Document jm3V2qOOJLk2GVMZD1X1M2Bn9

UNION CARBIDE CORPORATION P a. BOX 471 , TEXAS CITY. TEXAS 77530 INDUSTRIAL HYGIENE Mr. Bill Stewart, P. Executive Director Texas Air Control Board 6330 Highway 290 East Austin, Texas 78723 Re: Renovation Notification Dear Mr. Stewart: This is to notify you, as required by 40 Union Carbide Corporation, Old Ridgebury Road, 06817, as owner, plans to engage in renovation described below: CFR 61.146, that Danbury, Connecticut activities as Insulation will be removed from the fluid bed dryer at Bldg. 121, in the plant at 3301 5th Avenue South, Texas City, TX 77590. Approximately, 400 square feet of insulation is involved and the equipment is 20 years old. Removal of the insulation is scheduled 26, 1985, with completion by Sept. 30, 1985. employed in the handling and disposal of the conform to the requirements in 40 CFR 61.147 to start after August Procedures to be asbestos material will and 61.152. All asbestos materials removed will be disposed at Gulf Coast Waste Disposal -Authority. Loop 197, Texas City, TX. Yours very truly. JBL:IR:Renovat Bcc: C. L. Dudnick -- !500 S . J. Footer R. F. Kelley - 5< M. D. Lindsey K . E. Martin D. R. Reem M. G. Sellen/E. Sheely R. C. Wise - 500 R. E. Woodcock A. P. Yalcinkaya J. B. Leverton UCTC 18964