ABERDEEN MONTHLY PROGRESS REPORT SEPTEMBER, 1987
There was one first aid injury recorded during the month of September. As of September 30, 1987, the plant had operated 3,009 days or 3,890,107 manhours without a lost time injury.
PVC resin production for September was 35.1MM pounds. The major cause of downtime in the reactor areas was the new module shutdown. Major work completed during this outage included installation of reactor jacket expansion joints on 745, hydroblasting and inspection of 741 and 745, replacement of condenser studs on 744 and Modicon revisions for RQIP. Resin production for the 1987 fiscal year was a record 425.0M pounds. The previous fiscal year resin production record was set in 1986 at 415.2MM pounds. The VCM efficiency for September was 0.99756 pounds of VCM per pound of PVC produced versus a 1.00208 standard. Year-to-date VCM efficiency is 1.00933.
Compound production for September was 5.2MM pounds. Line I and Line III operated twenty-five days and twenty-nine days, respectively, during the month. Line V operated fifteen days. Downtime was taken on Line I and Line III to control inventory. Compound production for the 1987 fiscal year was also a new record at 80.3MM pounds. Quality performance for flexible compounds was 2.2% off-grade of which 71% was due to mill scrap. "BCM production was 0.43%.
Dry blend production was 5.2MM pounds for September and 56.1MM pounds year-to-date. Production was limited primarily by product changes. Quality performance for the month was 99.4% customer
The plasticizer unit operated nineteen days in September produce 1.0MM pounds. Year-to-date plasticizer production 21.4MM pounds.
to is
Feedback meetings for the plant attitude survey began during
September. We expect some of the feedback groups to evolve into
project teams as problems are identified.
Eleven project
involvement teams are now active.
A
-......... -Sr--
-lir-fv.-!.
s'j.r
:| 1 'J- il
|^|J -si:- : -IpSI'J'TV E: |*-
! rf: fcb ! . I. -i .. "S. .j-; . :.. m-f,;
VAB.0001191197
'I
I
R. T. Ferrell 10/19/87 Aberdeen Monthly Progress Report Page 2
Total energy consumption for September was 105.423 MMM BTUs. The energy consumption per pound of product was 2267 BTUs, resulting in an adjusted CMA reduction of 56.2%. The adjusted CMA reduction for fiscal 1987 year-to-date is 55%.
The total plant variable cost variance for September was $1599.8M unfavorable, resulting from an overall unfavorable price variance of $1509.3M and a net unfavorable efficiency variance of $90.5M. The total fixed cost variance for September was $184.9M unfavorable. Year-to-date total fixed cost variance is $45.1M favorable.
A
rah
VAB.0001191198
DISTRIBUTION
COVER LETTER
HOUSTON:
J. D. BURNS
X
R. E. mtftCUHL
R. T. FERREIL
[
-
R. D. GAMBUN
J. J. LANGFORD
X
R. E. SWANIKDWSKI
D. F. HAINAN
X
H. R. HAMER
R. R. SMITH
S. K. SABORSKY
K. J. EQGERS
D. H. SANDERS
PONCA CITY:
S. E. MCGUIRE
R. L. POE
X
H. J. HALL
C. M. STARKS
OKIAHCMA CITY:
HARRY GARRISON
LAKE CHARLES VCM PLANT:
DICK CONRAD
LAKE CHARLES CHEMICAL PLANT: J. A. DEBERNARDI
T. H. HUFFMAN
X
LAKE CHARLES LAB PLANT:
L. R. BAUER
X
BALTIMORE:
R. W. SEYMOUR
X
HftMDND:
J. B. MAHER
X
ENTIRE REPORT
COVER LETTER AND QIP
X X
X
X
X X X X X X
X X X X Safety Section and X
A
BLANE POLYMERS: PREMIERE POLYMERS: ABERDEEN:
E. L. K3ESCHNICK
P. L. FOOTE
JF, JWU, DWH, PJK, TEL, RAF, KLF, BAM,
VEM, HOC, CUT, K VLT, JEL, BEN
X X
VAB.0001191199
h4
%
-u i-#.
t*fi-lf-T lH.iliJyrt'ii-f-h-
-+
i-i-qi
; muhat.i,-:
ifwiti
= '
i
i
pih,.
r>I - ' l-E1-'" * f r*
: 1st R. i'.'Vi
r
*
SAFETY - K. L. Fogg, J. V. Uptain
Occupational Injuries
Fiscal September Y.T.D. 1987
First Aid OSHA Recordable
Total Injuries
1 _0
1
Number of Restricted Workday Cases Number of Lost Workday Cases
0 0
2
0
Fiscal Y.T.D 1986
Injuries by Department
Vinyl Operations Compound Operations Maintenance Laboratory Receiving/Warehouse Office
Totals
Injuries by Type
Cuts and Abrasions Eye Injuries Burns Bruises Strains/Sprains Stings Other
Totals
Non-Occupational Injuries
Lost Workday Cases Days Lost
0 0
Safety Record
Last lost time injury
7/5/79
Days since -
3,009
Manhours since -
3,890,107
On September 30, 1987, the employees of the Aberdeen plant completed 3,009 days with no lost time injury.
Topics for the plant safety meetings during the month included: Warehouse Walkway Safety and Annual Health Training (VCM, Lead, Noise, Asbestos and Respiratory Protection).
A
i, ri|-^i .Yi'ty
t-7 f
-I' ' 11 | -l' |-l- :iil- '
>>> -*
* t
: ... !>>
fl|l'
imnill'll
VAB.0001191200
.........
J
SAFETY - Continued
The plant formed a quality team to plan a celebration in recognition of the eight years completed without a lost workday case. Three dinners were planned to accommodate the shifts. A second team selected a gift certificate for each employee in recognition of their accomplishments. R. E. Lehmkuhl, R. D. Gamblin, and R. T. Ferrell attended the steak dinners. Attendance was good and everyone had a good time.
The Safety Department completed one attitude survey feedback session and one problem solving session.
Phase I of the interim VCM/lead physicals was completed in September.
The Central Safety Committee had its monthly meeting.
Routine dosimetry results for the month are as follows:
Chemical
Number
PEL Percent
Number
PEL Percent
VCM
76 97.4
Lead
13 86.7
Total Particulates
2 100.0
2 2.6
2 13.3
0 0.0
Both of the lead overexposures and one of the VCM overexposures was with benefit of respiratory protection.
VAB.0001191201
i
' `I
1H[
T'- -.........
-I
I'- : | - i . -
Out.
i
- ' p -rw-*q -
; .-i -.)
'
d
Uj
CQ T Q CC o o Uj cc
CJ
Uj
Uj
Q
nr
Uj
o
..................... -- |li*f
trO>
Oo
IODj
O ID
^
O
^
ID
O
s>3idnrNi jo y i&wfiN
VAB.0001191202
rrtl~^<p'fTtl
, .T TlSTi ?i|. I
-i;#?-. J^I| ^..
"H'-.-m: L-f-j:-j-=njifPimpa
k . .h- j - h:-.i
r'-'-i
P::I:ij^.i. jupH.. . n iH-v;
:S
I-Wfe^- . .. P (J-i .
h|iT^I-;...|, r-,y-Ma#l^W^i' ll =
`jn-1
J
QUALITY MANAGEMENT PROCESS - D. W. Hollis, R. B. Newton
Quality Management activities (SPC charts, teams, training, etc.) will now be reported by each department in their section of the monthly report. This is being done to emphasize the idea that QMP is not a progra 1 but the new way of doing business. Rendell Newton attended the seven-day Team Performance training seminar in Houston. Several employee feedback meetings were held to discuss results of the CVR Attitude Survey. These meetings were mainly problem identification meetings with problem solving meetings to follow.
VAB.0001191203
11 ,ppfc *
f.% . -pi. '!! L-: - i-: ...................^
-i p n
:- f
i. * i: rvr I?
L'l :ir-III jlJl-'i'i.-l'tljf
Jl |. .--r.-r-r* r>- -?
ft '
J 1 : I'l - . :\n : i!-._ ! I '.BfHfpPlr-.-4
r.y -T=-r'lfc"ftf'!n:
i I l.-Ufi ler-i-t.. t
-J
: .r iifl.fl , I
;a E-::
: > 4J!1 :-n
:
*
;.... 1
hv: ftp.. |*.l- i , | i%.. r^,- -y -r z
VINYL - P. J. Kober, J. M. Edwards
Safety
The Vinyl and Yard Departments worked without any reported injuries during the month of September.
Shift safety meeting topic for the month was OSHA Compliance Health Training.
Quality Improvement Process
The CVR employee attitude feedback meetings continued in September for the Yard and Vinyl Departments. The meetings are presently in the problem identification stage.
The Yard Department presently has one SPC team. This Railcar Team's objective is "to ship the best railcar possible to the customer*1'2. The team, which met three times in September, is in the recommendation stage of the problem solving process. Their main area of improvement involves cleaning, inspection and repairs to the cars before being released for filling and shipment.
Production
.1 Production, MM Lbs.
2. Daily Production Rate, M Lbs./C.D. 3. Total Charges 4. Charges, Reactor Batches/C.D.
.5. Reactor Stream Factor
6 Dryer Rate, Average Lbs./Hr. 7. Dryer Stream Factor 8. Accounting Days
September
35.1 1171
813 27.1 88.4 8737 69.8
30
Y.T.D.(Fiscal 87)
425.0 1164
10531 28.9 89.8 9691 63.0 365
Vinyl Department production for September was 35.1MM pounds.
Reactors
The reactor stream factor for September was 88.4%. reactor area occurred as follows:
Downtime in the
1) Operational Downtime: Accounted for 25.1% of the total downtime and was due to reactor recovery scheduling conflicts, downtime due to rinsing the chem wash tank, waiting on particle size information before charging, lines plugging, reactor manway O-ring failures, power failures, bad weather, and the lack of blend tank room to dump a reactor.
2) Maintenance Service Downtime: Accounted for no downtime because the cleaning of the reactor AMS injection ports and inert vent lines was accomplished while the reactors were normally down for other reasons.
s
I ^ h
I T. -!! (
' "I
^0 + : - = 1=
ftt-l'i --
:: i?->: iI--.v-'i , .44 myrn-niJ
*.:**
iu -.M:
Hi j
f'"
VAB.0001191204
VINYL - Continued
Product Quality Summary - continued
A total of thirteen railcars were shipped as "B" grade during the month which represented 9.2% of the 142 total resin hopper cars shipped.
Load Date Ship Date Car No. 08/11/87 09/03/87 VIPX 43855 08/01/87 09/09/87 VIPX 45303
Customer Silverline, NC Shawnee, MS
Product Reason
5385
Contamination
5415
Derailed
08/28/87 09/09/87 PLWX 44733 Apache Plast., CA Debox Quality
07/28/87 09/11/87 PLCX 43700 H&W, MS
Debox Quality
08/26/87 09/11/87 PTLX 41014 Wexford, WI
Debox Quality
09/01/87 09/11/87 VIPX 45855 Griffco Plast., MS Debox Quality
09/08/87 09/15/87 VIPX 45770 Custom Vinyl, TX Debox Quality
08/14/87 09/18/87 PLWX 44272 Kroy Indust., NE 5385 Contarn.
07/31/87 09/21/87 PLCX 43696 Gamma Mfg., CA
Pond Quality Resin
09/16/87 09/22/87 PLCX 43869 Western Plast., OK Debox Quality
09/04/87 09/22/87 PLWX 44292 Apache Plast., CA Debox Quality
09/08/87 09/24/87 VIPX 45810 H. Heller, MS
Pond Quality
09/22/87 09/24/87 PTLX 41609 Western Ag., TX
Debox Quality
Monthly Variable Cost Performance
Variable costs for the month were unfavorable at $1453M resulting from an overall unfavorable price variance of $1411M and an unfavorable efficiency variance of $41.9M. Resin variable cost for the month was 22.429 cents/lb. versus the budgeted 18.119 cents/lb.
The $1411M unfavorable price variance was primarily attributed to higher than budgeted pricing for VCM, $1402M, offset by favorable natural gas pricing of $26.3M.
The $41.9M unfavorable efficiency variance can be attributed mainly to an unfavorable variance due to Calcium Stearate, $13.6M; Alcotex, $21.4M; and electricity, $12.6M; offset by a favorable Polyvic variance of $16.2M; and VCM, $23.7M.
VCM efficiency for the month was 0.99756 lbs. VCM/lb. PVC versus the budgeted 1.00208 lbs. VCM/lb. PVC.
YTD variable cost efficiency variances in the Vinyl Department totaled $696.0M unfavorable.
VAB.0001191205
................
' -i! ir........................11-
**!-+*
Pl'frijmUfHi I
rrKt*si\^ a
iLJdna:
*
!! ti* t-i.
7 l-MV
M.'' iJ!r iji r 7
: }nKi.::i:i
A i i- = 0:
ip. <T - 1 J
*
VINYL - Continued
Reactors - continued
3) Maintenance Repair/Revision Downtime: Accounted for 74.9% of the total downtime and a majority of the time was due to the scheduled annual shutdown of the New Module. The following major jobs were accomplished during the shutdown: 745 jacket expansion joints added, Modicon manual mode was added, 741 and 745 reactors were hydroblasted and inspected, and the automatic chem wash system was installed. The safety discs were changed on reactors 741, 742 and 743. The condenser studs were changed on 744 condenser base. The safety discs were changed on D500 and D600 also.
Dryers
The dryer stream factor for September was 69.8%. Downtime in the dryer area occurred as follows:
1) Reactor Limited Production: Accounted for 74.3% of the total downtime. Dryers were shut down when possible for energy conservation.
2) Operational Downtime: Accounted for 11.5% of the total downtime and was due to centrifuge plugging, burner flameouts, dryer cleaning and transfer activator problems, and power failures. A significant increase in the amount of operational downtime this month was caused by low air pressure.
3) Maintenance Repair/Revision Downtime: Accounted for 14.2% of the total downtime and was due to repairs to #4 and #6 star valves, #1 and //8 centrifuge belts, #7 Sweco motor, #7 Trunnion roller, #5 Bird and #6 gas valve.
Product Quality Summary
Resin Type
Prime
"B"
"H"
% of Total Production
5265 5305 5385 5415 5425 5465 Debox Off-Grade Sifter Overflow Pond Resin
Total
4,249,674 2,905,740 14,614,714 11,937,227
9,680
33,717,035
942,920
0
942,920
38,627 429,560 468,187
12.1
8.3 41.6 34.0
0.0 0.0
2.7
0.0 0.1 1.2 100.0
Quality performance for September was 98.7% customer grade with 1.3% "H" grade production.
t
r. .1 .....
j- - : - 'H.I ! h! '
Li *h+n : -hTIllMblUI-t
!
: tf 11, 'll
pi} *
- 1
' 1l#
Cw1: m 1 STU SW SU
VAB.0001191206
:> . '.'i In*-! i ! - :
1
VINYL - Continued
Energy Performance/Progress 1. Plant energy performance for September was 2267 BTU/lb. General 1. Resin raw material in the 0744 account totaled $303.3M. 2. The New Module turnaround performance by maintenance, engineering,
and operations was notable. At month end, the shutdown work was processing on schedule.
A
VAB.0001191207
COMPOUND - C. W. Turner, J. E. Nickerson
Safety
The Compound Department worked without injury in September* misses were reported.
No near
All compound operations personnel attended the training class conducted by the Safety Department. on proper use of respirator equipment.
annual Health/Safety The training focused
Compound Production
Operating Days
Month
Production CM Pounds)
Average
Operating Day
Fiscal
Rate
Y.T.D.
Line I Line V Line III Total
25 14.5 29
1426 572
3175 5173
57 39 109
26701 8770
44838 80309
Line I operated twenty-five days in September at an average rate of 57M pounds per day. Major items affecting production efficiency were: product changes, 81 hours; mill maintenance, 18 hours; dicing system problems, 13 hours; quality problems, 12 hours; Banbury maintenance, 10 hours; and housekeeping, 5 hours. Line I was down approximately five days for inventory control. This downtime was used for SPC school and re-packaging of some products.
Line III operated twenty-nine days in September at an average rate of 39M pounds per day. Major items affecting production efficiency were: product changes and startup time, 74 hours; running line clean-out to remove streamers, 12 hours; dicing system problems, 7 hours; and mill maintenance, six hours. Line III was down Labor Day to control product inventory.
Line V operated 14.5 days in September at an average rate of 39M pounds per day. Major items affecting production were: product changes and start-up time, 54 hours; transfer system problems, 5 hours; twin-screw problems and maintenance, 8 hours; and quality problems and rework, 4 hours.
Quality performance for flexible compounds was 2.2% off-grade of which 71% was due to mill scrap. "BC" production was .43%.
The raw material requirement for flexible compounds was 1.03276 pounds of raw material per pound of compound versus a 1.01203 standard CYTD is 1.00915).
The variable cost variance for compound was $152.3M unfavorable with $88.8M unfavorable due to price and $63.5M unfavorable due to efficiency. The efficiency variance due to product mix was $28.8M unfavorable. The only major compound efficiency variance was for TOTM at $16.0M unfavorable.
Total compound inventory fell 3.0MM pounds in September to 4.2MM pounds.
A
VAB.0001191208
..........----------------------------------'
1
I
' 1 =-- '' " 1 s >r-------- I" '
>-
L
' . i
.. -||. I?fa1~,r1
-j\t (r
= V--5 fcif-!'*
-if- i
:::
il Hirf'"*
VI- |.
1""P
. 'f ,, !
COMPOUND - Continued
Dry Blend Production, M Pounds Operating Days
Month
5205 30
Average Operating-Day
Rate
173
Fiscal Y.T.D.
56135 364
Dry blend operated thirty days in September at an average rate pounds per day. Production included 80172C, 80273G, 90172D, RP-440, 186-139, 269-69, 269-66, 269-185, 269-151, 269-164, 317-30, 1960172, 317-91, and A10-001.
of 173M RP-421, 290-61,
Dry Blend production was hindered by: product changes, 79 hours; delays associated with quality and lab problems and normal Q.C., 53 hours; master batch feeder maintenance, 13 hours; transfer system problems, 7 hours; TiO,, system problems and maintenance, 5 hours; elevator maintenance, 5 hours; screener maintenance, 4 hours; and Welex maintenance, 4 hours.
Quality performance for the month of September was 99.4% customer grade.
The raw material requirement for dry blend was 1.00355 pounds of raw material per pound of dry blend versus a standard of 1.00491 (YTD is 1.00731).
The variable cost variance for dry blend was $14.5M favorable with $6.0M favorable due to price and $8.5M favorable due to efficiency. The efficiency variance due to product mix was $15.4M favorable. The efficiency variance for Liquid Methyl-Tin Mercaptide stabilizer was $15.0M unfavorable.
Plasticizer
Month
Average Operating-Day
Rate
Fiscal Y.T.D.
Production, M Pounds Operating Days
1024 54 21381 19 350
Plasticizer operated nineteen days in September at an average rate of 54M pounds per day. Production included 61OP and 108P.
VRP production totaled 59.4M pounds (5.8%).
The raw material requirement for plasticizer was 1.09354 pounds of raw materials per pound of plasticizer versus a 1.10192 standard (Y.T.D, is 1.10184).
The variable cost variance for plasticizer was $8.8M unfavorable with $15.2M unfavorable due to price and $6.3M favorable due to efficiency. There were no major plasticizer raw material efficiency variances.
The efficiency variance due to product mix was $2.3M favorable.
-t-
nI
l ,i
i ><
VAB.0001191209
it- r:: c? Mfi-i J Jm*. -I" p. d*
\lii- ih-v
i
COMPOUND - Continued
Quality Improvement
Compound and dry blend operators are now plotting critical Q.C. results on individual's charts which reflect deviation of results from target. This makes it possible to use a single, continuous chart for all products. Second-round SPC training (with emphasis on charts currently in use) has been completed by half of the compound personnel. The remaining people will complete the class next month. The product change project team has completed initial work to identify equipment and procedures to improve product change. The team plans to collect data during product changes using the new procedures to measure improvement and determine what additional work might be needed.
Energy
Compound Dry Blend Plasticizer
Usage (BTU/Lb.)
Actual
Standard
1960.5 782.3
2045.9
1783.0 730.0
1833.5
A
VAB.0001191210
i
i+,h.
%j-- -1-t. ?
-I
mil-.
. 'i
i-i f ......................................... ...
iL i :
!>-- - .........
1
MECHANICAL DEPARTMENT - T. F. Lyon
MAINTENANCE - D. A. Miller
Safety
There were no injuries to Maintenance Department personnel during the month. The monthly safety meeting topic was the annual VCM, Lead, Noise and Respirator Training.
Vinyl
The annual safety disc change for reactors 500, 600, 741, 742 and 743 was completed.
The D744 reactor agitator seal was replaced during the month. failure was due to an 0-ring deterioration.
The
The annual new module shutdown was completed in late September. following major work was completed:
The
- D741 and 745 reactors were hydroblasted and die-penetrant inspected. No problems were found.
- The recovery system subcoolers and seal water coolers were cleaned.
- The following vessels were opened, cleaned and inspected; blowdown tank, fresh VCM receiver, east recovered VCM receiver, recovery system knockout pots, hot water charge tank and 747 blend tank.
- D744 reactor condenser was removed and the attachment stud bolts were replaced. A non-metallic gasket was used on the condenser base and Belleville spring washers were installed. No leaks have been reported since startup.
- The evacuation jet had a new second stage venturi installed.
- A pinhole leak was repaired in the bottom of the D741 reactor jacket.
- A plant steam outage was taken to replace a ten-inch valve in the main steam header. During the outage, three pole mounted PCB contaminated transformers were replaced at the boiler house.
- Eight relief valves were overhauled and tested.
- A bus stab in #9 MCC was replaced. This was identified as a hot spot during an infrared inspection.
- The VCM turbine meters were inspected.
- The 903 and 905 compressor seal water flow meters were repaired.
- The catalyst Day freezer alarms were calibrated.
"'fUfwM*" 1
vr
' - ' 111 fir-1 Wir *"
i. . L^q:
r;:- -.if \> .-i . -.,syr
VAB.0001191211
P I - I'
i. '-1 V
MECHANICAL DEPARTMENT - Continued Vinyl - Continued
The following mechanical seals were replaced during the month: - 705 ERS compressor inboard and outboard seals. - 905 compressor inboard seal. - Old unit north chem wash pump seal.
The following major valves were changed out: - D300 main chem wash valve. - Primary VCM charge valve on D600. - D741 recovery valve. - D600 main rinse valve and shell rinse valves. - D600 atmospheric vent valves. - D742 and 744 main charge and dump valves.
A Daniels service technician assisted in a calibration and PM check on all gas chromatographs. The following major work was completed in the vinyl dryer area:
- New Maxon gas valves were installed on the #6 dryer burner system. - The pond resin slurry transfer pump was overhauled. - A Trunnion roller on #7 dryer was replaced. - A spare Pick heater was installed for the fluid bed dryer hot water
system. - Replaced the case on the fluid bed dryer hot water pump. - The 5415 transfer blower from 281 silo was overhauled. - Number six dust collector was overhauled. Compound, Dry Blend, Plasticizer The back roll driveside bushing was replaced on the Line I mill. New labyrinths were installed and the lube oil system was cleaned and rebuilt. The Line I Banbury seals were changed. The east conveyor belt for the east Line III mill takeoff conveyor was replaced.
VAB.0001191212
-|
r
I I
-1'-<
i-V
n
^ .> ,,v
lull'd
m/1 1
I | -y-\r
h -:i
i . *f.H!
1.': -e . i-iL.
. I \x |i H'+
` i - i -
'if
4
MECHANICAL DEPARTMENT - Continued
Compound, Dry Blend and Plasticizer - continued
- Pressure gauges were installed on the supply water piping for the plasticizer reactor condensers.
- The Line III #5 dicer motor was rewound.
- Repaired a ground fault in the Line V compounder control panel.
Utilities
The main process water header ruptured near the rail scale in the southeast corner of the plant property. The line was spliced with a Dresser coupling.
The annual inspection of #2 boiler was completed. The inspection revealed one leaking tube which was plugged and removed. A hot spot in the back wall was repaired.
All the boiler burner management systems were tuned during the month.
The dessicant and prefilter was replaced for the Pall plant air dryer.
The seals were replaced in the south fresh air compressor.
Corroded piping was refrigeration system.
replaced
for
the
VCM
receiver
condenser
Completed the quarterly crane P.M. and replaced the boom cylinder bushings and right rear outrigger holding valve.
The bio-disc inlet sump was cleaned of solids.
Quality
The Valve Team has completed fabrication of eight of the ten prototype valve assemblies. Design drawings of these assemblies have been completed. In addition, several of the team members designed valve kits for the plug valves purchased for the Subpart V Compliance Project. Plans for the near future will include building eighteen valves for stock and selection of a vendor for valve/actuator mounting kit fabrication.
A team has been formed to investigate the safety aspects of the boiler house from an operations, maintenance and administrative point of view. The team includes members of the Maintenance Department, Utilities, Process and Mechanical Engineering and the Safety Department.
1 p
I- -:: - V-.-: e-..::.
j: itr- .4. .f
r 1 -v
...............................
sin "
-i ' HH:
l-l-?.
bl*- Cl
-jhi-Htj"
tW-;!
VAB.0001191213
cf.nis
-.-i - rili*..jh-
i-t.-fl r>r:i^ih: i;
,"1'?
^ 'i.-, : h-f!: Ji rh-': M
;v t
t+i
MECHANICAL ENGINEERING - R. E. Polk
AFE F537 - Dry Blend Transfer Lines
Installation is 85% complete and in progress. Completion is scheduled for
11/1.
AFE F786/F557 - Resin Quality Improvement
Design at Litwin is 56% complete and in progress. Procurement of in-line instrumentation is complete. Drawing packages for electrical grounding, SA module control room layout and Modicon rack layout have been received and are being reviewed.
AFE D756 - Reactor Expansion Joints
Installation of joints on all reactors has been completed. Painting and minor punchlist items remain. The project will be closed to field charges in November.
AFE A567 - Rotary Dryer Duct Upgrade
Installation is planned for dryers #4 and #5 in October. Ductwork installation for dryer #8 will be coordinated with dryer shell repairs to minimize downtime. This is tentatively scheduled for late November.
AFE F587 - Laboratory Addition
All major equipment except the MCC has been placed on order. This will be requisitioned by 10/15. Design is 85% complete and in progress. Completion of design is scheduled for 11/1. Construction is planned for completion by 1/1.
AFE F657 - Roof Upgrade Phase II
All mechanical pre-work has been completed. Membrane installation is 50% complete and in progress. Completion is planned for 11/1.
AFE F596 - Chem Wash Automation
Installation in the Old Module was completed during the module outage in August. Startup and de-bugging of the control system is in progress. Installation for the New Module is in progress and will be completed by 10/19.
AFE D606 - Propane Tank Farm Electrical Revisions
Electrical construction is complete and the system operational. An operational check will be completed in October as a part of normal winter preparation.
PCB Transformer Replacement
Two pad-mounted transformers have been retrofilled. thirty-two pole mounted units have been replaced.
Nine of the
VAB.0001191214
i -i 1
: * --1*1*1!" -*
" ' 4 ' i -i'l-
}Nirr = --J.I-j h-J::ib-!- j. I**'*: v-:%- .<
:P---1^ .
-I- fc': ' i ' 1 1 * ^
1"
, - -- .'h
1 M ..l? "A i
1
PROCESS ENGINEERING - V. E. Messick
Resin Qualit
rovement Pro
Review of engineering design packages continues. Those included equipment
and pipe rack foundations, structural steel, control panel layouts, and site
preparation drawings. A trip was made to Houston to meet with Vista GED
personnel and review piping plans for the suspending agent building. The
operator interface unit which allows the operator to verify recipes in the
programmable controller was put into operation.
The "manual mode"
programming was activated during the CRD module turnaround. Also, several
tie-ins to the plant1s utilities (steam, process water, cooling water) were
made during the turnaround.
Breathing Air, Bottled Nitrogen, and Plant Air Systems Survey
Surveys were conducted of these systems to identify any system cross-contam ination or improper tie-ins. A report on results was Issued.
Subpart V - VCM Valve Leak Survey
A random leak survey of 200 valves in VCM service was completed. No leaks were found. A letter on results was issued.
AFE's Submitted
The AFE requests for Reactor Heat-up Loops, Line III Metal Detectors, VCM Unloading Area, Fire Protection Improvements, Recovery System Compressor and Furniture and Fixtures were issued.
SARA - Right-to-Know
Frank Jeanson attended a CMA workshop on estimating fugitive emissions and an environmental coordinators meeting concerning SARA. Compilation of data for the SARA reDorts is beine eathered.
745 BME Addition System Modifications
A design was issued to modify the 745 BME Addition System for operator exposure to BME vapors and adding interlocks for safety. system will be similar to the existing D700 BME Addition System. meeting is scheduled.
reducing The new
A review
5415 IR Problem
A relationship was identified between dry CaSt levels on 5415 resin and IR performance in Southwlre 1201 formulation. Due to this, limits were set on the amount of dry CaSt applied to 5415 and IR performance has improved.
Fusion Tea
A proposal for an experiment design on Line I was Issued for review. This design will vary Banbury batch size and drop temperature to determine the effect on fusion.
Reactor Temperature Control
A proposal for revisions to the test reactor control system on reactor 745
was Issued. A review meeting was held with operations. The revised control
scheme will be tested during the October 5305 production run.
VAB.0001191215
"* r*t"-:1' i:-
r-.
i |
:-.vi
-is-ij|ii ./ >t. i-11. f.. .a-r" r-
ii
* h.
.
i.
'I- :i -1j :
: -n.-.
|i >' -
.
PERSONNEL
R. A. Miller
EMPLOYMENT Jeffrey B. Popp, Rehire
PROMOTIONS/TRANSFERS
Daniel A. Miller, promoted to Maintenance Superintendent Charles A. Clark, promoted to Maintenance Supervisor Gilbert A. Morgan, from Maintenance Supervisor to Contract Supervisor 0. C. Pace, promoted to Vinyl Shift Supervisor Mike Nathan, promoted to Product Supervisor and transferred to Timberway Paul Cogsdell, from Lab Trainee to Lab Technician "A" Robert E. Stone, from Vinyl Chief Operator to Maintenance Helper Freddie Franks, from Vinyl "A" Operator to Maintenance Helper Kenneth Campbell, from General Helper to Vinyl "A" Operator Steven C. Wilkes, from General Helper to Vinyl "A" Operator
I
RETIREMENTS
Jerry L. Horstman Samuel L. Kennedy
TERMINATIONS
Satish K. Gianchandani Thomas A. Madigan, Co-op Student returned to school
TO/FROM LEAVE OF ABSENCE
- t
VAB.0001191216
i rtr -r i
s
s TMi'' - ' "'a- i:"iw
::a=-i ;<\-
' i , P^fT : i -- -I Hd-! n> II .IvlTfjm--
f :ir- -p r
: ill'!-;:*. fc
I-1 \? > . -ir i,-h.
c- k- - . .Jh,.-, .. . J-i*-.
-tv"
Mir
!:Ctt ilf;. .cNT i-e-*|
. . i. H --Vll
> -
Aberdeen, Mississippi
Salaried Employees
71 *
MONTHLY PERSONNEL REPORT
Minority Employees #
0
Hourly Employees Total Employees
168 239
Salaried Hourly
8 66
n%
Employees (Hourly)
Total 74 31%
New Employees Terminations
0
Hourly Min Hired % Min. Hired
Hourly Min Term. % Min. Term.
o
a
DEPARTMENTS PAR EMPLOYEES MIN. EHP
% MIN. NEW HIRES YTD TERM. YTD TURNOVER YTD
Warehouse Gen. Plant
JA. -L6_
16
Z 44
1a
00 0
Maintenance 12L
22
boratory
2L.
1
a
Compound
XL
22 m a
Vinyl
22-
31
a
a a a
Plasticizer
52
o0
Number of Applicants:
Month
Year to Date
APPLICANT BREAKDOWN:
# Minority * Female
2 0
% Minority % Female
0
Hires (Hourly)
Month
Year to Date
9
Terminations (Hourly) :
Month
0
Year to Date
Overall Turnover
0
Projected Annual Turnover
1.6%
* Includes 1 temporary employee and one Co-op Engineer
11 l i- == :: : a i hi
~^
\'s if s ' tt.:. .lira
VAB.0001191217
. : - I1; j;
i.`l i-.i
III IA iJ- Tl-
1 t. i:- ;
i~.i
?l h \
.....................
h I
OVERTIIC AND ABSENTEEISM
... I
...V -T- :
It >1.
M^i Wfriii Jh- r .'i.ip =i `
l-H
VAB.0001191218
n-Hi ' r
M>Lw''i l-: ' : * !.> . > ! ' r V1:"1!
1
'I'1 ,lVr,,
'h-i- . i-i i-.
-< n
> .i
ENERGY CONSERVATION - F. G. Jeanson
I. Plant Operations
Total energy consumption for September was 105.423 MMM BTUs. Energy consumption decreased to 2267 BTU/lb. from 2304 BTU/lb. In August. An adjusted CMA reduction of 56.2% was obtained for the month. The adjusted CMA reduction for fiscal 1987 Is 55%.
II. Plant Energy Conservation Program
Maintenance
There were twenty-seven energy related items completed in September. Twenty-six of these Items were steam leak repairs. The remaining one was a steam trap repair.
III. Boiler Operation
Boilers
No. 1 No. 2 No. 3
Combustion Efficiency %
Sept * 9 1987
Sept 9 1986
83.9
(1)
83.5
83.9
(1)
83.3
Note: (1) Boiler number two was not used during the month.
VAB.0001191219
>
+'
-ii n
*I :
'l.jfl I: + ak'- I
uJnIjUL
: -..t. -JFK . .:|rlT-I. j U^l: : . 4 1 rl.. :. If -1.. -4. . tijs t) j
..fc^
...................................................... .....
............ rl
I -qftfl (
. J-l-lj !j
.L
If 1.;
"'iH'
!'!.. II-
14 ; pir
I
Month
ENERGY CONSERVATION DATA 1987
September
Production, MM Lbs.
Resin Dry Blend Compound Plasticizer
TOTAL
35.1 5.2 5.2 1.0
46,5
Natural Gas
Consumption, MSCF Conversion, BTU/SCF Energy Consumption, MMM BTU Energy Consumption, BTU/lb.
47656
1020
48.609 1045
Electricity
Consumption, MM KWH Conversion, BTU/KWH Energy Consumption, MMM BTU Energy Consumption, BTU/lb.
5.6815
10000
56.815 1222
Propane
Consumption, M Gal. Conversion, BTU/Gal. Energy Consumption, MMM BTU Energy Consumption, BTU/lb.
0
92000
0 0
Total
Energy Consumption, BTU/lb.
2267
Energy Consumption, MMM BTU Actual Unadjusted Actual Adjusted 1972 Base Period
105.423 85.197
194.544
CMA Reduction (%)
Adjusted Unadjusted Fiscal 1987 Year-to-Date
Performance
55.0% Adjusted 45.1% Unadjusted
56.2 45.8
1986 September
34.4 4.3 6.5 1.8
47.0
48907
1020
49.885 1061
5.5768
10000
55.768 1187
0
92000
0 0
2248
105.653 83.212
199.580
58.3 47.1
h
VAB.0001191220
ENVIRONMENTAL - R. A. Frohreich
Water
All wastewater discharge parameters were within NPDES limits in September. One wastewater bypass did occur.
NESHAPS
An emission test of 200 valves in vinyl chloride service was conducted during the month. No leaking valves were found. The test was required as one of the provisions of the waiver of compliance granted for a portion of Subpart V.
Waste Management
One shipment of waste was made to Chemical Waste Management at Emelle, Alabama. The shipment included PCB oil switches and PCB capacitors.
h
h'
1
ii"
"I............... ! T
I ^k' ^I -H- .
- >11 ?-!*'!
VAB.0001191221
I' ;
rfr+"!3
--:Tr-P V i
-*--n i
.. j... ;| |.,
in 4>j v >'
i JJiL-i . if- *.
-l'"-I
' T : i- 1- ! iTf .
.
.1
TABLE I WATER COMPLIANCE WITH NPDES PERMIT PARAMETERS
A
'V
Oct. - Ave. Max.
Nov. - Ave. Mac.
Dec. - Ave. Max.
Jan. - Ave. Max.
Feb. - Ave. Max.
Mar. - Ave. Max.
.ipr. - Ave. tfex.
May - Ave. Max.
June - Ave. Max.
July - Ave. Max.
Aug. - Ave. Max.
Sept. - Ave. Max.
Flow GFM
1010 1207
1031 1075
987 1350
1062 1300
858 900
903 970
990 1177
1049 1243
979 1021
1150 1300
%5 1230
1132 1188
BOD PEM LB./dy.
6 77 10 120
15 183 17 213
23 268 46 373
15 194 20 310
14 142 26 266
11 119 21 217
8 93 10 121
8 104 11 116
6 71 8 98
4 55 5 66
5 61 8 118
3 45 5 68
GOD PEW lb./dy.
26 311 33 404
33 406 42 527
71 846 110 1284
53 662 57 775
42 431 75 766
38 409 50 541
42 505 56 680
31 384 40 515
27 350 40 480
45 618 60 797
39 474 50 744
28 427 49 660
Sus. Solids PPM LB./DY.
14 165 23 281
23 281 37 464
13 179 24 302
18 231 28 434
10 99 13 140
19 206 35 362
33 407 78 986
8 101 11 142
14 167 21 257
14 194 26 344
10 145 12 168
8 121 14 185
Diss. 0
7.4 8.0
8.2 9.1
7.6 8.6
9.6 10.3
10.0 10.6
8.8 10.5
9.1 11.0
7.7 7.8
7.0 7.3
7.1 7.4
7.2 8.0
7.7 8.2
NPDES Permit Limits - Deoenber 1 through April 30
Ave. Max.
32 431 43 800
- 1462 - 2713
NH)ES Permit Limits
November 30
Ave. Max.
26 357 40 744
- 1212
- 2523
674 - 1396
> 6.0
674 - 13%
> 6.0
NHL LB./DY.
2.7 7.3
0.1 0.1
2.0 4.7
2.1 4.6
4.9 9.3
4.0 7.6
2.5 6.1
8.8 17.8
6.9 14.2
1.4 1.6
1.7 2.2
2.4 4.3
7.6 8.0
7.6 7.8
7.3 7.8
' 7.7 7.8
7.7 8.0
7.8 8.3
8.0 8.3
8.0 8.6
7.7 7.9
7.9 8.1
7.3 7.8
8.0 8.4
13 6.0 - 9.0 28
13 6.0 - 9.0 28
VAB.0001191222
.. r ' i
I
r-
; s. :*
-. - 4r.
jf '::
. . /;!Fr
- ?H"*" : :!' ! 'I ' !--. !----J13 :! \?4.n V*'
t r>
- !*!
Jn jjJ; .I'ljil^.r.
.'. t !'V r- . + ^-:J th-. H^f: %
. ,,
............ Vff^lPL11::
. .V'J.'b'
.W^ 1 <
* ' Jl ' - .
j-i i ;..--s.
- i.u-.iM}
LABORATORY - H. G. Coleman
Safety
A, Safety
There were no injuries during September. The safety topic for this month was the annual respirator training, provided by the Safety Department.
B. Customer Relations
Customer Contacts
United Technologies Essex - Harold Coleman accompanied Pat Haugen on a visit to UTC's research center September 15. The remaining open issues on UTC's specification for 5415 resin were discussed.
Uniroyal Chemical Company - Harold Coleman and Randell Jackson visited Uniroyal in Painesville, Ohio on September 16. Basically, they agreed to accept our 5305 manufacturing specifications as their raw material specifications.
sts for Corrective Action
Date 9/02
9/02
Customer
Abitibi-Price Corp. Mlddlebury, IN
Central Plastics McPherson, KS
Product 5385
17462
Reason
Roughness In finished extruded profile.
Surface defects on profiles.
Customer Problem Reports
Date
Customer
Product
Reason
9/01
Dayton Extruded Plast. Dayton, CH
259-151 WHT 145
High, Inconsistent fusion torque
9/24
Hi Tech Cable Corp. Starkville, MS
Product Return Notifications
35851 NAT
Unknown foreign material (streamers).
Date 9/15 9/22 9/28
Customer Flexible Technologies Central Plastics Northern Electric Co.
Product 17121 CB50 17462 27251 BKN
Amount 1,077 lbs.
950 lbs. 5,950 lbs.
Reason Contamination. Profile surface defects Pigment instability.
i
ii'.
i
s
VAB.0001191223
LABORATORY - Continued
Customer Relations - continued
Waivers Issued
Customer Blane Polymers Gossen Hoechst Celanese Nlbco Southwlre Tteitchell
Product 5415 5265 5305 Exp. 5305 5415 5415
Reason Bulk Density Viscosity Viscosity Static Flow mets m Bulk Density
No. 1 R/C 1 R/C 1 R/C 2 H/t 3 R/C 1 R/C
C. Development Lab Stannary
RVCM of Inr-Process Sacples
The following is a summary of residual VCM results on in-process samples. None reactor daily averages exceeded 400 ppm during the month of Septenber, 1987.
the
Number of Samples Average ppm, VCM
Reactor Slurries
827 220
Dryer
5265
5305
60 1.9
32 0.2
Blend Tanks
5265
5305
84 17.3
44 7.3
RVCM of Shipment Samples
The following is a stannary of the residual VCM analysis of shipment samples for the month of September, 1987.
Product
5265 5305 5385 5415 5465 Debax Dry Blend Pond
No. of Sanples
67 81 36 59
0 20
Average RVCM, ppm 0.40 0.10 0.20 0.10 --
0.4
46 0.10
14 0.8
Resin Process Capabilities
Bulk Density
5265 0.88
5305 0.37
5385 1.74
5415 0.13
Inherent Viscosity 0.18 0.64 0.37 0.49
"L" Color Value
2.67 2.94 3.78 2.92
*
VAB.0001191224
4
LABORATORY
D Resin Process Capabilities - Continued
"A" Color Value
5265 2.50
5305 4.17
5385 --
5415 --
"B" Color Value
1.22
% on Pan (vs. 2% max)
1.89
% thru 140M
2.15
Drytime
--
Mets IR (vs. 95% of control)
--
Hard Particles (% > 10)
No 5465 production this month.
1.00 3.58
0.85 -- --
1.67 2.60
1.02 0.50
--
2.17
3.33 (0.83)
2.69
0.56
1.28 (0.88)
4.2
2.3
E Compound Quality Summary
Hardness Color/Clarity Hard Particles Heat Stability Contamination Dispersion Dicing Metal Contamination
Total
F Dry Blend Quality Summary
Adjustments M Lbs. (%)
22.0 (0.43)
--
--
----
20.0 (0.39) ----
----
----
----
42 0 (0.82)
M Lbs . (%)
9.1 3.2
--
16.6 2.3 7.5
11.8 50.5
(0.18) (0.06)
--
(0.32) (0.04) (0.15) (0.23) (0.98)
Color
Rejections
M Lbs.
(%)
31.0
f0.60,i
G Miscellaneous
Total 31.0
(0.60)
1. The revision of Aberdeen's test methods began this month. Dav
Cox is coordinating this proj
; methods will be stored on th
computer for ease of revision
)
.!
- L-
i, 4
. i. .
VAB.0001191225
-r| f
I- ...... ..
.***},). 11
.....................I -T
-h-f-4il:N:1.
:ui .-'Mft-:i%'* ' r {. .
:*' M|
;-|l : - i; -
P
' i 1 .-rl,li f .-..j
: if
. . ,i
is-.' --jl-.?'.
-::r
1
LABORATORY - Continued
G. Miscellaneous
2. As part of our Resin Analytical Capability Team efforts, dry resin samples were sent to Ponca City and Oklahoma City for comparative RVCM analysis. Again, Dave Cox is coordinating; samples will be sent every two weeks.
3. Brian Harrison completed color matches for Condutel (ivory) and Marine Industrial Cable (gray).
4. Brian Harrison attended the Effective Writing Workshop in Houston on September 14-15.
5. Harold Coleman attended The Management Process in Houston September 20-25.
' * |-
I = IS:,
m , A
I*:.': WM1P "ft -rt; S . J-IS+I PJ1 f
i **-'<-
VAB.0001191226
.... ~
.. .....jK-ffvcjJVTi
l- ? !I I .. -if.! II: :r+*M 'kh
i.h|.,. . ...., .. .u-JHTIM i-
: -
ir-M
I1! I
' M.
(....,1- 4JJ-;
.ri
1 !
...................
JS.
SHIPMENTS BY PRODUCT - M LBS
SEPT. 1987
FISCAL YEAR-TO-DATE
AES IN PLASTICIZER DRYBLEND COMPOUND
30,612 591
5,215 8,274
332,198 8,794
56,882 84,776
TOTAL
44,692
4S2,650
NUMBER OF SHIPMENTS BY MODE:
1 RAILCAR
VISTA TRUCK TRAILER ON C0M40N CUSTOMER BULK 1 VAN 1 A FLAT CAR | CARRIER PICK-UP CONTAINER
TOTAL
RESIN-Bulk 140 45
I1
94
Package
5 1 10
9
r
Export
PLAST.-Bulk
3
2
25
"S.
5
Package DRYBLEND-Bulk
Package Export
26
6 8
1
s
5
-
38 16
COMPOUND-Bulk Package
18
6 40
64 | 38
24 142
Export
1 12
TOTAL-SEPT.
OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST
187
116 146 133 193 154 181 150 162 165 178 159
59 53
41 51 64 39 46 29 68 44 50 45 60 56 53 46 60 44 60 49 60 44
68 63
1 59
172
2 52 160
2 64 135
1-- 48 133
89 147
5 56 143
64 129
4 44
140
54 159
6 41
152
0
1
45
145
3 47 160
1 532
422 450 390 544 451
5 493
i 438
459 473 2 476 504
*
A
VAB.0001191227
..MM POUNDS
ABERDEEN PLANT PRODUCTION
10/01/86 - 09/30/87
MM POUNDS
--------- Budget - - - - Actual
Cumulative
VAB.OOOl 191228
i
i'^4 . *!*- .->F
i'***-KljtF+fJl
I !^d--P'V'hf r1
.. i
iT.F. r. .
.
;-u
K :S --.-t
t hl?;
I V ' .? l
:lli I . T<-rr'. >i .1^!J .. <j m. . .. in: -u
J
** *
V
1.020
1.015 1.010 1.005
1.000
0.995
1.030
1.025 :
1.020 1.015 1.010 1.005
1.000
v
1.020
1.010
1.000
990
1.200 1.190 1.100 1.050
ABERDEEN PLANT EFFICIENCY
10/01/86 - Q9/30/8?
POUNDS OF RAW MATERIAL/POUND OF PRODUCT
/. 042,
HI
'T
Nr+
M \ ft -- kij- ' | i ' |, + .
! .-rt
rfT-.Tj-ji i v /> . s:fakiF|-,Njri-n+iF' -
.. i
i l' 1,1 '*lll
-r.l-i.
VAB.0001191229
I TI
ABERDEEN PLANT QUALITY PERFORMANCE
10/01/86 - 09/30/87
0/0
OFF-GRADf
1
4.0 3.0
2.0
1.0
0
'1-\
\-=?t
'* i H.i.r
H.-f
-.4
HV ' A"
rtw jifl i r 3
:h r| ^
I
M -tV
"I
VAB.OOOl 191230
*4 ' ........................... ..
MM POUNDS
PRIME
ABERDEEN PLANT INVENTORIES
10/01/86 - 09/30/87
v
Ml Ml, ------ * " - ^
f.
- > - ------ --- -----------------1-------Tm--
---------r--h-...--......
`
^
-
!
--
1 * !' "-------------------
L t ..
L
\
1\
1
*
+ I1
; -- -f
r
** i :;
t: -t;
: nrr-" -1
t:
-- -- -- i --.
j ^ t _____j -!
^ -
1 !i
T
t ;i t*
1i!
I:
Oct, Nov, I Dec.i Jan. Feb. Mar. Apr. Ma.V June July Aug. Sept, j Oct. i
VAB.0001191231
i
-T+.H--H*!
r i ... .. i4d.,.i> |l " :*H - -.M'-.V
rf :iik-" : .v ?-> id ii'iuriMUfcj#..
.i-, -. . ...:. -.*
- ..-