Document jmvkG54OE6EKoB9X4g27xLQ8y

TECHNICAL SERVICE REPORT THE EVALUATION OF ASBESTOS T-135 AS A PARTIAL REPLACEMENT FOR TITANIUM DI'OXrDE AMD for Consolidated Papers, Inc. Wisconsin Rapids, Wisconsin September 9, 1968 by G. L. Dickson Group Manager - W,, L. Carrick Project No. 443-Nil October 1, 1968 UNION CARBIDE CORPORATION Chemicals 8 Plastics Research and Development Department Niagara Falls, New York 14302 A 17 22 4 SUBJECT This report covers the initial evaluation of Asbestos T-155 as a partial replacement for titanium dioxide and Hi-Sil (50/50 combina tion) by Consolidated Papers, Inc., Wisconsin Rapids, Wisconsin on September 9, 1968-- The objective of this mill trial was to determine the conpatibility of Asbestos T-135 in their system and its effects on production quality, .WAk RESULTS Asbestos T-135 was evaluated on this mill's No, 11 machine dur ing th* production of 50-1/2 lb. coating-base stock- Approximately 21 T-135 was substituted for an equivalent amount of titanium dioxide and Hi-Sil for a period of three hours. During this time, no opera tional problems were encountered and production specifications were maintained. An increase in wire retention and lower saveall losses were observed while asbestos was present in the system. It is expected that an extended machine trial will be performed after their technical group has completed a test survey on converted production samples (coated and calendered): DISCUSSION As the primary objective of this machine trial was to evaluate the compatibility of Asbestos T-135 in their No- 11 machine svstem, no attempt was made at this time to determine the optimum amount of asbestos which can be used in their furnish. The trial consisted of substituting approximately 2% T-135 for the same amount of titanium dioxide-Hi-Si1 combination, following an expended period during which time their normal furnish was utilized. Prior to the introduction of Asbestos T-135 into the machine chest, the addition of their normal opacifiers was discontinued. This was done so that the transition period between the pre-trial control and trial proper would be held to a minimum. Asbestos was then added as a slurry for a period of about 3 hours, Following the production of two reels of paper con taining asbestos, which were to be used in part for testing, thev again reverted to their normal furnish. No problems with machine operations were encountered during these times, and production quality, as reflected by the test results contained in Table II, was maintained, A wet-end sampling program was carried out by their technical group during the trial and post trial period. These samples were sub sequently analyzed by our Niagara Falls laboratory- The obtained analytical data and calculated retention values based on these results are presented in Tables I -111 - Because of the paucity of samples, tli data are not as informative as might be desired, The results-indieat h 1722b tD It- that during the trial tray water and saveall effluent solids decreased,, This increase in retention is also borne out by the calculated retention figures presented in Table III. No explanation can be given for the increase in saveall influent solids during this time however, as it would seem that they should be lower because of the lower tray water solids. One other inconsistency which is evident is the presence of 2.401 Asbestos T-135 in the "after refining" sample. The intended T-135 addition level was 2%, as this was the amount of Ti02/Hi-Sil which was also removed from the furnish. By actual "bag count," the calculated addition level of T-135, based on their production rate, was equal to 1.9%. CONCLUSIONS The results of this trial demonstrated that Asbestos T-135 should be acceptable as a component in this mill's white paper furnishes. Providing their evaluation of coated and calendered samples is success ful, it is recommended that a second trial be conducted so that more complete information regarding furnish savings and optimum pigment addition levels can be obtained. Our assistance in any way at that time has already been offered to their technical group. G. L. Dickson/bsn -2- *17226 Trial Control Trial Control Trial Control Trial Control Trial Control TABLE I Analyses of Wet-End Samples 1 Consistency % Ash After Refining % Ti02 3.20 3.36 13.33 12.82 1.65 2.45 Headbox 0.775 0.717 20.71 23,96 2.69 4.80 Tray Water 0.267 0.297 48.70 54.00 6.16 10.82 Saveall Influent 0.154 0.123 66.54 64.66 12.23 13.14 Saveall Effluent 0.0035 0.0049 25.38 38.33 5.97 9.68 % Asbestos T-135 2.40 0 2.96 0 6.70 0 4.31 0,31 3.30 1,79 A 17 227 TABLE II Analyses of Reel Samples Reel NOc_ % Ash 110904 13.68 110906 (Transition) 9.91 Average 11.80 110907 110908 110909 110910 Average 12.42 12.46 12.09 11.60 12.14 % TiO, 1.68 1.42 1.55 1.28 1.11 1.10 1.12 1.15 * Asbestos T-135 0 0 0 1.97 2.28 2.16 1.79 2.05 BrightL 85.6 85.6 85.6 85.2 85.6 84.9 85.2 85.2 Opacit 92,2 91.3 91.8 93.5 93.5 93.0 92.0 93.0 TABLE III Calculated Retention I Single Pass: l-(ConcTray/ConcHeadbox) x 100 %$ * Ash TiOz Asbestos T-135 Trial Control 18.8 6.6 21.1 6.6 22.0 - II Saveall Efficiency: l(ConcEffluent/ConcInluent) x 100 Trial Control % Total Solids 97,7 96.0 % Ash 99.1 97.6 * Ti02 98.1 97. 1 l Asbestos T 98.3 - A 1 7228 UNION CARBIDE CORPORATION MINING & METALS DIVISION MILL TRIAL DATA SHEET I. COMPANY LOCATION AND DATE OF TRIAlP0^s?l,i,d^t,f.^., II. COMPANY REPRESENTATIVES AND TITLES September 9, 1968 * Wise. Rapids , Wise. Rich Wilhelm: Process Engineer________________ __________________________ ill. UCC pppppspntativpr B K Barton 6 G, L. Dickson IV. TRIAL OBJECTIVES (In order of impoftnnri*) Evaluation of Asbestos T-135 as a____ replacement for TiO?/Hi*Sil combination (50/50) V. PRODUCT IDENTIFICATION Type of Product_____ Coating Base StockCoated Yes/RJ* Grade NameSheet offset Basis Weight------ 5,0.* 1/2__Lh-__ (25x38*500J Daily Production8D-.t.OXLSIK /hour 6 t 7QQ Total Daily Production of Mill350 tnn^ {Tissue and Board) No. of Plysz VI. MACHINE DESCRIPTION Type of MachineFourdr-inier, pressurized headbox, Dandv roll Machine No--------------- LJ(Cylinder) No. of Cylinders=_s Machine Speed__7.Q.Q__FPM______ (Tissue) Reel Speedin (Tissue) % Crepe-------------=nWire Mesh=n Wire Width----------------------nnMachine Trimnn Size Press------ HjQXizonta]CalendersSingle 1 A 1.7229 DISTRIBUTION LIST / Messrs. B. K. Barton L. D. Berger W. L. Carrick F. D. Dexter/ N. J. Setter G L. Dickson B. D. Dobbs T. Dougherty T. J. Hall P. G, Horecka G. E. Kuehn Re T. Larkin J, K. Marshall J. S. McReynolds R. A. Miller Ge J. Norberg Ee J. O'Keeffe T. R. Orme A. E. Pufahl (2) J. A, Riddle// J. L. Myers r H. Bo Rhodes R. T. Scott J, Sidlovsky J. H. Stevens Ft Ho Thompson Ro Mo Tong J. Ft Volt F, Jo Welch Miss. J Ulrey Chicago New York Bound Brook New York New York Niagara Falls Cincinnati New York Brussels, Belgium Chicago Detroit Seattle Charlotte Houston Atlanta Charlotte Dallas Los Angeles New York King City King City Niagara Falls Detroit New York New York Niagara Falls New York New York South Charleston Bound Brook t1723C / Mr, B, K, Barton [4) 13300 West Radisson Dr, New Berlin, Wise? 53151 October 2, 1968 See Attached Distribution Consolidated Papers, Inc? Wisconsin Rapids, Wise, Asbestos T-135 Mill Trial The attached report contains the results of the T-135 evalua tion at Consolidated Papers on September 9,, As of this time, we have received no word from them regarding the outcome of their test pro gram on coated samples made from paper produced during the trial. If these results are favorable, it should be expected that they will make a more extensive run with T-135 in the near future. Although we offered our assistance in such a case, it may not be necessary for us to attend as Rich Wilhelm should be able to operate the repulper him self. Also, even though the main interest of this trial was to deter mine the compatibility of T-135 in their system and to check its effect on machine production, it should be worth while discussing with them the increase in retention which resulted. We did not get a great deal of information on this, but the indications are that wire retention and saveall efficiency were greatly improved. GLD/bsn Attach, A 17 22 3