Document k97aRgdVpbj5D8eY94xejdE6E

and C%eftUCO& CSCAMSIA PLANT INC. INTEROFFICE MEMORANDUM To: From: Re: Mr. R. E. Davis R. W. Beech PVC Monthly Report - February, 1972 Dote: Copies: March 6, 1972 SUMMARY Production tor the month was 4769M pounds versus a budget of 4765 M pounds and a forecast on February 18 of 4800 M pounds. Off-grade, tails and sweep8 totaled 414 M pounds, 8. 0% versus a budget of 5.2%, Contamination, iisheyes and bulk density were causes of off-grade. A total of 602 charges were made, an average of 20. 7 per day. The total variance for PVC is $6300 favorable broken down as follows: 1. PVC Bulk 2. PVC Bagging 3. PVC L.&S { 800) 5, 900 1, 200 The forecast for PVC bulk on January 20 was $4800 favorable. Major factors affecting PVC bulk variance are listed below: Raw Materials Vinyl Chloride Vinyl Acetate Process Chemicals By-Product Credit Royalties { 9,900) 1, 400 8, 160 Process Costs Volume Process Spending Machine Hours ( 8, 150) 14,280 ( 7, 300) PVC-2185 was $5140 unfavorable on volume caused by 175M pounds of off-grade and PVC- 1200 was $ 10^0 unfavorable on volume caused by production slowdowns for contamination checks and cleanouts to assure Phillips grade production. AP00047444 PVC Monthly Report -2- March 6, 1972 SUMMARY (continued) Production for March is forecast at 4925 M pounds with, a variance of $9240 favorable. Production in February was 4769M pounds versus a budget of 4760 M pounds. This production was achieved mainly through production of fast cycle resin types as indicated by the unfavorable volume variance above. Total hours budgeted for those resins produced was 7253 versus an actual of 7656. We averaged 20. 7 batches per day. An electric motor agitator drive was installed on the stainless steel reactor to drive the agitator at a constant 125 rpm. Performance on Pearls^ has improved markedly. Dr. Wiley Daniels of R&D was down to supervise a series of runs in the stainless reactor on PVC-2200. The results of this run and latest data is summarized in a report to R. W. Beech Irom W. C. Wilde, MPVC-2200 Production in the Stainless Steel Reactor*', dated February 25, 1972. The solvent recovery and dehydration units did not operate this month. Mechanical revisions should be complete March 3 with startup on March 6. Reactors 1, 10, and 11 continue to be the onLy ones chemically cleaned. We are encountering considerable difficulty in producing PVC-1200 and 1250 to meet the wet contamination test of Phillips Film. This is causing delays and lost production time. For example, PVC 1200 was $1020 unfavorable on volume in February. The writer made a visit to Calvert City concering this problem. The purpose was to study their operation and exchange information which might lead to improved performance on Phillips grade material. PVC - BAGGING A total of 3077 M pounds were bagged at a cost of $14, 410. Variance is $5,900 favorable as follows: Volume Spending $7,968 ( 2,065) Greater than budget bagging was caused by the types produced in February. AP00047445 PVC Monthly Report -3- March 6, 1972 STATISTICS Prime Production Homopoiymer Copolymer Total Off-Grade Ho mopolyme r Copolymer Tails Sweeps Total Total Production Off-Grade, % Total Prod. Bulk Prod. , % Prime VCM Efficiency Reactor Availability Production, #/gal,yr. Off-Grade Analysis tYPc 2225 2160 2185 2185 2185 2185 2185 1225 6180 Lot No. 8655 8665 8667 8669 8670 8672 8674 8727 8755 Production Sequence North Line Batches 1225 1200 2225 2250 2200 30 25 4 30 20 February Actual Budget 4, 029 740 4, 7 6? 4, 128 637 4, 7 65 Year to Date Actual Budget 21, 637 3, 472 25, 109 21,609 3, 299 24, 908 229 36 123 10 414 5, 201 8. 0 43. 7 94. 6 84. 5 1263 261 5, 026 5. 2 94. 8 88. 5 1258 500 288 585 44 1, 417 26,526 5. 3 54. 1 94. 6 85. 1 1264 1, 364 26, 272 5.2 - 94. 8 88. 5 1258 Pounds 22,550 6, 000 36, 000 18.000 52,600 40, 000 28. 650 32, 000 36,000 Reasons Fisheyes. Screens. Contamination. Contamination. Bulk Density, Bulk Density. Fisheyes. Contamination. Contamination. South Line 6180 2185 8217 1225 1230P Batches 88 29 4 39 53 AP00047446 PVC Monthly Report .4- Production Sequence (cont'd) Nofth Line 1200 2200 2250 2200 2225 1200 Batches 45 44 20 69 5 20 South Line 1225 2160 6180 Downtime Analysis Enter and Clean Reactors H. P. Water Cleaning Plugged Drop Valves Changing Types Low Drying Rates Mixing Solutions Behind on Recovery Hyd. Motor Maint. Scheduling Charges Miscellaneous Production Summary (Prime Only) Type February 1185 1200 1225 12 30P 1250 2160 2185 2200 2225 2250 3185 6180 8217 674 1, 028 597 - 96 71 1, 094 48 385 740 36 February Hours % 371 165 23 128 26 7 48 13 205 198 1184 4. 8 2.2 0. 3 1.7 0. 3 0. 1 0. 6 0.2 2.7 2. 6 15.5 January 24b 774 895 646 159 - 1, 075 291 377 - 689 - March 6, 1972 Batches 48 9 14 Year to Date Hours % 1937 720 168 449 108 81 503 78 985 978 6007 4. 8 1.8 0.4 1. 1 0. 3 0. 2 1. 3 0. 2 2.4 2. 4 14.9 Year to I 48 1, 330 4, 371 4, 908 1. 061 661 668 5, 510 668 1, 955 339 3, 472 120 AP00047447 PVC Monthly Report -5- March 6, L972 MAINTENANCE 1. Compressors (a) Replaced second stage valves in north recovery compressor. (b) Adjusted cross-head on north compressor to stop knock. (c) Repacked shaft seal on south compressor. (d) Adjusted piston rod nut on south compressor to stop knock. (e) Changed out valves in south compressor. (i) Repaired loose nut on end of piston rod on south compressor. 2. Repaired overspeed trip on hydraulic oil pump steam turbine. 3. Installed electric motor agitator drive on #10 reactor. 4. Replaced automatic steam valve on. the north stripper. 5. Replaced steam sparger on #11 reactor. 6. Changed out motor and some parts in the starting gear on the north centrifuge. DISCUSSION The RFE for the 40 psig steam line has been approved. This RFE was revised and economics calculated on the difference of high pressure steam at standard cost and 40 psig steam at fuel value. On this basis the project shows an ROI of 30. 3% and a payout of 1. 64 years. Completion is expected by April 1, 1972. A check on noise levels in the PVC Area indicated real improve ments lave been made in the area north of the reactor building. Previous readings of 113 - 115 decibels have dropped to 91 decibels. We have rerouted the jet exhaust through the roof on two jets and installed a muffler on the third jet. AP00047448 PVC Monthly Report -6- March 6, L972 SHORT-RANGE OPERATIONAL PLANS 1. Send out inquiry for resin post blending. 2. Submit request to engineering lor estimate to recycle off-grade. 3. Prepare plans and sketches for addition of one reactor and Submit to Engineering for an estimate. 4. Prepare RFE to recycle effluent of Foxtrot pond to cooling tower at nitric acid. LONG-RANGE OPERATIONAL PLANS 1. Submit RFE for an additional reactor at Pace. 2. Work with the PCC to reach a point where general purpose resins at Pace and Calvert are produced using the same recipe within mechanical limitations. 3. Submit RFE for hot water charging of reactors. aw. R. W. Beech AP00047449 Personnel f AP00047450