AM EVALUATION OF SIMULATED FIELD USE OF VARIOUS
c ASBESTOS-CONTAINING PACKING MATERIALS
STEPHEN W. CAMPBELL,CSP, CIH MAY 11, 1983
(
yonMg^c7as.o
JT
WLA the HARTFORD
> " ? I,
.TRACTION
A.W. CHESTERTON 30 INDUSTRIAL WAY WOBURN, MA 01801
LOSS CONT HO L DEPARTMENT ENVIRONMENTAL SCIENCES UNIT
On May 11, 1963 a aeriea of environnental testa were made at the A.W. Chesterton
Research Facility at 30 Industrial Way, Woburn, MA 01801. The purpose of the evaluation
was to monitor a simulation of the cutting, installation, and removal of
asbestos-containing packing materials. Packings for both valves and pumps were utilised
during the simulation.
The study was requested by David Lasnier, General Manager, A.W. Chesterton, and the
evaluation were conducted by Stephen W. Campbell, Certified Industrial Hygienist,
Hartford Insurance Group, Boston. Special thanks to Jack Santolucito and Bob Leduc for
their time and courtesy.
This report represents the conclusions, recosmendations, test methods and test m i of the data obtained on May 11, 1983. CONCLUSIONS 1. Airborne levels of asbestos measured during the simulation were all well below those
limits generally regarded as safe. The sample that was obtained for the entire monitoring period of all aix types of packing indicates levels of only 0.03 fibers per cc of asbestos. OSHA's legal limit for an 8-hour exposure to asbestos is 2.0 fibers per cc. 2. The simulation is deemed appropriate for the monitoring of the cutting and installation of asbestos containing packing materials. It should be noted that the removal of these packings from pumps and valves in field use may well pose a somewhat higher risk than that monitored.
! - i, ;-.vV
1. rtf.?*
.H -
owm swe-Tas-'o Jf
I JSESai THE HARTFORD
. A.W. CflESTFRTCN 30 INDUSTRIAL WAY WOBURN, MA 01801
LOSS C0NTRDI DEPARIMENT ENVIRONMENTAL SCIENCES UNIT
iv )e reason for the increased risk is associated with the deteriorated condition of
the packingi often experienced under normal veer end tear. The pecking removed
during the simulation ves relatively new end intact; thus, the likelihood of generating airborne fibers of asbestos was substantially reduced.
RECOMMENDATIONS
Normal field operations involving the removal, cutting and installation of asbestos
packing typically takes between 10-30 minutes. The variability is reportedly largely
dependent upon the difficulty in removing the worn asbestos containing packing from
valves or pumps. For test data to be truly meaningful, it is necessary to approximate
field conditions as closely as possible. What is necessary, then is to obtain samples
during removal of asbestos containing packing that has been "abused" under actual
conditions of use.
^ ( mentioned previously, the evaluation serves as a useful measure of employee
exposure to asbestos during the cutting and installation of asbestos containing
packings. Those values listed in the test results section of this report may well
understate the actual asiount of asbestos experienced by a field person during the
removal of worn packing from valves and pumps. Accordingly, the following recommendation is being submitted.
83-A In order to approximate more closely a real field situation, monitoring of
asbestos exposure to the removal of worn packing materials should be ;
simulated. If it is possible to provide for several types of packing
materials to be tested at one time, The Hartford's Loss Control Department
would very much like to conduct this type of testing again.
V
* . '.i a . . :< .
' J /toil
s' a:*!
1V
OPMt'wC73SO
Jf
THE HARTFORD
xeL METHODS
A.W. CHESTERTON 30 INDUSTRIAL WAY WOBURN, MA 01801
LOSS CONTROL DEPARTMENT ENVIRONMENTAL SCIENCES UNIT
The purpose of the study vss to approximate employee exposure to asbestos during
typieal field operations for the removal, cutting and installation of various packing
fA materials. A member of A.W. Chesterton's research staff at the Woburn facility assisted
by simulating these operations utilising 3 types of valve packings and 3 types of pump
packings. Each of these packing materials vas cut to length, installed in the
appropriate equipment, momentarily .brought np to normal operating conditions, and then
removed. The total time for this procedure involved approximately 10-18 minutes.
One sample vas taken during the entire procedure involving all 6 types of packing
materials. In addition another sample vas collected for each of the individual packing
materials to measure the exposure created by that one substance.
The entire sampling period involved 97 minutes comprised of 6 separate sampling ( ei ds ranging from 14-18 minutes each. All samples vere collected on millipore type
AA0.8 micron cellulose acetate filters mounted in 3 piece open faced caasettes attached
to the lapel of the operator. Air vas dravn through these filters vith the use of Mine
Safety Appliance Model G Vacuum Pumps set at flow rates spproximating 2.0 litres per
minute. Analysis of samples vas conducted by phase contrast microscopy. This technique
measures all fibrous material present on the filter and may tend to overstate the actual
presence of asbestos material.
Periodic calibration of all equipment and analysis of *11 samples takes place at The
Hartford's AIHA Accredited Laboratory in Hartford, Connecticut.
V
"Sir A?'
FOWMSWtTaS-P
A.V. CHESTERTON 30 INDUSTRIAL WAY WOBURN, MA 01801
LG35 CONTROL DEPARTMENT ENVIRONMENTAL SCIENCES UNIT
TEST RESULTS
All semples were collected on Jeck Sentolucito e he sinuleted the cutting,
instelle&on end reaovel of esbestos-conteining peeking. Semple #30 reoeined on hie
left lepel for the entire eempling period, wherees semples #31-37 were chenged with eech
etjle of pecking. The results obteined ere ell quite low end indicete exposures well
below those levels generelly regerded es sefe.
SAMPLE # 30 31 32
< 33 34 35 36
TOTAL TIME (HRS:MIH) 1:37 0:16 0:15 0:14 0:14 0:18 0:18
TOTAL VOLUME(L)
189 32 30 29 28 36 36
TOTAL FIBERS
6,000 43,000 43,000 43,000
7,000 3,000 3,000
FIBERS/ce 0.03
4 0.09 4 0.09 4.0.09
0.25 0.08 0.08
STYLE PACKING All listed below
Velve 1000 Velve 1500 Velve 5010 Pump 1722 Whitelon Pump 320 Blueon* Pump 330
OSHA's 8-hour legal limit ACGIH TLV - Chrysotile ACGIH TLV - Amosite ACGIH TLV - Crocidolite
2.0
2.0 0.5
-
0.2
* Most likely conteins crocidolite, wherees ell others most likely contein chrysotile esbestos.
V
* l'- >.
:i > * ..-*-.-si*s. *. ..**i*V.AfiTb- *y t*" v..
>0HIP,tM-73i0
THE HARTFORD
A.*?. CHESTfcRTCN 30 INDUSTRIAL WAY WOBURN, MA 01801
LOSS CONTROL OE^AMtoENT ENVIRONMENTAL SCIENCES UNIT
Hopefully this report has been of assistance to you in your attempt to aseess the exposure to airborne asbestos contamination. Respectfully submitted.
Stephen W. Campbell, CSP, CIH Certified Industrial Hygienist StfC/ea
(
Y
Mr. David Lasnler, General Manager A&. Chesterton 9 Forbes Street Woburn, MA 01801
RE: Loss Control Service A-690
THE HARTFORD
Boaton Regional ORleo Two Center Plaza Boston. Massachusetts 02108 Telephone: <617) 726-7400
t
Dear Dave:
This letter will confirm my visit with Bob LeDuc at Chesterton's Woburn Research Plant on August 30, 1983.
As in the past, purpose of the visit was to collect asbestos samples during the
removal of packing material from pumps operating under field, conditions. The
need for this sampling vas documented during previous monitoring when it was
decided that to approximate actual operating conditions, sampling would be
necessary during removal of
packing materials. This latest attempt at
determining airborne concentrations of asbestos fiber Involved removal of
"product A" that had run for approximately 100 hours during a field test
situation. As can be seen from the results listed below, no measurable amount
of fiber was detected during the samples, and all results indicate exposure
concentrations of less than 0.1 fibers per cc of air.
Jack Santolucito and the area to. his left (approximately 6" to the left side of the shaft) at the height of the pump were monitored on 8/30/83 during removal of 5 pieces of "product A" packing that had run for approximately 100 hours in a field simulated test. The pump was repacked with "product B".
Name/Area
# Total Time Volume (L) (minutes)
Jack Santolucito Area to left
1 2
15 15
30 30
OSHA's permissible exposure limit OSHA's administrative action level
Fibers
Fibers/cc
< 3,000 < 3,000
< 0.1 < 0.1
2.0 0.1
^ a an haaed upon observations or information available at the time of aurvays which may not discover an hazards. We cannot warrant - -<y. health or compliance with any rule or regulation. We can only assist you In Mulling your responsibility In controlling accidents.
form 8RE-67M
Leas Control Department
Hartford Firs Insurance Company and Its AflSatM Hartford Plaza. Hartford. Comacttcut 06116
Mr. David Laanier rage 2 November 7, 1983
The .significance of this test is simply that concentrations of asbestos fiber* If present at all* exist at levels below OSHA's administrative action point* and therefore do not constitute s significant threat to health. Future measureqpnts will necessarily need to be made utilising other materials and under different conditions* and these results will be reported later.
Hopefully this latest attempt has been of assistance to you in your effort to evaluate exposure to airborne asbestos fiber.
Stephen W. Campbell*C.S.P.* C.I.H. Certified Industrial Hygienist
cc: Horst Berhoth* Plant Engineer A.W. Chesterton 9 Forbes Street Woburn* MA 01801
Gregory Smith* Personnel Manager A.W. Chesterton 9 Forbes Street Woburn* MA 01801
Frank Boccelli, Insurance Manager A.W. Chesterton Middlesex Industrial Park Stoneham* MA 02180
Edward Bonaccorso* Assistant Vice President Corroon and Black 99 High Street Boston* MA 02110
SWC:mha
r
>CWM6Wt-735-0
Jr ( THE HARTFORD
4
A. V. CKLSXtF.ION
COMMERCE WAY WOBURN, MA
LOSS CONTROL DEPARTMENT ENVIRONMENTAL SCIENCES UNIT
EVALUATION OF AIRBORNE ASBESTOS DURING CUTTING, REMOVAL, AND PACKING
OF PUMPS
STEPHEN W. CAMPBELL, CSP, CIH JUNE 23, 1983 JUNE 28, 1983
i
'* it'
INTRODUCTION As result of a previous study and recommendations made at that time, another 'Jt
evaluation of the simulated use of asbestos containing packing materials was conducted st the A* W. Chesterton plant in Woburn, HA< This latest study involved two sets of samples collected on June 23, 1983 and June 28, 1983* The first set involved strictly cutting of four types of asbestos containing packing material for a total of 63 pieces during a period lasting approximately one hour. The second sampling occurred several days later when a pump containing asbestos packing was dismantled, the packing removed, new packing cut, and installed. This procedure lasted only 17 minutes. The survey was conducted by Stephen W. Campbell, Certified Industrial Hygienist, The Hartford Insurance Group, Boston, MA. Special thanks to Jack Santoluccito, Bob LeDuc, and Victor DiDonato
r ieir time and courtesy.
.
This report represents the conclusions, discussion of findings, test methods and test results of the data obtained on June 23 and 28, 1983.
CONCLUSIONS All samples collected during the cutting, removal, and repacking of asbestos
containing packing materials demonstrate airborne levels of fiber well below those levels generally regarded as safe. In fact, levels.were so low that no measurable amount of fiber was able to be detected during the sampling period.
To provide an even more realistic assessment of this simulated exposure, additional tests should be performed during the removal of asbestos containing packing materials from pumps that have run for an extended period of time. Necessarily, such an approach vi-l) 'e ongoing by its nature, and will undoubtedly encompass a period involving several ~
v_.
Months.
>oM$i>twe X
( !& THE HARTFORD 71
A. V. CHESTERTON COMMERCE WAY WOBURN, MA
LOSS CONTROL DEPARTMENT ENVIRONMENTAL SCIENCES UNIT
DISCUSSION OF FINDINGS Testing conducted on June 23, 1983 involved essentially a blind test. Simply this
means that the material cut was known only to the operator and the tester by the code letters A, B, C, and D. In an attempt to obtain as long a sample as possible, and to approximate the absolute "worst case condition", the operator cut packing rings from each of these materials for periods of approximately 14-15 minutes. Depending upon the type of material, the amount available, and the ease of use, between 13-20 rings were cut from each of the unknown samples.
On June 28, 1983 a very brief sampling period was chosen since the operator merely had to remove the packing from a pump that had been run for a period of 14 hours._ The removal procedure lasted approximately 10 minutes, following which the operator cut new ( -i end installed them back into the pump again. This procedure approximates a more
realistic assessment of the typical conditions faced in the field. Since the pump was only run for a period of 14 hours, the deterioration of the gaskets was not significant. Consequently, additional testing in the future will hopefully measure exposures found under more severe conditions of use.
TEST METHODS As in the past asbestos samples were collected by placing a three piece open face
cassette onto the lapel of the operator during the processes described. Samples were collected in the three piece open face cassette on a millipore type AA, pore sice 0.8 micron, 37 millimeter filter* Air was drawn through this apparatus with the use of a Mine Safety Appliance Model G Vacuum Pump operating at a flow rate of 2.0 liters per
i' ^.e for the times indicated in the test results section.
FfeNM SWi-735 0
r
THE HARTFORD
A. V. CHESTERTON COMMERCE WAY WOBURN, MA
LOSS CONTROL DEPARTMENT ENVIRONMENTAL SCIENCES UNIT
In one instance the sampler was placed in an area extremely close to the stuffing box of the pump during the removal of asbestos containing packing material.
Analysis of all samples and the periodic calibration of the vacuum pumps takes place at The Hartford's AIHA Accredited Laboratory in Hartford, Connecticut. Analysis involved the counting of fibers via a phase contrast microscopy technique.
TEST RESULTS - ASBESTOS
All samples were collected on Jack Santoluccito during cutting of 5/16 inch or 10mm
packing while cutting on a 50mm shaft on June 23, 1983. To simulate worst case
conditions numerous cuts of aeh type of packing were made and the entire procedure
lasted 57 minutes and involved 65 cuts of various packing.
SAMPLE #
TYPE PACKING
TOTAL TIME (HRS:MIN) VOLUME(L) FIBERS FIBERS/CC
TOTAL CUTS
1
A, B, C & D
0:53
106
3000
40.03
65
2
A
0:15
30 ^3000 40.10
20
3
B
0:14
28 43000 40.11
13
4
c.
0:14
28 43000 40.11
14
5
D
0:14
28
43000
4o.ii
18
OSHA -- 6 Hour Time-Weighted Average Permissible Exposure Limit 2.0 Fibers/cc
The next series of samples were taken during the removal of A. W. Chesterton Model 2022 3/8 inch packing with a model 1722 end ring from a pump that had run for 14 hours, following removal of the six rings and the end ring another series of rings were cut and the pump was again packed for a future test.
0V>M SHE 735-0
THE HARTFORD
A- W. CHESTERTON
COMMERCE WAY WOBURN, MA
LOSS CONTROL DEPARTMENT ENVIRONMENTAL SCIENCES UNIT
This activity took place on June 28, 1983 and the entire procedure lasted 17 minutes.
Samples ^ere taken on Jack Santoluccito and to the left side of the drive end of the
Z
pump stuffing box.
LOCATION Jack
SAMPLE 6
TOTAL TIME (HRS:MIN)
0:17
VOLUME(L) 34
FIBERS 43000
FIBERS/CC 4?.09
Area
7
0:17
34
43000
0.09
Hopefully this information has been of assistance to you in your attempt to evaluate
field exposures to asbestos containing packing material.
Respectfully submitted,
wtepuen W. Campbell, CSP, CIH
J
Certified Industrial Hygienist
SWC/ea
0DATE: November 10, 1986
Ref. No.2179
OVM 00 VMRS or twonut WOC BDWtCC
T0 Richie Dyment
O A. W. Chesterton Co.
from l.b. Maglin SUBJECT STYLE 1500 TESTING
D Chesterton International. Inc.
Attached are the results of two samples taken on October 8, 1986. This testing is the ongoing study of our asbestos products, to make sure no respirable fiber is generated when the material is cut according to directions. Testing was done using personnel and engineering samples. Results were below the current OSHA Limit of 0.2 fiber/cc.
As we discussed* all products listed on our MSDS's must be tested.
MSDSH
Styles Involved
Done
1003 1011
1012 1016 1017 1018 1020 1022 1023 1029 1032 1033 1043 1044 1050
Style 64
210,211,225,235 260,270,281,285 240,250,290 315,1715 Style 320 322,1722,2011,2022 Style 326 330,1730 Style 364-T 600S,600HO 1000,10000 Style 1500 Style 2500 Style 5010 Asbestos Gasket for Flat Glass
X
Only one style in each MSDS must be done.
Please relay the test results to J. Williamson and call if you have any questions in this, matter.
Lawr
iglin, CSM
Sr. ital, Health &
das
Safe _
lator
Attachment
cc John Gaucher Dick Hoyle L. Loreth
Creg Smith
a *
MIDDLESEX INDUSTRIAL PARK - ROUTE 93. STONE HAM. MASS. 02180 U.U Ml
LABORATORY ANALYSIS REPCRT
Client: A.W. dESTOKlUl eo.
Task Number: 86101612
Location: WCBUFN PLANT
Job Number: G6025 Date Sampled: 08-OCT-1986
PO Number: 49717 RED.05220
FIBER COUtTT
NIOSH 239
Saitple ID Lab ID VDL (ai*)
i*
W7B A-3980-A 024280 110,940
FIB/FILTER FIEERS/CH
<7000
<0.06
W79 A-3976-A D24281 110,720
<7000
<0.06
N80 A-3989-A D24282 NA
<7000
NA
Field sanpling was not performed by GALSCN. GALSCN presents analytical results based on sanpling data provided by the Clients.
(<) - Less Than (>) - Greater Than bR Not Applicable ND - Not detectable NS - Not specified
Method(s): NIOSH 239 Footnotes:
Submitted by: U v improved by: Date: 31-OCT-1986
tege 1 of 1
y
r
WE: May 4, 1987
CHESTERTON
OWDMOO VMM or WORLD WIOC tBMCS
TO: Linda Loreth FROM: L.B. Maglin SUBJECT: * ASBESTOS TESTING ON PACKING PRODUCTS
0 A. W. Chesterton Co. Q Chesterton International, Inc.
Summary
As you are aware, on June 20, 1986 The Occupational Health & Safety Administration (OSHA) published its final rule on Occupational Exposure to Asbestos. This revised standard dropped the Permissible Exposure Limit (PEL) for 8-hour employee exposure for asbestos, tremilite, anthrophyllite, and actinolite
to a level of 0.2 fiber/cc, (with 0.1 fiber/cc as the new action limit).
This required product retesting on our part for our products, because of the disclaimer we make on our Material Safety Data Sheets.
The purpose of this evaluation was to monitor the cutting, installation, and removal of asbestos containing packing materials.
Discussion
1. All the samples tested were well below the OSHA PEL. The
samples obtained for 9 styles of packing indicates levels of <0.04-<0.06 fibers/cc of asbestos. 2. It should be noted that these tests were done under ideal conditions, with packing being installed according to Chesterton procedures, (packing done by Steve Flanagan), which may not be the case in the field. Also, the material which was used was relatively new and intact; thus, the likelihood of generating airborne fibers of asbestos was low.
3. As the results clearly show, our disclaimer is a true statement as far as our testing demonstrates.
Test Conditions
1 Samples were'tested by NIOSH Method #239, using Millipore
* MAWP037A0, pore size 0.8u, with DuPont Alpha-1 pumps set at flow rates of - 1850 cc/min or Niosh 7400, using Millipore MRWP025AC, pore size 1.2u using same pumps.
2. Samples were taken for 60 min., and approximately 1-6 installations and removals were done in that time for each style.
3. Engineering Samples were run approximately 6" away from the valve being packed. Personnel samples were run in conjunction with the engineering samples.
* MIDDLESEX INDUSTRIAL PARK - ROUTE S3, STONEHAM, MASS. 02180 U. S. A.
5* A. W. OMCSTERYoN COMPANY
t l t[
t
4. Each packing material was cut to length, installed in the appropriate equipment, brought up to normal operating conditions, and then removed.
5. Analysis of samples was done by Galson Technical Services, Inc. - by phase contrast microscopy.
Test Results
NIOSH No.
Sample No.
Style Pking
Personnel/ Fibers/ Engineering cc
Sampling Int/
Time
Remov
239 T-l 239 T-2 239 T-3 239 T-4 239 T-5
239 T-6 239 T-7
239 T-8
1715 1715 322 322 320
320 1000 1000
P
<0.06
60 min.
1
E
<0.06
60 min.
1
P
<0.06
60 min.
1
E
<0.06
60 min.
1
P
<0.06
60 min.
3
E
<0.06
60 min.
3
P
<0.06
60 min.
3
E
<0.06
60 min.
3
7400 7400 7400 7400 7400 7400 7400 7400 .7400
T-12 T-l 3 T-14 T-15 T-17
T-18 T-19 T-20 T-21
1500 1500 326 326 Ambient Air 5010 5010
330 330
P E P E E P E P
E
<0.04 <0.18* <0.04 <0.04 <0.03 <0.04 <0.04 <0.04
<0.04
60 min. 15 min. 60 min. 60 min. 90 min. 60 min. 60 min. 60 min. 60 min.
6 2 5 5
--
7 7 6 6
OSHA PEL (Legal Limit)
0.2
ACGIH (American Conference of
Governmental Industrial Hygienists Chrysolite Crocidolite Amosite
2 0.2 0.5
* Due to low sampling time.
References
Threshold Limit Values and Biological Exposure Indices for 1966-1987 American Conference of Governmental Industrial Hygienists
Federal Register Vol. 51, No. 119, Friday, June 20, 1986 22612-22790
NIOSH MANUAL of Analytical Methods, Method 7400, Issued 2/15/84, Revised 5/15/85
Chesterton Environmental Log #1, Winchester 1,2
LBM/das
3> Lawrence B. Ma$lJLn, CSM
ec A.W. Chesterton,.J. Gaucher, C. Howe c. Moreno. K. O'Brien. G. Smith
EXHIBIT