Operation Report Dept. A-246 - Electrical Blends August - 1966__________________ .
PRODUCTION (Current Month)
PRODUCTION SUMMARY
Blend
1260 PPO 1254 PPO A13B3B
Scheduled Actual
925,674# 925,674#
Current Month
301,062# 100,800#
, #523,812#
925 674
Year to Date
3,228,706# 1,185,850#
2,142,992#
"6,55?, 548#
YIELDS
# Theory Yield on: TCB TTCB -
Standard
98.0# 98.o
Actual
96.86# 97.23#
YTD
99.35# 97.82#
Operations
The heating coil in the mix tank was replaced to eliminate moisture contamination. Two batches were contaminated with moisture this month because of wet air. The air dryers were not switching because two valves on the unit were sticking. The valves were repaired and four batches were produced with no moisture contamination.
Stock Position Whse. Stock
Blend
( 1260 PPO ( 1254 PPO ( A13B3B
Total
1st of Month
310,148# 69,422#
235,055#
614,625#
Last of Month
302,556# 55,9^2#
.223,851#
582,449#
Dept. Stock (Bulk)
( 1260 PPO ( 1254 PPO ( A13B3B
Total
52,422# ' 50,400# Cu\ 0 21,820
52,422#
72,220#
Total Whse. & Dept. Stock -
667,047#
654,669#
D. E. Harris ghw