Document jyq4YN8KnZ33NegKyY6015Eg9
Drawing Number PD-38-32411 PD-38-32425 PD-38-32427 PD-38-32428 PD-38-32430 PD-38-32431 PD-38-32432 PD-38-32433 PD-38-32434
Specification Number EG-398-H EG-516-C EG-581 EG-850-C EG-851 EG-1048-A EG-1049-C EG-1675-E
Drawing Number
GB-Q-68922-13 GA-P-99935-2
Number
1404 EP-2200
PLAINTIFF'S EXHIBIT CHV-492
CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT - EL PASO, TEXAS
SPECIFICATION NO. EP-432-J February 23, 1981 (RRK) Appendix A Page 1 of 1
A.1 CONSTRUCTION DRAWINGS
, .
'I
Title
Stub-Up Plan and Elevations of Terminal Boxes- at Control House
Terminal Connection Diagram - Thermocouples
Overhead Plot Plan and Elevations
--
Schematic Conduit Layout
Plan and Elevations of Overhead Conduit in Terminal Boxes
Plan and Elevations of Thermocouple and Instrument TerminaT~BOxes
Plan and Elevation of Terminal Box for Pneumatic Instruments
Connection Diagram Alarm Terminal Box
Conduit and Wire Schedule
.
A.2 STANDARD SPECIFICATIONS
Title
Steel Fabrication
Reinforcing Steel Fbbrication.
"
Clearing, Grading and Earthwork
.
Placing and Curing Concrete
Concrete Proportioning and Mixing
Small Tools and Equipment
Supplies -
.
~
Installation of Electrical Facilities - General Requirements
A.3 STANDARD DRAWINGS
Title
Anchor Bolts Standard Conduit Support and Electrical Equipment Connection
Details
A.4 REFINERY AND ENGINEERING INSTRUCTIONS Title
Instruction to Contractors Working Within the Refinery
Qualification of Welders__.
__ .
CHEVB8 5787