Document k90Oq37XaoE7bj4pDjzyVbk10

DownloadRandom document
@@aciceanalyt FieldServicesDivision 3M Prepared by: Pace Analytical Services, Inc. Minnesota Field Services 1700 Elm Street,Suite200 Minneapolis, MN 55414 Bradley G. Jacobson ProjectManager dv PaceAnalyticSaelrvicesI,nc. 1700ElmStreeStu,lt2e00 MlnneapolMiNs5,5414 Phone6.1-2.6017700 Fax6.1-2-6076444 PortSt.LucieFlorida Water and Sediment Resample forthe Empirical Human Exposure Assessment Multi- City Study PortSt.Lucie,Florida July 18-19,2000 Prepared under contract with: 3M ET&SS Field AnalyticalServicesand Technologies Client Coordinator: Jess Eldridge 3M Lab Request: EOO-2003 3M Department: 502180 Pace Project No.: 1034438 (Field) August 15, 2000 Table of Contents Paqe Introduction 1 Sampling Protocols 2 FieldObservations 3-5 Deviationsfrom the GPO 6 Contacts forMunicipalSites 7 Table 1 - FieldSummary 8 Table 2 - Garmin GPS12 Coordinates 9 Table 3 -Abbreviations 10 Table 4 - Samples Collected 11 Figure1 - SurfaceWater Collectio(nQuietWater) 12 Figure2 - Sediment Sampling 13 Figure3 - WVVRP InjectioWnell 14 Figure4 - WWTP ChlorineContact Chamber 15 Figure5 - WWTP InjectioWnell Pond 16 Figure6 - QuietSurfaceWater 17 Figure7 - Quiet Surface Water Shoreline1 18 Figure8 - Quiet SurfaceWater Shoreline11 19 Appendix A GeneralProjectOutline(GPO) A-1 Appendix B FieldData Log Sheets B-1 Appendix C Chain ofCustody Forms C-1 Introduction Pace AnalyticaSlervices,Inc.was contractedby the 3M Company to recollect samples forthe Port St.Lucie Multi-CitSytudy, The sampling was originally conducted inJuly 1999 by Battelle.The resamplingwas conducted to confirm baselineinformatioonbtainedduringtheJuly1999 event.Targetanalytesforthis event are PFOS, PFOSA, POAA, PFHS, and TFA (fluorochemicals)S.urface watersamples were alsoanalyzedformetals.The area ofgreatestintereswtas the quietsurfacewater locatednear MartinCounty Marina (Mapp Rd and SW Chapman Way). Emphasis was placedon qualitycontrolmeasures such as extensivefieldmatrix spikingat multipleconcentrationlevels,duplicatesamples, and proceduresto reduce possible contaminationduring fieldcollection.The sampling was conducted accordingto the specificationsset forthin the 3M General Project Outline(GPO), except as noted inthe reportsection"Deviationtsothe GPO". A summary ofthe fieldobservationscan be found inTable 1. Sampling locations were locatedforfuturereferencewith GPS longitudeand latitudceoordinates and are listeidnTable 2. PaceAnalyfical Page 1 Sampling Protocols Equipment Preparation: The 1 literNalgeneTm sample containersused for samplingwere rinsedwith"Optima"grade methanol and Di (Type Iwater)prior to use. Transferdevices,such as the stainlesssteelbucket,were field decontaminated between samples by mechanical removal of visible contaminantsfollowedby a thorough rinsingwith methanol and Type I DI water. New nitrilgeloves were worn at alltimes duringthe equipment preparation, sample collectioannd handlingprocedures. New gloveswere donned withevery change ofsample locationand/orsample matrix. Surface Water Samples: Samples were collectedapproximately15 cm below the surfaceofthe water by firsstubmersing the sample containerintothe water. Then the containerwas uncapped, filledand recapped while continually submerged (Figure1). This procedurewas used to avoid capturinga possible concentratedsurfacefilmlayer. Sediment Samples: Samples were collectedusinga stainlessteelscoop. The sediment samples were collectedatthe correspondingsubsurfacewater sample location.Approximatelythe top 2 centimetersof sediment were collectedinto the scoop. The scoop was then raisedslowlyto the surfaceto avoid lossof top sediment layer(Figure2). Tap Water Samples: Samples were collecteddirectliyntothe sample container viathe coldwater tap. Wastewater Treatment Sludge: This sample was collectedusing a stainless steelbucket and a nylonrope. The firsttwo feetof nylonrope above the pointof attachmentto the bucket was rinsedwith methanol and Type Iwater inthe field priorto use. Pace Analytical Page 2 FieldObservations A summary ofthefieldobservationscan be found inTable 1. MunicipalDrinkingWater Plant:The drinkinwgaterplanthas added a deep aquifer(approximatel1y350 feet)to the plantintakesource. Thiswater is treatedviareverseosmosis and isreferretdoas the RO water. Thissitewas not availableforcollectiodnuringthe 1999 Battellseamplingevent,per site contactBrad Macek. The RO sitewas collecteidnadditionto the original shallowaquifer(approximatel1y00 feet).The shallowaquiferundergoes lime-softenintgreatment.The outflowfrom the plantisa blendofthe RO and limesoftenedwaters. The plantrefersto the plantoutflowas the"pointof entry"because thiswaterentersthecitywatersystem. North PortWastewater Treatment Plant(WWTP): The finaelffluenftorthe WWTP isatthe InjectioWnell(Figure3). Thisisthe pointwhere theeffluent isinjecteidntothe ground. Samples were collecteadtthispoint,but after furthedriscussionswithsitecontactCarlNorton,itwas determined thiswater would notbe representativoeftheeffluenctollectebdy Battellien1999. This sampling pointis now a blend of the WWTP effluenatnd waste reverse osmosis (RO) water from the drinkinwgater plant.The samples were submittedto the laboratoryb,ut effluenstamples were alsocollecteadt the chlorinecontactchamber (Figure4). Per CarlNorton,the chlorinecontact chamber effluenwtould be representativoefthe dischargecollectedin1999. Chlorinatiownas notoccurringinthe chlorinecontactchamber atthe timeof sampling. Note Figure5,which shows the algae-likfeilmon the surfaceof the pond leadingtothe injectiownell. Port St. Lucie Landfill: There were two leachateponds in use. The operatorswere currentlpyumping intoPond #3 and pumping out ofPond #4. Pace Analyfical Page 3 Samples were collectedfrom Pond #4 using a pond sampler. The sample containerwas invertedas itwas submerged intothe leachate pond to minimizethe entryofsurfaceleachateintothe container. Fire Department - Station #5: The cold water tap to the kitchensink was purged for approximately5 minutes and the sample was collected.No abnormalitiesnoted. Stuart Harbor: This siteis locatedjustoffthe NW corner of Jefferson Bridge.The sediment appeared to be relativelcyleansand. There appeared to be some landscapingactivitieosccurringapproximately100 yards to the west. Pendarvis Park: The cold water tap samples were collected from the women's restroom. The surfacewater samples were collectedby walking out on the concrete boat landingto avoid stirrinugp sediment. Sediment samples were collectedapproximately20 yards to the rightof the landing.A lightrainstartedduringthe surfacesampling and the 3M projectcoordinator Jess Eldddge was contacted. Per thatfirspthone conversation,as long as the rainremained lightf,inishPendarvis Park sampling. A second phone call was made to Jess EldridgeaftercollectinPgendarvis Park. The rainhad become heavierand outsidesampling activitiewsere haltedforthe day to allowthe surfacewater systems to settle. Totalrainfalflorthe event was 0.23 inchesand lastedapproximatelyone hour. 0 Holiday Inn: Samples were collected in room 413 after purging the cold water lineforten minutes. The water remained near ambient temperature. Nothing abnormal noted. 0 Martin County Marina: GPS coordinates from the 1999 sampling event indicatedthe sampling locationto be withinthe boat docking area. This area of the marina was littereadnd had severalboats indock, so a sampling point was selectedjustoutsidethe boat docks. 0 Quite Surface Water: The pond was relatively small (approximately 200 feet X 200 feet)see Figure6. The water was fairlcylearwithsome minnows Pace Analybcal Page 4 prqsent.Styrofoam,plastibcags,a can and a bottlewere some ofthe lifter noted inthewater(Figures7 and 8). Samplingwas conductedapproximately 45 feetaway from visiblelifterT.he technicianwaitedapproximatelyfive minutesaftersteppingintothe waterto allowbottom sedimentto settleprior to collectintghewater sample. Pace Analytical Page 5 Deviationsfrom the GPO o Additionofthe deep aquifer- reverseosmosis samplingpointatthe drinking water plant. 0 Additionofthe chlorinecontactchamber sampling pointdue to changes at thewastewatertreatmentplant. o PendarvisPark samples were collecteduringlightto moderate rainfall. Sampling atMartinCounty Marina and the QuietSurfacewater occurredwith 24 hours ofa rainevent. GPO requesteddry conditionfsora 24 hour period priorto sampling. Per the July11, 2000 phone conversationwithJess Eldridge,use of the subsurfacewater sampler would be needed onlyifa sampling configuration requireditsuse. The surfacewater samples were collectedmanually by hand. Benchmark locationfsorGPS accuracyconfirmatiownere not locateddue to constructioanctivities. As mentioned inthe "SpecialPrecautionsQ,A/QC" sectionof the GPO, Zip Lock bags and aluminum foilwere to be testedfor background levelsof fluorochemicalsT.he Zip Lock bag was clean but the aluminum foilhad some positiveresults.As a precautiona,fterthisinformatiownas made known, the sediment scoops which had been cleaned and wrapped infoil, were rinsedwith"Optima"grade methanoland Type Iwater inthe fieldprior to use. The data regardingthe aluminum foilwillbe evaluatedand reanalyzed ifnecessary. Pace Analytical Page 6 ContactsforMunicipalSites 9 Permissions Granted by Municipal OfFicials:Full cooperationwas receivedfrom the respectiveofficialosf the municipaldrinkingwater plant, municipalwastewater treatmentplant,municipallandfilalnd Station#5 fire department. Followingare the names and phone numbers of the 'site contacts: Municipal Drinking Water Plant 1.Wes Upham - 561/873-6400 2. Brad Macek - 561/343-2373 Wes Upham made the arrangements for Brad Macek to show the Pace techniciansthe monitoringpoints. Wastewater Treatment Plant 1.Wes Upham - 561/873-6400 2. CarlNorton(onsite) 3.Mark Rowen (onsite) Wes Upham made the arrangements forCarl Norton to show the Pace techniciansthe monitoringpoints. MunicipalLandfill. 1.Ron Roberts- 561/462-1768 2. Chuck Lamb (onsite) FireStation#5 1.ChiefVaughn - 561/462-2312 Pace Analytical Page 7 E'aO = c) -am wd-) >E c@:,E Cl)W C-4 In ID 10 "D 40 7N CD m CL < 06 U) 06 FA (00 WC)L 0 0 '2 .2 31: t 15 tm co co x u. 0 lot co CL -b 1 co w 09 CML a. a. L) E 0 -a2 U.. Z Izo 0. a. a. CE) 's m li Ft g 22 C.) -2 CL 0a. CL co E a. tot zz CIOL CVF LIL PortSt.LucieResampling Lab Request: EOO-2003 July2000 Event Garmin GPS12 Coordinates Table 2 Sampling Location July-200 event Instrumentreading t Position (deg.and min.) July 2DDu event Convemion t (deg.,min. and sec.) MunicipalDW Plant 1001S.PdnvilleRoad Latitude N27" 18 .521' Longitude W0800 20 .484' N270 18'31.3" W0800 20'29.0" NorthPortWWTP 281 St.James Ave. Latitude N27" 20 .175' Longitude WOBO* 21 .070' N270 20' 10.5" W0800 21'04.2" PortSt.LucieLandfill 6120 Glades CutoffRd Latitude N270 23 .362' Longitude W0800 23 .912' N270 23' 21.7" W0800 23' 54.711 FireStation5 1616 PortSt.LucieBlvd Latitude N27* 16 .246' Longitude W0800 18 .195' N270 16' 14.8" W080" 18' 11.7" StuartHarbor Latitude N270 12 .197' N. sideof RooseveltBridge Longitude W0800 15 .693' N270 12' 11.8" W080* 15'41.6" PendarvisPark PendarvisCove Park Latitude N270 11 .251' Longitude W0800 16 .213' N270 1l' 15.1" W0800 16'12.8" HolidayInn 10120 S Highway 1 Latitude N270 16 .748' Longitude W0800 17 .494' N270 16'44.9" WOBOO 17'29.6" MartinCounty Marina Latitude N27* 10 .997' Mapp Rd/SW Chapman Wa Longitude W0800 16 .118' N270 10,59.81, W0800 16'07.1" QuietSurfaceWater Latitude N270 10 .991' Mapp Rd/SW Chapman Wal Longitude W080* 16. 344' N270 10'59.5" W080* 16'20.6" July "@99 event BattelleMeasurements (deg.,min. and sec.) N27* 18'32.1" W0800 20' 37.S" N270 20' 10.7" W0800 21' 08.7" N270 23' 21.4" W0800 23'53.1" N27* 16'21.8" W0800 18'14.6" N270 12' 13.6" W0800 15'43.0" N27* 1l' 15.2" W080* 16'12.9" N270 16'46.2" W0800 17'30.1" N270 11'00.1" W0800 16'08.7" N27* 11'00.1" W0800 16'20.4" t The Garmin GPS12 used forthisprojectdisplaysthepositionindegrees and minutes.Previousdatawas reportedindegrees,minutesand seconds. For comparison to previousdata,the fractionailncrementof the minutewas multipliebdy 60 toconverttoseconds. Pace Analytical Page 9 PortSt.LucieResampling Lab Request:EOO-2003 July2000 Event Abbreviations Table 3 Abbreviation c dup FB-Empty FB-Filled FMS FSCS (Dl and D2) K MDWPIN-LIME MDWPIN-RO MDWP-OUT NPWWTP-CC NPWWTP-EFF NPWWTP-SLUDGE PSLLF-LEACH QSWPALM CITY SED #1 PEN PK SED #2 MCM SED#3-SH SW#l PEN PK SW#2-MCM SW#3-SH TW#l HOLIDAY INN TW#2 FIRE DEPT TW#3 PEN PK FullDescription Sample forCentreLaboratory Duplicatesample collectedsame as onginaIsample FieldBlankControlSample Empty FieldBlank ControlSample Filled FieldMatrixSpike(eithe2r00 ppt,1 ppb,or25 ppb) FieldSpikeControlSample (Day I and Day 2) Sample forKrisHansen MunicipalDrinkingWater PlantIntake- LIME MunicipalDrinkingWater PlantIntake- Reverse Osmosis MunicipalDrinkingWater PlantOutflow NorthPortWastewater Treatment PlantChlorineContactChamber NorthPortWastewater TreatmentPlantEffluent Wastewater TreatmentPlantSludge (pretreated) PortSt.LucieLF Leachate QuietSurfaceWater Palm City Sediment Site#1 PedarvisPark Sediment Site#2 MartinCounty Marina SedimentSite#3 StuartHarbor SurfaceWater Site#1 PendarvisPark SurfaceWater Site#2 MartinCtyMarina SurfaceWater Site#3 StuartHarbor Tap Water sit#e1 HolidayInn Tap Water Site#2 FireDepartment Tap Water Site#3 PendarvisPark Pace Analytical Page 10 mm 0. (L LL LL LL. CL 6 6 co m In co r4 .0 i0L. i0L. t0. i a 8C4 8C4 88 U. CL CL UM @A 6 6 .0 CL 7H 0. 8 C84 U- U. co 6 U. CL CL CL 0. CL C:) C) c:@ -s o U. a. r_ t5 (L (L 0. g g 3: -z . t5 w LU ww 0 A ,, m 0 C'01 E cC@',4L) .0 iL a. W E m :3 (D cr0 cn CL co 0 to 0 Ln 0 !@ 0 0N u, NLO N uV, L0n Ln cm 88 ;a CL 0 co.!n (L -i -i 1. C> co CL In iInN 0c..4