Document k9E8vYM1N6j6preqRwJ4m0gQn

E^ON COMPANY U.S.A. POST OFFICE BOX 1512 HOUSTON, TEXAS 77001 "STANSHIP HOUSTON TO BE FiLED MARINE DEPARTMENT ____ T (5 mc.),,_ MARINE DEPARTMENT j H SWARTZ OPERATIONS manager a. D N*OOKhq=k afleet branch manager L H EARLE MARINE ADVISOR H j BORGEU MAINTENANCE & SERVICES MANAGER May 17, 1978 EXXON GETTYSBURG Shipyard Specifications Newport News Shipbuilding 4101 Washington Avenue Newport News, Virginia 23607 Attention: Mr. G. Guy Via, Jr. Vice President Dear Sir: Please add the attached addendum to the subject specifications. Very truly yours, E. J. Worrel, Jr. ` Asst. Repair Superintendent EJW: bt Attachment c: Mr. H. J. Borgen Mr. R. X. Caldwell Mr. W. N. Ekstrand Mr. L. A. Hanf t Mr. W. A. Ingham, Jr. Mr. H. P. Leyendecker Mr. J. A. Tompkins A DIVISION OF EXXON CORPORATION EXX-MOR-010650 S/S EXXON GETTYSBURG Navigational Equipment (Similar to EXXON JAMESTOWN) 601/608 B Furnish labor and material to accomplish the following: A) Take delivery of owner furnished Loran C and speed log equipment from Sperry Systems. Rig same to the bridge of the vessel. B) Provide engineering services to produce necessary drawings and obtain approvals from USCG, ABS, and Owner's Representatives as required. After completion of all work, all revisions or modifications are to be obtained and approved in final drawings. The drawings and approvals for the EXXON JAMESTOWN may apply. C) Fabricated one (1) shelf from 1/8" galvanized steel and 1/2" x 1/2" angle frame. D) Furnish electrical wiring as necessary and install same. Installation of new equipment to be under the direction of the contractor-furnished Sperry Representative. See wheelhouse arrangement. E) Make necessary removals of overhead and bulkhead panels in way of above installations. F) Install Loran C antenna coupler in location as directed and run wiring from same to their associated equipment. Fabricate supports for antenna. The shipyard is to purchase and install a standard 8' whip in the Loran C coupler. G) Take delivery and install a Sperry MK301B doppler speed log system. The sea chest kit is to be installed between Frame 151 and 152 in the bottom shell as close to the centerline as possible in the forward peak tank. The transducer will be inserted and wired to the transceiver located in the Foc'l. space. Exxon supplies the wire between these two units. The electronic unit should be installed in the chart room, or a gyro room whichever is convenient. The Master display is to be located above the windows forward of the radar display on the starboard side of the wheelhouse. The unit is to be integrated the Loran C. EXXON GETTYSBURG MAY 1978 EXX-MOR-010651 May 1978 FXXaN GBT7YS BUZC CL JPP~>y JPf;:;) L&LAT/OSS HAifioL n DffP TAk>i/ EXa ON GETTYSBURG j 'QA'MDucek Locator/ a 67 I ' ^>FF Pour a 61 STfiP EXX6M D5A. HtOO^TOaj TX ^ y J. EXX-MOR-010652