Document jmZ3m02DE0eQv2g1OZgqbM2V2
JOINING AND METALS DIVISION
To (Nam*) Division Lotatioo
Mr. Paul W. McDaniel Medical Dept., 4th Floor New York, New York
Messrs:
R. J. Kronkhyte
F. H. Larrison, Jr.
W. C. Thurber y
P. 0. SOX K. KING CITY, CALIFORNIA 9^530
Personal air samples taken for June, 1975.
SUBJECT Ray Rodriquez Jimmy Vasauez Joe Villanueva Joe Pereira Richard Betancourt David Cruz
JOB CLASSIFICATION
AVERAGE SAMPLING TIME
TIME WEI AVE. +5 :
Main Press-Dryer Operator
60 min.
0.86
Shipping Forklift Operator
60 min.
0.64
Outside Operator
60 min. & 30 min. 2il0
RG-244 Wet Circuit Operator 60 min.
0.52
Main Bagger Operator
30 min.
4.10
RG-244 Bagger Operator
30 min.
4.74
E. Cn Maalangba^in
Quality Control Supervisor
/snip
Att:
June 23, 1975
Subject: Area: Conditions:
Ray Rodriquez - Press-Dryer Operator Main Press-Dryer Circuit Full operating conditions.
.
Time 9:30 A.M. - 10:30 A.M.
10:30 A.M. - 11:30 A.M. 11:30 A.M. - 12:30 P.M. 12:30 P.M. - 1:30 P.M.
1:30 P.M. - 2:30 P.M. 2:30 P.M. - 3:30 P.M.
Work Performed
Cleaned presses and occassionally checked or cleaned extruder
Same as above
Same as above, had 20 min. lunch break
Same as above, (Sample was dropped, possible contaiminate; not counted)
Same as above Same as above
Weighted Average:
Average +5 M/ML.
1.10 1.01 0.91
0.46 0.82
0.86
June 23, 1975
Subject: Area: Conditions:
Jimmy Vasauez - Shipping Forklift Operator Main Bagging and Product Storage area 1) Clear day with the wind started to blow at about
post noon time. 2) He wore a respirator.
Time 9:45 A.M. - 10:45 A.M.
10:45 A.M. - 11:45 A.M. 12:30 P.M. - 1:30 P.M.
1:30 P.M. - 2:30 P.M.
2:30 P.M. - 3:30 P.M.
Work Performed
Moved pallets from main bagging room to storage area; had 20 min. break
Same as above
Loaded pallets in trucks
Moved product from main bagging room and loaded in the trucks
Same as above
Average +5 M/ML.
0.64
0.58 0.52 0.54
0.90
Weighted Average:
0.64
t
.June 23, 1975
Subject: Area: Conditions:
Joe Villanueva - Outside Operator General Mill area. 1) Full operating conditions in the Mill. 2) He wore a respirator when loading ore to the feed
hopper, when working inside the main bagging room, and when working near incinerator.
Time 10:20 A.M. - 11:20 A.M.
11:20 A.M. - 12:20 P.M. 12:50 P.M. - 1:50 P.M.
1:50 P.M. - 2:20 P.M.
2:20 P.M. - 2:50 P.M. 2:50 P.M. - 3:20 P.M.
WORK PERFORMED
Average 5 M/ML.
Loaded ore to feed hopper, worked in the incinerator area, worked in the press area
1.45
Same as above
1.69
Worked in the bagging room; dumped incinerator ashes in the dump
(Sample heavily tarnished by ashes)
Worked in the bagging room and assisted in palletizing operation
2.88
Same as above
2.43
Same as above
2.04
Weighted Average:
2.10
June 24,1975
Subj ect: Area: Conditions:
Joe Pereira - RG-244 Wet Circuit Operator RG-244 Wet Circuit 1) Full operating conditions; 2) Clear day with approximately 15 m.p.h. wind, 3) He wore a respirator when inside the RG-244 bagging
room.
Time
Work Performed
Average 45 M/ML.
10:15 A.M. - 11:15 A.M.
Worked in the wet circuit; occassionally takes a sample to the lab.
0.56
11:30 A.M. - 12:30 P.M.
Same as above; took a dryer discharge sample 0.54
12:35 P.M. - 1:35 P.M.
Worked in the wet circuit; occassionally takes a sample to the lab.
0.51
1:40 P.M. - 2:40 P.M.
Same as above; took a dryer discharge sample 0.56
2:45 P.M. - 3:45 P.M.
Worked in the wet circuit
0.44
Weighted Average:
0.52
June 26, 1975
Subject:
Area: Conditions
Richard Betancourt - Main Bagger Operator Main Bagging Room 1) Bagging and palletizing SG-101 2) West door open; light wind 3) Light forklift traffic 4) Light wind 5) Accumulated product fines on the floor and bagging
system. 6) He wore a respirator.
Time 8:35 A.M. - 9:05 A.M, 9:10 A.M. - 9:40 A.M, 9:40 A.M. - 10:10 A.M, 10:10 A.M. - 10:40 A.M, 10:55 A.M. - 11:25 A.M. 11:25 A.M. - 11:55 A.M. 12:20 P.M. - 12:50 P.M. 12:50 P.M. _ 1:20 P.M.
Work Performed Drove a forklift and moved pallets Same as above Same as above Same as above Bagged Product Same as above Same as above Same as above
Average 45 M/ML.
4.76 4.50 4.24 3.77 4.37 4.42 .4.16 2.56
Weighted Average:
4.10
June 26, 1975
Subject: Area: Conditions:
Dav?'d Cruz - RG-244 Bagger Operator RG-244 Sagging Room 1) Bagging SX-24 2) Tow other men shrink-wrapping Super-Visbestos 3) North door open, light wind 4) Bagger dust collector not working due to some mechanical
problems. 5) He wore a respirator
Time 8:45 A.M. 9:15 A.M. 9:15 A.M. 9:45 A.M. 9:45 A.M. - 10:15 A.M. 10:15 A.M. - 10:45 A.M. 10:45 A.M. - 11:15 A.M.
11:15 A.M. - 11:45 A.M. 12:15 P.M. - 12:45 P.M. 12:45 P.M. - 1:15 P.M.
Work Performed
Bagged product; occassionally takes a sample to the lab.
Same as above; helped RG-wet circuit operator clean a press
Bagged product; occassionally takes a sample to the lab
Same as above
Same asabove; one mansweeping the floor after finishing shrink-wrapping of SuperVisbestos
Bagged product; occassionallytakes a sample to the lab
Same as Same as
above
t
above
Average 5 M/ML.
4.97
1.41
4.20
5.48 5.35
6.27
5.30 4.94
Weighted Average:
4.74