Document jmvwNnJDEO7Raojd4xrD7q1RZ

PLAINTIFF'S EXHIBIT J, - Mr. C. W. Adair Mr. S. D. Weaver September 8, 1972 OSHA Expenditures Attached ia the expected expenditures to comply vith OSHA regulations per your letter of June 27, 1972, and Paul Allemang's of June 22, 1972. SDW/bgb Attachments 2 S. D. Weaver CAPCO JEN 0004-392 CC EE MM EE NN TT ASBESTOS PRODUCTS COMPANY Van Buren, Arkansas Cf,/s//l. TO: FROM: S. D. Weaver Fred L. Gerth, Jr. fate August 30, 1972 SUBJECT: OSHA Regulations In compliance with your letter of June 29/ 1972, I submit the attached list of corrective measures to be taken to conform with OSHA regulations. Attachment FLG:mbo cc: P. Cooper Fred X.. Gerth, J CAPCO JEN 0004393 Corrective Measures for OSHA August 30, 1972 PVC .1 Move Extruder Drive Outside .2 Move PVC Grinder Outside or System $1,000.00 Enclosed 750.00 3. Exhaust Pan over Blending System 550.00 4. Guards on Heat Units, Shafts, Pulleys, etc. 500.00 .5. Color Code Air, Hydraulic Water and Gas Lines 6 Storage Rack for PVC Scrap 100.00 350.00 .7. Storage Bin for Regrind 8 Wiring in'Conduit or Special Wiring 650.00 -500.00 9. Fire Fighting Equipment 300.00 TOTAL $4,700.00 1. 2. 3. 4. 5. 6. .7. 8 .9. 10 A/C Pipe Machine Modify Bucket Elevator to Eliminate Fiber Exposure $1,000.00 to $10,000 Guards on Shafts, Pulleys, Couplings, Munson Mixer Trunion Rollers, Drive on Stripper, Chain Drive-End of Secondary Oven, etc. 1,000.00 Shot Blaster - Doors 3.000.00 Stripper 750.00 Buffers on Autoclave Manual Blow Down Sump on Automatic Blow Down Color Code Air, Hydraulic, Gas and Water Line Wiring in Conduit or Special Wiring Vacuum for Cleaning 150.00 2.000.00 200.00 1,000.00 1,000.00 Fire Fighting Equipment 500.00 TOTAL $10,600.00 to 19,600.00 A/C Finishing 1. Dust Collection 2. Guard on Shafts, Pulleys, Couplings, etc. 3. Wiring in Conduit 4. Fire Fighting Equipment 5. Vacuums 6. Housing for Hydrotester and Pump System $3,000.00 750.00 1,000.00 750.00 1,000.00 6,000.00 CAPCO JEN 0004-394 -2- A/C Finishing Cont. 7. 8. 9. 10. 11. Pork Lift - Safety Equipment Drainage Ditch from Special Pitting, Coupling Tester and Hydro Tester Area to Main Drain Regrind System Encased or Moved Outside Color Code Air, Gas, Hydraulic, Water Lines Fire Wall Enclosing Diesel Tank TOTAL General 1. Medical Supplies 2. Safety Poster Signs 3. Ear Plugs 4. Noise Monitoring Equipment 5. Dust Monitoring Equipment 6. Water Monitoring Equipment TOTAL GRAND TOTAL August 30, 1972 1,200.00 ,750.00 8 000.00 300.00 2,000.00 $24,750.00 3,000.00 $3,000.00 $43,050.00 to $52,050.00 CAPCO JEN 0004395