Inter Office
/ Car Engineering
October 6, 1980
To: Mr. J. P. Bernard Mr. A. G. Folger Mr. S. Gratch
Mr. 11. V. P.essler Mr. V. V'. Su6sa&n
Mr. C. F. Talbot
Mr. P. E. Toth*^"
Subject: 19&1 Advanced Budget - Toxic/Hazardous Group
Attached is a*draft of the Toxic/Hazardous Report to the Advanced Review Committee. These projects were prioritized by the Toxic Substance Advisory
Group on September 2b.
(Xr plan is to present this report as a "vaUc-on" item to the Corpora* Hazardous Control Committee on October 10. As in past years, the final report will be incorporated into the Components Methodology Presentation to the Advanced Review Committee on October 20, 1980.
We would appreciate your comments by close of business Wednesday, October 8,
for inclusion into the final report.
FC/ksl Attachment
G F. Bolling
8006 1752
SCF-FORD-2144
' PRODUCED BY FORD
ADVANCED REVIEW COMMITTEE
TOXIC SUBSTANCES PROJECT REPORT 66To5flmW
The toxio substance proJsots of the 1981 Advanced Budget have been separately high
lighted from the Components/Methodology/SEN Subcommittee. Aa examination was conducted by an AD HOC Toxic Subatenoe Committee. 1/ Tbie paper preaente the resulting prioritisation.
Background
'
Since the 1978 Advanced Budget, toxio substance projects have been revioved by the AD,BOC Toxio Substance Committee to assure that the Company*a needs in this area were recognized and met. The Committee has acted as a catalyst in surfacing issues and recommending resolutions in areas such aa freon detection, the Company's response mechanism to fluorocarbons regulatory pressures and plastic filler development to replace lead solder.
Assessment
The same procedure developed in past years was used again. The AD HOC Committee was wade up from Company areas informed about and concerned with toxic substances. Needs
and responses were critically discussed. This approach has resulted in the following preliminary projects totals for the 1981 proposed budget:
Summary of Ranlrinys (At Incurred Economics)
Priority
1978 Approved
$(000}
1979 Approved
$(000)
1980
Approved $(000)
1981
(Proposed)
$(000)
1 2
3 TOTAV.
$ 114.0
1203.3
- 2730 $1590.6
$ 572.6
701.7 482.6 -$175579
$ 493.3 764.2
$1257.$
$ 485.1 782.0
'$1267.1
. Tb.'t total is preliminary since the Committee expressed a concern that a BEPE project for developing alternate air bag generante was not included for 1981.
BEPE has agreed to submit a 1981 Advanced Engineering project prior to the November E&RS meeting to support this effort.
. Other then thie question, the proposed 1981 Toxic Substances Advanced Budget is essentially at carryover level and is considered to be the minimum level necessary to mast projected Corporate needs. There are no Priority III projects.
,, A general concern was, however, restated from last year. There is still a need to investigate some potential risks before regulations are proposed bo as to have factual input into possible regulations and to be ready to sot promptly on any new regulations. The environmental conditions for model workers were cited
as an example for potential regulatory aetion.
. A Corporate Hazardous Substance Control Committee has recently been formed. The
Uoumbtee'a intent is to focus attention on toxio substances 0octroi issues to
omivo that the Company* a future needs are met. It is probable that no AD HOC yvtrtjp will bo needed in future years since the new Corporate Committee encompasses
tOi e.etivHJen involved with toxic subatancea control.
8006 1753
PRODUCED BY FORD
Exhibit I give* details for the projects examined and Exhibit H gives the spending for toxio substances by division. Recommendation Ibe AD HOC Committee recommends approval of all listed projects end due consideration of the forthcoming BEPE submission. It should be noted that none of this year's projects vero rated less than "highly desirable".
3./-MimKiwTX Bere><mtf> 0. F. Bolling, A. 0. Folger, s. Gratch, N. V. Ressler, V. V. Sussman, C. r Talbot,
p. E Toth October, 19&0
8006 1754
* PRODUCED BY FORD
iAnitur 1
PRIORITT RANDNO 1961 PROPOSED TOTIC $t/gSTAN0g PROJECTS
Project Title Priority I Asbestos-free Brake Lining Friction Materiala and Systems Total (Priority I)
Priority II Reduced A/C R-12 Leakage and Charge Chlorofluorocarbon Regulatory Matters R-12 Reduced Leakage/Charge Alternate Fluorocarbons Lead Solder Replacement Toxic Substances Total. (Priority II) Total (Priority III) Toxic Substances Total
MEMO: Proposed I960 Total
Project No.
Location Code
CZA014 R6120
PPE-C Res
Present Proposed
Budget ~$'(ooo) `
$ 175.0
--310.1
$ 485.1
CCDA12 AA124 FAF06 FAID9 BROUO
R?660
CCD VDT CCD CCD BEPE Res
` 25.0
28.0
261.0
193.0 54.0
221.0 $ 782.0
-0$1267.1 $1320.2
Ootober, I960 8006 1755 PRODUCED BY FORD
EXHIBIT II
Reee&roh PCPK BBPH COB VDT
TOTAL
ADVANCED BUDGET* TOOCIC SPBBTAMftttfi {BREAKDOWN BY pYfaSICal $PBfolNO)
1980
Approved / Funding Levels'
$(000)
1981 Proposed . Funding Level-
$(000)
$ 575.5 152.0 100.0 402.0 28.0
$ 531.1 175.0 54.0 479.0 28.0
,$1257.5
$1267.1
Jpwja.vy 19$cHEconoinic8o
b/ Saptjfibas' 3.580 Foonom^.Cii ,,
October, 1980 8006 1756
PRODUCED BY FORD