Document jy1kjOEo1dYBwzBXx70vd4GXp

I ', ' . ' CONFIDENT)AC INTRODUCTION i MANUFACTURE t WASTE ABATEMENT IN AROCLOR PRODUCTION I. Chlorination! The flrt step In the manufacture of Aroclor compound6 la the chlorination Of biphenyl to the desired level (i.e. 1242 - 42% Cl2, 1254 - 54% Cl2 etc.). Biphenyl is charged into a cylindrical tower (chlorinator) and chlorine is fed to the reaction mass until the desired chlorine content is reached. During this chlorination step, HC1 gas is evolved and passes through a Brink misteliminator to knock out initial entrainment before pooling in which Aroclor vapors are condensed and removed in a collection tank for recharging to the chlorinators. As the NCI gas exits the collection tank, it again pastes through a prink mist eliminator for a second stage of entrainment removal. The BC1 gas then passes to a.knock-out tank which Is packed with coke at a third stage of ftroclor removal and then passes through a third mist-eliminator St the outlet Of the knockout tank. (Knockout tank, coke and third mist eliminator installed on Phase I). HC1 gat is then piped to an acid absorber where it Is absorbed in water. The resulting acid solution then'passes through a coalescing unit (liquid-liquid .separator installed on Phase I) which reduces level of organics which has Condensed out after absorption. The acid stream then is passed through carbon * - towers which adsorb solubilised organics in the prodUict acid. The acid is then passed through filters to remove any carbon flees which are picked up in ' the carbon towers. The product acid is then pumped to storage from which it it sold. Occasionally, due to.tank car shortage, storage tanks are full and acid must be sewered. Any gas which makes its way through tha absorber i drowned by a water jet and sent to the process sewer. This sewered scid then passes through the process sewer where it is directed to one of the two limestone pits (second pit installed on Phase I) for neutralisation. HONS 056611 \ CONFIDENTIAL i After neutralisation of all the HCl, the material passes through a settling changer (settling chambers Installed on Phase 1) where suspended solids ' (Inerts from limestone pit) are separated and carries adsorbed Aroclor out of solution with it. The clear water stream is then sent to Snow Creek. Phase II will iirprove coalescing and carbon tower removal with installation of an improved coalescer and will reduce flow of Aroclor containing water. Phase III will provide tertiary treatment of the water stream discharged to Snow Creek. . II. Air Blowing to remove residual Cl^ And HCl gast ' After completion of the chlorination step, the material is pumped to a horisontal tank where it is air blown to remove Clj and residual.JHC1 These gases are drowned using a water jet and are routed to the prooess sewer. This water passes through the Aroclor department sump (Installed - Phase 1) prior to going to the limestone pit for neutralisation. Any Aroclor which is sntrained in this water or any Aroclor second phase is trapped in the Aroclor department ' sump. Phase XI inoludes plans to recirculate this water to reduce net outflow to sump, neutralisation and final treatment. III. Distillationt ' After air-blowing the chlorinated mass is transferred to the still, where any HCl is neutralised with lime. This material is then distilled rising heat and vacuum. Vacuum for the distillation step is provided by multi-stage steam . jets. The steam from these jets is condensed and sent to the Aroclor depart ment sump. Phase XI includes plans for indirect rather than direct condensers on these jets to reduce net water outflow from the department. Product Aroclor is transferred to storage tanks for later loading out in tank cars, tank trucks, or drums. Phase II -Includes plans to pave and curb all KONS 056612 areas subject to Aroclor spills so that any spilled material is contained. Phase 1 has already provided curbing In the drumming area and pump drains, and drip pans to oollect any small leaks from piping systems. *! HONS 056613