Document jykErynN8ywQq61EpkO17mq0p
SAFETY - A. H. Sather
Occupational Injuries
October
1980 Year-to-Date
1979 Year-to-Date
Injuries Treated
First Aid Medical Cases Restricted Workday Cases Restricted Workdays Lost Time
3 41 0 14 02 0 23 00
32 8 2
29 1
Injuries By Department
Vinyl Operations Compound Operations Maintenance Laboratory Receiving and Warehouse Office
0 12 3 18 0 23 03 00 01
13 3
22 1 0 2
Injuries By Type
Cuts and Abrasions Eye Injuries Burns Bruises Strains and Sprains Other
2 29 04 17 0 11 04 04
12
5 12
10 5 2
As of October 31, 1980, the plant had operated a total of 481 days or 623,504 manhours without a disabling injury.
Safety Meetings
The topic for October Safety Meetings was "Slips and Falls and Hand Safety". The film "Slips and Falls" (Conoco produced film) was shown and a National Safety Council - Petroleum Newsletter Article "Ten Safety Rules to Help Preserve All Ten of Your Fingers" were reviewed. Also, C. R. Miller, Plant Superintendent, and A. H. Sather conducted three (3) safety performance review meetings, one each for the Maintenance, Compound and Vinyl Departments. Personnel involved in these meetings included first and second level supervisors and department heads. Several topics were reviewed and discussed in each of the meetings. The topics included: 1980 year-to-date on and off-the-job safety performance, job planning, incident control and the effects of attitude.
VCM Tank Car Derailment
On October 15, 1980, C. R. Miller, Plant Superintendent and A. H. Sather, Safety Director, responded to a CHEMTREC assistance call for 3 derailed VCM cars near Strong, MS. The cars were found not leaking. The cars were re-railed without incident.
1- -
DTH 000021629
SAFETY - (continued)
Plant Noise Level Survey
W. Guy Warren of CED conducted a noise level of the plant and plant boundaries October 7 through 10, 1930. Numerous suggestions were made regarding improve ments. Several of these improvements are currently being evaluated for implementation to reduce sound levels.
Chemicals Industrial Hygienist
T. G. Grumbles, Chemicals Industrial Hygienist, visited the plant October 14 through 16, 1980 to familiarize himself with the Aberdeen Plant, review chemical usage, review the plant Industrial Hygiene Program and to discuss the usage of the compound raw material. Antimony Trioxide.
VCM Plant Turnaround
J. G. Roberts, Safety Inspector, assisted W. V. Henry for the VCM plant turn around. His work activities in Lake Charles required him to be at the VCM plant from September 29 through October 23, 1980.
OSHA Compliance
Activity in this area included VCM and lead dosimetry, and a review meeting on lead compliance activities. The results of the dosimetry work are indicated below. A lead compliance plan review was conducted on October 16, 1980, and efforts were reinforced.
VCM
A total of 85 samples were taken and analyzed with six (6) indicating overexposure. The results are tabulated by range below. Overexposures are also explained.
Range (ppm)
Number
Percent
0.0-0.5 0.5-1.0 1.0-5.0
5.0+
75 88.24 4 4.71 4 4.71 2 2.34
85 100.00
Of the six (6) overexposures, one occurred to a Yard Operator who was connecting and disconnecting VCM railcars while wearing a respirator, one each occurred to a Reactor Operator and a Mechanic working in the old reactor module without respirators, one occurred to a Mechanic-Oiler who worked in several VCM process areas without a respirator, and two occurred to Mechanics who were working on recovery equipment seals while wearing respirators.
-2-
000021630
dth
SAFETY - (continued)
Lead
A total of twelve (12) samples were analyzed, the results are shown below with overexposure information.
Number
Greater than PEL* Less than PEL
2 10 12
Of the two (2) overexposures which occurred, one occurred to a color weigh room compounder and one to a line I compounder. Both of the overexposed employees were wearing dust respirators.
-3^
DTH 000021631
VINYL - P. E. Markey
Production
Month
Y.T.D.
Budget
1. Total Production, MM Lbs. 2. Production Rate, M Lbs./C.D. 3. Charges, Reactor Batches/C.D. 4. Total Charges 5. Reactor Stream Factor 6. Drying Rates, Average Lbs./C.D. 7. Dryer Stream Factor, % 8. Accounting Days
26.5 853
21.0 650
87.9 5821
87.4 31
209.3 686
17.0 5176
73.5 5545
73.7
305
900
Vinyl Department production for September was 95% of budget at 26.5 MM pounds. Production levels for the first half of the month were reduced for inventory control purposes during which time advantage was taken by performing dis cretionary unit maintenance and available dryer line capacity was used to debag "BC" and "H" grade resin. Production target was increased mid month from 22.0 to 26.5 MM pounds.
Reactor and dryer stream factors were 87.9% and 87.4% respectively. The major items affecting stream factor and production were:
1. Inventory control programs during the first half of October continued to represent substantial stream factor penalties in the reactor and drying areas (3.0% and 4.2%, respectively).
2. Steam limitations resulting from boiler downtime to install energy conserving economizers caused a 2.9% stream factor penalty.
Resin Quality Summary
Resin Type
Prime Pounds
"BC" Grade
"H" Grade
% of Total Production
5305 5385 5425 5465 Sifter Overflow
2,299,652 17,700,967
6,036,973 419,880
-
40,500 239,650 (335,250)
-
-
40,200 (174,850) ( 40,500) ( 40,300) 269,835
9.0 67.2 21.4
1.4 1.0
TOTAL
26,457,472 ( 55,100) 54,385
100.0
Quality performance for October was 100.0% customer grade with (0.2%) "BC" grade and 0.2% "H" grade. Debagging operations upgraded 672,050 M pounds to prime quality resin.
4- DTH 000021632
VINYL - (continued) The variable cost variance was $606.3 M with $542.6 M due to price and $63.7 M due to efficiency. The major price variance was $546.6 M for VCM. Favorable efficiency variances for VCM and processing additives totaled $39.3 M. Favorable variances in the off-grade category were $23.9 M. There was no variance due to product mix. The raw material requirement for October was 1.01785 pounds VCM/pound PVC versus the 1.01960 standard. (Y.T.D. is 1.01865) General 1. Resin packaging for October totaled 2,004,600 pounds. Resin debagging
totaled 672,050 pounds upgrading "BC" and "H" grade resin to customer grade. 2. A test run was conducted 10/20/80 through 10/26/80 using the experimental J-48 Methocel. 48 batches were produced in the old reactor module producing 7 coarse batches, at which time testing was discontinued. Old module testing indicated J-48 produced a poorer coefficient of variation than our currently used F-50 Methocel and had a tendency towards higher gels. 2 batches were produced in the new module with better results, but with only 2 batches produced the results are best categorized as inconclusive.
-5-
DTH 000021633
COMPOUND - J. R. McCrimon
Compound Production
Month
Day
Y.T.D.
Line I, M Pounds Line V, M Pounds Line III, M Pounds Total, M Pounds Accounting Days
1,545 134
3,116 4,796
31
55 45 101 155
11,593 968
26,633 39,194
305
Line I operated 28 days during October at an average rate of 55 M pounds per day. Major items affecting production efficiency were: product changes (61.7 hours), maintenance on blender conveyor bucket (24.1 hours), dicers (19.4 hours), scale adjustments (12,5 hours). No. 1 blender gearbox failure (14.1 hours), and maintenance on skip hoist (10.3 hours).
Line V operated 3 days during October at an average rate of 45 M pounds per day. Major items affecting production efficiency were: maintenance on the Orbitran (14.3 hours), pellet blower bearing failure (7.0 hours), and WernerPfleiderer temperature control problems (3.5 hours).
Line III operated 31 days during October at an average rate of 101 M pounds per day. Line III production was affected by: product changes (50.5 hours), FCM clutch failure (20.5 hours), mill steam leak repairs (18.3 hours), and quality control (11.1 hours).
Quality performance for flexible compounds was 3.1% off-grade of which 83.9% was due to mill scrap. "BC" production was 0%.
The raw material requirement for flexible compounds was 0.'98083 pounds of raw material per pound of compound versus a 1.01300 standard. (Y.T.D. is 1.01475).
The variable cost variance for compound was $54.7 M with $49,6 M due to price and $5.1 M due to efficiency. The variance due to product mix was ($20.0 M). Major efficiency variances were: $14.1 M for resin and $25.8 M for Vinyzene SB-1 which is due to the use of Vinyzene BP-5 in order to deplete the inventory of BP-5 (obsolete). Major price variances for the month were $10.9 M for T0TM
and $14.1 M for colors.
Dry Blend
Month
Day
Y.T.D.
Production, M Pounds Accounting Days
4,209 31
183
19,537 305
Dry Blend operated 23 days during October at an average rate of 183 M pounds per day. Production included 80273G, 80172B, 90171, and 3948-44-1. Dry Blend production was affected by: No. 1 Welex motor failure (43.0 hours), quality control (22.7 hours), Orbitran (11.5 hours), and boxing dry blend (8.3 hours).
6- DTH 000021634
COMPOUND - (continued)
Dry Blend - (continued)
Quality performance for the month was 99.99% customer grade.
The raw material requirement for dry blend was 0.98941 pounds of raw material per pound of dry blend versus a standard of 1,00321. (Y.T.D. is 1.00471).
The variable cost variance for dry blend was $107.0 M with $5.7 M due to price and $101.2 M due to efficiency. The variance due to mix was $91.4 M. The only major efficiency variance for the month was $16.6 M for resin. There were no major price variances for the month.
Plasticizer
Month
Day
Y.T.D.
Production, M Pounds Accounting Days
1,122 65 8,152 31 305
Plasticizer operated 17 days during October at an average rate of 65 M pounds per day. Production included: DIDP, 610P, and D0P.
VRP production totaled 101 M pounds (9.0%). Production was limited by: R-3 phthalic anhydride charge valve replacement, safety disc replacement on all 4 reactors, and steam restrictions (10/24 thru 10/31) due to boiler economizer installation.
The raw material requirement for piasticizer was 1.08732 pounds of raw materials per pound of plasticizer versus a 1.08258 standard. (Y.T.D. is 1.10967)
The variable cost for plasticizer was ($44.3 M) with ($28.3 M) due to price and ($16.0 M) due to efficiency. Major price variances were: ($12.4 M) for
ALF0L 610, and ($12.5 M) for 2 EH. There were no major efficiency variances for the month.
The variance due to product mix was ($2.3 M).
General
Total customer grade compound inventory decreased from 6.7 MM to 6.0 MM pounds during October.
-7-
DTH 000021635
MECHANICAL - S. J. Vincent
Vinyl
There were two large reactor seal failures in this period. The seal failures were both in the old module on the D-400 and D-600 reactors.
There were two large reactor gearbox failures this period. Both failures were in the old module with the high speed pinion shaft failing on D-500 and a high speed pinion gear failure on D-400.
There were two condensers cleaned in the old module on the D-500 and D-600 reactors. In addition to cleaning the condenser, the safety valves were tested and all safety discs changed on the D-500 reactor.
The universal joint on the 741 agitator experienced a bearing failure requiring a major overhaul of the unit. This was the same universal joint that was damaged during the summer by a resin accumulation inside of 741 reactor. Also the 741 reactor drive motor was replaced with the spare when it began making noise.
There were 17 seal failures to pumps and compressors in this period, 8 of the seal failures were in the old module and 9 were in the new module. In the old module, seals were replaced on the 705 emission recovery compressor outboard seal, the east VCM charge pump, the recovered VCM charge pump, the east RVCM return pump, and the outboard seal was replaced three times on "A" vacuum pump. In the new module, seals were replaced on the east VCM charge pump, the west VCM charge pump, the 905 compressor inboard seal, the west chem wash pump, the PVA transfer pump, the 904 compressor inboard seal, the east RVCM return pump, the west RVCM return pump and the west RVCM charge pump.
Pump and compressors overhauled in this period included the east hot water charge pump in the new module. In the old module the "B" recovery compressor, "B" vavuum pump, 706 emission recovery compressor, and the spare 1256 recovery compressor were all overhauled. A new compressor was installed on the inerts vent chiller system.
The north and south seal water separator level controllers were calibrated in the new module. The deckwriter in the vinyl control room was repaired and re installed. The conversion from 110 volts to 24 volts on the blowdown tank controls was completed.
In the vinyl drying equipment the #7 dryer was down to repair the oil seal on the drive gearbox, to repair the drive motor and to rework the day collector explosion door. The sock holders were replaced in #4 day collector. Belts were replaced on #6 exhauster. The #1 Bird was pulled for cleaning. The #8 Bird and gearbox were changed out twice for plugging and bearing failures. The resin blower transfer system controls were also revised.
Repairs in the vinyl storage area included replacing two loading hoses and to rebuild one 690 Corken for a case repair and packing leaks.
-8-
DTH 000021636
MECHANICAL - (continued)
Vinyl - (continued)
A major effort was made to repair steam tracing leaks and repair insulation in both reactor modules. An intensified effort by several of the maintenance people completed these repairs in a timely fashion.
Compound - Dry Blend - Plasticizer - and Silo Storage
Repairs to the compounding equipment on line III were to replace the clutch unit to the FCM, change FCM seals twice, and to replace the spindle on #6 dicer. Minor steam and process leaks were also repaired. Repairs to line I consisted of minor adjustments to the conveyor and scale system. There was a failure of the #1 blender gearbox on the last day of the month.
New controls were installed on the line III condensate pump. A new locking mechanism was installed on the pellet blower. Several start and stop switches were installed.
The major repairs in dry blend included replacing the drive end shaft and bearings and replacing the drive motor and belts on #1 Wei ex unit. The Wei ex motor failed when water apparently entered it when a heavy rain came in through an open doorway.
Repairs in the plasticizer unit included replacing bearings in the north blower. The safety disc on R-2 was replaced and the discs on R-l reactor were replaced twice. The PM inspection of the glycol unit in the plasticizer tank farm was completed.
The final adjustments and revisions were completed and the new portable product transfer system was placed in operation.
Utilities and Service
There were five repairs to equipment in the plant air system in this period. Valves were repaired in #2, 7, 8 and 9 compressors and the motor repaired on #1 compressor. The fire pond overflow dike material was replaced with new red wood material. The D-500 and D-600 cooling tower distributer was repaired to control water loss. The gearboxes, supports and fan hubs were cleaned and coated with special paint on this cooling tower. All electrical switchgear and instruments were also inspected on this tower.
One new bulk storage tank for the cooling tower chemicals was installed. Sight glasses were installed on both the new and existing bulk chemical tanks.
Boiler repairs completed this period included having #2 and #3 boilers down to install economizers on them. With the unit down, the Drum baffles were pulled to wash the tubes. Three leaking tubes were repaired in the #2 boiler.
-9-
DTH 000021637
MECHANICAL - (continued)
Utilities and Service - (continued)
The propane system was test fired three times in this period. The machinist and tool room mechanic completed repairs or machine work on twenty-four pieces of equipment. Also all plant central heating systems were PM inspected.
Planner
The Planner estimated 105 work orders in this period and material was ordered for 28 work order projects. The Planner closed 16 invoice registers and issued 17 new registers. There were 20 statements processed for payment and 692 work orders closed for the month.
The history and safety valve records were brought up to date at the end of the month.
-10-
DTH 000021638
MECHANICAL ENGINEERING - J. A. Dixon
AFE's Submitted, Approved, and Closed
The following AFE's were submitted and approved during October:
AFE No.
Title
Authorized
9700 9710 9720 9730 9740
Compound Fines & Streamer Removal Fire Protection Improvements - Phase III Reactor Agitator Replacement Compound Line III Debottlenecking Modifications to Make Profile Dry Blend
$ 95,000 385,000 420,000
1 ,350,000 200,000
Completion reports were issued for the following AFE's during October:
AFE No.
Title
Authorized
9297
9158 9228 9248 9769
Automatic Plasticizer-Stabilizer Weigh-Up System
Fire Protection Improvements - Phase I Dry Blend Silo Alarms Silo Isolation Valves Automatic Setback Thermostats
$ 60,000
176,000 25,000 25,000 3,000
There were no AFE's closed to field charges during October.
Design
Design work is in progress on the following projects:
- Replacement of Hot Water Charge Tank - Methocel Charge Revisions - Reactor Inert Vent System - Interplant Communications - Phase II - Spare Reactor Condenser - Multi grade Resin Production Facilities - Water Stripping - Fire Protection Improvements - Phase II - Spare Inert Incinerator - Breakroom Extension - Sweco Installations
AFE Activity
1. AFE 9629 - Air Compressor - M. S. Richards
Conversion of the old Joy compressor to dual control is scheduled for November.
-11-
DTH 000021639
MECHANICAL ENGINEERING - (continued)
AFE Activity - (continued)
2. AFE 9689 - Diking of Sphere and Curbing of Drum Storage Area - J. L. White
All exterior walls are complete. Backfilling and final grade work is in progress.
3. AFE 9709 - Facilities for Multigrade Resin Production - S. Krause
Overall project design is 30% complete. The contract for concrete and site work has been let.
4. AFE 9729 - Fire Protection Improvements - Phase II - M. Ingle
Overall project design is 97% complete. The piping and concrete drawings are undergoing final revisions.
5. AFE 9739 - Methocel Charge Revisions - J. L. White
Design is complete. Bulk material is being quoted. Bids have been requested for installation of piping.
6. AFE 9530 - Spare Incinerator - D. Haub
Overall project design is 54% complete. Piping plans are complete. Concrete basis of bids to be issued in November.
7. AFE 9550 - P. A. Handling Improvements - J. P. Windham
The new jacketed unloading line is complete and operational. Instrumenta tion design work is in progress.
8. AFE 9580 - Boiler Economizers - J. L. White
The economizers have been installed on number 2 and 3 boilers and are operational.
9. AFE 9590 - Critical Spare Equipment - J. P. McKee
The drawings have been reviewed and approved and are ready to be mailed out for bids.
10. AFE 9610 - API Clean Water Bypass - M. S. Richards
Sewer design is complete and construction work is scheduled.
11. AFE 9630 - Water Stripping - M. Ingle
Overal project design is 70% complete. Piping drawings are undergoing final revisions.
-12-
DTH 000021640
MECHANICAL ENGINEERING - (continued)
AFE Activity - (continued)
12. AFE 9660 - Hot Hater Charge Tank Replacement - J. P. McKee
Concrete and site work is in progress. Bids have been requested for installation of the piping and electrical.
13. AFE 9680 - Fixed Point Monitor Data Computer & Warning Lights - R. B. Harned
Overall project design is 35% complete. Computer Services Division in Ponca City is negotiating the purchase of the computer for this project.
14. AFE 8395 - Interplant Communications - Phase II - R. B. Harned
Design is complete. All major equipment is on order. Bids have been requested for the equipment installation.
Construction - G. A, Morgan
The foundation for the new hot water charge tank was completed. Bids have been requested for piping, equipment, structural and electrical installation on this project.
A proto-type loading chute for the resin silos was installed and approved.
Two boiler economizers have been installed and the third is scheduled for early November.
Repairs to the Lagoon Aerators was completed during the period.
Installation of the new back-up plasticizer filter was completed.
Six contracts were let during the period. They were for:
1. Boiler Economizers Piping and Equipment
2. Boiler Economizer Structural 3. Concrete work for Silos, Cooling Tower, Blend Tanks and Initiator Storage
4. Piping for Part I of Fire Protection Improvements - Phase II
5. Concrete, Demolition and Sewer Line Installation for Batch Water Stripping
6. Maintenance of Plant Two-Way Radios and Closed Circuit Television
Nineteen (19) register tickets were issued during October.
-13-
DTH 000021641
1) Thru September, 1980 Actual Accountinq 2) Thru October, 1980
ABERDEEN AUTHORIZATIONS RT I'OU 1'
Aivni. Capital
NO.
description
PATE
AUT11.
APPROVED AH; AMT.
0) EXPENDED
TO DATE
(2) COMMITTED TO DATE
FINAL TOTAL EST. COST COMP.
UNDER (.OVER) All III. AMT.
EST. EST. COMP. CI.OS. DATE DATE
REMARKS
9237 Heated Plasticizer Addition System 10/11/77
9143 Plasticizer Chemical Exposure Abatement
8/21/78
9258 Dryer Operation Improvements
12/14/78
9519 Critical Spare Equipment
2/6/79
9559 Color Heigh Room Modifications
4/19/79
9589 Instrument Air Dryer
5/30/79
9609 Reactor Inert Vent System
6/28/78
9629 Air Compressor
7/9/79
9639 Revisions to Emission Recovery System
7/12/79
37,000 152,000
315,000 175,000
25,000 110,000
90,000 340,000 100,000
13,090 143,513
14,691 145,005
287,958 107,281
18,552 90,134 13,488 260,090 60,726
324,848 161,214
19,346 91,694 17,895 266,368 72,445
37,000 152,000
324,848 163,000
25,000 110,000 90,000 340,000 100,000
0 2,842
12/80 3/81 Design in progress. 9/80 12/80 Closed to field charges.
( 9,848) 9/80 12/80 Closed to field charges. 12,000 12/80 3/81 Revisions in progress. 0 1/81 4/81 Project operational. 0 12/80 3/81 Revisions in progress. 0 3/81 6/81 Project on hold. 0 3/81 6/81 Revisions in progress. 0 12/80 3/81 Revisions in progress.
9649 9669 9689
Double Block Valves for VCM Charge
New Air Header
Diking of Sphere & Curbing of Drum Storage Areas
7/18/79 8/15/79 9/15/79
182,000 25,000 170,000
143,075 17,084 97,375
167,026 18,296
127,330
182,000 25,000
170,000
0 12/80 3/81 Project operational. 0 12/80 3/81 Revisions in progress. 0 1/81 4/81 Construction in progress.
9699 9709
Plant Dryer Debottlenecking
Facilities for Multiple Grade Resin Production
9/15/79 9/20/79
80,000 870,000
5,805 28,560
24,205 330,305
80,000 870,000
0 3/81 6/81 0 3/81 6/81
Engineering in progress CED. Construction in progress.
9719 9729
Aberdeen PVC Resin Expansion
Fire Protection Improvements Phase II
9/10/79 10/1/79
850,000 490,000
11,421 19,953
817,600 166,185
850,000 490,000
0 1/81 4/81 0 6/81 9/81
Equipment on order. Piping contract let.
9739 rietnocel Charge Revision
10/3/79
66,000
8,732 21,119
66,000
0 12/80 3/81 Bids requested on piping.
9759 Aberdeen PVC Resin Expansion 9510 Miscellaneous Projects Under
$10,000 9530 Spare Incinerator 9550 P. A. Handling Improvement 9560 Safety Equipment 9570 Replace T-100 P.A. Tank
9580 Boiler Economizers
9590 Critical Spare Equipment 9600 Calcium Stearate Addition System 9610 API Clean Water Bypass 9630 Water Stripping 9650 Miscellaneous Projects Under
$10,000 9660 Hot Water Charge Tank Replacement 9670 Laboratory Equipment 9680 Fixed Point Monitor Data Computer
and Warning Lights 9690 Breathing Air Modifications 9700 Compound Fines & Streamers Removal 9710 Fire Protection - Phase III 9720 Reactor Agitator Replacement
9730 Compound Line III Debottlenecking 9740 Modifications to Make Profile
Dry Blend
12/10/79 11 ,150,000 1,272,679 5,062,100 11,150,000
1/3/80
150,000
94,951 120,361 150,000
1/23/80 3/3/80 3/12/80 3/27/80 3/26/80 3/26/80 4/2/80 4/15/80 4/30/80 5/30/80
650,000 63,000 25,000
119,000 140,000
59,000 84,000 23,000 810,000 150,000
1,036 214,455
25,093 33,914
1,711
7,843
57,782 62,366
4,365 132,676
44 11,486
00
4,628
5,039
12,501 76,926
67,370 115,630
650,000 63,000 25,000
119,000 140,000
59,000 84,000 23,000 810,000 150,000
6/4/80 7/9/80 9/4/80
160,000 32,000
113,000
200 67,772 160,000
151 30,529
32,000
0 8,800 113,000
9/9/80
21,000
10/1/80
95,000
10/14/80 385,000
10/14/80 420,000
10/16/80 1,350,000
10/27/80 200,000
0 0 21,000 0 0 95,000 0 0 385,000 0 0 420,000 0 0 `l,350,000 0 0 200,000
-14-
0 9/81 12/81 Foundation work in progress 0 12/80 3/81 Forty-Eight projects approved.
0 6/81 9/81 0 2/81 5/81 0 12/80 3/81 0 12/80 3/81 0 12/80 3/81 0 12/80 3/81 0 5/81 8/81 0 12/80 3/81 0 4/81 7/81 0 12/80 3/81
Engineering in progress CEO. Unloading line complete. Smoke detection portion complete Project on hold. Two economizers operational. Engineering in progress. Engineering scheduled. Sewer construction in progress. Sewer contract let. Thirty-eight projects approved.
0 2/81 5/81 Bids requested for piping. 0 12/80 3/81 Analyzer purchased. 0 9/81 12/81 Engineering in progress.
0 3/81 6/81 Engineering scheduled. 0 10/81 1/82 Engineering scheduled. 0 10/81 1/82 Engineering scheduled CED.. 0 10/81 1/82 Updated quotes requested. 0 10/81 1/82 Engineering scheduled. 0 10/81 1/82 Engineering scheduled.
DTH 000021642
(1) Thru September, 19SQ Actual Accounting (2) Thru October, I9o0
ABERDEEN AU'i'IICM?! "ATIONFS REPORT
Ainu. Capita)
NO.
description
DATE
AUTll.
APPROVED AEE AMT.
(1) EXPENDED
TO DATE
(2) COMMITTED TO DATE
FINAL TOTAL EST. COST COMP.
UNDER (OVER) All'll!. AMT.
EST. EST, COMP. CEOS. DATE DATE
REMARKS
8395 Interplant Communications - Phase II 1/22/80
55,000
0 8,142 55,000
0 6/81 9/81 Equipment on order.
9010
Expense Centrifuge Rotor Repair
9/19/80
20,000
0 0 20,000
0 12/80 3/81 Repairs in progress
-15
DTH 000021643
PERSONNEL - J. L. Carter
EMPLOYMENT None
TO/FROM LEAVE OF ABSENCE None
TRANSFER/PROMOTION None
RETIREMENT None
TERMINATION None
OTHER During October there were five casual labor employees on payroll. Total hours worked were 868.
-16-
DTH 000021644
CONOCO CHEMICALS Aberdeen, Mississippi
October 1980__________
MONTHLY PERSONNEL REPORT
Salaried Employees Hourly Employees Total Employees Employees (Hourly)
78* 156 234
Minority Employees #
Salaried
6
Hourly
59
Total
65
0'0, 7.7%
38% 28%
New Employees Terminations
0 0
Hourly Min. Hired % Min. Hired
Hourly Min. Term. % Min. Term.
0 U 0 n
DEPARTMENTS
Warehouse Gen. Plant Maintenance Laboratory
PAR # EMPLOYEES MIN. EHP. - % MIN.
99
2 22%
10 11
4 36%
46 46
7 15%
22 20
3 15%
NEW HIRES YTD
00 04 00 00
TERM. YTD TURNOVER
00
0
YTD
0
02
0
16.6%
00
0
0
00
0
0
Compound 37 35
Vinvl
32 31
28 80% 0 0 0 3** 0 6% 12 39% 0 0 0 1 0 3%
Plasticizer
5
4
3 75% 0 0 0 0 0 0
Number of Applicants:
Month
92 Year to Date
208
APPLICANT BREAKDOWN:
If Minority
57
% Minority
# Female 21 % Female
52%
23%
*Includes three (3) temporary employees.
**Includes one (1) retirement and is not counted in turnover rates.
Hires (Hourly) :
Month 0______ Year to Date
4
Terminations (Hourly) :
Month 0______ Year to Date
6**
Overall Turnover
0
Projected Annual Turnover
3.2%
-17-
DTH 000021645
OVERTIME AND ABSENTEEISM
- 18-
<u
CO *3- vo ro
5-y 5-3
O VO
i4-> r--
OO <TJ
4- o O h-
o-3
0-3 S-S r>
r-
to vo sj- cm O cm
ro
ro!VO O CM 0000 o
<D
O
C
CD to
JtOo
to CD
<c C
oo
CO cn
5-3 oo
coo-3
oo
oo
_X
<_)
00
C\i
CD
O
X> rtj CD r--
o
o
to i-
to
3O c
o
o
o to CD
o
o
o
o
to CD
to 0
o3
0
co1
z
CD
o0 VO O O O 0 VO 0 oVO CM O to vo to r*. 0
10 VO p-- CO CO 0 00 0 cn
CM CM CD r-- 0 CM vo CM VD
CO <3- CD
^3-
CM
CD
E -a I- 0)
h- -J*:
0 to vo
0 10 O 0
0 10
oS_ to r-. r-~ LO I-- O 0 to h-
CD r-- 10 ro i_
0 tn CM VO CD CO
pv.
r-. co vo co
VO to CM O CO CO vo VO
vo VO
0 CO r-
p-. cn co
4S-J- O3
VO X
tCoD
S-
ro
CL CD O
CD VO 3
O
X
1--(D 4C-> CD i- 03
U >>
CD O
<--
cro
V_ o
N CO Ct.
C <D
<T3
3
O
io- o9-
J3 E
ro O
_J O > Cl
to
o
ro
s_ CO CD c Q. O O
c <0
CD
*foD CoL
x:
x >> 1- ro to *o
CD
sz +J
X
CD to
c
r- CD
i. _+CJ o
3
*o
co
c to
ro i-
>> O foO
S-
tO O JZ 3
CD
rC (D
CD
to
$3o
j*:
so-
2
J- *0 ra cr0
3
CD >1 CD rO
TD
CD -- CO
TO
o
2
o
c o
+J to
CD 3
3O *d -C
CD tro
S- CD
CD CD
> S-
O
CD
-o
_x
s_
3o
3
U
X
CD
CD
-3a
<D
CD
o>
<D >
ro O
QJ E
4-> I
CD CD >
O JrOO
CD
DTH 000021646
PROCESS ENGINEERING - R. A. Frohreich
A. Expansion Project
Basis of bids for the new railroad spur was issued to contractors. The second concrete package which includes the silos, slurry blend tanks, cooling towers, and initiator storage freezer was awarded and field work has begun. Concrete work is continuing in the CRD and V-ll reactor areas. Review of piping, electrical, and instrumentation layout continues. Preliminary layout of equipment and piping for chem wash system was reviewed and comments returned to CED.
B. Heat Recovery System
The revised class "A" design incorporating comments from the review meeting was issued. The project will be AFE'd upon completion of the cost estimate.
C. Emission Recovery System Compressor Problem
New casings were installed on the east compressor which improved performance. Process Engineering is also examining the cost versus the benefit of installing compensated seals.
D. Process Water Filter Replacement
A design to reduce filter replacement costs by the installation of a different type of water filter was issued.
E. Fire Protection Improvements - Phase III
A revised process design for this project is being prepared.
F. Kemp Air Dryer Modifications
The class "A" design to add coalescing filters, replace purge piping, upgrade wiring, and make other modifications in order to correct the dew point problem in the Kemp air dryers was issued.
G. VCM Tank Farm Revisions
The design to add liquid detectors, a VCM knockout pot, and made other modifications in the VCM unloading area was issued and a review meeting was held.
H. Fixed Point Monitoring Data Computer and Warning Lights
Process Engineering issued a report for CCD giving detailed requirements for the operation of the data computer.
-19-
DTH 000021647
PROCESS ENGINEERING - (continued)
I. Hot Water Charge Pump Problem
Process Engineering has determined that the main cause of hot water charge pump failure is improper suction piping. A sketch showing proper suction piping configuration was given to operations. The possibility that the pumps might also be experiencing some cavation is being investigated.
J. Resin Reclaim
A revised process design incorporating comments from CED and PED is being prepared.
K. Rotary Dryer Insulation
A report evaluating potential energy savings from insulating various sections of the rotary dryers was issued. An AFE request for insulating the uninsulated portion of the dryers was submitted.
L. Plasticizer Initiator Handling
The Class "A" design to improve plasticizer initiator handling is underway.
M. Reactor Drum Storage Areas
The design to provide a curbed drum storage area for each reactor module is being prepared.
N. Resin Silo Aeration
The class "A" design to provide additional aeration in the Series 600 resin silos was issued.
O. RVCM Receiver High Level Alarms
The class "A" design for this project is being prepared.
P. Line III Mill Temperature Control
An evaluation on the temperature control scheme of the Line III mill was made. A letter was issued on the condition of the existing heating system.
t20-
DTH 000021648
ENVIRONMENTAL - V. E. Messick
Particulates
Two dryers were tested for particulates in October.
Water
All effluent parameters were within NPDES limitations in October.
NPDES Laboratory Performance Evaluation samples were received, analyzed, and the information was transmitted to the EPA contractor.
A meeting was held with the State Bureau of Pollution Control to discuss waste water limitations for the renewal of the plant's NPDES permit.
VCM
A comprehensive leak survey of all piping and equipment in VCM service has begun. Areas with higher than normal VCM concentration are being reported to operations for corrective action.
Hazardous Waste Management
A visit was made to the Chemical Waste Management disposal site in Alabama. The RCRA permit application for treatment, storage, and disposal of hazardous wastes is being reviewed prior to submittal.
-21-
DTH 000021649
Flow GPM
Jan. - Ave. Max.
810 941
Feb. - Ave. Max.
645 802
Mar. - Ave. Max.
595 743
Apr. - Ave. 628 Max. 877
May - Ave.' 304 Max. 480
June - Ave. 670 Max. 804
' July - Ave. 696 Max. 813
Aug. - Ave. 698 Max. 753
Sept. - Ave. 679 Max. 767
Oct. - Ave. 956 Max. 1066
Nov. - Ave. Max.
Dec. - Ave. Max.
TABLE I
-WATER COMPLIANCE WITH
NPDES PERMIT PARAMETERS
BOD PPM LB./DY.
COD PPM LB./DY.
Sus. Solids PPM LB./DY.
Diss. O2
43 131
436 1342
86 851 216 2214
11 103 13 143
6.8-8.5
6 42 8 56
29 220 36 314
21 147 30 232
15 116 24 171
66 502 95 828
54 378 67 519
10 79 13 125
11 74 14 94
12 86 13 129
6.7-7.9 6.6-8.3
6.4-8.3
16 69 32 184
6 49 11 84
53 197 74 426
40 316 51 367
10 40 14 81
12 98 15 145
6.7-7.3 6.7-7.3
14 112 19 145
7 56 9 70
5 42 7 64
9 110 17 217
39 322 78 597
32 270 42 380
22 168 27 248
27 316 45 576
11 88
14 no
15 126 24 187
7 44 14 89
7 78 11 119
6.6-7.3 6.5-6.9 6.2-6.7 5.9-7.3
NPDES - Ave. Max.
32 387 43 520
1390 1940
- 605 - 909
> 6.0
> *-- i
-n
00
Ph
7.7-8.0 7.1-7.8
7.5-8.4 7.2-7.9 7.5-7.9 7.3-8.0 7.6-7.9 6.5-7.9 7.6-8.0
6.0-8.5
-22-
dtH 000021650
ENERGY CONSERVATION - V. L. Thornhill
I. Plant Operations
Total energy consumption for October was 112.5 MMM BTUs. The energy consumption per pound of product decreased from 3215 BTU/lb. to 3066 BTU/lb.
11. Plant Energy Conservation Program
Steam Leaks
Forty-six (46) steam leaks were repaired in October.
Boiler Economizers
Installation of economizers on two of the plant's three boilers was completed in October, with the installation of the third economizer to be completed in November.
-23-
DTH 000021651
ITEM
ENERGY CONSERVATION DATA 1979
1980
Production, MM Lbs.
Resin Dry Blend
Compound
Plasticizer
TOTAL
Natural Gas
Consumption, MSCF Conversion, BTU/SCF Energy Consumption, MMM BTU
Electricity
Consumption, MM KWH Conversion, BTU/KWH Energy Consumption, MMM BTU
Propane
Consumption, M Gal. Conversion, BTU/Gal. Energy Consumption, MMM BTU
Total
Energy Consumption, MMM BTU Energy Consumption , BTU/Lb.
Boiler Operating Data
No. 1 No. 2 No. 3
Avg. Stack Temp.
1979
1980
365 392 404 483 407 406
28,8 5,4 3,4 0.9
38,5
56582 1020
57.714
5.0496 10000 50.496
0,601 92000
.055
108.265 2812
26.5 4.2 4.8 1.2
36.7
57964 1020
59,123
5.3398 10000 53.398
0 92000
0
112.521 3066
Avg. % Excess Air
1979
1980
27 22 26 24 27 31
-24-
DTH 000021652
LABORATORY - R. D. Jackson
CUSTOMER COMPLAINTS Customer
Product
Complaint
Report By
Kaiser Aluminum Packard Electric World of Plastics
34641 Blk. 34533 Nat.
5385
Undispersed material
Poor processing Resin streamers
RDJ RDJ CRM
WAIVERES RECEIVED Date Identification
Product
Complaint
Reason
Waived By
10/7 10/3
iCONX 45705 iCust. Truck
5385 VRP
Charlotte Pipe Heritage
Particle size EKL
Color
Customer
PRODUCT 1DEVELOPMENT & SERVICE
Amount
Ship Date
Product
(Lbs.)
Customer
Requested By
10/1/80
18031 CLBL50
50
PMS
10/1/80
14431 CLBL50
50
PMS
10/1/80
15041 CLBL50
50
PMS
10/1/80
16851 CLBL50
50
PMS
MAS MAS MAS MAS
10/7/80
5305
50 Amoco Chemicals
MAS
10/7/80 10/7/80 10/7/80
15041 CLBL50 34533 Natural 48562 Black
10 5 2
Conoco Inc. Conoco Inc. Conoco Inc.
ERC ERC ERC
10/7/80
5385-3
5 W. R. Grace Co,
MFM
10/8/80
5305
100 Dayco
-
10/8/80
34501 Black
5 Conoco Inc.
ADK
10/10/30
5385-3
50 General Binding Corp.
MFM
10/10/80
5305
50 Fritz Airfreight
JPM
10/14/80
VRP
1 gallon
Heritage International Inc.
WR
10/14/80 10/14/80
5385-1 5425
50 Electric Hose & Rubber Co. MFM 50 Electric Hose & Rubber Co. MFM
10/16/80 10/16/80
5385-1 5425
50 Sheller Globe 50 Sheller Globe
MFM MFM
10/22/80
5385-1
50 Fritz Airfreight -25-
JPM
DTH 000021653
LABORATORY - (continued)
PRODUCT DEVELOPMENT & SERVICE - (continued)
Amount
Ship Date
Product
(Lbs.)
Customer
Requested By
10/22/80
27121 Black
100
Standard Mirror
JTW
10/22/80
17461 Natural
50
Tafco Corp.
MFM
10/22/80
5465
10 Kalex Chemical Co.
RNG
10/22/80
5305
5 Wilson Products
RNG
10/24/80
27121 Natural
50
PMS Consolidated
MAS
10/27/80 10/27/80 10/27/80 10/27/80
5305 5385-1 5425 5465
50 Diamond Shamrock 50 Diamond Shamrock 50 Diamond Shamrock 50 Diamond Shamrock
JTW JTW JTW JTW
10/29/80
5305
50 Uniroyal Chemical Division NTH
Special Compound Testing
Complete specification tests were run on 2 samples of 36861 Natural for Western Electric, and selected critical tests were run on 2 other samples.
Oven aging tests were run on 2 shipments of 38601 to Phelps Dodge and one shipment of 35851. One shipment of 34641 to Kaiser was subjected to oven aging
tests.
Customer Color Samples
Sample plaques of 6 gray colors available in electrical compound were prepared and sent to Electri-Flex.
QUALITY CONTROL TESTING
Resin
Regular Samples = 403 Bag Samples = 53 Other In-Process Samples = 3020 Bulk Shipments = 202 (Railcars = 87; Trucks = 115)
Dry Blend
Blenders Produced = 452 Blenders Tested = 400 Blenders Adjusted = 12.4% Other In-Process Samples = 541 Bulk Shipments = 61 (Railcars = 4; Trucks = 57)
-26-
DTH 000021654
LABORATORY - (continued)
QUALITY CONTROL TESTING - (continued)
Compound
Blenders Produced = 737 Blenders Adjusted = 2.4% Line 5 Production = 71 skids; 0 boxes Other In-Process Samples = 573 Bulk Shipments = 24 (Railcars = 5; Trucks = 19)
Resin Heat Stability
Fifty two (52) lots of resin were tested for oven heat stability using the Metrastat oven.
5385 5425 5305 5465
20 lots 20 lots 10 lots
2 lots
Heat stabilities were acceptable, except for one sample of 5335 which was marginal.
RVCM of Shipments
A total of 159 shipment samples were tested for residual VCM in October None of the samples exceeded 10 ppm. A summary of this data is below.
Product
5305 5385 5425 5465 Dry Blend
Number of Samples Average RVCM, ppm
71 54 27 2.6 0.8 0.1
2 0,1
6 0.4
Inherent Viscosity
A total of 681 samples were analyzed for a daily average of 22 samples per day. All railcar shipments during October were tested for inherent viscosity.
Dry Blend Controls
Wei ex batches of 80273G and 80172B were prepared as quality control standards.
Raw Material Testing
Fifty-eight (58) lots of plant raw material were tested and released. One lot of Hydral 710 (hydrated alumina) and four lots of Thermaguard S (antimony oxide) were rejected for poor dispersion.
-27-
DTH 000021655
LABORATORY - (continued)
MISCELLANEOUS PROJECTS
Resin Volume Resistivity
Volume resistivity was measured on 4 recent samples of 5425 resin and 2 recent samples of 5465 resins. All the samples gave values that were equal to or better than the control.
Compound Property Verification
The compound property verification program is complete unless the plant should make additional compounds for the first time in 1980.
Residual VCM in Slurry
A total of 639 slurry samples were tested for RVCM. The overall average was 179 ppm. There were no days where the average exceeded 400 ppm.
RVCM of Blowdown Tanks
A total of 149 samples of blowdown tank water was tested for RVCM. The overall average was 4.7 ppm.
RVCM of 5305 Regular Samples
A total of 63 samples of 5305 taken from the regular QC drier samples were tested for RVCM. The overall average was 3.6 ppm.
Personnel Dosimetry
There were 94 analyses of VCM dosimeters reported to the Safety Department during October.
L & N Particle Size Tester
The startup of the L & N particle size tester is complete after many problems. Most of the startup problems were electronic which the L & N service people worked on. In addition we found several operation parameters which were much more critical than expected. One such item is lazer alignment. A test program to define the short term and long term precision is in progress. The precision study will be completed during November.
-28-
DTH 000021656
TRANSPORTATION - J. E. Stark
Shipment by Product - M/lbs.
October
Year-to-Date
Res i n Plasticizer Dry Blend Compound
Total
24742
83 4423 5566 34814
163464
729 22123 -326.58. 223974
Number of Shipment by Mode
R/C
O.T Bulk
O.T Van
Resin - Bulk
Package
Export
Platicizer
Dry Blend - Bulk
- Packaqe
- Export
Compound - Bulk
- Package
- Export
Other
- Antifreeze
- Alumina
Back Hauls for October
112 47 6
67
10 16
*
128 76
Number of Shipment by Month-Year-to-Date
5 37
10 13 31 11
107. 33
C.O.T.
1 1 1
'
c.c. 16
TOFC
1 3 1
3 19
CPU TOTAL
43 218 7 12 43 12
44 60 1 12 13 29
20 71 11
43 0 116 471 2 36
January
February March April May
June July August September October
R/C Bulk Van C.O.T. C.C TOFC CPU TOTAL
104 53
72
111 83
66
130 95
64
69 43
84
42 41
75
55 36 136
57 47
52
79 51
65
102 53
62
128 76 107
0 0 1 0 0 0 0 0 0 1
4 2 36 273 21 4 35 320
37 0 48 375 5 0 29 230 3 0 30 191 7 0 74 308 2 0 64 222
12 0 89 296 7 2 53 279
43 0 116 471
-29-
DTH 000021657
TRANSPORTATION - (continued)
Material Handling Report
M/Lbs.
T/L
Packaged Resin From Production Packaged Compound, Dry Blend From Production Transferred From Main to Prairie Transferred From Prairie to Prairie Reverse Transfer Resin to Plant Reverse Transfer Compound to Plant Shipment From Warehouses Special Packaging Transferred From Prairie to Main
2,470 4,415 2,187
0 769 203 5,427 2,471 2,389
61 109
54 0
19 5
134 61
__ M
TOTAL
20,331
502
Off-Grade In Storage
Material
M/Lbs.
T/L
Sifter Overflow Resin "BC" Resin "H" Mill Scrap Compound "B" Compound "H" Dry Blend "O.G."
519 3,983 1,735
183 930 114 110
13 98 43
5 23
3 ____ 2
TOTAL
7,574
187
D. F. Operation
Total packaged inventory for the month remained the same. Production for packaged compound and resin was up for the month, but shipments were high, therefore the inventory remained approximately the same. Export shipments were up for the month. Total shipments for the month was the highest this year.
-30-
DTH 000021658
\ LOCATION MAIN-East
TOTAL M SQ. FT.
48
Prairie 12-1 12-2
12-3
12 22
21
12-4 12-5
22 21
12-6
21
12-7 12-8 12-9
21 21 21
Total
209
CONOCO TRANSPORTATION
ABERDEEN WAREHOUSE
CONTENTS Compounds Dry Blend Export Resin Conoco Resin HOPE Resin Export Resin Conoco Export Resin
3 -6 2
1 -0 .5 .4
3 .0 .1 .3
3.6
Conoco.Resin Resin O.G. Mill Scraps Cmpd 0. G. Dry Blend 0. G. Sifter Overflow Resin 0. G. Compound Resin Raw Material Resin 0. G. Conoco
Conoco Resin Sub-Total (Plug-Aisles)
Total Conoco
4. 4
.2 1. 1
.1 .5 1- o .1 2- 6 .2 3. 0 4. 5 3. 7
ESTIMATED MM POUNDS ON FLOOR OPEN TOTAL
5. 3 .4
4.7 1.1
10.0 1.5
3.1 .4 3.5
* 3- 9 * 4-4
3.5 3.5
*2-9
2.5
2-9 3 -0 * 4-5
fi_ 3.5 . 5_ 3.5
3.5
3.7
Hr DTH 000021659
3.5 " 38,5 2.9
34,1 ____7,3__ . -a
ABERDEEN FIRST-AID CASES 12 MONTHS MOVING AVERAGE 50 45 Frequency = Total First Aid Cases X 1
Total Employees 40 35
30 25 20 15
10 5
0
DTH 000021660
ABERDEEN OSHA RECORDABLE INJURIES 12 MONTH MOVING AVERAGE
20
15
10
5
0 DTH 000021661
MONTHLY HOURLY TURNOVER
DTH 000021662
ENERGY USAGE
B TU /LB .
Monthly
12 Month Movin
DTH 000021663
Average
ABERDEEN PLANT PRODUCTION 1980
MM POUNDS CUMULATIVE
35 30 25 20 15
6
5 4 3
2 1
: 40 \ 35 6 l 30 5 i 25 4 3 2
1.
2
I
0
----------- actual ----------- CUMULATIVE
DTH 000021664
ABERDEEN PLANT QUALITY PERFORMANCE 1980
STANDARD 1.02
STANDARD 1.35
DTH 000021665
1.01
ABERDEEN PLANT EFFICIENCY 1980
POUNDS OF RAW MATERIAL/POUND OF PRODUCT
STANDARD 1.01960
STANDARD 1.01300
MONTHLY CUMULATIVE
DTH 000021666
ABERDEEN PLANT INVENTORIES
DTH 000021667