Table 5: Summary of Capital, O&M and Levelized Costs for EPA Estimate Method, EPA Emission Baseline
Summary of Particulate Emissions Control Costs from Colstrip
PM
PM-10 Control Removal
Alternative
(Ranked by PM-10 Rate)
Efficiency %
(Note B)
Upstream ESP . Upstream FF Wet ESP Reheat ESP Reheat FF 2022 Baseline (Scrubber)
48 72 . 48.72 48 72 48.72 48 72
Emission
Rate lb/MMBtu
0 010 0.010 0 010 0.010 0 010
0.0195
Emissions
Hourly
Annual Emission
Emission
Lbs/Hr 152 152 152 152 152
Emission Reduction
Tons/yr
Tons/yr
566 . 538
566
538
566
538
566
538
566
538
296
1103
Installed Capital
Economic Impacts
Annual 0 &M
Total Annual
Cost
in millions S
406 1 . 338.3 622 2 220.2 293 4
Cost
in millions S
29 8 . 29.9 16 6 10.5 14 9
Cost
millions/yr
78.0 70.1 90.4 36.6 49.7
N/A
N/A
N/A
Average Control
Cost $Iton
145,000 130,300 168,000
68,000 92,400
N/A