PITTSBURGH CORNING CORPORATION
BC: Mr. J. H. Biarer Dr. L. B. Grant Mr. R. C. Packard
March 19, 1970
Mr. Waodell R. Blair, Regional Director D. S. Dapartnant of Labor Bureau of Labor Standards Office of Occupational Safety Roam 601 411 North Akerd Street Dallas, Texas 75201
Dear Mr. Blair:
On April 8, 1969, you wrote a letter informing us that a recent Labor Department Survey of our Tyler, Texas, facility revealed several vio lations of the Safety and Health Requirements of the Walsh-Healey Public Contracts Act. Mr. 8. H. Stout, formerly Vice President, Hanufactaring, for Pittsburgh Corning Corporation, wrote to you on July 2, 1969 and outlined the action our company would take to bring the Tyler plant into coop1lance with the provisions of the aforementioned act. This letter will serve to update your information as to our activities in this area.
Pittsburgh Corning Corporation's Central Engineering Department, with consulting assistance from Dr. Morton Corn, has completed detailed plans for a ventilation system to control asbestos dust at this plant. However, purchase and installation of the required equipment have been delayed for the following reasons:
1. Engineering estimates for purchase end installation of the fabric filtars, ducting, etc. ere quite high when considered against the very reel possibility that such equipment may prove to be obsolete in the near future. As you know, s reduction of the Threshold Limit Value of aebestos from twalva to five fibara/cc is achadulad for May 1970. This nsv laval will requlra a thorough review of the proposed ventiletion system by Dr. Corn in order to assure its adequacy in meeting the new TLV, or possible further reductlons in the TLV that nay occur at a later date. Further reductions may make it Impossible to control dust with the proposed equipment.
Mr. V. R. Blair
- 2-
March 19, 1970
2. The equipment, oa the other head, nay prove to be unneceeaary. Pittsburgh Corning Corporation Is vigorously pursuing develop* uent of a substitute aaterlal for use In its pipe Insulation. Initial results appear favorable and w are optlalstlc over the possibility of marketing the new pipe Insulation by aid 1972. Success In this area will coupletsly eliminate asbestos frees our product and greatly reduce the need for extensive ventilation equipment. (Note: Please treat the above infor* nation la a confidential manner).
For the above reasons, we request a temporary variance to the health requirements of the Walsh*Healey Act. During the variance period, we will take the following steps to insure health protection for personnel exposed to asbestos dust:
1. Continue the respiratory protection program In all manufacturing areas shoving excessive exposure until such areas are brought under control.
_ ___ ~'
^ ^Initiate a health education program that will fully explain to . ^ the employees the health hazards aeaociatod with asbestos
exposure and how they can protect themselves.
3. Expand the periodic medical examination program for our employees to include not only chest X-rays as performed to date but also, on all employees with store than five years seniority, an extensive medical history and physical examination, and pulmonary function tests performed biannually. We have discussed such a program with Dr. Caorge Hurst, Clinical Director of the East Texas Tuberculosis Hospital, who Is Interested In providing these examinations.
We would sppreclata the opportunity of going over in detail the afore mentioned points. If you think this Is desirable we will be happy to meet with you in your Dallas office at your convenience. In the Interim, if you require additional information or if I can be of further help, please contact me.
Very truly yours,
PITTSBURGH CORNING CORPORATION
p-~
EWH/rb
r>
E. W. Holman