Document jmXDvL11jaGD6mJXGOk8vEQy
C. F. 'Buckley - VJGK
FROM (NAME ft LOCATION)
SUBJECT REFERENCE
TO
February 7, 1973
G. L. Bratsch
cc
V/. C. .Engma
Status - PCB Environmental
P. E. Keisler
Control Program
C-. A. Hippe.
P. B. Hodges - E1SF
A. E. Leisy/J. Grant
J. R. Savage - B2SL
W. R. Richard - T3A
E. E. Stewart
Starting this month the status of the PCB environmental control program will be reported by the environmental control group at WGK. This report for Feb. 1, 1973 follows the same format as earlier reports.
I. PCB Level in Sewers
January losses at 3.3 #/day from the operating
departments and the incinerator area are 837^
higher than in December. The V.Taste Treatment
influent losses of 12 {!/day is 1*107? higher than
last month but the loss in the effluent has *
remained low at 3 #/day. .
A. Aroclor Department. PCB losses from the department increased to 3-25 #/day from 1.63#/day last month. This reflects an l8#/day loss for 3 days due to a mist eliminator failure, however the current level appears to have risen to 3-*J#/day
' since air blowing had to be restarted because of corrosion problems.
B. Incinerator. Down all month and losses fell to 0.05 #/day.
C. Total Plant. Influent losses average 12#/day hov^ever
the individual samples show a peak at 5*l#/day
corresponding to a peak of 13 #/day from the
department. A subsequent peak at 21 #/day was
not related to a department loss. No conclusion
.
regarding background levels can be made from
January results.
.
D. Treatment Plant Effluent. This level of losses .... remained low at 3#/day spite of the higher influent
load. 3# day is equivalent to about 0.003 ppb in
the Mississippi River at average flow-and about
0.002 ppb at the present river level.
IN - 10 REV. 1/72
DSW 353186
STLCOPCB4085377
1.
f
''
J. R. Savage - B2SL Status - PCB Environmental Control Program
'
. Page 2 WGK 2/7/73
II. Project Status
Project 3972 - "Rework North Basin Sewer". Project completed during month. Essentially ' all flows which could contain PCB's are flowing through one source where the effluent flow rate is measured and a composite sample obtained for analysis.
Project 3956 - "Alteration to HC1 Distribution System", to eliminate possibility of sewering Dept. 246 HC1 off-gas. EDC 5/1/73.
Project 4438 - "Reduce Water Flow to Sewer". Estimate approved 1/24/73 $5000 Capital, $9000 Expense. Will not only permit water reduction as related to chemical treatment of plant waste stream, it will also permit elimination . of air blowing.
III. Program Status
Re Engman/Bratsch 4/24/72
1. HC1 Off-Gas
.
a. Aroclor - Continuing to coordinate production with chlorosulfonic acid
' production to minimize sewering off-gas at Dept. 246.
' b. Design in progress to "Install PCB Off-Gas Scrubber", $73000 capital, $5000 expense.
2. Blow Tank Off-Gas
Estimate approved to permit elimination of air ..... -blowing. See-above re project 4438.
3. Aroclor DepartmentCatch Basin
.
Project 3972 completed and put in service in January.
4. Incinerator Scrubber.
Mo work planned.
5. Incinerator Catch Basin '
No activity to reduce losses. Incinerator idle during January for repairs.
DSW 353187
STLCOPCB4085378
J. R.-Savage - B2SL Status - PCB Environmental Gontrol Program
Page 3 WGK 2/7/73
III. Program Status (Continued)
6. Rip Track Washes
No activity to reduce losses in January. Prom data at WTP Influent would Indicate possible losses from this area. To review in February.
' NGK Strategy
Plant strategy meeting to be held again when additional information is received from EPA with regard to Specifics or with regard to formulation of government effluent standards with regard to PCB's.
C. P. Buckley
dy
DSW 353188 STLCOPCB4085379
2 0 X 2 0 T O "T H E IN C H 4 6 1 2 4 0
7 K lO IN C H E fi
NADC IN U. S. A.
1 KEU TFEI. ft ESSER CO.