Document jzdMyMVywXNxBG6qrLMDE1jR

r COMPANY CONFIDENTIAL J. T. Bell J. L. Corder A. G. Hill G. L. Jessee L. C. Lahman J. C. Landwehr H. E. Schulte W. F. Taffee General Offices H. C. Carder D. Danna (5) M. W. Farrar P. B. Hodges F. J. Holzapfel D. B. Hosmer R. E. Howard w. K. Johnson C. F. Luecke w. R. Richard W. R. Robirds C. W. Roos J. R. Savage J. E. Smith J. A. Stephens Anniston Plant TECHNICAL SERVICES DEPARTMENT MONTHLY REPORT Summary SEPTEMBER 1970 Month COST IMPROVEMENT RESULTS Est. Act, ______ Target % of Target $67,676 $45,175 150% YTD $635,723 $542,780 117% Organic Division South Second St. P. 0. DeGarmo The new autoclave for HB-40 (CEA 1482) was installed in early September. Startup for the new vessel (using the existing therminol system) will be during the week of 10-5-70. Total TSD time expended on project this month was 369 hours. A test run was begun on the Polyphenyl Tubular Unit to deter mine capacity and operating bottlenecks when attaining a 50/50 biphenyl/Santowax C split. Redesign of the Aroclor chlorinator chlorine spargers was completed and Maintenance will fabricate two units to be in stalled and tested for chlorine efficiency (free chlorine in the HC1 gas). Other Locations A. H. Forsten Alvin, Texas D. W. Jackson W.G.K. One batch of low color Aroclor 5460 was successfully produced and met all specs. Samples were sent to Marketing for evalua tion. Cost will be less than one cent per pound. Progress report will be issued first week October. A sampling/analysis program was started on Aroclor 5460 to determine relationship between biphenyl in Santowax R and PCB in 5460. A project (AFE 3605) was forwarded for approval to decrease/ contain Aroclor leaks to decrease the loss of PCB to the plant effluent ($15,300 capital and $6,850 expense). DSW 014929 an -joe CONFIDENTIAL INFORMATION "This document contains confidential intormetion which it the proparty of Montento Company. Only thoie portions of the document relevant to a duly authorised individual'! need to know may be excerpted for him. The report mutt not be tent oettide the Company without written approval and the Authorised recipient it eccounteble for its safe kaapinq, axcerptinq or othorwiio ditclotinq of its contents and for its proper disposal. The doeu- ment remains the property of Monsanto Company and shall ba returnad within two months to its author, excapt upon tpocial authorisation to hold for a lonqar pariod." ,' STLCOPCB4003305 Organic Division - continued 2. Muriatic Acid - A design and safety review was held for Project 3512 Improved Organics Catch Tank in HCl Off-gas Line. Drawings were revised and the project will be transmitted the week of October 5. Preliminary design proceeded on the HCl Fume Collection and Scrubbing System to reduce water load to the sewer and the need for subsequent PCB removal. An AFE will be submitted in mid October. CED transferred $28,000 to the plant from CEA 1831 to modify Chlorine Unloading Facilities and provide nitrogen pad for unloading of cars. TSD began design of new facilities late in September. Agricultural Division Assistance was provided to determine causes for high raw material and acetone usage in the condensation step, and also to correct a color problem in stored refined intermediate. Some success was achieved in acetone usage and color correction. The raw material yield problem remained unsolved at month's end. Field testing of the "Hydrocarbon Dilution of Still Residue" process amend ment proceeded independently of "Chlorination In The Presence Of Acetone." A progress report is in preparation for issuing in October. Process correlation studies on the parathion intermediate chlorinators, followed by a confirming process control experiment, have demonstrated a 4% yield improvement from optimization of chlorine flow rate. Instrumenta tion to provide automatic control have been installed on one reactor to give long-term confirmation for a potential $50,000 annual savings. Quality Control The Plant Quality Score was 76.9, down 11.0 from August, with a YTD score of 85.0 against a target of 95.0, and the lowest score of 1970. All depart ments except Parathion dropped sharply in quality scores. Pollution Control The new neutralization pit was started up on September 23. The PCB content in the pit effluent is running below the 10 PPB division goal. A skimmer has been installed on the Aroclor sump and preliminary indications are that it is working satisfactorily. An additional set of fish samples from Chocco locco Creek and the Coosa River were collected in September. STLCOPCB4003306 r 3. PLANT LABORATORIES ANALYTICAL AND QUALITY CONTROL - S. 0. Kemp Complaint Report Quality None. YTD Quality Complaints/100 Shipments 0.29 Target 0.20 osw 014931 STLCOPCB4003307 COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT 4. Community Relations 1. Dr. Fred Lippman, Ag Research, visited PR&D concerning Parathion Research. 2. Mallory visitors were here concerning the product - Aroclor, and worked with Chief Chemist, J. T. Bell on special analysis. 3. J. C. Landwehr attended A.I.Ch.E. meeting in Birmingham on September 23. 4. J. T. Bell and J. C. Landwehr went to Auburn, Alabama for Alabama Environmental Conference, September 30 and October 1. Personnel Development 1. D. J. Johnson completed his summer of employment and returned to the University of Alabama on September 4. 2. D. G. Dixon, Co-Op student from Georgia Tech, completed his second quarter of work and returned to school on September 25. 3. D. A. Secrest, Co-Op from Georgia Tech, reported for work on September 28. Billy will report to W. B. Dunlap. 4. M. M. Marcum completed his second Sumner of work and returned to the University of Tennessee on September 4. 5. Department Safety Meeting was held two days, September 30 and October 1. Meeting was conducted by Tom Lawrence, Safety Supervisor. Visitors 1. P. E. Cherry, CED, visited plant on September 11 to discuss limestone neutralization pits and to look at construction of new pit. 2. Drs. Gunning and Suttkus conducted a biological survey of Choccolocco Creek and the Coosa River on September 22, 23, and 24. DSW 014932 STLCOPCB4003308 1970 DISTRIBUTION OF TIME BY TECHNICAL SERVICE EXISTING PRODUCT TECHNOLOGY IMPROVEMENT NEW PRODUCT EVALUATIONS MAJOR PROJECT SUPPORT PROCESS CONTROL IMPROVEMENT 70 60 50 40 PROJECT DESIGN PROCESS MAINTENANCE TECHNOLOGY AND TECHNICAL SUPPORT 30 20 10 10 0 15 5 TECHNICAL MANPOWER PLANT IMPROVEMENT PROGRAM REAL ESTATE MANAGEMENT DSW 014933 STLCOPCB4003309 > ORGANIC DIVISION 1970 TSD COST IMPROVEMENT FUNCTIONAL FLUIDS Disposal of Liquid Montar #3 Aroclor Still New Burners #2 Still Entrainment Separator 1242 Distillatio t Productivity TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR PLASTICIZERS EST ACT Flaking & Drum ming Facilities Headcount TAR EST ACT Solid Aroclor Instrumentation TAR EST ACT TAR Sandvik Belt EST ACT Add Tray Strip TAR ping Sections to EST Santowax ACT TAR Cl2 Bulk Handling Facilit . EST LeSACT Solid Aroclor Expansion Chlorinator Back Pressure TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 1500 600 600 1080 C C 1080 .0 c 1500 500 500 1080 0 n 1080 1080 1080 1080 0 u ------O' 0 000 3000 0 0 1080 3000 1080 150C 1500 1500 1500 1500 1500 150C 1500 1500 c 100 lood 1520 2565 2uuU 1210 c 100 1000 1520 2565 2000 1080 1500 3000 3000 3000 5000 3500 3500 3000 2000 1000 3000 2000 1000 3000 2000 1000 3750 0 1000 10(30 1000 3750 3750 3750 3750 3750 3750 00 U00 0 000 2250 2250 2250 2250 0 00 00 4580 4580 4580 4580 4580 4580 4580 0 00 0 00 C 0 0 00 5000 5000 2QQ0 3550 1950 344C 3550 3050 344C 30000 5000C 30000 4950C 5000C 10000 36000 24000 20000 17900 4300C 5190C 5590C 1050C 38500 23500 24700 27600 - 360 360 0 3750 2250 4580 360 3750 2250 4580j ! j 360 DSW 014934 STLCOPCB4003310 l ORGANIC DIVISION 1970 TSD COST IMPROVEMENT FUNCTIONAL FLUIDS & PLASTICIZERS TAR EST ACT JAN FEB' MAR APR MAY JUN JUL .AUG SEP OCT NOV DUELUC (AFE ECTIN 3 BOT 1 BUS I NESS GROUP S) Aroclor Ware house Reduced Headcount Improved Santowax Yield TAR EST ACT TAR EST ACT 1QQCL 1000 1000 1000 1000 1000 1000 1000 1000 4000 4000 4000 4Q0Q 4000 4000 4000 4nnn 4QQQ 5900 2800 5800 4000 97C 663C 6280 4450 2800 5800 4000 97C 6630 4Q0.Q . HB-40 Reduce Nickel Catalyst Usage Substitution of Santowax C for TAR EST ACT TAR EST 1160 700 1330 1335 700 700 700 525 1230 425 525 2080 565 700 700 700 C c 540 C0 20QQC 2QQQffl Santowax R ACT TAR EST ACT GENERAL CHEMICALS TAR EST ACT C&IP 3ENYL PNP, HC11 Biphenyl Cool ing Water Treatment PNP Modify Acidifies DumD valve Svste m Install Entrain ment Separator Product!on Variables-PNP TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT 600 670 670 3150 520 520 600 . 600 680 580 680 580 3150 3150 1277 2164 3016 2164 600 600 600 60C 600 67C 440 675 440 600 290 29C 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 5500 5500 5500 5500 0 00 00 463r 4630 4630 4630 463Q 4630 463 0 12' 1604 0 1525 1780 236S 12' 1 1605 0 1525 1780 --t 625 625 5500 5500 4670 4670 : Re-use Well Water TAR EST ACT 500 500 500 ' Untargeted PNCB Heel Credits HC1 HCT Catch Tank & Coalescer 150 M Gallon Storage Tank HC1 Instrumentation TAR EST ACT 2275 563 3078 1650 920 410 550 753 2275 563 3078 1650 920 410 550 TAR 5700 5700 5700 5700 57Q0 EST 2500 7560 9000 1030C 6545 ACT 2500 7560 9000 1030C 6545 TAR '4300" 4300 4300 4300 4300 EST 4300 4300 4300 4300 4300 4300 ACT 4300 4300 4300 4300 4300 4300 TAR EST ACT 1875 1875 1875 1875 1875 1875 1875 1875 4000 1230C 3440 6500 3940 8160 129QC 4000 1230C 3440 6500 3940 8160 TAR 1AZ5- EST ACT TAR ----- - - -- EST DSW 014935 ACT STLCOPCB4003311 r ORGANIC DIVISION 1970 TSD COST IMPROVEMENT PLANT WIDE Improve Plant Power Factor Central Air Compressor Chlorine Plant Shutdown RTN Cooling Water to Tower Cooling Con veyor - P2S5 Total Organic Month - M $ Total Organic YTD - M $ JAN TAR FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC EST ACT TAR EST ACT TAR EST ACT TAR 950 900 940 950 950 950 950 950 933 916 790 333" 845 914 840 790 810 845 . 1000 1000 1000 EST ACT TAR 19900 EST 19900 ACT 19900 19900 19900 19900 19900 19900 19900 19900 19900 19900 9950 9950 9950 TAR EST ACT 25 25 25 25 25 25 0 00 TAR EST ACT TAR EST ACT TAR 40.6 72.1 96.88 58.07 44.62 27.97 34.12 30.52 30.88 64.68 51.68 51.68 EST "35729 ACT 36.33 94.54 99.86 103.6 'TO.39 74.61 109.1 70.89 77.98 43758-1 42.22 30.'331 35.03 37.6b 47. 35 67.68 TAR 40.6 112.7 209.6^ 267.6 312.3 340.2 374.3 404.9 435.7 500.4 552.1 603.3 EST 36.29 130.9 239.8 3l5.7 390.8 437.7 467.1 510.0 587.6 ACT 36.33 136.2 245.3 316.2 394.1 437.3 472.4 519.7 t [ DSM 014936 STLCOPCB4003312 AG DIVISION 1970TSD COST IMPROVEMENT PARATHIONS Replace #3 Chlorinator Improve Cl,Still Yields Increase Chlorinator Coolings Acetone Recovery ` Chlorine Unloading Optimize Methyl PNP/PCT Ratio Optimize Ethyl PNP/PCT Ratio Change Cooling H-0 - Item 737 Untargeted: Plant Test - Total AG Month M $ Total AG YTD M $ Total Plant Month M $ Total Plant YTD M $ JAN FEB MAR APR TAR MAY JUN JUL AUG SEP OCT EST ACT TAR EST ACT TAR EST ACT 4860 4860 3500 2340 2340 3000 0 0 3500 0 0 3000 0 0 3500 0 0 3000 0 0 3500 0 3000 0 0 3000 0 3000 TAR EST ACT TAR 2800 2800 2800 EST 1957 "T065" 1225 ACT 1957 1069 1225 TAR 2250 EST 3634 ACT 3634 2250 4237 4237 2250 3350 3350 TAR EST ACT 2800 1935 1935 3200 1406 1406 2800 130 130 3200 3431 343] 3000 0 0 2800 715 715 3200 2430 2430 3000 0 0 8500 "0 0 2800 00 3200 1750 1750 3000 0 0 2800 0 0 3200 2710 2710 1500 0 0 8500 0 2800 0 8500 2800 TAR EST ACT 500 750 0 2641 0 2641 750 0 0 TAR 200 200 200 EST 310 230 270 ACT 310 230 270 TAR EST 2430 5270 2430 5270 TAR EST ACT TAR EST ACT TAR EST ACT TAR EST 5.75 5.90 5.90 6.0 8.17 8.17 6.0 4.85 4.85 6.0 10.63 10.63 15.5 11.2 11.2 15.5 3.15 3.15 5.75 11.75 17.75 23.75 39.25 54.75 5.90 14.138' 18.92 29.55 40."/T 43.87 5.90 14.08 18.92 29.55 40.73 43.87 15.5 22.5 14.3 1.75 /I 0 1.75 2.71 14.3 70.25 92.75 107.1 121.4 45.62 48.33 48.33 45.62 48. 33 ACT TAR 46.35 78.1 102.9 64.07 EST 42.19 102.8 108.5 81. U2 ACT 42.23 108.0 113.9 81.52 TAR 46.35 124.5 227.3 291.4 EST ACT 42.19 42.23 145.0 150.3 258.8 264.2 345.3 345.8 60.12 43.47 49.62 53.02 45.13 78.98 85.T5 46.72 "32.08 40.36 67.68 89.15 45.36 36.78 50.06 351.5 395.0 444.6 497.6 542.8 621.8 431.5 481.6 513.3 558.3 635.7 434.9 481.2 518.0 568.0 NOV 2800! 500 3.3 124.7 54.98 676.7 DEC 5Q; .: 125.: 52.1: 728.: DSW 014937 STLCOPCB4003313