INDUSTRIAL HYGIENE REPORT TEXAS OPERATIONS
DOW CHEMICAL USA. AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY
TITLE:
FILE NUMBER: DATE ISSUED: PLANT CODE:
SA.3I16.flSa .
July 10, 1988 44680------------
EVALUATION OF CONTRACTOR EMPLOYEE EXPOSURES TO ASBESTQS-QURING REMOVAL OF PIPING WHILE DOING A HOT GAS PASS INSPECTION FOR THE CRIIJCAL TURBINE EQUIPMENT DEPARTMENT
Asbestos monitoring was conducted during the removal of pigtail piping and steam injection piping while doing a hot gas pass inspection on GT-33 turbine at Power 3, on January 16, 1989. Personal breathing zone samples were collected to determine potential exposures to asbestos. The asbestos removal was being done by contract maintenance employees working at Power 3, for the Critical Turbine Equipment department.
Potential asbestos exposures were well below the OSHA PEL of 0.2 fibers/cubic centimeters of air. Employees wore half face negative pressure respirators equipped with HEPA filters, disposable coveralls, and used a wetting method during the removal of the piping. The removal procedures followed the written guidelines in the Texas Operations Asbestos Handbook.
STOOI 5409
Distribution:
H.E. Aaron, B-413 C.K. Browdy, B-101 D.E. Cragar, B-101 J.R. Jones, B-2405 R.P. Shuman, B-101
G.W. Engdahl, 1803 Midland M.G. Swank, 1803 Midland *L.E. Lebeau, 1803 Midland *L.W. Rampy, 1830 Midland File
RESTRICTED FOR USE WITHIN THE DOW CHEMICAL COMPANY ONLY
V
IHS File B4-3116-ASB
EVALUATION OF CONTRACTOR EMPLOYEE EXPOSURES TO ASBESTOS DURING REMOVAL OF PIPING NHILE DOING A HOT GAS PASS INSPECTION
FOR THE CRITICAL TURBINE DEPARTMENT
INTRODUCTION
Asbestos monitoring was conducted during the removal of pigtail piping and steam injection piping at while doing a hot gas pass Inspection on GT-33 turbine at Power 3, on January 16, 1989. Personal breathing zone samples were collected to determine potential exposures to asbestos. The asbestos removal was done by contract maintenance employees working at Power 3, for the Critical Turbine Equipment Department. Survey results were supplied to Mailay for employee notification.
CONCLUSION
Potential contractor eight-hour, time-weighted average (TWA) exposures to asbestos were 0.02 fibers per cubic centimeter (f/cc) of air during the removal of pigtail piping and steam injection piping during a hot gas pass inspection. Exposure'level were well below the OSHA PEL of 0.2 f/cc.
DISCUSSION OF RESULTS
Mallay contractor employees were monitored during the removal of pigtail piping and steam injection piping while working on a turbine during a hot gas pass inspection at Power 3. The Mallay employees wore half face respirators equipped with HEPA filter cartridges and disposable coveralls and a wetting method during the removal. The removal procedures followed the written guidelines in the Texas Operation Asbestos Handbook.
Table I summarizes the individual potential exposures. Potential exposures were well below the OSHA PEL of 0.2 f/cc
METHODOLOGY
Asbestos samples were collected using a calibrated Gilian HFS 113 air sampling pump. A known volume of air was pulled through 25 mm cellulose ester membrane filters, 0.8 micron pore size. Samples were collected at a flow rate of approximately 2 liters per minute. The sample were counted by McKee Environmental Health Services using NIOSH Analytical Method #7400.
ST00 51 4io
IHS FILE B4-31I6-ASB
EVALUATION CRITERIA
The evaluation of exposure levels was based on the following criterion:
AGffi
QmSSL
Asbestos
0.2 flbers/cc
The OSHA Permissible Exposure Limit (PEL) Is the time-weighted average concentration for a normal 8-hour workday, 40 hour work week, to which nearly all workers may be repeatedly exposed without adverse health effects.
co
--i o o
cn
IHS FILE B4-3116-ASB
TABLE I
SUMMARY OF 8-HR TWA EXPOSURES TO ASBESTOS DURING PIPING REMOVAL WHILE PERFORMING A HOT GAS PASS INSPECTION
CRITICAL TURBINE DEPARTMENT
JOB CODE/ CLASSIFICATION
Mall ay Contractor
EMPLOYEE NUMBER
95-8-741
95-8-765
DATE
SAMPLE TIMEfmin)
8-HR TWA CONCENTRATION
(f/CC)
1-16-89
172
0.02
1-16-89
171
0.02
OSHA PEL
0.2
STOO15412