Document jmLmwBpmOGmMQ565zEKXNe3z5

Sauget, Illinois January 28, 1970 1970 AKOCLOR GROUP OBJECTIVES Messrs. G. L. Bratsch R. M. Blowers T. W. Dalton D. W. Jackson W. A. Kuhn - 0 J. J. Luecken C. B. Williams X. SAFETY <tva A. Objectives ----- ^ 1. Mo aerlous Injuries, for Dept. 246 and maintenance personnel in 246 area. 2. No disabling injuries for Dept, 246 and maintenance personnel In 246 area. 3. 0.75 minor injuries per man per year for Dept. 246 personnel. ' iSSV Three minor Injuries per year for all maintenance 5B1. personnel 5. Aft + Actions while In Dept. 246. ' EDC Responsible It. aluate need for sight glasses where they exist in preparation for 4/1 TSB/P'rba".------- plant wide change to Pres-Sure glasses. jf' Supply department data to with WGK Procedure L-4o. comply 4/1 Production 3- Use safety device and interlock Con- Production system Inspection frequency tin developed for department. ulng 4. Install addition to fume removal system. 7/1 TSD 5. Issue quarterly status for Safety 4/15 Production Audit. 6. Evaluate gas mask location/ 4/1 Safsty/ relocation to control room. Production 7. Install ramp for lime delivery to 2/1 Maintenance 2nd level. 8. Install concrete pad for fork lift 7/1 Mech.Design lime delivery. 9. Make safety evaluation of drum leanto. 1/1 Mech.Design 10. Review grounding of Equipment 4/1 Malnt./Prod. a. List equipment to be grounded 2/1 Malnt. /Prod. b. Implement grounding 4/1 Malnt. 11. Establish equipment preventive maintenance procedure(SIAM). 1/1 Malnt. 12. Extend elevator to 29 foot level. 5/1 Malnt. 13. Widen walkway around fume scrubber. 5/1 Malnt. 14. Complete repairs on ONA explosion Malnt. damage. 15- Install alerm in drums'in" station. 6/1 E4T MONS 034904 -2 - II. -QUALITY- .... - A. Objectives 1. Maintain 1969 Aroclor Quality Level q' a. Re8l8tlvlty(10:' OHM-CM) 1969 1248 1254 3021 19785 . b. Power Factor( at 60 Cx) 2.09 0.61 c. TCC(PPM) 0.15 0.52 2. Customer Complaints: <0.3/100 shipments (1969 Actual: 0.51/100 shipments) 3. Improve reproduceabllity of electrical analysis. B. Actions EDC Responsibility 1. Resolve status of new electrical 1/1 Laboratory analysis(dependent on lab air scrubber). 2. Determine reasons for and correct * TSD discrepancies between lab analysis and ln-llne Instrument indications of electrical properties. 3. Define effects of storage retention. 4. Derine quality degradation during * TSD * TSD loading; need for loading through Porocel. 5. Evaluate need for Isolated area for Laboratory Aroclor analytical work. 6. Improve maintenance of Aroclor quality Production In sampling bottles. (Dependent on Action No.l also). a. Sulfur treated bottles b. Bottles at constant temperature 7. Install facilities to blow the mix 5/1 Production tanks with nitrogen. 8. Operating procedures changed to Con- Production unload Pyranol cars with nitrogen. tin ulng 9. Install weather protection at loading 1/1 Mech. Design docks. 10. Alter piping to locate polishing 6/1 Production filters ahead of absorbers In #3 and #4 still systems. 11. Relocate gear meters to point in 6/1 Production process where maintenance costs will be decreased. 12. Complete tank car Inspection procedure. Con- Prod. tin ulng 13- Monitor quality of product and 3/1 TSD/Proi. chlorine during change to Ag Grade KC1. 14. Provide sales sample with necessary 4/1 Prod. Information for proper handling of Aroclor products. Dependent on accomplishment of Objective 3. HONS 034905 -3- III. CAPACITY A. Objectives 1. Meet 1970 sales forecast of 42M pounds Aroclore and 12M pounds Arocior blends. B. Actions . 1. Make Brodimatlc meters operable. 2. Publish MIP and Issue status periodically. . Demonstrate maximum capacity. . Insulate #7 storage tank. 5. Evaluate need for Improved mixing . facilities. 6 evaluate need for Increased loading rate of Pyranols. 7. Demonstrate use of filter in xylene mix drumming line. EDC Responslblllt 7/1 Prod. 2/1 TSD Qrt. Prod. 5/1 TSD 8/1 Prod./TSD 4/1 Production 2/1 Production IV. COST A. Directives 1. Mo negative variance from 1970 cost standard. 2. Mechanical expense not to exceed 1970 budget. . Overtime for Dept. 246 personnel - 8$. . Absenteeism for Dept. 246 - 3 ft 3. Mechanical overtime 4$ B. Actions 1. Complete and implement preventive maintenance list. EDC Responslblllt 371 Malht./Prod. 2. Install nevr pumps on #2 and #3 mix tanks. 6/1 Maint. 3. Annual physical inspection of ware house stock to reduce repackaging 6/i Production COBtB. 4. Set drum Inventory levels agreed on by 3/1 Production Production. Marketing and Production Planning. 5. Eliminate overtime on porter job. 6. Complete upgrading of control room. 7. Evaluate dismantling air dryers, o. Dismantle spiral heat exchanger. 9- Check asset run versus physical check of department. ?/i Production 4/1 Maintenance ?/l Production 4/1 Production 4/1 Production 10. Obtain credit for TCB and TTCB raw material mlscharges In 1969* 3/1 Purchasing 11. Determine maximum water content In steel-HCl systems to avoid corrosion 9/1 TSD In off-gas system. 12. List and evaluate needs on high repair coBt items. 2/1 Maintenance MONS 034906 -4 - YIELDS A. Objectives Biphenyl TCB TTCB TCP Coal I" $ 70 Std. $ 9 98 99 69 Act. 99.24 98.34 94.30 91.66 70 Act. B. Actions . X. Continue close surveillanceof blending procedures and raw material shipments. EDC Responsiblllt' Con- Proa tin ulng VI. PROCESS CONTROL A. Objectives 1. Improve operational control of the process. B. Actions 1. Identify key process .variables and Initiate control charts. 2. Prepare new operating Instructions. 3. Prepare Standard Manufacturing Process. 4. Complete Data Bank. . 3. Establish and Implement key variable audit. 6. Make pertinent process control data available to operators. KDC Responsiblllt; 4/1 Production 7/1 Production 12/1 Production 11/1 Prod./TSD 6/1 Prod./TSD 1/1 Production VII. POLLUTION A. Objectives 1. Reduce Aroclor losses to sewer from 130 pounds per day to 10 pounds per day from department. 2. Evaluate need to reduce HC1 air pollution. B. Actions . 1. Quantify process Material going to toxic dump. 2. Determine adequacy of drowning Jet. 3. Catch all wastes from drip pans and sample lines. 4. Modify piping on continuous blow tank to prevent accidental Aroclor losses to sewer. 5. Modify absorber relief lines to prevent Aroclor from reaching the sewer. 6. Design and Install a sewer basin to trap accidental Aroclor losses. 7. Establish two week PM on blow tank level control(discontinue with Item 4 completion). EDC Responsiblllt I7T Production 6/1 TSD 3/1 Production 5/1 Mech. Design 6/1 TSD 7/1 Mech.Design/ TSD 1/15 Maintenance HONS 034907 - 5- VII. POLLUTIONfCont'd.^ B. Actions . 6. Design and install a system to remove Aroclor entrained In HC1 routinely sewered through drowning jet. 9. Continue to monitor sewers to find sites and locations of Aroclor losses in plant. . EDO Responslblllt 1/1 TSD Con- Production tin Control ulng Group Members: V. P. Brawley T. N. Carrico Bob Eden R. M. Humphries K. A. Krull J. R. Kuster R. M. McCutchan HONS 034903