INTER OFFICE MEMO TENNECO OIL P&M
To D. M. Hershkowitz
At Flemington
From R. A. Donovan
at Flemington
Subject Activity Report - September, 1983 Production Department
Date October 5, 1983 Copy to
I. Safety
There were no Lost Time or Restricted Duty accidents in the Production Department during September.
The monthly shift safety meeting addressed handling of chemicals, with emphasis placed upon the peroxide cata lysts used in the operation.
II. Statistics
Attachment I Attachment II
Production Summary Production Loss Report
Controllable Overtime - 13.0%
III. Personnel
1) Two (2) ICWU employees remain out on long term ab sences. One employee is due back to work on 10/10/83, the other will be out for an indefinite time period.
2) One employee was given a written reprimand for a time card violation in September.
IV. Costs
Variable cost estimate lower than budget due primarily to favorable #6 fuel oil price. Raw material prices, VCM in particular, are on an increasing trend although they are still slightly favorable compared to budget.
It should be noted that September's production of 3709 M lbs. is the highest the plant has accomplished for a thirty (30) day month since implementing the reduced running mode.
V. Major Projects and On-Going Programs
1) Work on the installation of the trash compactor was initiated in September. The compactor and dumpsters are due in October, Project will be completed in October.
TEN 4708
I
2- -
2. The AFE for installing the facilities to vacuum clean railcars was approved in September. The unit is due to be received in December.
3. The facilities for running tests aimed at eliminating the effluent ponds were installed in September. Evalua tion of the removal of suspended solids without using the ponds will be evaluated in October.
4. Work is in progress on the installation of the new auxiliary frame heat exchanger. This project will enable a significant reduction of the load on the refrigeration sys tem.
VI.
Environmental
1. Reactor building VCM level averaged 0,1 ppm.
2. Reactor vapor samples averaged 2134 ppm in September.
3. Stripped slurry samples averaged 88 ppm in September.
There were no violations of EPA regulations in September.
4. Work on the ph neutralization project for the effluent streams from the mixed beds continued in September. Modifications to the caustic and acid charges have been successful in getting the ph of the combined streams to be within specification.
- Work will continue in October to maintain the reliability of this system.
VII. Opportunities Nothing to report.
Vin .Vulnerabilities
Corrosion problems with the economizer on the big boiler has lead to removing the unit from operation. Operating without the economizer will have a negative impact on the efficiency of the big boiler.
IX. Industry Trends
Increases in certain raw materials prices, i.e., VCM, VAM and Ninol, in September will have an unfavorable affect on the unit variable costs for ROY.
X. General Comments Nothing to report.