MONTHLY REPORT
Summary
SEPTEMBER 1970 AROCLOR WASTES
CONFIDENTIAL Read and destroy
Current Laval
Aroclor loaees during September averaged 32#/day. (2600 ppb) .
Fluctuation of losses occurred and were csused byi
1. Die old limestone pit was overloaded with and discharged solids containing PCB.
2. Use of detergent to clean the Aroclor depart ment resulted in emulsification and decreased efficiency of the department sump.
3. Variable sewering of Muriatic Acid which, at high rates, causes PCB carrythrough from old limestone pit.
4. The new limestone pit not discharging any PCB to the plant effluent.
Alabama Water Improvement Comnlsslon Contacts
Contacts with AWIC Technical Staff were made to arrange to discuss program and results. Illness of staff members and press of other business prevented their meeting with us in September. We are now able to inform them that the new limestone pit was started up on September 23. To date the PCB level in this pit effluent has been from 0-3 ppb on five 24-hour composite samples (corresponding plant efflusnt was 90-240 ppb or 1.1-2.8 #/day). This supports the pre mise for interim action that Anniston's major discharge originated in the old limestone pit. Acid samples show that the new pit has neutralized loot of the HC1 which has been sent to the pit.
M0NS 033847
CONFIDENTIAL INFORMATION
'Ttitl dMVIMftt eoaialM caftfirfaattal InttnwttiaN wMch U Iks praparty of MaataaSm Company. Only that#
*ha daaumaat rala*a*t fa
My apthprtaad IndlyHaal'i rn4 tm know may ha utirtlU far him. Ths raaart most amt ha #nt awItMs tha Company vllhao* writtma appeal aatf
fha patharlMd roalplamf l accosMaMs (or Its safe leaping ascarptlng > athsrwita disclosing of Iti contents and far lh proper disposal. Tha docu
ment remains tha property at Measente Company end shall ha ratsraed within twe months to IH nether, escept epee special eatherlieMee to held
spins
2.
One drum of Therminol fell from a fork lift and broke open. Approxi mately one gallon entered the sewer, The rest was absorbed in the chat and was cleaned up.
Projects and Evaluations
The Pollution job status report is attached.
Data input for solid wastes containing PCB has been completed. A report will be published the first week in October.
Preliminary evaluation for removing spent carbon from the HC1 carbon towers without dumping into the sewer is in progress. Sewer relocation and sump revisions will be required.
Feasibility of pumping the limestone pit sludge will be determined in October test. This will reduce cost of periodic pit cleanout.
AFE 3605 was forwarded for approval to contain/decrease Aroclor department process leaks ($15,300 capital and $6,850 expense).
A test skimmer was installed in the Aroclor sump and has operated success fully in removing the built-up scum floating in the sump.
:kd Attachment
HONS 033848