Document k6bB7gLjGJbY2QBpxEBagM24O
,, --
**
. .;.- - "" Anniston Plant -
-
. ..
TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Anniston
C. K. Eastman A. J. Koenig J. C. Landwehr L. J. Boesch G. W. Miller W. B. Papageorge W. F. Taffee H. L. Williams
Summary - February, 1969
' * 1 Cost Improvement Results
Est. Act. Target 7. of Target
Month
27,135
21,960
123.5
YTD
46,975
40,410
116.2
i
General Offices
Organic Division
H. C. Carder W. R. Robirds \ Danna (5)
. B. Hodges D. B. Hosmer (2) W. A. Kuhn C. F. Luecke N. L. Sample J. E. Smith R. J. Stratmeyer H. S. Trail
Manufacturing cost estimate to be made by March 15, 1969 on low color Solid Aroclor 5460 by sodium treatment of Santowax R. Marketing estimates 1 H lbs/yr. sales at start.
Debottlenecking the Biphenyl stills and upgrading No. 1 Tubular Unit project mechanically complete. Insulation, painting and dismantling phases remain for final completion.
Staley Grade and water-white HC1 project continues to receive top priority. Aroclor off-gas catch tank installation being expedited for 3/15 completion, and this will give an immediate increase in recovery. Total project completion still scheduled in June.
PNP reactor cycle time controlling variables are under intense study by TSD process and statistical groups. If current batch size of 8,000^ and cycle time of 151 minutes/batch can be main
tained, rate will improve to 1.78 M |/mo. .
Construction underway on central chlorine unloading facility. Revised completion date is May 26, 1969.
OTHER LOCATIONS
D. W. Jackson - WCK T. M. Patrick -
So.2nd St. A. H. Forsten -
y Alvin, Texas
Agricultural Division
Tentative amendment "A" to Niran process to Recover Acetone was approved 2/17/69.
The Sulfur Recovery - Liquid Residue Recycle Process was re viewed with CED and Ag Division. CED has begun work on a preliminary project scope and evaluation grade estimate.
AN-306
DSW 377684 COMPANY CONFIDENTIAL INFORMATION
"This document contains confidential information which is the property of Monsanto Company.' Only those portions of the document relevant to a duly authorized individual's need to know may be exerpted for him. The report must not be sent outside the Company without written approval and the recipient is accountable for its safe keeping, exerpting or otherwise disclosing of its contents and for its proper disposal."
STLCOPCB4099417
Company Confidential 2.
Design and Drafting Installation of emergency radio communications equipment started with mid-March completion targeted. Solid Aroclor instrumentation (Phase II) drawings forwarded for review.
Process and Quality Analysis The Plant Quality Score was 94.9, up 5.4 from January, with YTD score of 92.0 against a target of 95.0 minimum.
. C. Landwehr jw
OS**1685
STLCOPCB4099418
organic division
1969 TSD COST IMPROVEMENT
ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Sol.Aro. Li-Still SpG.
TAR EST
2250 2250 1250 225Of;2250 2250 2250 2250 2250 `|
AFE *1015 Sp.Solid Aro.
ACT TAR 26Q0 2600 2600 2600 2600 2600 2600 V600 ?600 -
--
Lower 5060
est: ACT
1500 5490 1500
Sol .Aro.-Still TAR Coolout temp. EST
160 170 160 170 i 160 170 160 170 160
AFE 3015
ACT
Sol .Aro. -Chlortor TAR
390 390 390 390 1 390 390 390 390 390
Batch End AFE 3015
EST: ACT
1
SW/R Composition TAR
2750 2750 2750 v2750 2750 2750 2750 2750
EST.
AFE 3016
ACT
Solid Aro.
TAR
1080 1080 1080 '1080 1080 1080 1080 1080
Montar 5 Flake EST
AFE 2949
ACT
Sol.Aro.
TAR 2500 2500 2500 2500 2500 2500 2500 '2500 2500 2500 2500 2500
Blend 4465
EST 1690 1920 ACT 1690
Sol.Aro.-Verti- TAR
cal Still Cond. EST/
AFE 2324
ACT
70 80 70 80 70
70 90 70
|
Sol .Aro.Cl2
TAR
940 940 950
T/C Dock
EST.
AFE 2342
ACT
Cl2 Pit.Down No TAR
950 940 * 950 940 950 940 950
Unload
EST-'
CED 1831
ACT
Solid Aro.-Flake TAR 3000 3000 5000 5000 5000 5000 5000 1:5000 5000 5000 5000 5000
& Drum CED 1430 Liq.Aro.
EST.
00
ACT 0
TAR 3000 3000 - - - - - - - -
--- ---- --
48-53 M #/yr. AFE 2545
EST. ACT
0 5500 0
Liq.Aro."No.2 TAR
3000 3000
Still Entrain Sep. EST.
AFE 3093
ACT
Liq.Aro. -Montar TAR
1080 1080 1080 1080 1080 *1080 1080 1080 1080 1080
Disposal
ES.T.
AFE 2952
ACT
Warehouse
TAR 2000 3000 3000 3000 3000 3000 3000 13000 3000 3000 3000 3000
CEA 1452
EST. 2000 2000 ACT 2000
Liq.Aro.Nev7
TAR
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
Burners $3 Still EST ACT
Biphenyl Relocate TAR
500 500 500 500 500 500 500 ! 500 500 500 500 500
No. 1 Preheat CEA 1892 HB-40 2 A/C's
AFE 3102
.
EST ACT
TAR
EST ACT
1500 150C
3000 3000 3000 3000 2230 2580 3490
3000 3000
3000
3000
3000 3000 13,000 3000 1
DSW 377686
STLCOPCB4099419
ORGANIC DIVISION 1969 TSD COST IMPROVEMENT
ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Bi0 Improve
TAR
450 450 450 450 450 450 450 450
Tower Treat.
EST
AFE *>155
ACT
Improve Pit.
TAR
900 900 900 900 900 900 900 900
Power Factor
EST
ACT
Central Air
TAR
1000 1000 1000 1000
System
EST
ACT
Optimize Rx Time TAR
2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500
EST 0
PNP ACT
Reduce Mole
TAR
4000 14000 4000 4000 4000 4000 4000 4000 4000
Ratio NaOH/PNCB
EST
PNP ACT
New Wash Water
TAR
50 50 50 50 50 50 50 50
Pump - PNP
EST
25
AFE 2998
ACT
Automatic pH
TAR
500 500 500
Control
EST
PNP ACT
HC1 Filter
TAR 330 550 340
Pump
EST 330 33O ACT 330
New Blow Tank
TAR 200 goo 200 200 200 g00_
HCl
EST 200 200 ACT 200
150,000 Gal.-HCl TAR
1760 1760 1780 1760 1760 1780 1760 3.760 1780
Storage Tank
EST
AFE 2468
ACT
Produce Staley
TAR
780 780 790 780 780 790
Grade Acid
EST
AFE 5076
ACT
Clp-Pit, Shutdown TAR
8880 8880 8880 8880 8880 8880 8880
EST
CEA 1851
ACT
Hg Recover from TAR 350"
250 250
Residue
EST ACT
3910 3910
0
Hg Wash Tank AFE 2802
TAR EST ACT
250 50 250 250 00 0
Biphenyl Productivity
TAR ^EST
0 9U0U
ACT 5150
Total Organic By Month M $
Total Organic
TAR
EST ACT TAR
17 7 21, 2LUL aLJL *6.7 45.5 46.0 46.0 46.0 47.1 47.9 45.0
27.1
19.8
17'. 7 *5877 ?2TT TTTcT 131.5 176.8 222.9 268.9 J16.0
412.C 457.0
YTD M $
EST 46.9
ACT 19.8
_____
DSW 377687 STLCOPCB4099420
AG DIVISION 1969 TSD COST IMPROVEMENT
Cooling Tower
ANNUAL JAN . >I TAR
Repiping
EST
AFE 2598
-ACT
Optimize &
TAR
Cl2 Levels
EST
. ACT
Increase Waste
TAR
Acid Sales
EST
'ACT.
Chlorinator R.I.
TAR
EST
AFE 2244
ACT :
EVOP Condensation Rx.
TAR EST ACT
750 0 0
Cl2 Unloading
TAR
EST:
CEA 1851
ACT
Recycle Wash
TAR
Water
est:
AFE 2960
ACT
Parathion Recovery TAR
EST
AFE 2655
ACT
Reduce Acetone
TAR
Losses
EST
ACT .
Formulations
TAR
EST
AFE 2897
ACT.-
Change Cooling
TAR
HaO Item 7}7
EST
AFE 5067
ACT
Well H^O to Jets
TAR
EST
ACT
Ag. Division by Month
TAR EST :
750
ACT 0
Ag. Division YTD
TAR EST ' ACT
750 0
TAR
EST' ACT
TAR EST ACT
FEB MAR APR MAY JUN JUL. AUG SEP OCT NOV DEC
- 1
1- T * --1 i
m -- -- n ' f -- m. m r, -T-- " -- -
420 420 410 41.0 420 420 410 420 420
6600 6700 6700 660 6700 67 00
400 500 ?00 40 500 500 400 500 5Q0_
25 250 250 250 250 250
750 500 0
500 750 750
500 5000 5000 2000 2000 2000
-
29 290 290 290 290 290
580015800 5800 i i
45OO 4500 4500
1600 1600 1600 160 1600 1600
-
|
125 125 125 125 125 125 125i 125 125
500 500 500
750 500 9145 9145 91,,55 14675 1468.5 14685 14575 1448514.485
0 1500 P00C m45 20290 29423 44109 58785 75470 3 8045 IO255: 117015
0
DSVV 377688
STLCOPCB4099421
AROCLOR
Company Confidential 3.
E. E. Bowles, C. R. Mcllwain, (V. R. Haupt)
Evaluate Quaterphenyl-
1969 Savings $63,200
TSD Objective
Polyphenyl Effects on
NFC $14,000
B-8 (a)
Solid Aroclor Yields__________'_________________ ____________________________ ___________
Nuclear gage instrument installation scheduled to begin week of March 3* Awaiting receipt of radioactive materials license from State Health Department before radio active source for level alarm can be shipped.
Drawings for second part of project. Still Condenser Coolant Control, returned from plant review with minor changes. ,
-
Make Solid Aroclor
Meet 1969 Forecast
TSD Objective
in Liquid Aroclor Systemof 15 M lbs.B-8 (b)______________
Project completed in early February. Produced 280 M lbs. of Aroclor 5460 in Liquid Aroclor system during February.
Montar 5 Flaking ' '. _________
Savings $ll,500/yr.
TSD Objective
NFC $12.000 ______________ B-8 (c)
Montar 5 flaking project will be transmitted in March and installed by May 1. Pump delivery prevents earlier EDC.
Low Color Aroclor 5460
Quality
TSD Objective
________ ___________________ NFC ~ to be estimatedB-8 (e)
Presently estimating capital investment required to produce low color Aroclor 5460 by sodium treatment of Santowax. Marketing estimates sales of up to 3 M lbs. yearly of low color Aroclor 5460. Manufacturing cost estimate to be completed by 3/15/69.
Therminol System ; B-8 (h)
Evaluation
TSD Objective
The Therminol distribution problem was discussed at the Solid Aroclor Expansion Scope Review February 4, 1969 with CED. CED will provide a new surge tank plus the pump and lines for the expansion Therminol needs. TSD will provide pump and lines to effectively distribute the Therminol in the existing system. Distribution in the existing system is poor and does not supply heat where needed without re adjusting most of the 22 branches from the main header.
DS\N 377689 STLCOPCB4099422
Company Confidential 4.
AROCLOR (Cont'd)
Montar Use and Disposal Project 952___________________
Savings $13*000
TSD Objective
NFC $10.000__________________
B-8 (g)
Installation is scheduled for March to provide a line for pumping Liquid Aroclor Montar to Montar disposal pond.
BIPHENYL-SANTOWAX
W. G. Niemeyer, J. W. McGee, D. A. Self (V. R. Haupt)
Debottleneck Biphenyl Stills to 87.6 M lbs/yr.
Capacity _______ Increase'
TSD Objective _____________B-7 (a)
CED's work in this area was mechanically complete on February 28. The plant plans to put the Santowax C surge tank and column feed pump into service on March 15, 1969 after replacement of damaged Leveltrol instrument.
No. 1 Furnace Upgrade
Capacity
Liaison (CEA-1892)Increase________________
TSD Objective ______ B-7 (c)
This project was mechanically complete on February 28. Remaining work includes: piping and tank insulation, dismantling of tanks and piping, tank painting, and access road work.
Improve Santowax R
Quality
TSD Objective
Quality with New
B-7 (d)
Distillation Column_______________ ;_____________________________________________________
All instruments to be received in March. Installation of this project may be de layed due to maintenance manpower drain for the Niran turnaround.
CHLORINE
D. W. Dudley (A. G. McCarty)
Central Chlorine
CED I83I Liaison
TSD Objective
Unloading______________________________ Savings $55.500_______ ;________ B-6 (a)
Elevation grading for installation of new railroad tracks underway. Final design to be completed in March. Construction completion date is now targeted at May 1, 1969.
DSW 377690 STLCOPCB4099423
HC1 0. J. Norris, G. L. Moore (A. G. McCarty)
Company Confidential 5.
Production of Staley Grade
New Earnings $28.8 M
TSD Objective
Acid - Project ^076Potential Savings $71 MB-10 (c)
The catch tank portion of project 3076 continues to be expedited. Shop prefabri cation essentially complete. Bad weather held up pouring the concrete pad. Sche dule for week of 3/3 includes completion of concrete pad and walls and painting of pipe and tank. Field installation set for week of 3/10.
A meeting was held with Production and PR&D to outline program to define Staley Grade acid in terns of organic contamination level.
Muriatic Acid StorageSavings $21.200_________
TSD Job No. 497
Rubber lining 85% complete. Piping work scheduled to begin by mid-March.
PNP 0. J. Norris, G. L. Moore (A. G. McCarty)
Debottleneck to
Capacity
1.8 M #/mo.__________________ Savings $27.500B-9 (a)
TSD Objective
Production rate continues to improve. Reaction time remains at targeted 66 min./batch with letdown continuing in 3O-35 minute range. Batch size continuing to be increased, now back to 8,000 #/batch. PR&D has completed their study of charge tank contents changes, and intensive study of process variables is leading to much better understanding of the causes of reactor letdown problems. Solid phase build up (measure of 7. solids) observed in sample bottles is attributed to NaPNP. This level build up is a better "before the fact" indication of letdown trouble than the old method of observing an increasing "hump" in the cooling curve. Letdown problem is strongly indicated to be phase-related phenomena. A progress report on developments to date will be issued by 4/1/69.
NIRAN
K. G. Hale, D. W. Dudley, (A. G. McCarty)
Demonstrate Parathion
Savings $17,500
TSD Objective
Recovery
10-157. Reduced
B-5 (a)
_______________ 'C.O.D. Load_____________________________ ________________________________________
Coalescer was Inspected for cause of pluggage by representative of RPC corporation (coalescer manufacturer) and TSD February 6. Vendor reported that pluggage may have been caused by breakdown of wire elements since solids on elements were "high" in iron. Laboratory filtration of process stream and subsequent qualitative analy sis indicates filter and coalescer pluggages were caused by gelatinous ferric hydr oxide. Steps being taken to test sequestering of iron before filtration. Labora tory test to be run in early March.
DSW 377691 STLCOPCB4099424
Company Confidential 6.
NIRAN (Cont'd)
Parathion
Savings $10,000
TSD Objective
Formulations;,.__________________________________________________ B-5 (f)
Preliminary design for expanded facilities has been completed and drawings are out for review. Justification for the project is marginal and depends on a significant formulations volumn increase over last years Anniston production. Doubt now exist that this increased requirement will be forthcoming. In the event that an AFE is not submitted the design package will still be completed and held for future use.
Acetone
Savings $12,900
TSD Objective
Recovery
40-50% Reduction
B-5 (i)
________________________ '_________________ in C.O.D.________________________________________
Tentative amendment to Niran Process for recovery of acetone was approved 2/17. Gathering of background, data on percent acetone presently remaining in batches is underway. Plant tests will begin on the number 3 condensation reactor in March.
Recycle Wash Water,,B-5 (g)
Savings $3,500
TSD Objective
Project 2960 to make washing operation counter current flow is scheduled for con struction during March turn-a round. Plant tests will begin on one washing system in April.
Sulfur Recovery
$500,000/yr. Savings
TSD Objective
From Residue40% Reduction in S0aB-5 (d)__________________________________________________
A sulfur recovery meeting was held in St. Louis on 2/20 with Representives from Ag Research, CED Engineering, Utilities Planning, Ag Manufacturing, Anniston PR&D and TSD. The purpose of the meeting was to review the proposed process, justifi cation, waste disposal, scale-up problems and other engineering aspects.
Jim Lakemeyer, Project Manager for Sulfur Recovery, is preparing scope. Anniston TSD and PR&D will assist where possible on scope and follow-up design problems.
Submerged Pump for Refractive Index Control of Chlorination
Savings $1,500
TSD Objective
(potential automation)
B-5 (c)
___________ ^,;;______________
The pump has been re-installed. Refractometer tests have been delayed because of sandblasting and painting operations in immediate area. Production will run pump during each batch and begin collecting samples from circulating line. Refracto meter will be started-up in March to gain background data during ethyl run.
DSW 377692
STLCOPCB4099425
Company Confidential 7.
NIRAN (Cont'd)
Fume Collection System in Parathion Department
Reduce Atomosphere Corrosion___________
TSD Objective F-10
New fan still on order. Transmittal for new foundation and transition pieces was completed during February.
ENGINEERING DESIGN AND SERVICES
Mechanical/Electrical/Instrument Design and Drafting
J. C. Price. J. A. Veazey,
R. L. Brewer. J. K. Rennie.
(W. F. Taffee)
__________
Installation of emergency communications radio system (AFE 2951-$14 M) underway. Completion targeted for mid-March.
Design packages forwarded to Maintenance for Handrail and Lighting at Niran Limestone Pit (AFE J06l - $2500), Staley Grade HC1, switch Heat Exchanger to Tower Water.
Review drawings completed for Niran Formulation, P2S5 Vent Alarm (AFE 3I8I - $838 Recommendation of safety investigation), Solid Aroclor Instrumentation (Phase II).
Corrosion inspection services provided for Thio Acid and Condensation Reactors, Aroclor Blow Tanks and Roof Tank. Test panels of DuPont exterior finish for rigid frame structures installed as start of five year test exposure. Construction of rubber lined HC1 storage tank observed - testing scheduled for early March.
UTILITIES ENGINEERING
J. C, Price (W. F. Taffee)
Transmitted design package to P&S for Project 2988 - Biphenyl Gas Meter and Project 3067 - Cooling Water on Item 737 (savings $1500/yr.). Forwarded AFE 3184 - Relocate 1800 KVAR Capacitors (savings $10,800/yr.) for approval. Reviewed proposed improved treatment for Biphenyl Cooling Tower with John Bufe and 0. W. Siebert. Met with W. E. Chandler and discussed Utilities Cost Improvement.
PLANT IMPROVEMENT
G. C. Goodwin (W. F. Taffee)
1968 Plant Improvement 4th quarter Progress Report was published. 1969 Plant Improvement Program was reviewed with W. E. Chandler.
oSMVl 377693
STLCOPCB4099426
POLLUTION CONTROL
E. G. Wright (W. F. Taffee)
Company Confidential 8.
Contact With
Community and Govt.
TSD Objective
Regulatory AgenciesRelationsF-2
One visit to city treatment plant during February. Solids continue to be their major problem.
Waste Audits
Pollution Abatement
TSD Objective
:;____________________________________________________________________________________ .______________________________________________________________________________________________
Planning underway for waste audits. Report will.be issued in March.
Waste Treatment
All wastes were effectively treated during February. High solids concentrations continue to be the major problem. Average daily values for Monsanto's effluent are as follows:
Average Daily
Specifications
PNP 1.4 ppm
5
COD 52.6 ppm
<200
Parathion
.12 ppm
1.0
BOD 4 ppm
<200
PROCESS AND QUALITY ANALYSIS
W. B. Dunlap
Quality
The Plant Quality Score was 94.9, up 5.4 from January, with YTD score of 92.0 against a target of 95.0 minimum. Cost optimization experiments in Niran condensation, and a deliberate reduction in Aroclor 1242 gravity have made these products deviate from established averages. Statistical standards will be recalculated when equilibrium is reached.
Parathions - Correlate Intermediate and Parathion Isomers
Potential Savings $88,000
___ _______________
TSD Objective C-2
Job 878
Laboratory tests for intermediate isomers have wide discrepancies which must be reconciled in order to correlate intermediate with parathion isomers. Routine surveillance of parathion isomers is continuing.
DSW 377694
STLCOPCB4099427
Company Confidential 9.
PROCESS AND QUALITY ANALYSIS (Cont'd)
PNP - Monitor Critical Process Variables
Potential Savings
TSD Objective
$60,000
C-3
______________ Job 879_________
Extensive analysis of operating data was carried out with collaboration of the Process Engineer. This work is reported under TSD Job 482. There is strong evidence that extended reactor cooling cycles involve a phase change (crystalli zation of NaPNP) with liberation of heat. If this occurs at the boiling point, levitation of the reactor mass into the condenser and receiver results in loss of pressure drop and longer cooling cycles. This also recycles solids into the next batch, with continuing build-up of solids and increasingly severe "bumping" of the reactor during depressurization.
Manpower
Interviewing and testing of candidates for Process and Quality Analysis Technician was completed. A selection will be made early in March.
DSW 377695 STLCOPCB4099428
Company Confidential 10.
PLANT LABORATORIES G. W. Miller
PROCESS RESEARCH AND DEVELOPMENT J. T. Bell
Out of the scheduled 95 working days, 68 days were directed toward projects in the 1969 PR&D Program with 17 days expended on a nonscheduled project. The Blend Scavenger Refinement (Aroclor) study has been delayed approximately 3 weeks for a preliminary Investigation of Montar 9 conversion to biphenyl or terphenyls. The program to establish possible Montar Utilization is approximately 8 days behind the published work plan.
p-Nitrophenol
Reduce Cycle Times
W. H. Howard ______________ J. T. Bell
Analysis of charge tank and 216 recycle water samples under normal and upset
(prolonged cool-down) conditions has been completed. The only significant
difference observed was an increased sodium paranitrophenate level in the
charge tank under upset conditions. The laboratory reactor studies will be
initiated according to the work plan with other studies included as may
appear feasible.
.
Aroclor 1272
Sample Preparation ______ for Sales
G. L. Arnett
The program has been concluded and a report issued on the laboratory investigation.
Sulfur Recovery
Sulfur Refinement
____________
for Reuse____________________ I. Ransaw
A report entitled "Proposed Process for Purification of Sulfur" has been issued. A 40% or greater reduction in the COD level may be reached by chlorination of wash effluent. A technique for the quantitative determination of off-gases generated in the wash step has yet to be developed. A corrosion study to establish the feasibility of utilizing a nickel centrifuge as a substitute for the final filtration has been initiated. .
Blend Scavenger
Improved Aroclor
Refinement (Aroclor) Electrical Properties___________________
J. L. Brown
The project was delayed to permit a preliminary investigation of Montar 9 conversion to lower polyphenyls. A work plan is to be issued and effort resumed by 3/3/69. The work will be directed toward establishing if phenyl glycidyl ether is incapable of yielding excellent resistance values by virtue of molecular dipoles.
DSW 377696 STLCOPCB4099429
PROCESS RESEARCH AND DEVELOPMENT (Continued)
Company Confidential 11.
Quaterphenvl Conversion
Possible Montar 9 Utilization
J. L. Brown
Preliminary data indicates probable biphenyl and terphenyl production by Montar 9 reaction with A1C1-. Low yields and high catalyst requirements have been observed. Sodium-aluminum trichloride reaction with Montar 9 has produced an unidentified white crystalline material. This initial study is to be completed and terminated.
Solid Aroclor
Meet Color of
Color Improvement__________ Competitive Material
G. L. Arnett
A chlorinated competitive material, KC-100 (Kanagefuchi) has been found to have lower color than Aroclor 5460. A sample of Kanagefuchi Santowax was chlorinated in the laboratory and found only equivalent in color to Aroclor 5460. This indicates an unknown color Improvement step presumably relating to the terphenyl starting material. This project has been concluded.
Montar Utilization
Recover Aroclor Value
G, L. Arnett
The project work plan has been issued. Initial efforts to determine the maximum number of distillations that may be made prior to still bottoms removal has been initiated. Aroclor 1142 is being employed as material under investigation.
ANALYTICAL AND QUALITY CONTROL
S. 0. Kemp
Complaint Report
Quality
Number
Material
Customer
Reason
2-A-69
HB-40
General Cable
Color
YTD Quality Coraplaints/100 Shipments 0.16 Target 6.20
Service
None
YTD Quality Complaints/100 Shipments 0.0 Target 0.25
DSW 377697 STLCOPCB4099430
Company Confidential 12.
COMMUNITY RELATIONS. PERSONNEL. RECRUITING. AND DEVELOPMENT
Personnel 1. D. A. Self, B.S. Ch.E. University of South Carolina and 1968 summer
employee, joined TSD permanently 2/10/69. 2. A. G. McCarty, K. G. Hale, and Ish Ransaw made presentation to Ag Division
Management & CED on Sulfur Recovery Project 2/20/69. Development 1. R. L. Brewer attended glass lined equipment training course at Pfaudler
Co., Rochester, N. Y., February 3-7. 2. E. G. Wright attended a training course "Biological Treatment of Waste
Waters & Sludges" at Taft Sanitary Engineering Institute, Cincinnati, Ohio, February 10-21. 3. J. A. Veazey attended a seminar on control valves, sponsored by Fisher Governor, in Birmingham, Alabama, February 3, 1969. 4. Four people from Engineering Design and Services attended a demonstration seminar on Armstrong steam traps 2/17. 5. J. L. Brown attended an Instrumentation Seminar at Central Research on 2/13/69. 6. A. G. McCarty attended Kepner-Tregoe in St. Louis week of February 10th. 7. J. C. Landwe.hr attended Capsule Process Control Course at Delaware River Plant 2/17 & 2/18 and Comprehensive Interviewing Course in St. Louis week of 2/29. Visitors 1. B. B. Hedieston visited the plant to discuss railroad repairs and relocations on CEA 1831.
DSW 377698
STLCOPCB4099431
(
PROCESS IMPROVEMENT
DISTRIBUTION OF TIME BY TECHNICAL SERVICE
NEW PRODUCTS
PLANT IMPROVEMENT
ASSIST OPERATIONS
SPECIAL
E. i'xGINi---^ ' iN o
SERVICES
TECHNICAL MANPOWER
MISCELLANEOUS ACTIVITIES
AND ABSENCES
Jan. Feb. March Apr. May June July Aug.. Sept. Oct. Nov. Dec.
STLCOPCB4099432
IN MAINTENANCE
FOR CONSTRUCTION
600 500 400 500 200 100
00
Company Confidential TSD PROJECT SUMMARY
PROJECTS SUBMITTED
FOR APPROVAL
cEoo <co o
APPROVED PROJECTS IN TSD
STLCOPCB4099433
LABORATORY ADMINISTRATION
ANALYTICAL SAMPLES
60 1967 1968
1 56 II
6 52 1
1 48 1
44 40 I''**
.7
I Njv 11 1IV
MA
ANALYTICAL MANPOWER
2400
2300
--11--1-- 1i
2200
1i 1i
2100
1! 1i
2000
i r- l
1900
|i 1 1 <rr S3
1800
i t!
i i1
1700 i 1__- ~L. -
MJ
1 .... 1| 1| 1 1 1 1
A
Jf -
0N
--f-- 11 1 1 1 I !_ ri i
$/Manhours
% Total Plant Operating Cost
/' ' \
Overtime %
/ r~i
i5 !
13 ... ~--
ii <
1 ____ i
i
1967 1968 J
1 V
!11
iii
rH 1
1 -1
i '
s.
iii
.
' oS'N317101
11!
.. i
i i. i ii1
i
;.
l
1 i
M AM
J J A SO
is i)
STLCOPCB4099434