EPA Region 10 Enforcement and Compliance Assurance Division INSPECTION REPORT
Inspection Entry Date/Time Inspection Exit Date/Time Weather Media Statute(s)/Program(s) Type of Inspection
02/16/2023 09:08 AM (PT) 02/16/2023 11:00 AM (PT) Sunny, 45F Water Clean Water Act, NPDES, Industrial Industrial Stormwater Inspection
Announced: No Access: Granted
Permittee Name Facility or Site Name Facility/Site Physical Address City, State, Zip Code County/Borough/Parish Facility GPS Coordinates Mailing Address City, State, Zip Code
Interstate Concrete and Asphalt Interstate Concrete and Asphalt - Richland Facility 2505 Robertson Drive Richland, WA 99352 Benton County 46.321889, -119.288002 P.O. Box 3366 Spokane, Washington 99220-3366
FRS ID Permit Number NAICS
ORT9663738365
WAG505182
212321 - Construction Sand and Gravel Mining 327320 - Ready-Mix Concrete Manufacturing 327390 - Other Concrete Product Manufacturing
Lead Inspector:
RAYMOND ANDREWS Date: 2023.04.11 07:44:07 -07'00' Digitally signed by RAYMOND ANDREWS
Raymond Andrews
EPA Region 10
andrews.raymond@epa.gov
(206) 553-4252
Supervisor Review:
PETER CONTRERAS Date: 2023.04.11 09:59:20 -07'00' Digitally signed by PETER CONTRERAS
Peter Contreras
EPA Region 10
contreras.peter@epa.gov
(206) 553-6708
Page 1 of 8
Interstate Concrete and Asphalt - Richland Facility WAG505182
SECTION I - INTRODUCTION
Site Entry and Inspection Objectives
I arrived at the Interstate Concrete and Asphalt - Richland site (the "Site" or "Facility") for an unannounced inspection. I presented my inspector credentials to Jana McDonald and informed her I was there to determine compliance with the Clean Water Act (CWA) and the Washington Department of Ecology's (WDOE) Sand and Gravel General Permit. This report is based on information and documentation supplied by Interstate Concrete and Asphalt and direct observations made during the inspection. In addition, information gathered prior to or after the inspection from a review of EPA, State, and/or public records may be included in this report.
Attendees:
Organization Attendee Name
Title
EPA Region 10 Raymond Andrews
Lead Inspector
CRH Americas Materials, Inc.
CRH Americas Materials, Inc
CRH Americas Materials, Inc
Jana McDonald Environmental Manager
Kelby Johnson Ready Mix General Manager
Jimmie Roper
Ready Mix Site Superintendent
Present in Opening Conf.
Yes Yes
Yes
Yes
Present in Closing Conf.
Yes No
No
No
Site Information:
Responsible Official
What is the principal product generated? Type of Operation
Mike McBreen, Vice President, michael.mcbreen@na.crh.com The principal product produced is concrete.
The raw material, i.e., sand and gravel, required to produce concrete is quarried onsite.
The quarried materials are then sent to the Wash Plant to be separated into its different components.
Most of the quarried material is used as inputs to make concrete but some is sold on the retail market.
Size of Facility Outfalls?
Parameters monitored?
Concrete produced at the facility is primarily sold on the retail market; however, some is made into other products such as ecology blocks.
227 acres
No outfalls are identified in the Site Management Plan (SMP) or Site map; however, there is an outfall identified as 001 in the Notice of Intent for permit coverage renewal dated September 29, 2020.
The facility is only required to monitor pH, which is monitored in-house. The pH meter is calibrated prior to each use and the calibration buffer solutions are within their expiration dates.
Page 2 of 8
SECTION II - OBSERVATIONS
Interstate Concrete and Asphalt - Richland Facility WAG505182
We walked the production portion first, and then drove to the back of the property where sand and gravel quarrying operations occurred (Photos 1 & 2) as needed to acquire more raw materials for production. At the time of my visit to the quarry area, minimal activity was on-going.
Photo 1/P1010587 - Quarry Area, facing north
Photo 2/P1010588 - Quarry Side Wall, facing east
In the production area, there were gravel and sand piles located around the site. The topography of the site appeared to be graded slightly down towards the north (Photo 3). On the northern perimeter of the property is a berm that helps keep any stormwater on-site (Photo 4). The northern perimeter berm is a remnant from when the front area was quarried.
Page 3 of 8
Interstate Concrete and Asphalt - Richland Facility WAG505182
Photo 3/P1010578 - Gravel Piles, site graded down to north
Photo 4/P1010580 - Gravel Piles, berm to north As I stated in "Site Information" above, the quarried material is sent to a Wash Plant. The Wash Plant discharges wastewater into a gulley where it infiltrates (Photos 5 - 7).
Page 4 of 8
Interstate Concrete and Asphalt - Richland Facility WAG505182
Discharge Pipe from Wash Plant
Photo 5/P1010581 - Discharge from Wash Plant, photo 1
Photo 6/P1010582 - Discharge from Wash Plant, photo 2
Page 5 of 8
Interstate Concrete and Asphalt - Richland Facility WAG505182
Photo 7/P1010583 - Discharge from Wash Plant, photo 3 The site also maintains a truck washing area (Photo 8). The trucks pull into chutes which are part of a closed loop water recycling system. The water used to wash the trucks runs to the rear of the chute and enters a concrete pond that collects the water (Photo 9). Water enters the pond from the washing chutes via passthrough holes at the bottom of the diving wall.
Pass-through Holes
Photo 8/P1010585 - Truck Wash Area
Page 6 of 8
Interstate Concrete and Asphalt - Richland Facility WAG505182
Pass-through Holes
Photo 9/P1010586 - Concrete Pond The facility tries to capture and reuse as much water as possible. All captured water is carried by underground piping that surfaces at the site's concrete reclamation settling pond (Photo 10). The sediment settles out and the water is siphoned out for reuse. The settling ponds are cleaned of sediment as needed.
Photo 10/ P1010586 - Concrete Reclamation Water Settling Pond
Page 7 of 8
SECTION III - RECORDS REVIEW
Interstate Concrete and Asphalt - Richland Facility WAG505182
I reviewed the following documents:
Notice of Intent (Renewal) - dated September 29, 2020
Site Management Plan (SMP) - dated October 15, 2018
SMP Site Map - dated 2018
Discharge Monitoring Reports (DMRs) - February 2022 through January 2023
EPA's Integrated Compliance Information System - January 1, 2018 through February 28, 2023
SECTION IV - AREA OF CONCERN
AOC Reference #: RA1-RR-001
Records Review: Facility Map
Regulation and/or Permit Requirement S5.D.2.b of the Permit states, the site map must "show the drainage area for each point."
AOC: The Richland site map did not show the drainage area for each monitoring point.
AOC Reference #: RA1-RR-002
Records Review: Facility Map
Regulation and/or Permit Requirement
S5.D.2.d of the Permit states, the site map must "label whether the discharge is to surface water or groundwater."
AOC: The Richland site map did not label if stormwater discharges to surface water or groundwater.
AOC Reference #: RA1-RR-004
Records Review: Other - Site Management Plan
Regulation and/or Permit Requirement
S5.D.2.a of the Permit states, in part, the site map must "assign a unique identifier up to four characters (e.g. S001, S002, etc.) to each outfall and monitoring point."
AOC: The Site Management Plan (SMP), dated October 15, 2018, identifies two stormwater sample location, i.e., monitoring points, labeled SW1 and SW2. The SMP does not indicate a discharge point or outfall. The Notice of Intent (NOI) renewal application lists four monitoring points, i.e., sampling locations, labeled MP2 - MP5. The NOI identifies a single outfall as 001. The facility site map shows four monitoring points, labeled MP1 MP4. The site map does not show a discharge point.
SECTION V - CLOSING CONFERENCE
I conducted a closing conference with facility personnel. During the closing conference, I discussed observations made during the inspection. I informed the attendees my observations and Areas of Concern have not been evaluated for a formal compliance determination.
SECTION VI - LIST OF APPENDICES 1. Photo Log
Page 8 of 8
APPENDIX 1: PHOTO LOG
P1010578 - Gravel Piles, site graded down to north P1010579 - Gravel Piles, berm to north, in distance P1010580 - Gravel Piles, berm to north, close-up P1010581 - Discharge from Wash Plant, photo 1 P1010582 - Discharge from Wash Plant, photo 2 P1010583 - Discharge from Wash Plant, photo 3 P1010584 - Concrete Pond P1010585 - Truck Wash Area P1010586 - Concrete Reclamation Water Settling Pond P1010587 - Quarry Area, facing north P1010588 - Quarry Side Wall, facing east