Document jgQrOX7vKEEQL7nBpbjgwxvmp

c$!& Distribution H. L. Hubbard - S. 2nd St. R. H. Munch - S. 2nd St. M. A. Terpstra - S. 2nd St. M. E. Qibbs - S. 2nd St. W. D. Robinson - S. 2nd St. R. E. Keller - S. 2nd St. J. D. Sullivan - S. 2nd St. H. Williams -Anniston L. C. Fuhrmeister - Anniston L. L', Faulkner - Anniston P..0. Benlgnus - 0.0. E. L. Boehm - 0.0. R. F. Neunaebel - 0.0. J. C. Weber - 0.0. H. C. Carder >0.0. W. R. Richard - 0.0. E. L. Moore - 0.0. J. A. Stephens - 0.0. W. J. Wilson T. W. Dalton E. D. Malone O. D Dressel P. E. Heisler J. M. Connaughton B. J. Bailey D. Harris H. F. Ray P. A. Erzer J. A. Heilala 0. C. Vincent W. J. Gresham H. J. Horner B. W. Cor lew J. W Molloy D. W. Jackson R. W. Flint 0. J. Geers . F. B. Matthews H. F. KeHerman C. F. Moore J. Soffranko J. H. Coleman Cresce - 0.0. C. A. Pratte - 0.0. DSW 200721 STLCOPCB4058785 MONSANTO COMPANY Sauget, Illinois August 5, 1967 ESTERHAZY KC1 QUALITY - SPECIFICATION CHANGE STATUS REPORT AS OF 8/1/67 SUMMARY: The Aroolor 1242 representing a high temperature and high catalyst base line was shipped to Electric Utilities for capacitor life testing on 8/1/67. The run will be repeated with bromine being metered into the chlorine, representing the maximum bromine concentration expected after the specification change. Target shipping date 8/15/67* A material balance on the DeNora cells has been attempted. Closure was far from complete. A problem has been found with the newly developed measurement for bromine in chlorine. Charges for the Whole testing program have been revised. The large shift upward is due to the product being given to Electric Utilities in exchange for capacitor life testing. This schedule Is attached. DETAILS: Increased bromine in chlorine has an undesirable effect on Aroclor quality. Laboratory studies have found conditions which correct the effect. The shipment of Aroclor 1242 representing the baseline test batch left the plant 8/1/67. It was shipped to Electric Utilities for processing into capacitors. They will perform life tests on the capacitors and furnish us with an evaluation In return for the product. A test batch is a 50,000 to 40,000# trailer load. Bromine will be metered into a production run of non-electrical Aroclor. It will be segregated in the same manner as the base line run and a trailer load will be shipped for comparative evaluation. The target date for this shipment is 8/15/67. Electric Utilities takes one trailer load every two weeks. These shipments are one month behind schedule. We missed having the test material ready for shipment by about a day and a half. Electric Utilities refused special product oh the mid-month shipment due to vacations. Results on both test batches should be available between ll/l5 - 12/1/67* Supplementary data Is being geperated In the form of a DeNora cell material balance based on bromine. The weak link at the present time Is the measurement of bromine in chlorine. This newly developed analytical procedure Is receiving additional improvement. The trouble may be only an instrument problem. The first material balance did not come close to closure. DSW 200722 STLCOPCB4058786 2 Charges for the tests and development work which are anticipated to be against inorganic division are attached. My thanks to Cole Weber for assistance in estimating these charges. Inorganic cost for approval of high bromide KC1 as of 7/26/67. At WGK To Date Projected PR&D work $ 1,440 $ 1,700 TSD work Equipment changes, installation and removal 475 None 900 200 Production - Two experimental loads of Aroclor + special analyses by PR&D None 5,640-7#250*Aroclor 200 Analyses Organic Research analytical methods development Total for program at WGK None , +1 200 $ 97840'"-' $ 11,720 Billed at cost value of $0,089/# + $0.05 freight. The initial charge will be to 2-03-811.00-625, Aroclor experimental. It will be transferred at divisional level to Inorganic division. A teBt batch weighs between 20,000 and 40,000#. If the program is extended to the Anniston plant the following additional charges will be necessary. WGK PR&D experimental TSD labor (Anniston) Equipment, installations, and removal Production - two loads $ 200 900 750 5,640 - 7,2i>0 Same terms as above Special Analyses 200 Additional Supervision 200 $ 7,990- 9,600 Aroclor customers need to be advised when the change will be made and must approve. Some additional cost may be incurred here. DS\N 200723 D. C. Armstrong STLCOPCB4058787