Document jpRXJjY96o7b83RLKQ5p9ExQ
To: B . Coopersmith
Location: From: Location: Extension:
NA H. C. Gaffney MCG
Subject: MONTHLY REPORT Reference:
Date: Copy to:
August 31, 1984
R. F. Anderson J . F. Daly J. S . Druzbacky R. L. Johnson F. F. Loffelman S. M. Lustig C. G. Neumann
I. SAFETY & HEALTH
A. The plant has operated 4643 days (thru 8/30) without a disabling injury.
B. There were no recordable injuries during this period Y.T.D. I.E.A. is 5.6.
C. The latest blood lead levels for 25 employees (all but office personnel) are:
AUG.
LAST
6 Mos . Average
50 ug Pb/ 100 grams blood or above 40 - 49 below 40 % below 50 Average
0 8 17 100% 36
0 12 13 100% 37
2 9 14 9 2% 38
PRODUCTION & SHIPMENTS
Budgeted Rate
Stabilizers Litharge
Plant total
SHIPMENTS k pounds
Stabilizers Litharge
NA 839 REV. 4-82
4-82
ACTUAL EST. AUG. SEPT.
EST. Oct.
132 88 136 100
134 92
117 136
123
790 450 0 20
600 20
CYWl 1-000171
2
III. INVENTORY
END OF JULY' END OF AUGUST END OF SEPT. END OF OCT
k$ DOS k$
DOS k$
DOS k?
DOS
Finished Goods
203
18 231
33 220
24 230
27
Support Goods 353 31 316
45 280
31 220
26
Plant totals
556 49 547
78 510
55 450
53
DOS for August results from a sales forecast for September of only 420 k lbs.
IV. TECHNICAL
.A. EXTRUDATES
The 6" Extructor arrived at the plant On 8/3/84 and was running by 8/7/84 . All four grades of extrudate have now been run successfully at rates from 200 - 240 lbs/ PHR for Phthalate to 450 - 500 Ibs/PHR for Sulfate and Carbonate.
The system is now being fine - tuned to optimize through put, physical quality of extrudate and ease of operation.
Technical data for a sales brochure are being generated. All data other than retention of Tensile and Elongation will be completed by 8/31/84. Retention of Tensile and Elongation will be run in Bridgewater.
Requests for new MSDS's have been initiated.
We firmly believe the Bepex Extructor is the machine for producing stranded material and have recommended purchase of two units .
B. PPG
PPG has run salt spray on Cyastab 40 lots 261 - 264. These lots had low oil absorption (12 - 13) and predominantly 4-2-1- crystal form (63 - 85%). They were all found to have excellent salt spray resistance. This would seem to in dicate that oil absorption, and not crystal form, is the critical factor.
The Technical Review in Allison Park, Pa is on hold. PPG research people there are doing some further rechecking of their results.
CYWI 1-000172
TECHNICAL (continued)
-3-
C. TENNECO
The sample of Tribase - oiled has been received.
D. ETHYL / GEORGIA - PACIFIC
A new supply of Masterbatch has been received. It was sent to Chicago, however, and will have to be sent on to Bridgewater .
E. COMPLAINTS
There was one new complaint this month (PA 84-20, Kalex). This was the fault of the trucker.
The YTD total is now 11, broken down as follows:
Quality
2
Shipping - Fault of trucker
3
Not justified
5
Development problem (PPG)
1
GENERAL
A. LEAD - Amax and St. Joe, altho on strike, have been able to ship lead so we will be covered for the balance of the year.
Lead price now at 28 - 30C with the latest metals week average at 28.4$ a lb.
B. VISITORS
R. Anderson - Wayne - Extrudate trials K. Davis & W. Schulz - Bridgewater - Warehousing at Chicago F. Fuchs - OSHA - Regional office and Mr. Suwarte top ranking
official of the Indonesian Safety & Health Dept, toured our plant to see how an effective "STAR" plant was controlled.
R. Heilman - W. Barclay - WI - CRIS program & Job review
C. Prelie - WI
1985 Budget
C. Personnel
Salary 12 Hourly 16
one/ two per week on vacation one/ two per week on vacation
CYWI 1-000173
4 V. GENERAL (continued)
C. PERSONNEL (continued) If the new Cyastab 1000 Series product line takes off we
will probably hire two more hourly. D. We have been notified that'effective September 1st. we will assume the inventory & shipments of the Rubber Processing & Chemical Dept Factice products. E. Dryer trials for Lead Sulfates and Phthalates have been put on hold until a decision is reached regarding extrudate production
H. C. Gaffney
CYW I-OOOI74