CORPORATION 34 5 PARK AVENUE. NEW YORK. N. Y. 1 0022 TELEPHONE (212) 421-7122
January 31, 1974
Bechtel Power Corporation P. O. Box 3965 San Francisco, California 94119
Attention: Mr. G. F. Brown, Project Manager
Gentlemen:
This v/ill acknowledge receipt of your letter of January 4, 1974.
Needless to say we wen quite surprised at the form
and content of your letter. and is hereby rejected.
Yq4
1
er is totally unacceptable ;l
While you may find ii* i jy^ivMhard to understand why Keene would discard $14,500 wortjhj jq| ijmaierial" the answer is
quite simple. The reason for di soarding the Unibestos material
was that it was an asbestos prqd
jjvtihiqh. could not be used
(with, exceptions not relevant he rq).after January 1, 1973. .* '
The other points in yo jur letter indicate a similar
degree of misunderstanding as to What happened.
Preliminarily, I would like to reiterate that the draft claim submitted to your Mr. Yost on December 28 , 1973 related solely to the costs of emergency materials and direct labor application costs related to such emergency materials. The draft claim did not include other costs resulting from the Ov/ens-Corning strike, such as those arising from erratic work release sequence due to the delay caused by the strike. We are preparing a separate work release sequence claim per our December 13, 1973 agreement with you.
Your reference to Amendment! No. 1 in response to our claim for added labor costs for . pplii cation of double vs single layer calcium silicate is iriapafojpriate -- Amendment Mo. 1 does not apply. Amendment No.! i was not issued until
late November 1971 after we had ] eeni yerbally instructed because
2- -
of emergency circumstances to proceed to insulate the auxiliary
steam and heating pipe systems with whatever material we could find in whatever thickness was necessary to complete the insula tion at once. That amendment, however, relates to the auxiliary steam system only. It does not include costs for applying double layer material to the hgat.j.n<j pipe system. We al?o call your attention to the fact that the amendment does not provide for additional costs to either fabricate or apply .016 jacketing in our warehouse, nor in the alternative, costs related to .025 field applied, jacketing. The ameindmantI is confined strictly to cost for applying double layer material on the auxiliary steam system only. The amendment doe$ iiot ^include the items for
which our claim was made.
iYour comments on Items
and 4 are correct in the
delineation of specifications. Item 3 is the added material
cost for purchasing ,016 jacketihg to match factory applied
jacketing -- this would relate to both auxiliary steam system
and the heating pipe system. Item 4 covers the added cost for
handling and applying .016 jacketing offsite in our St. Louis
warehouse because of the unavailability at that time of factory
applied jacketing. Because factory applied jacketing was net
available and in order to meet the emergency job site instruc
tions from your representatives to proceed with insulation,
Keene had two alternatives:
1. To field apply .025 jadketing at additional cosh, or
2. To fabricate and apply .016 jacketing in the
? ^lirN St. Louis warehouse at added
Election of the latter! diptii lln i/as based on the fact
that it represented the least costlyt of the alternatives and provided a uniform installation.J jTh!ej; costs of the material, fabrication and application of . (jl6 ijacketing in the St. Louis
warehouse were added costs directly attributable to the Owens Corning strike. They would not Have been incurred except for that strike.
Your letter on Items 3 and 4 also refers to the fact that at the time of the contract bid Ke^ne stated that .016 jacketing would either be installed in the factory or at the St. Louis warehouse. While we cain find no reference in our file to that statement, it would not l?e unusual for Keene to
:I
-3-
qualify the bid in this manner. As you know, we reached decision to use factory applied .016 from Owens-Corning. This decision was frustrated by the Owens-Corning strike and we were forced to change our plans and fabricate in out St. Louis ware house. This change was dictated by the strike; it was beyond our control and it resulted in extra costs. Since factory applied jacketing was unavailable because of conditions beyond Keene's control, Keene would expect reimbursement for added costs .
If we had originally planned to use the St. Louis warehouse, it would have been somewhat more costly to us than the Owens-Corning factory applied,, b ut not nearly of the magnitude of the actual costs incurred, wh en the strike forced a change in plans. Thus, these were reeaal]): increased costs as a result of the strike over and above these that might have been incurred if we had picked a dififpjreg bourse initially. In addition, we believe that we are enttitied to the increased costs resulting from the strike even tthpu gjb there may have been other more expensive options available ,ijto use pre-strike. We planned to use the least expensive option! an d the strike stopped us.
With respect to the loss on Unitestos material, see the
comment above about the asbestos content. Unibestos was not pro
hibited in the Bechtel specifications.- The prohibition against
its use was contrary to the specifications. V,re were instructed
to get whatever material was available from any available source
because of the Owens-Corning strike. In response to this instruc
tion, we( obtained the Unibestos material - both single layer and
double layer. The discussion in you^ letter about double layer
vs. single layer is largely irrelevant since we had both.
: i| 1 IN
Please let us have yoyrl cphdHCXence as to the items you
disallowed in your January 4th letteri We would be pleased to
furnish further information if you
jthat would be helpful.
If you have problems i n regard to the other drafts submitted, it might save time and e ffor ; if we could discuss them before you take "formal" action.
Very truly yours,
4^ /# c
Dani<*l C. McCarthy Vice President
CC:
Mr. K. E. Bridegroom Manager of Mechanical Engineering Union Electric Company 316 Worth 12th Street St. L\ouis, Missouri