Document jgym7MwQN2e21xBkGNawn8K0y
Date of Proposal: Proposal No. 71U3-15&60 Bidder:
Date of Sub-Contract: Sub-Contract No.:
This Proposal/Sub-Contract is hereby submitted in quintuplicate to Kaiser Engineers, Inc., (hereinafter called "Contractor") Agent for Armco Steel Corporation, (hereinafter called "Owner"), P. 0. Box F, Middletown, Ohio, lt$0U2. Attention Mr. Vern L. Frankson, ManagerProcurement.
ACCEPTANCE: Contractor's acceptance of this Proposal/Sub-Contract shall be accomplished ly Contractor's execution thereof and its insertion of a Sub-Contract number and date as provided for above. Contractor will return to the successful bidder one (1) signed and completed copy hereof. Upon such acceptance, the Proposal/Sub-Contract shall constitute a Sub-Contract between Contractor and the undersigned successful bidder and shall, thereafter be designated by the Sub-Contract Number specified above, and wherever the term "Bidder" is written herein it shall be construed to mean "Sub-Contractor", and wherever the words "Proposal/Sub-Contract" are written they shall be construed to mean "Sub-Contract".
ACKNOWLEDGMENT: Bidder acknowledges that he has visited and has thoroughly examined the site for the proposed work, and without limitation, has ascertained fully all pertinent conditions which may in any manner bear upon the performance of the work herein proposed and the compensation Bidder proposes therefor; acknowledges receipt of and familiarity with and understanding of the plans and specifications therefor, as well as the various instructions, information, requirements, exhibits, terms and conditions covering the same, all as mentioned or referred to herein.
REJECTION: It is recognized and understood that Contractor has reserved the unconditional right to reject ary or all proposals or to waive irregularities therein. It is further recognized and understood that Contractor has reserved the right in its absolute discretion to accept any particular proposal submitted by any bidder even though the price or completion date, or both, specified therein may not be so favorable as those set forth in some other proposal.
FACE SHEET "A"
<
BLUE, SMALL RED, ORANGE
AKE-001592
WCRK TO BE PERFORMED; Bidder hereby agrees to perform all the work described in and in strict accordance with this Proposal/Sub-Contract and the following attached documents which are by this reference incorporated as part of this Proposal/Sub-Contract:
Sub-Contract General Terms and Conditions (Articles 1 thru 37) Exhibit ''A" - Plans, Drawings and/or Specifications Exhibit "B" - Items to be Supplied by Contractor or Others Exhibit "C" - General Work Schedule
Without limiting the generality of the foregoing, the work to be performed includes the following*
SCOPE OF WORK* Furnish all labor, tools, supervision, supplies, transportation and equipment and do .all things necessary to install, pressure test, pickle, and dean all piping systems in Owner's new Soaking Pits, all in strict accordance with Exhibit "A"; all such work being hereinafter sometimes called
' *"The Work".
COMPENSATION* In consideration of performance of the work hereunder Contractor shall pay to Bidder the compensation set forth below which includes all present and future, State, Federal, and local, sales, use, excise and transportation taxes, and all other taxes pertaining to the transaction*
LUMP SUM AMOUNT $
BOND* (Not Required)
LIQUIDATED DAMAGES: None. Article 31 of the General Terms and Conditions hereof is inapplicable and is hereby deleted.
LOCATION OF WORK* New South Area of Owner's Middletown Works, Middletown, Ohio.
WORK TO COMMENCE* Offsite work as of the date of acceptance of this Proposal/ Sub-Contract with field work to commence on date specified in Contractor's Notice to Proceed which is anticipated to be July 8, 1967.
WORK TO BE COMPLETED* Time is of the essence of this Proposal/Sub-Contract and all the work shall be completed by Bidder as soon as due diligence and good practice will permit, but in no event later than 120 calendar days after Contractor's acceptance of this Proposal/Sub-Contract, or such extended completion date as may be applicable In accordance with, and pursuant to, the provisions of Article 15 of the General Terms and Conditions hereof.
FACE SHEET "B"
BLUE, SMALL RED, ORANGE
AKE-001593
LICENSES OF SUB-CONTRACTORa Bidder shall indicate by completing the blank spaces provided below that it holds valid license(e) of the proper classification under Contractor's License Laws of the State of Ohio to perform the work proposed:
License(s) No.(s)
Classification^)
The offer expressed by Bidder in this Proposal/Sub-Contract shall be binding upon Bidder for a period of sixty (60) days from the date of Proposal/ Sub-Contract and may be accepted any time on or prior to said date.
Signed:
By: Title: __________________________
Indicate whether Bidder is a Corporation, an Individual, or a Partnership. If Partnership, give names of Partners.
Corporation Partnership _Individual Names of Partners:
ACCEPTED THIS DAI OP KAISER ENGINEERS, INC. Agent for Armco Steel Corporation (Contractor) BI: TITLE:
FACE SHEET C"
<
BLUE, SMALL RED, ORANGE
AKE-001594
EXHIBIT "A"
PLANS. DRAWINGS AND SPECIFICATIONS
The following Scope of Work Specifications and the following attached Standard Specifications and Drawings are hereby incorporated:
A. SCOPE OF WORK SPECIFICATIONS:
The Work encompasses the following, all in accordance with Item B Standard Specifications, and as shown on Item C - Drawings:
1. Perform all necessary pipefitters' work to install and test the piping systems delineated bn the drawings and do the work of additional crafts as. required except the work of electrician^, millwrights, painters, insulators, and sbeetmetal workers since these crafts will be provided by Contractor as stated in Exhibit "B hereof.
2. Start the FCWR and FCWS Piping Systems (Drawing No. 63?65?) at' the first joint above ground elevation 106'-6" (approximately).
3. Perform all work shown on Drawing No. 638033 above elevation stated "By Others". All other work shown on this drawing is "By Others". Install all Bosh Collection troughs.
U. Perform the work in accordance with the following conditions:
(a) Pickling to be done after installation; the only piping to be furnished to Sub-Contractor in a pre-pickled condition is oxygen piping.
(b) Work in close coordination with crafts of Contractor and other sub-contractors.
(c) Pipe will be furnished in itO feet random lengths
(d) Welding to be in conformity to the following: 1. All steam, condensate, and oxygen piping must be welded using the uphill method, except where a procedure for semi automatic (MIQ) welding has been qualified, downhill welding will be accepted if it is part of the qualified procedure. Two inch diameter and under will be socket weld, two and one-half inch and larger oxygen piping will have backing rings on all butt weld joints. 2. Downhill welding will be acceptable on water systems where operating pressure does not exceed 20f> PSI, compressed air piping up to 1^0 PS3J and natural gas piping up to 60 PSI.
, SMALL RED, ORANGE
AKE-001595
EXHIBIT "A"
-2-
A. SCOPE OF WORK SPECIFICATIONS - continued li.(d) continued
3. Cause for rejection under the downhill welding procedure method would be any of the following! a. One opening V long, 1/16" deep, or an accumulated total of V* length, 1/16" deep in one test strip*
b>. Slag inclusion in excess of 1/8" in ary one test strip or an accumulation of 3/li" of slag inclusion in a set of It test strips from one test set up.
c. Excessive gas pocket or porosity.
(e) Well water piping it" and under will have screwed joints. Larger diameter well water piping will have Dresser fittings, fabricated and galvanized.
B. STANDARD SPECIFICATIONS (Armco Standards all dated March 16, 1S>66, except ACS lj00-3lt)*
.1. Armco Standard Specification No. ACS It00-01 "Piping General".
2 Armco Standard Specification No. ACS It00-03 "Piping Steam 163 PSIG".
3. Armco Standard Specification No. ACS It00-03 "Piping Water Drinking
130 PSIG".
It. Armco Standard Specification No. ACS lt00-06 - "Piping Water Contaminated
130 PSIO".
.3* Armco Standard Specification No. ACS 2*00-12 "Piping Coupresa ed Air".
6 Armco Standard Specification No. ACS 1*00-13 "Piping Oxygen", as
modified by attached
Project Deviation No.
10 (May 3, 196?)
.7. Armco Standard Specification No. ACS U00-22
8 Armco Standard Specification No. ACS 1*00-11*
.9. Armco Standard Specification No. ACS 2*00-15
10 Armco Standard Specification No. ACS 1*00-32
"Piping - Oil - Fuel". "Piping Natural Gas". "Coke Oven Gas".'
"Piping Grease Systems", as
modified by attached Proj.
Dev. No. 7 (April 21, 196?)
11. Armco Standard Specification No. ACS It00-3U - "Piping - Cleaning and
Pickling", dated
April 12, 1967
12. Project Deviation No. 1 dated October 18, 1966, (applicable to all Armco
Standards)
13* State of Ohio for Welding - Section IX, latest- issue.
ill. Edition of State of Ohio Bulletin 21 i* - "Installation of Pressure Piping", (latest edition)
L
BLUE, SMALL RED, ORANGE
AKE-001596
EXHIBIT "A"
-3-
C. ffiAWINOS
Dwg. No.
Rev* No.
Description
6CQ.308
12
Piping Legend
601697
631595
2
0
Master Material List - Valve Code b8n x 96fl Slabbing Mill - Steam Mains - Plot Plan
631599
3
IjS" x 96" Slabbing Mill - Service Piping Plan and Section - Col. E 18. Ita to E 15.5a
631601
It
b8" x 96" Slabbing Mill - Service Piping Plan -
Section - Col. E 2.5a to E 9.5a
637001
2
General Plan - West Half
637002
2
General Plan - East Half
637650
1
Soaking Pit Facilities - Compressed air Flow Diagram
637651
b
Soaking Pit Facilities - Oxygen & Natural Gas Systems - Flow Diagram
637652
0
Soaking Pit Facilities - Service Piping at Car Thaw
i
637653
0
Pits - Plan and Sections Soaking Pit Facilities - Service Piping Details -
Plan and Sections at Col. W-20 and X-20
63765b
0
Soaking Pit Facilities - Service Piping Arrangement
Plans and Sections at Cole. 35X, 9.5X, 18X and
10, bf
637655
3
Soaking Pit Facilities - Service Piping - General Arrangement - Plan - Sheet No. 1
637656
3
Soaking Pit Facilities - Service Piping - General
Arrangement - Plan - Sheet No. 2
637657 637658
2 2
Soaking Pit Facilities Service Piping Details Soaking Pit Facilities Service Piping Details
637659
2
Soaking Pit Facilities Service Piping Details
Sheet No. 1
637660
2
Soaking Pit Facilities - Service Piping - Details
Sheet No. 2
637661
1
Soaking Pit Facilities - Piping - Furnace Cooling
Water Return - Partial Plans
637662
1
Soaking Pit Facilities - Piping - Furnace Cooling
Water Return - Sectional Elevations
637663
1
Soaking Pit Facilities - Piping - Furnace Cooling
Water Return - Details - Sheet No. 1
637669
3
Soaking Pit Facilities - Sump Pump Piping -
Arrangement and Details
637671
1
Soaking Pit Facilities - Skip Hoist &. Truck Repair
Sump Steam Syphon Piping - Plans and Elevations
Sections
637672
7
Soaking Pit Facilities - Plumbing, Htg. & Vent.
Toilet Rooms, 1 & 2 Plan, Isometrics ic Details
637673
0
Soaking Pit Facilities - Piping - Furnace Cooling
Water Return - Details - Sheet No. 2
BLUE, SMALL RED, ORANGE
1
AKE-001597
>
EXHIBIT "A"
-u-
; C. DRAWINGS continued
|. t,
Dwg. No.
Rev. No.
Description
637671* 637679
637680
0 Soaking Pit Facilities - Service Piping Details
Plans and Sections at Col. X-l through 2.$
0 Soaking Pit Facilities - Ingot Buggy Drive House
Plant
and Bulk Orease Systems - $M-2
and $M-3, Plan, Sections & Details
0 Soaking Pit Facilities - 3n Bulk Orease Tie In
Booster Pump Detail - Bulk Grease Service Drop
Coke Breeze Col. V and Skip Hoist
THE FOLLOWING DRAWINGS ARE INCLUDED FOR REFERENCE PURPOSESt
638033 63803$
638036 638037 638038
6380148 6372UL 637214$
$. Six (6) Four Pit Batteries - Ingot Ht'g Fee's. Fuel Oas Piping - Elevation Sc Section
2 Soaking Pits - Six (6) Four Pit Batteries -
General Arrangement - Fuel Oil Sc Steam Piping Sections
0 Soaking Pits - Six (6) Four Pit Batteries - Plan Cooling Water Piping
0 Soaking Pita - Six (6) Four Pit Batteries *
Sections - Cooling Water Piping i Soaking Pita - Six (6) Four Pit Batteries -
General Arrangement Fuel Oil Sc Steam Piping -
Sections, Details & Bill of Material 0 Soaking Pits - Six (6) Four Pit Battery -
Compressed Air Piping - Plan
$ Soaking Pits - Mezzanine Floor Framing - Plan Sheet 1 of 2
6 Soaking Pits - Mezzanine Floor Framing - Plan Sheet 2 of 2
< *
!? i!
BLUE, SMALL RED, ORANGE
<
AKE-001598
EXHIBIT "B" ITEMS TO BE FURNISHED BY CONTRACTOR OR OTHERS
1. All required pipe, fittings, valves, and pumps as presently stored on the site.
2. All required pipe support material and catalog pipe hangars as presently stored on site.
3. Potable water at designated points by the Contractor,
1*. Electric power - LLO volt, 3 phase and 120 volt single phase at Contractor's distribution panel in immediate vicinity of Soaking Pits.
*>. Sanitary facilities at points designated in Soaking Pits.
6. All painting and insulation} and all electricians', millwrights' and sheetmetal work.
?. All Bosh Collection troughs. (Reference Drawing No. 637661)
8. Necessary excavation and backfill for underground piping to Ingot Buggy Drive House.
9. Necessary fluids for testing except oil free nitrogen. 10. All embedded piping in place.
BLUE, SMALL RED, ORANGE
<
AKE-001599
EXHIBIT "C"
GENERAL WORK SCHEDULE
It la anticipated that the Sub-Contractor can commence work immediately after award (approximately August 1$, 1967).
All work will be completed within 120 calendar days after award. Within thtrtyC30) days after the award of the sub-contract, the Sub-Contractor shall submit to the Contractor, for approval, the scheduling documents indicated below:
1, A bar chart of CPM or scheduling type in detail acceptable to the Contractor, and indicating the schedule and durations of all major installation activities to be performed.
2. Manloading schedule from start to completion in curve or tabular form indicating the anticipated manpower by crafts and by months consistent with the above schedule.
These two documents when approved shall comprise "The schedule set forth herein" as referred to in paragraph B of Article 12 - "Performance of Work" of General Terms and Conditions.
In accordance with Article 9, Sub-Contractor shall provide a daily force report containing the craft breakdown for all craftsmen present and working, including foreman, general foreman, number on payroll, number present, number absent, number of supervisory personnel, number of engineering personnel, and number of clerical personnel.
Periodic scheduling meeting will be held with Sub-Contractor and Contractor's representative present to discuss progress and detail scheduling, coordination, and integration of the work.
j.
I
f
BLUE, SMALL RED, ORANGE
AKE-001600