Document jm259nqr6Vn9KR1LKKLVdexZN

FILE NAME Allied Signal Bendix ASB DATE 1958 Dec 22 DOC ASB074 DOCUMENT DESCRIPTION Memo RE Pressure Packed Asbestos - Dry Mix Application Pressure Packed Astestos 1958 With further reference to the general subject of pressure packed asbestos and the resulting nneedeed for an asbestos opening operation we are prepared resulting request of to submit an appropriatioapnpropriataiopn propriation covering the installationinstallation the two openers furnished gratis by Hauville for our dry wix operation Plody furnished Considered strictly ularly The attractive a cost saving feature this project is not partic- following informationinformation is given for your review end . comment The estimated cost of installing the twounits whichprimarily involves the necessary dust collection for the operation is as follows 2 - Hoody Asbestos Openers H 2 5 HP TAPE Motore $ 389.00 Systems 2 Cyclone , including fags and fan motors Sheet Metal Work 1,90.0 1,990.00 1,200.00 1,200.00 ewe? ast 1991 Installation Naterials Laber Burdes & 0SX 8400.30 60.00 435.00 1.315.00 4,745.00 4,745.0 4,745.00 An average year's consumption of asbestes fiber for dry mix is 2,500,000 $ The Production Department has previously estimated a labor saving of ton in unloading time This results in an estimated annual saving of 750.00 There are of course other savings primarily in varahouse space and a possible reduction in rejects in certain formulations At the same time it is not certain that this additional operation can be performed by the without dry mix personnel as a part of the machine loading precedure effect- ing the overall cycle There are of course definite indicationsof product quality improvement Your specific comment and recommendations are requested adf 60 F. Weyburne L. Martin C. A. NemZ 80-631-6989 PLAINTIFF'S 80-631-698 EXHIBIT PENGAD 801 PENGAD WCK016045