1970 AKOCLOR GROUP OBJECTIVES
Messrs.
G. L. Bratsch R. M. Blowers T. W. Dalton D. W. Jackson
W. A. Kuhn - 0 J. J. Luecken
C. B. Williams
X. SAFETY <tva
A. Objectives
----- ^ 1. Mo aerlous Injuries, for Dept. 246 and maintenance
personnel in 246 area.
2. No disabling injuries for Dept, 246 and maintenance
personnel In 246 area.
3. 0.75 minor injuries per man per year for Dept. 246
personnel.
'
iSSV Three minor Injuries per year for all maintenance
5B1.
personnel
5. Aft +
Actions
while
In
Dept.
246.
'
EDC Responsible It.
aluate need for sight glasses where they exist in preparation for
4/1 TSB/P'rba".-------
plant wide change to Pres-Sure
glasses.
jf'
Supply department data to with WGK Procedure L-4o.
comply
4/1 Production
3- Use safety device and interlock
Con- Production
system Inspection frequency
tin
developed for department.
ulng
4. Install addition to fume removal system.
7/1 TSD
5. Issue quarterly status for Safety
4/15 Production
Audit.
6. Evaluate gas mask location/
4/1 Safsty/
relocation to control room.
Production
7. Install ramp for lime delivery to
2/1 Maintenance
2nd level.
8. Install concrete pad for fork lift
7/1 Mech.Design
lime delivery.
9. Make safety evaluation of drum leanto.
1/1 Mech.Design
10. Review grounding of Equipment
4/1 Malnt./Prod.
a. List equipment to be grounded
2/1 Malnt. /Prod.
b. Implement grounding
4/1 Malnt.
11. Establish equipment preventive maintenance procedure(SIAM).
1/1 Malnt.
12. Extend elevator to 29 foot level.
5/1 Malnt.
13. Widen walkway around fume scrubber.
5/1 Malnt.
14. Complete repairs on ONA explosion
Malnt.
damage.
15- Install alerm in drums'in" station.
6/1 E4T
MONS 034904
-2 -
II. -QUALITY- .... -
A. Objectives
1. Maintain 1969 Aroclor Quality Level
q' a. Re8l8tlvlty(10:' OHM-CM)
1969 1248 1254 3021 19785
. b. Power Factor( at 60 Cx)
2.09 0.61
c. TCC(PPM)
0.15 0.52
2. Customer Complaints: <0.3/100 shipments
(1969 Actual: 0.51/100 shipments)
3. Improve reproduceabllity of electrical analysis.
B. Actions
EDC Responsibility
1. Resolve status of new electrical
1/1 Laboratory
analysis(dependent on lab air
scrubber).
2. Determine reasons for and correct
* TSD
discrepancies between lab analysis
and ln-llne Instrument indications
of electrical properties.
3. Define effects of storage retention. 4. Derine quality degradation during
* TSD * TSD
loading; need for loading through
Porocel.
5. Evaluate need for Isolated area for
Laboratory
Aroclor analytical work.
6. Improve maintenance of Aroclor quality
Production
In sampling bottles. (Dependent on
Action No.l also).
a. Sulfur treated bottles
b. Bottles at constant temperature
7. Install facilities to blow the mix
5/1 Production
tanks with nitrogen.
8. Operating procedures changed to
Con- Production
unload Pyranol cars with nitrogen.
tin
ulng
9. Install weather protection at loading 1/1 Mech. Design
docks.
10. Alter piping to locate polishing
6/1 Production
filters ahead of absorbers In #3 and
#4 still systems.
11. Relocate gear meters to point in
6/1 Production
process where maintenance costs will
be decreased.
12. Complete tank car Inspection procedure. Con- Prod.
tin
ulng
13- Monitor quality of product and
3/1 TSD/Proi.
chlorine during change to Ag Grade KC1.
14. Provide sales sample with necessary
4/1 Prod.
Information for proper handling of
Aroclor products.
Dependent on accomplishment of Objective 3.
HONS 034905
-3-
III. CAPACITY A. Objectives 1. Meet 1970 sales forecast of 42M pounds Aroclore and 12M pounds Arocior blends.
B. Actions .
1. Make Brodimatlc meters operable. 2. Publish MIP and Issue status
periodically. . Demonstrate maximum capacity. . Insulate #7 storage tank. 5. Evaluate need for Improved mixing
. facilities.
6 evaluate need for Increased loading rate of Pyranols.
7. Demonstrate use of filter in xylene mix drumming line.
EDC Responslblllt 7/1 Prod. 2/1 TSD
Qrt. Prod. 5/1 TSD 8/1 Prod./TSD
4/1 Production
2/1 Production
IV. COST A. Directives
1. Mo negative variance from 1970 cost standard. 2. Mechanical expense not to exceed 1970 budget.
. Overtime for Dept. 246 personnel - 8$. . Absenteeism for Dept. 246 - 3 ft 3. Mechanical overtime 4$
B. Actions
1. Complete and implement preventive maintenance list.
EDC Responslblllt 371 Malht./Prod.
2. Install nevr pumps on #2 and #3 mix tanks.
6/1 Maint.
3. Annual physical inspection of ware house stock to reduce repackaging
6/i Production
COBtB.
4. Set drum Inventory levels agreed on by 3/1 Production Production. Marketing and Production
Planning.
5. Eliminate overtime on porter job. 6. Complete upgrading of control room.
7. Evaluate dismantling air dryers, o. Dismantle spiral heat exchanger. 9- Check asset run versus physical
check of department.
?/i Production 4/1 Maintenance
?/l Production 4/1 Production 4/1 Production
10. Obtain credit for TCB and TTCB raw material mlscharges In 1969*
3/1 Purchasing
11. Determine maximum water content In steel-HCl systems to avoid corrosion
9/1 TSD
In off-gas system.
12. List and evaluate needs on high repair coBt items.
2/1 Maintenance
MONS 034906
-4 -
YIELDS A. Objectives
Biphenyl TCB TTCB TCP
Coal
I"
$
70 Std. $
9 98 99
69 Act. 99.24
98.34 94.30 91.66
70 Act.
B. Actions .
X. Continue close surveillanceof blending procedures and raw material shipments.
EDC Responsiblllt' Con- Proa tin
ulng
VI. PROCESS CONTROL A. Objectives
1. Improve operational control of the process.
B. Actions
1. Identify key process .variables and
Initiate control charts.
2. Prepare new operating Instructions.
3. Prepare Standard Manufacturing
Process.
4. Complete Data Bank.
.
3. Establish and Implement key variable
audit.
6. Make pertinent process control data
available to operators.
KDC Responsiblllt; 4/1 Production
7/1 Production 12/1 Production
11/1 Prod./TSD 6/1 Prod./TSD
1/1 Production
VII. POLLUTION A. Objectives 1. Reduce Aroclor losses to sewer from 130 pounds per day to 10 pounds per day from department. 2. Evaluate need to reduce HC1 air pollution.
B. Actions
. 1. Quantify process Material going to
toxic dump. 2. Determine adequacy of drowning Jet. 3. Catch all wastes from drip pans and
sample lines.
4. Modify piping on continuous blow tank to prevent accidental Aroclor losses
to sewer. 5. Modify absorber relief lines to
prevent Aroclor from reaching the sewer. 6. Design and Install a sewer basin to trap accidental Aroclor losses. 7. Establish two week PM on blow tank
level control(discontinue with Item 4 completion).
EDC Responsiblllt I7T Production 6/1 TSD 3/1 Production 5/1 Mech. Design
6/1 TSD
7/1 Mech.Design/ TSD
1/15 Maintenance
HONS 034907
- 5-
VII. POLLUTIONfCont'd.^ B. Actions
.
6. Design and install a system to
remove Aroclor entrained In HC1
routinely sewered through drowning
jet.
9. Continue to monitor sewers to find
sites and locations of Aroclor losses
in plant.
.
EDO Responslblllt 1/1 TSD
Con- Production tin Control ulng
Group Members:
V. P. Brawley T. N. Carrico
Bob Eden
R. M. Humphries K. A. Krull
J. R. Kuster R. M. McCutchan
HONS 034903