Document jzdMyMVywXNxBG6qrLMDE1jR
r COMPANY CONFIDENTIAL
J. T. Bell J. L. Corder A. G. Hill G. L. Jessee L. C. Lahman J. C. Landwehr H. E. Schulte W. F. Taffee
General Offices
H. C. Carder D. Danna (5) M. W. Farrar P. B. Hodges F. J. Holzapfel D. B. Hosmer R. E. Howard w. K. Johnson C. F. Luecke w. R. Richard W. R. Robirds C. W. Roos J. R. Savage J. E. Smith J. A. Stephens
Anniston Plant
TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Summary
SEPTEMBER 1970
Month
COST IMPROVEMENT RESULTS
Est. Act, ______ Target
% of Target
$67,676
$45,175
150%
YTD
$635,723
$542,780
117%
Organic Division
South Second St.
P. 0. DeGarmo
The new autoclave for HB-40 (CEA 1482) was installed in early September. Startup for the new vessel (using the existing therminol system) will be during the week of 10-5-70. Total TSD time expended on project this month was 369 hours.
A test run was begun on the Polyphenyl Tubular Unit to deter mine capacity and operating bottlenecks when attaining a 50/50 biphenyl/Santowax C split.
Redesign of the Aroclor chlorinator chlorine spargers was completed and Maintenance will fabricate two units to be in stalled and tested for chlorine efficiency (free chlorine in the HC1 gas).
Other Locations
A. H. Forsten Alvin, Texas
D. W. Jackson W.G.K.
One batch of low color Aroclor 5460 was successfully produced and met all specs. Samples were sent to Marketing for evalua tion. Cost will be less than one cent per pound. Progress report will be issued first week October.
A sampling/analysis program was started on Aroclor 5460 to determine relationship between biphenyl in Santowax R and PCB in 5460.
A project (AFE 3605) was forwarded for approval to decrease/ contain Aroclor leaks to decrease the loss of PCB to the plant effluent ($15,300 capital and $6,850 expense).
DSW 014929
an -joe
CONFIDENTIAL INFORMATION
"This document contains confidential intormetion which it the proparty of Montento Company. Only thoie portions of the document relevant to a
duly authorised individual'! need to know may be excerpted for him. The report mutt not be tent oettide the Company without written approval and
the Authorised recipient it eccounteble for its safe kaapinq, axcerptinq or othorwiio ditclotinq of its contents and for its proper disposal. The doeu-
ment remains the property of Monsanto Company and shall ba returnad within two months to its author, excapt upon tpocial authorisation to hold
for a lonqar pariod."
,'
STLCOPCB4003305
Organic Division - continued
2.
Muriatic Acid - A design and safety review was held for Project 3512 Improved Organics Catch Tank in HCl Off-gas Line. Drawings were revised and the project will be transmitted the week of October 5.
Preliminary design proceeded on the HCl Fume Collection and Scrubbing System to reduce water load to the sewer and the need for subsequent PCB removal. An AFE will be submitted in mid October.
CED transferred $28,000 to the plant from CEA 1831 to modify Chlorine Unloading Facilities and provide nitrogen pad for unloading of cars. TSD began design of new facilities late in September.
Agricultural Division
Assistance was provided to determine causes for high raw material and acetone usage in the condensation step, and also to correct a color problem in stored refined intermediate. Some success was achieved in acetone usage and color correction. The raw material yield problem remained unsolved at month's end.
Field testing of the "Hydrocarbon Dilution of Still Residue" process amend ment proceeded independently of "Chlorination In The Presence Of Acetone." A progress report is in preparation for issuing in October.
Process correlation studies on the parathion intermediate chlorinators, followed by a confirming process control experiment, have demonstrated a 4% yield improvement from optimization of chlorine flow rate. Instrumenta tion to provide automatic control have been installed on one reactor to give long-term confirmation for a potential $50,000 annual savings.
Quality Control
The Plant Quality Score was 76.9, down 11.0 from August, with a YTD score of 85.0 against a target of 95.0, and the lowest score of 1970. All depart ments except Parathion dropped sharply in quality scores.
Pollution Control
The new neutralization pit was started up on September 23. The PCB content in the pit effluent is running below the 10 PPB division goal. A skimmer has been installed on the Aroclor sump and preliminary indications are that it is working satisfactorily. An additional set of fish samples from Chocco locco Creek and the Coosa River were collected in September.
STLCOPCB4003306
r
3. PLANT LABORATORIES
ANALYTICAL AND QUALITY CONTROL - S. 0. Kemp Complaint Report Quality
None. YTD Quality Complaints/100 Shipments 0.29 Target 0.20
osw 014931
STLCOPCB4003307
COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT
4.
Community Relations
1. Dr. Fred Lippman, Ag Research, visited PR&D concerning Parathion Research.
2. Mallory visitors were here concerning the product - Aroclor, and worked with Chief Chemist, J. T. Bell on special analysis.
3. J. C. Landwehr attended A.I.Ch.E. meeting in Birmingham on September 23.
4. J. T. Bell and J. C. Landwehr went to Auburn, Alabama for Alabama Environmental Conference, September 30 and October 1.
Personnel Development
1. D. J. Johnson completed his summer of employment and returned to the University of Alabama on September 4.
2. D. G. Dixon, Co-Op student from Georgia Tech, completed his second quarter of work and returned to school on September 25.
3. D. A. Secrest, Co-Op from Georgia Tech, reported for work on September 28. Billy will report to W. B. Dunlap.
4. M. M. Marcum completed his second Sumner of work and returned to the University of Tennessee on September 4.
5. Department Safety Meeting was held two days, September 30 and October 1. Meeting was conducted by Tom Lawrence, Safety Supervisor.
Visitors
1. P. E. Cherry, CED, visited plant on September 11 to discuss limestone neutralization pits and to look at construction of new pit.
2. Drs. Gunning and Suttkus conducted a biological survey of Choccolocco Creek and the Coosa River on September 22, 23, and 24.
DSW 014932
STLCOPCB4003308
1970 DISTRIBUTION OF TIME BY TECHNICAL SERVICE
EXISTING PRODUCT TECHNOLOGY IMPROVEMENT
NEW PRODUCT EVALUATIONS
MAJOR PROJECT SUPPORT
PROCESS CONTROL IMPROVEMENT
70 60 50 40
PROJECT DESIGN
PROCESS MAINTENANCE
TECHNOLOGY AND TECHNICAL SUPPORT
30 20 10 10
0
15 5
TECHNICAL MANPOWER
PLANT IMPROVEMENT PROGRAM
REAL ESTATE MANAGEMENT
DSW 014933 STLCOPCB4003309
> ORGANIC DIVISION 1970 TSD COST IMPROVEMENT
FUNCTIONAL FLUIDS
Disposal of Liquid Montar
#3 Aroclor Still New Burners
#2 Still Entrainment Separator 1242 Distillatio t Productivity
TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT
TAR EST ACT TAR
PLASTICIZERS
EST ACT
Flaking & Drum ming Facilities Headcount
TAR EST ACT
Solid Aroclor Instrumentation
TAR EST ACT
TAR
Sandvik Belt
EST ACT
Add Tray Strip
TAR
ping Sections to EST
Santowax
ACT
TAR
Cl2 Bulk Handling
Facilit
. EST LeSACT
Solid Aroclor Expansion
Chlorinator Back Pressure
TAR EST ACT TAR EST ACT TAR EST ACT TAR
EST
ACT TAR
EST ACT TAR
EST
ACT
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1500 600 600
1080 C
C
1080
.0 c
1500 500 500
1080 0
n
1080 1080 1080 1080 0 u ------O' 0 000
3000 0 0
1080 3000
1080
150C 1500 1500 1500 1500 1500 150C 1500 1500 c 100 lood 1520 2565 2uuU 1210 c 100 1000 1520 2565 2000
1080 1500
3000 3000 3000
5000 3500 3500
3000 2000 1000 3000 2000 1000 3000 2000 1000
3750 0
1000 10(30 1000
3750 3750 3750 3750 3750 3750 00 U00 0 000 2250 2250 2250 2250
0 00
00
4580 4580 4580 4580 4580 4580 4580
0 00 0 00 C 0 0 00
5000 5000 2QQ0
3550 1950 344C
3550 3050 344C 30000 5000C
30000
4950C 5000C 10000 36000 24000 20000 17900 4300C
5190C 5590C 1050C 38500 23500 24700 27600
- 360 360
0
3750 2250 4580
360
3750 2250 4580j
!
j
360
DSW 014934
STLCOPCB4003310
l ORGANIC DIVISION 1970 TSD COST IMPROVEMENT
FUNCTIONAL FLUIDS & PLASTICIZERS
TAR EST ACT
JAN FEB' MAR APR MAY JUN JUL .AUG SEP OCT NOV DUELUC (AFE ECTIN 3 BOT 1 BUS I NESS GROUP S)
Aroclor Ware house Reduced Headcount
Improved Santowax Yield
TAR EST ACT TAR EST ACT
1QQCL 1000
1000 1000 1000 1000
1000
1000 1000
4000 4000 4000 4Q0Q 4000 4000 4000 4nnn 4QQQ 5900 2800 5800 4000 97C 663C 6280 4450 2800 5800 4000 97C 6630
4Q0.Q
. HB-40 Reduce Nickel Catalyst Usage
Substitution of Santowax C for
TAR EST ACT TAR EST
1160
700
1330 1335
700 700 700 525 1230 425
525 2080 565
700 700 700 C c 540 C0
20QQC 2QQQffl
Santowax R
ACT TAR
EST
ACT
GENERAL CHEMICALS
TAR EST ACT
C&IP 3ENYL PNP, HC11
Biphenyl Cool ing Water Treatment
PNP Modify Acidifies DumD valve Svste m Install Entrain ment Separator Product!on
Variables-PNP
TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT
600 670 670
3150 520 520
600 . 600 680 580 680 580
3150 3150 1277 2164 3016 2164
600 600 600
60C 600 67C 440
675 440
600 290
29C
625 625 625 625 625 625 625 625 625 625 625 625 625 625 625
5500 5500 5500 5500 0 00
00
463r 4630 4630 4630 463Q 4630 463 0
12' 1604
0 1525 1780 236S
12' 1 1605
0 1525 1780
--t 625 625 5500 5500 4670 4670 :
Re-use Well Water
TAR EST ACT
500 500 500 '
Untargeted PNCB Heel Credits
HC1 HCT Catch Tank & Coalescer 150 M Gallon Storage Tank
HC1 Instrumentation
TAR
EST ACT
2275 563 3078 1650 920 410 550 753 2275 563 3078 1650 920 410 550
TAR 5700 5700 5700 5700 57Q0
EST 2500 7560 9000 1030C 6545
ACT 2500 7560 9000 1030C 6545
TAR '4300" 4300
4300 4300 4300
EST 4300 4300 4300 4300 4300 4300
ACT 4300 4300 4300 4300 4300 4300
TAR EST ACT
1875 1875 1875 1875 1875 1875 1875 1875 4000 1230C 3440 6500 3940 8160 129QC 4000 1230C 3440 6500 3940 8160
TAR
1AZ5-
EST
ACT
TAR ----- - - --
EST
DSW 014935
ACT
STLCOPCB4003311
r ORGANIC DIVISION 1970 TSD COST IMPROVEMENT
PLANT WIDE Improve Plant Power Factor Central Air Compressor
Chlorine Plant Shutdown RTN Cooling Water to Tower Cooling Con veyor - P2S5
Total Organic Month - M $ Total Organic YTD - M $
JAN TAR
FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
EST ACT TAR EST ACT TAR EST ACT TAR
950
900 940
950 950 950 950 950 933 916 790 333" 845 914 840 790 810 845
.
1000 1000 1000
EST
ACT TAR 19900
EST 19900 ACT 19900
19900 19900 19900 19900 19900 19900
19900 19900 19900
9950 9950
9950
TAR EST ACT
25 25 25 25 25 25 0 00
TAR EST ACT
TAR
EST
ACT
TAR 40.6 72.1 96.88 58.07 44.62 27.97 34.12 30.52 30.88 64.68 51.68 51.68
EST "35729 ACT 36.33
94.54 99.86
103.6 'TO.39 74.61 109.1 70.89 77.98
43758-1 42.22
30.'331 35.03
37.6b 47. 35
67.68
TAR 40.6 112.7 209.6^ 267.6 312.3 340.2 374.3 404.9 435.7 500.4 552.1 603.3
EST 36.29 130.9 239.8 3l5.7 390.8 437.7 467.1 510.0 587.6
ACT 36.33 136.2 245.3 316.2 394.1 437.3 472.4 519.7
t [
DSM 014936 STLCOPCB4003312
AG DIVISION 1970TSD COST IMPROVEMENT
PARATHIONS
Replace #3 Chlorinator
Improve Cl,Still Yields
Increase Chlorinator Coolings
Acetone Recovery
` Chlorine Unloading
Optimize Methyl PNP/PCT Ratio Optimize Ethyl PNP/PCT Ratio Change Cooling H-0 - Item 737
Untargeted: Plant Test -
Total AG Month M $
Total AG YTD M $
Total Plant Month M $
Total Plant YTD M $
JAN FEB MAR APR TAR
MAY JUN JUL AUG
SEP OCT
EST
ACT
TAR EST ACT TAR EST ACT
4860 4860
3500 2340 2340
3000
0 0
3500 0 0
3000 0 0
3500 0
0
3000 0 0
3500 0
3000 0 0
3000 0
3000
TAR
EST
ACT
TAR 2800 2800 2800 EST 1957 "T065" 1225 ACT 1957 1069 1225
TAR 2250 EST 3634 ACT 3634
2250 4237
4237
2250 3350
3350
TAR
EST
ACT
2800 1935 1935
3200 1406 1406
2800
130 130 3200 3431
343] 3000
0 0
2800
715 715 3200 2430 2430 3000
0 0
8500 "0
0
2800
00 3200 1750 1750 3000 0 0
2800 0 0
3200 2710 2710
1500
0 0
8500 0
2800 0
8500 2800
TAR EST ACT
500 750
0 2641 0 2641
750 0
0
TAR 200 200 200
EST 310 230 270 ACT 310 230 270
TAR EST
2430 5270 2430 5270
TAR
EST
ACT TAR EST ACT TAR EST ACT TAR EST
5.75
5.90 5.90
6.0
8.17
8.17
6.0 4.85 4.85
6.0 10.63 10.63
15.5 11.2
11.2
15.5
3.15
3.15
5.75 11.75 17.75 23.75 39.25 54.75
5.90 14.138' 18.92 29.55 40."/T 43.87
5.90 14.08 18.92 29.55 40.73 43.87
15.5 22.5 14.3
1.75
/I
0
1.75 2.71
14.3
70.25 92.75 107.1 121.4 45.62 48.33 48.33 45.62 48. 33
ACT
TAR 46.35 78.1 102.9 64.07 EST 42.19 102.8 108.5 81. U2 ACT 42.23 108.0 113.9 81.52
TAR 46.35 124.5 227.3 291.4
EST ACT
42.19 42.23
145.0 150.3
258.8 264.2
345.3 345.8
60.12 43.47 49.62 53.02 45.13 78.98
85.T5 46.72 "32.08 40.36 67.68
89.15 45.36 36.78 50.06
351.5 395.0 444.6 497.6 542.8 621.8 431.5 481.6 513.3 558.3 635.7 434.9 481.2 518.0 568.0
NOV
2800!
500
3.3 124.7 54.98 676.7
DEC
5Q;
.: 125.: 52.1: 728.:
DSW 014937
STLCOPCB4003313