted. Multiple lavers shall be applied so that the butt joints of one layer do not coincide with those of any other laver. (4) .All butt edges and ends of insulation fabricated forinner layer or layers shall be given a smooch brush or 3pray coat of the specified anti-abrasion coating and allowed to dry fora minimum of l/2 hour, but preferably 2 hours, before application of insulation to equipment. (5) .All butt edges and ends of outermost laver (or single laver) of formed insulation shall be sealed with a buttered coat o: the specified joint sealer. This coating shall be of sufficient thickness to provide proper ache nor., seal, ana cusnion between the individual pieces of insulation. Typical installation is shown m Figure IQ-OX-l. 10-OX-2 n. b 1 contd g. Expansion Joints (l) Cellular glass applications shall be provided with expansion-contraction Joints at vessel flanges, con structed as shown in Figure 10-OX-3. Where movement is likely to occur, anti-abrasion coating shall be applied to surfaces of insulation, as shown, to provide proper slip Joint. (Z) Longitudinal contraction of vessels shall be provided for by installing expansion-contraction Joints at the insulation supports, as shown i* Figure IQ-OX-4. Where more than one thickness of insulation is specified for a vessel, an insulation support shall be provided at the Junction of two different thick nesses, and insulated in a manner similar to that shown in Figure 10-OX-4. 10-OX-4 n. b i coned K'LLE* BLOCK Of cetlULA* CLASS APPLICATION OF CELLULAR GLASS INSULATION TO VESSEL HEAD AND NOZZLE Fid (0-OX l e. Flat Surfaces Block shall be applied to flat surfaces in the same manner as previously specified for curved surfaces. f. Securement (1) Where contour of vessel permits firm and effective attachment, all layers of cellular glass insulation shall be secured in place with stainless steel insulation strap. Insulation shall be secured to irregular surfaces with stainless steel wire. (2) Inner layer or layers of cellular glass insulation on bottom heads of vertical equipment, or heads of horizontal equipment, shall be held in place with specified stainless steel strap secured to insulation supports, as shown in UCCC Standards IS-- 31* IS-36, and IS-42. Outer layer of cellular glass insula tion on bottom heads of vertical equipment or heads of horizontal equipment shall be secured with in sulation strap, as shown in Figure iO-OX-2. iO-OX-3 n# a. i. contd 1. Flat Heads (1) Insulation on top of flat heads of vertical equipment shall be applied in the same manner as previously described in this 3pecification. Water pockets shall be eliminated and proper drainage provided as shown in Figure LO-OX-7. (2) All top nozzles on insulated equipment shall be provided with flashing as shown in Figure GA-3 of the GENERAL SPECIFICATIONS. J. Vessel Legs (1) Vessel legs shall be insulated with block which shall extend over channel flanges and down channel legs to the junction with anv fire resistant material, or a distance of four times the insulation thickness, but not less than 24 inches. Thickness shall be as specified for body of vessel but never less than 2 inches. Body insulation shall be butted firmly against tank leg flange. (2) Re-entrant space between channel flanges shall be filled with block, cemented in place with the speci fied adhesive cement. Surface of fire-resistant material abutting tank leg insulation shall be coaled with weather-barrier coating. Installation shall be a-: shown in Figure 1Q-OX-8. LC-OX-6 II. 3. I. g. coatd (3) One inch of cushioning blanket shall be packed around nozzles and projections where they extend through the insulation, as shown in Figure 1Q-OX-3. Where movement is likely to occur, anti-abrasion coating shall be applied to surfaces of insulation to provide proper slip joint. h. Mechanical Expansion Joints Corrugated mechanical expansion Joints in piping (usually listed as equipment items) shall be insulated as 3hown in 'Figure LO-OX-6. Where movement is likely to occur, anti-abrasion coating shall be applied to surfaces of insulation to provide proper slip joint. 1 O-OX-5 a. b l. j. contd k. Vessel Skirts Skirts supporting vertical equipment shall be insulated inside and outside. Insulation shall extend downward, from junction of inside of skirt with insulated bottom head, a distance of not less than four times the thick ness of insulation, but never less than l foot. Thickness of insulation over skirts shall be as specified for body of vessel, but never less than 2 inches. Insulating material shall be secured to inside of skirt with Joint sealer. Support for inside skirt insulation, and bottom head insulation, shall be in accordance with UCCC Standard 15-42. Installation shall be as shown in Figure 10-OX-9. CELLULAR GLASS INSULATION nCAVT FILLET Of WfATHR gARRlCft COATING AT all insoe CORNERS INS'OE INSULATION SUPPORT ANGLE in ACCCROANCE *iTM uCCC STD iS-42 INSIQC INSULATION 5UPPQWT CgTtt'L ~ APPLICATION OF CELLULAR GLASS INSULATION TO EQUIPMENT SKIRT f.Z O' 1 O-OX-7 n. b i contd 1. Equipment Supports (1) Where equipment is supported on cradles * vessel insulation shall extend over c r a d 1 e s as shown in Figure 10-OX-10. section cc APPLICATION OF CELLULAR GLASS INSULATION CRAOLES AND SUPPORTS FOR EQUIPMENT PIG. i0-0*-'0 (2) Where equipment is supported by structural steel members, insulation shall extend not less than lour times the specified insulation thickness in each direction, measured from junction of vessel with insu lated support lug. Thickness of insulation over steel supports shall be not less than l/2 that specified for bodv of vessel. Thickness of insulation over support lugs shall be the same as that of body insula tion. Installation shall be as shown in Figure 10-OX-ll. application of cellular glass insulation to equipment lugs a supporting steel ____________________________ - O-Cv________________________________________________________________________________________________ _____________________ LO-OX-8 II. 3. 1. contd m. Weather-Barrier (1) Weather-barrier coating shall be applied in accordance with the GENERAL. SPECIFICATIONS, Parts I. B. 9. and 17. (2) Weather-barrier consisting of stainless steel Jacketing, if required, shall be applied in accordance with the GENERAL SPECIFICATIONS, Part I, B. 18. This requirement is indicated by the addition of the letter M to the specification designate thus: 10-OXM. (3) Weather-barrier membrane shall be carried out 3 inches onto any metal, beyond termination of insu lation. 2. Piping a. Pipe Insulation (1) Pipe insulation shall be supported as specified in the GENERAL SPECIFICATIONS, Part I. B. 5. (2) Insulation in excess of 2-l/2-inch total thickness shall be applied in multiple layers as specified ir the GENERAL SPECIFICATIONS, Parti. B. 2. (3) Pipe Insulation shall be applied In a staggered position, in accordance with Figures GA-1 and GAof the GENERAL SPECIFICATIONS. (4) Piping shall have 1-inch thick cushioning blanket secured with stainless steel wire and compresset to approximately i/2 inch, applied before the application of cellular glass insulation. Cushioning material shall not be considered as part of insulation thickness. (5) All butt edges and ends of single layer insulation, and outer layer of multiple layer applications, aha.'. be buttered with joint sealer before application. The joints shall be drawn together when insulation i. applied so that only a very thin, vapor-tight, vapor-seal coat separates the sections of insulation. (6) Insulation shall be applied with all joints tightly butted and fitted, to eliminate voids. Large voids shall not be filled with Joint sealer, but eliminated either by refitting or replacing insulation. Any rounded corners on the insulation surfaces to be butted shall be trued before application. (7) Butt edges and ends of all inner layers of insulation 9hall be given a smooth brush or spray coat o: anti-abrasion coating and allowed to dry for a minimum of l/Z hour, but preferably 2 hours, befor application. Care shall be exercised to obtain a thin, even coat of sufficient thickness only to covand fill the cut cells of the insulation. (3) When scheduled for installations where severe vibration is expected, entire surface area shall b coated with anti-abrasion coating as called for in Part II. 3. 2. a. (7). b. Fitting, Flange, and Valve Covers (1) Welded fitting covers shall be fabricated to an inside diameter l inch greater than the outside diamete of the welded fitting to allow for cushioning material. (2) Fitting, flange, and valve covers shall be shop-fabricated in accordance with UCCC Dime-nsional Standards Fabrication Manual or ASTM Recommended Practice C 450, latest revision. Installatio of tvpical fittings and valves is shown in Figures 1Q-OX-12, 10-OX-13, 10-OX-14, 10-OX-15, ar. 10-OX-16. 10-OX-9 n. a b coatd -- TWO HALVES Of TH COVER SHALL 86 CEMCNTCO APPLICATION OF CELLULAR GLASS INSULATION TO WELDED TEE f'O iO-OX'i3 10-OX-10 % II S. 2. b. contd t nr TH two HALVES OF THE COVES SMALL BE CEMENTEO TOGETHER WiTM jOiNT SEALER AP*.i0 TO THE OUTERMOST 2 11? (APPRO* I Of THE jO*NT FACES OUTER LAYER BUTT JOINTS COATEO WITH JOINT SEALER - # AS SPECIFIEO CELLULAR GLASS INSULATION ----------- CUSHIONING BLANKET - wy/sfr INNER LAYER BUTT JOINTS COATEO WITH ANTI-ABRASION COATING ANO ALLOWEO TO ORT BEFORE INSTALLATION -- / T-* -H MIN SURFACES COATEO WITH ANTIABRASION COATING ANO ALLOY TO ORT BEFORE INSTALLATION RQUNO OUTSIDE CORNERS HEAVY FILLET OF wEAThER-84RRIER COATING THICKNESS T, AS SPECIFIED WEATHER-BARRIER AS SPECIFIEO APPLICATION OF CELLULAR GLASS INSULATION TO UNE FLANGE FIG 10-GY-14 APPLICATION OF CELLULAR GLASS INSULATION TO LANGEO ELl f iG lO-Ox. S 10-OX-l I IX. 3. 2. b. contd r#0 HALVES OF the COVER SHALL SE CEMENTEO TOGETHER WITH ,,C.NT DEALER APPLIED TO THE OUTEBMOST IAPPROK.I OF THE JOINT FACES EXTEND VIE AT ME A -BARRIER COATING OVER METAL PACK ANO FILL BETWEEN IN$ULA'lON ANO VALVE STEM WITH JOINT SEALER meavv fillet OF weatherbarrier COATING 'NNER LAVER BUTT JOINTS COATEO *|Tm ANTI-ABRASION COATING ANO ALlOWEO to ort before install ation CUSHIONING BLANKET SURFACES COATEO WITH ANTIABRASION COATING A HO ALLOWCO TO ORT BEFORE INSTALLATION APPLICATION of cellular glass insulation to flanged valve FIG IO-OX-1# (3) All valves shall be packed and filled around valve stem and packing gland assemblv with joint sealer, to avoid water pockets. (4) Cementing of shop assemblies shall be done with the specified fabricating cement. In all cases the joints shall be as thin as possible, with just sufficient cement to obtain good adhesion and complete closure. In. no case will wide cement joints, or voids and holes plugged with cement, be permitted. c. Sealing Plate (1) This plate, shown in Figure 1G-OX-17, shall be used wherever insulation is terminated. A typical installation is shown in Figure 10-OX-21. (2) This plate shall also be used at expansion joints in vertical runs to carry the weight of the insulation, as shown in Figure 10-OX-19. iO-OX-12 II. B. 1. c. contd d. Expansion, and Contraction Joints (1) Expansion and contraction joints shall be installed as shown in Figures 10-OX-L8 and 10-OX-19, in both horizontal and vertical straight run piping, at 10-foot intervals. (2) At the various fittings, expansion and contraction joints shall be installed so that each run of pipe shall have at'least one joint in it, as shown in Figures 10-OX-20 and 10-OX-21. * wioe neoprene rubber strip wrappco AROUNO FOAMGLAS OvCR ONE WET COAT OF JOINT SCALER NEOPRENE ENO LAPPED APPROX 4' USING JOINT SEALER TO MAKE SEAL AT LAP ---------------------------------------------------------- CELLULAR GLASS INSULATION USE BANOS TO SrCURC NEOPRENE TO CELLULAR GLASS L ''///.A//////&'/////,?///A CUSHIONING BLANKET *EATmCR BARRIER AS SPECIFIED----- -- CUSHIONING material C-T to ``t P'E a no TO \tZ" LESS Twin inSjlATn OiamETER APPLICATION OF CELLULAR GLASS INSULATION TO EXPANSION ANQ CONTRACTION JOINT IN HORIZONTAL PIPING Fifl 10-0X *8 10-OX - i3 n. b. z d. coutd 1 l elevation application of cellular glass insulation to horizontal line fig iO -0< 20 iO-OX-14 b. 2. d. conta e. Securcment (1) All outer layers o cellular glass pipe insulation 4 l/Z inches and larger in outside diameter shall be secured with insulation strap. (2) All inner layers and outer layers less than 4 l/2 inches in outside diameter shall be secured with stainless steel wire. (3) Use and location of strap and wire shall be as described in the GENERAL SPECIFICATION'S, Part I. B. 6. f. Support and Hangers (1) Where horizontal, low temperature piping is supported on the outside of insulation surfaces, in accord ance with UCCC Standard P-82, insulation shall be complete with weather-barrier applied before piping is placed In cradles. UCCC Standard P-32 is a guide to the maximum horizontal span or pipe which may be supported on the outside of Insulation. (2) Hangers attached directly to piping shall be insulated as shown in Figure 1Q-OX-22. LO-OX-15 II. B. 2. f. contd g. Traced Installations Traced lines, where specified, shall beinstalled and insulated in accordance with the GENERAL SPECI FICATIONS. Parti. B. 16. h. Weather-Barrier (1) Weather-barrier coating shall be applied in accordance with the GENERAL SPECIFICATIONS, Parti. B. 17. (2) Weather-barrier of stainless steel jacketing, if required, shaLl be applied in a c c o r d a n c e with the GENERAL SPECIFICATIONS, Parti. B. 18. This requirement is indicated by the addi t i o n of the letter M to the specification designation, thus: 10-OXM. 10-OX- lo K t 4. f~ * \ UNION CARBIDE CHEMICALS COMPANY DEPARTMENT OF DESIGN AND CONSTRUCTION THERMAL INSULATION SPECIFICATIONS SPECIFICATION 14-J Preformed Flexible Plasti F oam Scone This Specification, describee the essential requirements for the purchase and application of preformed flexible plast foam insulation for use on indoor piping up to and including 3 inch I.P.S. normally operating at temperatures from 32 up to and including 200 F. A. MATERIAL 1. Composition Insulation shall consist of preformed flexible foamed plastic having a closed cellular structure. 2. Properties Preformed flexible plastic foam insulation shall have the following properties: Combustibility................................................Shall be self-extinguishing. Density ..................................................... Shall be not less than 6.5 lb per cu ft, nor more than 7.5 lb per cu when tested in accordance with ASTM C 302, latest revision. Resistance to Adds................................ Shall be resistant to common acids. Resistance to Caustics...........................Shall be resistant to common caustics. Shrinkage ..................................................... Shall be not more than 3% at 200 F. Specific Heat................................................Shall average 0.41 Btu per lb per degree F. Temperature Limit..................................... Maximum temperature without mechanical, thermal, or chemical failu shall be not less than 20 0 F. Thermal Conductivity When tested in accordance with ASTM C 177, latest revision, o r AS T C 335, latest revision, the thermal conductivity at the following mea temperatures shall not exceed the following values: Mean Temp Btu/inch, hr *F sq ft, *F 75 . 28 120 .29 Water Absorption..................................... After 24 hours submersion, shall not exceed 0.5% by weight. Water Vapor Transmission . . . . When tested in accordance with ASTM C 355, latest revision shall not e ceed 0. 1 gram per sq ft per hour. 3. Accessory Materials a. Adhesive - Armstrong No. 520 or approved equal. b. Tape - Dutch Brand Trantex V-10 or approved equal. c. Reinforcing Cloth - Glass fabric, 10 by 10 thread count. Perma-Glas Mesh. Twinsburg-Miller. Benjarr Foster Open Weave or approved equal. d. Lagging Coating (color as specified) - Resin base, Benjamin Foster Lagtone, Armstrong Insuicolor, Vi masco Viny-Lag, or approved equal. L4-J-1 n. b. B. APPLICATION L. Concealed Straight Piping a. Preformed pipe covering shall be placed on the pipe by slipping it over the end of the pipe or cutting it longitudinally so that the insulation can be opened up sufficiently to permit placing it on the pipe. Wherever joint has a tendency to open up, it shall be secured with t.*e specified tape. b. All butt joints shall be Joined and sealed by a thin coat of the specified adhesive. The adhesive shall be allowed to dry Co a non-tacky state. After the adhesive has dried, the surfaces of the joint shall be pressed firmly together. c. Where pipes, pipe fittings or supports extend beyond the insulation, the edges of the insulation shall be sealed with a fillet of adhesive. 2. Concealed Bent Piping Insulation shall be installed on bent-piping as described in Part II. B. 1. The outer surface of the insulation shall be wrapped with a lapped layer of tape to prevent opening of longitudinal joint. 3. Fittings a. Fitting covers which can be fabricated of molded pips covering shall be prefabricated In accordance with ASTM Recommended Practice C 4507 using adhesive as fabrication cement. b. Fitting covers larger than those which can be made with molded pipe covering shall be field fabricated of sheet insulation of specified thickness or multiple layers of sheet insulation built to specified thickness. The sheet insulation shall be tightly fitted with all joints sealed with specified adhesive. The outer sur~ face of the insulation shall be secured in place by wrapping with a lapped layer of tap&~ 4. Piping arid Fittings Exposed to View a. Insulation of piping and fitting shall be installed as described in Parts II. B. 1, Z and 3. b. The specified reinforcing cloth shall be adhered to the insulation surface with the specified lagging coating to provide a smooth, even surface. After the coating has dried, .a second coat shall be applied to the cloth, in sufficient thickness to provide a smooth, evenly textured, colored surface. 14-J-2