199611 3:09AM
iJJ :^b-Iblb
ftus 28`96 m.-i
? : -J1 P.Ol
i' 'J , J U V '
* . V
r*x:
(314) 248-1815
DATE:
SOt CCt
an/finsii
FAX PEONS)
N*jn. WtrncLuv
ftjJalie. Ajftur*
Mor>*oJf\.4a Ca. .
4^. Lam , >40 (8i^feQM-4g72.
RDKBSR Of FACES) U
(XHCLODZMC COVER SHEET)
A\nusJ
^ i*
-
fEOkt
ne. <Sr.v>r`
(2141
DSW 135672 STLCOPCB4035650
Aug. 28. 1 996"' 3:09AM
iu^by-iyib
AUG 28'96 \| 3397J2 ?, 2 3)1 P.02
Proposed Dates: 4* Friday Sept. 27th. 1996 Friday Oct. 4th. 1996
Monday Oct. 14th. 1996
1996 EMERGENCY RESPONSE DRILL
(WIND DIRECTION TO THE SOUTH WEST)
8:25 A.M. ACID PLANT OPERATOR BEGINS UNLOADING I1CT. TANK TRUCK. THE UNLOADING HOSE RUPTURES. THE OPERATOR AND DRIVER ARE DOTH EXPOSED TO FUMES AND RENDERED UNCONSCIOUS.
8:30 A.M. ES&H OPERATOR WORKING IN THE HAZARDOUS WASTE SHED OBSERVES THE ACID PLANT OPERATOR LAYING ON THE CONCRETE. THE ES& H OPERATOR STARTS TOWARD THE ACID PLANT OPERATOR AND IMMEDIATELY DETECTS AN ODOR OF HCL.
0:31 A.M. ES&H OPERATOR RETREATS TO THE HAZARDOUS WASTE SHED, IMMEDIATELY CALLS UNIT <19, VIA PORTABLE RADIO, TO REPORT THE EMERGENCY. HE GIVES HIS NAME, LOCATION AND TYPE OF EMERGENCY (NAME- HCL RELEASE AT HCL UNLOADING AREA, TRUCK DRIVER AND EMPLOYEE DOWN FROM EXPOSURE TO HCL FUMES)
HE
8:32 A.M. SECURITY SOUNDS THE EMERGENCY ALARM, MAKES THE ANNOUNCEMENT OVER THE-PORTABLE RADIOS AND PUBLIC ADDRESS SYSTEM. EMERGENCY IN THE PLANT, HCL RELEASE AT THE HCL UNLOADING AREA, TWO PEOPLE INJURED. NOTIFY &CS AND PLACE OH STAND-BY
JWIND DIRECTION SHIFTS TO `fflB SOUTH EAST! I5MPH
8:32 A.M. ES&H OPERATOR ANNOUNCES OVER THE RADIO, HCL FUMES IN THE AREA, RESPIRATORY PROTECTION REQUIRED TO ENTER IMMEDIATE AREA, A SCOTT AIR PACK
8:33 A.M. FIRST RESPONDER PROCEED TO EMERGENCY SCENE.CERT TEAM MEMBERS PICK UP SCBA'S WHILE IN ROUTE TO SCENE. CERT ACKNOWLEDGES TO ECC.
8:36 A.M. EMERGENCY PERSONNEL ARRIVE IN THE AREA, TWO PEOPLE SUIT UP AND REMOVE INJURED PEOPLE TO A.CLEAR AREA. NEED ADDITIONAL PPE FOR PERSONNEL TO WEAR WHILE CLOSING TRUCK VALVE.
8:37 A.M. RECOMMEND TO ECC TO CALL ST. LOUIS FIRE DEPARTMENT
8:37 A.M. AMBULANCE IS DISPATCHED TO THE ACID PLANT GERMANIA GATE
8:38 A.M. SITE COMMUNICATOR ACKNOWLEDGES UNLOADING HOSE LEAKING AND CANNOT SECURE THE SOURCE OF HCL AT THIS TIME.
8:40 A.M. SITE COMMUNICATOR RECOMMEND ECC CHECK WITH OPERATING DEPARTMENTS AND DETERMINE EFFECT OF HCL FUMES IF ANY UPON
CSW 135673 STLCOPCB4035651
j. 28. 1996 8:09AM
J. u 4
i. U 1 -J
fiug yo >j7 0, jr>:j*d":J^ * *^ *vj x r Uo
OPERATIONS. HCL CONTINUES TO ACCUMULATE IN THE UNLOADING AREA. FUMF.S ARE BEGINNING TO TRAVEL TOWARD THE REST OF THE PLANT
8:41 A.M. ECC REQUEST PLANT OPERATIONS TO START EMERGENCY SHUT DOWN PROCEDURES.
8:42 A.M. FIRE DEPARTMENT ARRIVES ON THE SCENE, THROUGH THE GERMANIA GATE. PLANT PERSONNEL MEET WITH FIRE CHIEF AND DEVELOP ACTION PLAN.
B:45 A.M. DUE TO HCL CONCENTRATIONS TN THE IMMEDIATE AREA SITE COMMUNICATOR RECOMMENDS TO ECC TO EVACUATE THE FACILITY.
0:46 A.M. ECC REQUEST SECURITY TO SOUND THE EVACUATION ALARM AND HAVE PERSONNEL REPORT TO THE SECONDARY ASSEMBLY AREA. ECC WILL RELOCATE TO THE BACKUP ECC IN THE WEBER FIREPLACE ROOM.
8:46 A.M. FIRE DEPARTMENT WITH REQUIRED PPE ENTERS AREA OF HCL TRUCK AND CLOSES VALVE AT TRUCK. WHILE DILUTING THE HCL WITH WATER.
8:55 A.M. HEAD COUNT REPORTS CONTINUE TO BE RECEIVED.
9:00 A.M. 5 EMPLOYEES REPORTED COMPLAINING ABOUT SORF. THROATS
9:02 A.M. ECC DECIDES WHAT TO DO ABOUT EMPLOYEE COMPLAINTS.
9:05 A.M. HEAD COUNT "REPORT COMPLETED ALL ACCOUNTED FOR
9:05 A.M. EMERGENCY AREA SECURE. FIRE DEPARTMENT AND CERT ASSESS PLANT OPERATIONS FOR SAFE ENTRY.
9:15 A.M. ECC REQUEST SECURITY TO ANNOUNCE ALL CLEAR AND EMPLOYEES CAN RETURN TO THEIR WORK AREAS.
9:30 A.M. DRILL CRITIQUE HELD.
DSW 135674 STLCOPCB4035652