Document jmExZaenOo6zjbGkNVNOdMK75

WATER DISCHARGE TO SEWER AROCLOR DEPARTMENT LOCATION '#1 Still Jet APPROX. AMOUNT SUGGESTED ACTION DISCHARGE TO 20 GPM 1. Use the minimum water to con- New Sump Pit dense the steam. No. 1, 2, 3. Run water hot. Reinstall thermo meters in tails water line to allow operator to adjust. 2. No. A, No. 5 Jet. a) Adjust water to fiiiniinui.i with rotometer. Eliminate water to one condenser by b) Operating No. 5 Jet without the after condenser. Save 7 GPM. Allow steam to discharge to atmosphere (per W.E.Voss) 2. 02 Still Jet 20 GPM Same as 01 above New Sump Pit 3. 03 Still Jet 4. U Still Jet 5. #5 Still Jet 6. Sprinkler Valve 7. S&l Jets at Blow Tanks (2) 20 GPM 20 GPM 70 GPM 15 GPM 20 GPM Same as 01 above Same as 01 above Same as 01 above Issue MRO to repair water leak. Operate with minimum water. Suggest 10 psig and tag valves. New Sump Pit New Sump Pit New Sump Pit New Sump Pit 8. Aroclor 1268 Flaker 9. Aroclor Cooling Tower Water 2 GPM 30 GPM Issue MRO to repair leak in water line at union. Miller/E.G. Wright Make up water now tied open. Repair fan & overflow float. Floor-then to New Sump Pit Acid Sever 10. Sink in Aroclor Control Room -- Keep water valve closed when not using. Sump Pit 11. Chlorinator Cooling Coils when cooler plugged Shut down & repair cooler Sump Pit 12. Cooling Water on -Pumps Use minimum water. Sump Pit MQNS 076*00 WATER DISCHARGE TO SEWER MURIATIC ACID DEPT. LOCATION APPROX. AMOUNT SUGGESTED ACTION DISCHARGES TO 1. East Acid Loading Dock A GPM when water is on Keep water valve at sink closed when not using. Phosphoric Acid Sewer 2. West Acid Loading Dock A GPM Same as above Phosphoric Acid Sewer 3. Sink at Acid Plant 7 GPM when water is on Replace bad water valve and keep closed when not using. HC1 Sewer 4. Drowning Jets 100 GPM 2 Heil(by-pass HC1 line from chlors. f< line from tails tower. These jets are in scries. Enters large jet then to small jet.) Issue MRO to relocate pressure gauges in water line to downstream side of valves. Also chain operator for valves so that operator may adjust flow'. (If by-pass is not used one jet can handle HC1 from tails tower.) If by-pass roust be used then open water to second jet. HC1 Sewer 5. S&K Drowning Jet AO GPM (Fumes from stg. tanks) Issue MRO to replace bad water valve, also replace & relocate pressure gauge. Believe this may possibly be cut completely off wlen not air blowing.(See TSD section for piping alter ation to reduce HCl released when air blowing tank. HC1 Sewer 6. Acid leak at flange 10 GPM when Issue MRO to repair leak so under South carbon water is on that water hose can be re tower. moved. HCl Sever 7. Surge Tank Pump leakLng at seal 10 GPM when water is on Issue.MRO to repair leak so that water hose can be re moved. HC1 Sewer 8. Proposed Fume 10 (3PM Collection System (Long-Range Load ing docks and stg. tanks. . TSD Proposal - Hale and Etheredge HCl Sewer 9. Underground Spring 20 + GPM Phos.Acid Sewer Note; City water is.metered to acid dept. 200 (BPM at time of survey, (20 GPU for acid make water, 1A0 GPM for jets, A0 GPM waste.) *0NS 076401 WAREHOUSE & PACKAGING AREA 1. The water from this area now running into sanitary sever is estimated at 100 GPM, It is suggested that this water be piped into return line to cooling tower to save city water. (This is all city water from compressors, biphenyl flaker tank and pumps.) 2. Surface water running off bank, from Aroclor storage tank area, to railroad track at Aroclor loading dock enters a perforated underground pipe. Aroclor from spillage around docks can enter this pipe which drains into neutralization pit. Water also enters this underground pipe through two open drains along railroad track. A steel separator tank located west of neutralization pit has been installed to separate solids. MGNS 076402 BIPHENYL DEPARTMENT LOCATION APPROX, AMOUNT Benzene Storage Tank Pump West Tank Most surface water also goes to Acid ewer. 2 GPM Conversion Sampler 1 GPM #1 Decoking Pit Condensate Water 6 GPM 4. Hydrogen Compressor Cooling Water Tank 5 GPM SUGGESTED ACTION Faulkner DISCHARGE TO Acid Sewer Faulkner Faulkner Faulkner Descale compressor to eliminate waste water. Acid Sewer Acid Sewer Acid Sewer ' Many steam leaks in #1 #2 Biphenyl still rooms. Cooling water to sewer when operating. Repair before next OMP run. MGNS 076403 LOCATION 1. Cut off steam and water W-U PLANT APPROX. AMOUNT 2 0PH' SUGGESTED ACTION Faulkner DISCHARGE TO Phoa. Acid Sewer HONS 076404 CURRENT TSD. ARQCLOR AND HC1 WATER REDUCTION JOBS I. Loading docks and storage tonics fume collection system A. Net change - 15 to 25 gpm to acid sewer 100% of the time, plus 120 gpm 15% of the time,- instead of existing flow of 180 gpm 100% of the time. B. The job is being done by J. Etheredge TSD Job #1045 K. Hale Premise out by 9-2-70 AFE out by 9-9-70 XI. Aroclor Water Recycle A. Reduce flow from 250 gpm Co approximately 50 gpm. B. Two water recycle system (4 jets) a. Still jet water recycle (1 jet) b. Absorber water recycle (3 jets) C. Job by Jim Mattern Premise in circulation (8-31-70) XII. Acid Sewer Revision A. Three choices of operation a. Route 1IC1 effluent to Aroclor sump. b. Install sump in existing acid sewer. c. Install new acid sewer with sump. B. Job being done by Etheredge Premise by 9-7-70 C. This Job will also provide a system for keeping spent carbon from the HC1 carbon towers out of the acid sewer. V. Temporary Limestone Pit A. Divert Aroclor containing effluent through temporary pit while cleaning existing limestone pit. B. TSD and Maintenance. C. Start up by 9-11-70. HONS 076405 VI. Nlrnn Phosphoric Acid Pit Effluent A. neutralize and divert north. a. Efficient limestone pit to ph 5.2 max. b. NaOH to 5.7 ph. B. Neutralize anu divert to 36" storm sewer a. Efficient limestone pit to ph 5.2 max. b. NaOH to ph 5.7. C. Do nothing D. Send to city sewer at Niran E. Divert to a new acid sewer at 5th and Duncan and route to Snow Creek. F. Acetone - Optional Process 1. Cut down Niran residue to incinerator Thereby reducing water flow. G. A. McCarty K. Hale H. 200 gpm flow. MONS 076406