Document jg1wYVyODEe93wd4mkLaj27qk

TO at COPIES TO SUBJECT NTER-OFF1CE MEMORANDU See Distribution DATE FROM AT JOB NO. KAISER ENGINEERS' WEEKLY FIELD ACTIVITY REPORT June 11, 1968 0. A. Finsand 9/7 i/y-'s-tA- -.'~ci` Middletown Construction 7100 Transmitted herewith is the subject report for the weelc^S ending June 11, 1968. OAF/LM/sec Distribution Armco D. C. Osborne C. G. Kramer F. W. Barnes T. R. Foley P. R. Smith D. Cctx J. S. Lotz R. L. Brannaman aiser J. Wolf (Oakland) W. F. Bort (Oakland) D. A. Daly F. X. Kast S. Ustel V. L. Frankson A. L. Gordon H. C. Boucher cc: Central File Kaiser Reading File Armco Reading File ( r KEN 004282 mam wuap mnpiMgn i?p'iLa"gini 2 WEEKLY FIELD ACTIVITY REPORT Week Ending June 11, 1968 WEATHER: Hot and clear. TEMPERATURE: Minimum - 65 degrees Maximum - 96 degrees CLIENT: Armco Steel Corporation LOCATION-: Middletown, Ohio JOB NUMBER: 6471 JOB VISITORS None Management General Supervision Field Engineering Warehouse & Ktl. Control Survey Office Service St Repro. Clerical Craft * TOTAL SUMMARY FORCE REPORT Kaiser Engineers Exempt Non-Exempt Subcontractors 44 15 40 15 36 1 13 15 -- 606 64 649 17 12 3 13 m. 801 Foothill Electric Total 19 5 37 14 81 1 10 17 6 11 24 h2k 1.836 506 2,020 * Average for week of men on payroll. Average for week of Crafts is as follows: Kaiser Engineers ............................... 496 Subcontractors ................................... 557 Foothill Electric.............................410 Total Crafts Working..................1,463 KEN 004283 3 WEEKLY FIELD ACTIVITY REPORT Week Ending June 11, 1968 PROJECT PROGRESS 7148 - HOT STRIP MILL In the hot strip mill, coiling operations were continued on a one shift basis throughout the period with the exception of Sunday, June 9th. During this period, 1,142 coils were processed for a daily average of 190 coils. 10,394 coil tons were recorded for a daily average of 1,732 tons based on six turns during the period. In the furnace area, the #3 induced draft fan unit was reassembled and tested. Because of continued' excess vibration and noise, it was taken apart for re-examination. It was found that excess stress in some of the pipelines leading to the tur bine unit could have been the cause of the vibration. These stresses are now being relieved and the unit is being reassembled for additional test ing.. Boil-out of the #1 boiler is continuing to be delayed until this fan is operable. Dry-out of #3 furnace continued throughout the period and is scheduled to be completed on Thursday, June 13th. Furnace #3 was accepted by Armco on June 12th. The refabricated discharge doors have been installed for the three furnaces'. Pipe insulation work was com pleted at furnace #2 and is continuing at furnace #3- #1 furnace was partly operated on fuel oil during the period. Ironworkers completed the platform requirements in the downcoiler area and are now working on additional ladder requirements in this area. The dry scale skip hoist repair work was completed. Pipefitters completed the pump installation and remaining piping for the #5 dewatering well. This unit is scheduled for test operations next period. In bag houses, new vacuum breakers are on order and will be installed on the steam outlet piping in order to prevent a vacuum condition at the coils. It was necessary to remove some sections of siding in the upper portion of the waste heat boiler building in order to release excess heat accumulated in the area. Tem peratures reached 140 degrees in this area during the hot weather. Louvers are on order to install in openings. Foothill Electric main tained an average work force of forty-five men in the hot strip mill during the period. .2 7146 - SLAB MILL 2.1 Excavation and Backfill; 700 cubic yards of backfill was made on the east side of the slab mill between the crop conveyor and column 2.5. 2.3 Structural and Miscellaneous Steel: An average work force of nine ironworkers continued with miscellaneous iron in the slab mill. During the period, progress was continued on handrails and platforms in the main mill aisle. At the fume eliminator, siding is now 90^ complete. KEN 004284 WEEKLY FELD ACTIVITY REPORT Week Ending June 11, 1963 2.5 Heating and Ventilating: Wiring for the main office area heating and ventilating system was completed this period and charging of the unit is scheduled for next period. #1 bag house was completed and is now ready for check-out and bag installation. Bag house #2 is complete and ready for operations. The other three bag houses are now operating. 2.6 Mechanical: Eichleay Corporation maintained an average work force of twenty-five men on remaining mechanical installation and start-up support work. At the main mill, uncoupled tests were performed for both horizontal mill drive motors. Chock blocks and ventilation covers are being installed on the vertical mill motor. Uncoupled tests are scheduled for this motor next period. In the main mill aisle, all roll tables have been operated. Insufficient clearances were noted at tables 12 through 15 and adjustments are now being made. All other tables appear in satisfactory condition. Uncoupled tests were completed on the manipulator side guides and #1 and 2 piler. Coupled tests were made on the crop pusher, manipulator finger lift and the pump controls for hydraulic system #1. 2.7 Piping: Hunter Corporation maintained an average work force of sixtyone men on slab mill piping systems. Major piping systems worked en during the period were: plant air, natural gas, steam, scarfer water, slab mill air, hydraulic system 1 and bulk grease. 2,361 feet of piping was installed for a total to date of 46,904 feet. A corrected total of 6,288 feet remain to be installed. Piping for the scarfer system is now 75# complete. Linde Company's representative is scheduled to arrive at the job site next period to conduct the check-out and completion of the scarfer unit. Instrumentation work in the scale pit pump room is now 90# complete. The grease header pipe has been completed and filled with grease. 2.8 Electrical: Foothill Electric Corporation maintained an average work force of one hundred and fifty-one electricians in the slab mill. 4,266 lbs. of exposed conduit was installed for a total to date of 222,242 lbs. or 97# complete. 41 lbs. of structure grounding was in stalled for a total to date of 33,847 lbs. or 84# complete. 2,700 feet- of low voltage cable was installed for a total to date of 484,000 fee%<ws 99#^ complete. 4 low voltage terminations were made for a totlpit&date^ of 228,700 feet or 97# complete. 48 control cable tarnifiiationswere made for a total to date of 9,048 or 90# complete. 3,153Klba of lighting conduit, 5,044 feet of lighting wire and 70 fixtures: were installed. 3. 7143 - SOAKING PITS 3.3 Structural and Miscellaneous Steel: During the period, a crew of ironworkers continued with installation of the windbreak screen at the skip hoist structure. This unit is now 75# complete. KEN 004285 r 'T~ WEEKLY FIELD ACTIVITY REPORT Week Ending June 11, 1968 ' 3.6 Mechanical; Loftus Engineering maintained an average work force of one hundred and twenty-one men on battery installation. Battery 6 is now ready for dry-out. Painting and pipe insulation is in progress at batteries 4 and 5* At battery 3, the final refractory lining was completed. Refractory lining was continued in battery 2 which is now 75$ complete. Remaining electrical conduit and wire pulling was con centrated in the battery 1 through 3 area during the period. The skip hoist and belt conveyor was operated in the presence of the manufac turer^ representative and it was noted that some adjustments will be required on the cable travel. The hoist for the recuperator together with the battery room hoist relocation was completed this period. 3.7 Piping; The grease header is now complete and charged with grease to the soaking pit area. The soaking pit header is expected to be charging next period. Ventilation piping for the burning stations was completed. Pressure testing was completed in all piping systems except the oxygen line. Leaking ball valves are delaying this pressure test. Toilets are now in operation with temporary water. Pipe installation is essen tially completed for the soaking pits: -rk %. 3.8 Electrical: Foothill Electric Corporation maintained an average worljk force of seventy-eight electricians in the soaking pits during the -r period. 1,565 lbs. of exposed conduit was installed for a total to date of 124,280 lbs. or 88$ complete. 1,769 lbs. of lighting conduit, 7,280 feet of lighting wire and nine fixtures were installed. 160 feet of low voltage cable was installed for a total to date of 45,275 feet or 84$ complete. 3 low voltage terminations were made for a total to date of 362 or 89$ complete. 578 lbs. of structure grounding was installed for a total to date of 6,775 lbs. or 67$ complete. 800 feet of communication wire was installed and 18 terminations were made. 1,700 feet of welding and utility feeders was installed for a total to date of 12,570 feet or 48$ complete. 24- welding and utility feeder terminations were made for a total to date of 24 or 10$ complete. 4. 7128 - BASIC 02YGEN FACILITY 4.1 Bxcavyfcioiy and Parkf-ni: 3,391 cubic yards of backfill was completed fog:j|tofcal-to- date of 262,484 cubic yards. Backfill included storm aewsHfejttoat--manhole #728 to 800, underground conduit and areas both insHp|x outside the electrical control room. i 4.2 Concrete; 703 cubic yards of concrete was placed during the period for a total to date of 23,156 cubic yards. This concrete included the cooling tower base slab, operating floor from column 25-5 to 27, the service floor from column 26 to 27 and various underground conduit and fill concrete. Carpenters and rebar men are limiting concrete placement. I t t I i KEN 004286 1 WEEKLY FIELD ACTIVITY REPORT Week Ending June 11, 1968 4.3 Structural and Miscellaneous Steel: The welding of the bins has now been" completed and welding of the liner plates continued during the period with approximately three weeks work remaining on the liner plates. Checkered plate flooring was being welded on the flux loadin floor. 4.6 Mechanical: Combustion Engineering continued assembly of the #1 and 2 gas coolers. Progress during the period included the welding of #1 gas cooler sections at elevation 200. Fitting and welding of the skirt frame continued on unit #1. The doors for unit #1 was erected and fitted. At unit #2, fitting and welding of the pressure seals continued on the upper section. 4.7- Piping: A total of 584 feet of piping was installed at the B.O.F. during the period. Progress continued on the roof drains at H line with 78 feet installed during the period. Natural gas piping was being installed between columns I9.5 and 21.5 on H line with 80 feet installed during the period. Service piping continued outside the B.O.F. building. Plumbing was completed to toilet room #3 and the water fountain stub-ups are complete to column 17. Pipe supports. I were being installed on H line and D line between column 17 and 27. f 4.8 Electrical: Foothill Electric continued installation of the under ground conduit in the electrical control room and in the pump build ing enclosure and slurry area. Electrical work continued on cranes 506 and 507 together with embedded conduit at column 22 for crane 503* Distribution panels were being wired on the operating floor and high bay hangers and brackets and conduits were being installed in the ser vice, teeming and maintenance areas. Foothill Electric installed 428 lbs. of structure grounding for a total to date of 6,519 lbs. or 5h% complete. 24,476 lbs. of embedded conduit was installed for a total to date of 349,740 lbs. or %% complete. 91 feet of crane feeder bus was installed for a total to data of 125 feet or 9% com plete. 4.9 Miscellaneous Subcontracts: Chicago Bridge, and Iron continued assembly of ,ttefcB0.F. furnaces during the period. Welding of the furnace #1 PJ|vIrtual3y completed including the lip ring, brick retainers ^ire ta twa seams'. The #1 trunnion is completely welded and SEandr- cleaning of welds is in progress. Welding has been started ical seams on the base and side walls for the #2 furnace. Preheaters are- now being installed at #2 trunnion. At the lab and. office building, McGraw Construction Company continued with restricted progress due to the labor disputes. Three lighting panels and two transformers are now on site. All subfloor duct has been placed. KEN 004287 WEEKLY FIELD ACTIVITY REPORT Week Ending June 11, 1968 Otis-Elevator continued with the installation of the counterweight guides for the freight elevator. Stuart Painting continued progress on the structural steel along H line and on the columns on E line from column 23 westward. 5. 7150. 7156 and 7159 - PICKLE AREA 5.1 Excavation and Backfill: Backfill at various areas on #5 pickle line was continued during the period. 5.2 Concrete; 108 cubic yards of concrete was placed on pickle line #4 during the period for a total to date of 14>533 cubic yards. This con crete included the floor slab between columns 35 and 37 and the #4 acid waste disposal foundation. 135 cubic yards of concrete was placed at pickle line 7Jt5 during the period for a total to date of 7,745 cubic yards. This concrete included encased conduit between columns 16 and 17 and 19 and 21 and at #5 pickle line south lean-to between columnar- 30 and 32. 5.4 Roofing and Siding: During the period, 2,440 square feet of siding: installed along H line and across column line 48 in .the pickled coilfstorage building. 5.6 Mechanical: The only activity by Ohio Valley Riggers during the period was work on miscellaneous items on the pickle tank structure. 5.7 Piping: Delta Pipeline Constructors continued installation of the ser vice piping along F line and at the #4 pickle tanks. 1,060 feet of piping was installed during the period for a total to date of 14,610 feet. Steam and water piping was installed along the #1 pickle tanks. Prefabrication continued on the various sections of pipe in preparation for the steam header installation. KE pipefitters will now install the extra pipe support steel required for the steam line installation. 5*8' Electricalgi: In the green coil storage building, the intercommunication sta^|60|haafebeen.-, installed on B line. Remaining work includes the compl i.icrane intercommunication system. In the pickle lines, Electric continued with terminations on the welder stations Conduit runs to the welder stations in the maintenance aisle are-presently being installed. Installation of equipment in the #4 delivery motor room was started on June 7th with motor control cen ters and control panels being moved into position. Conduit grounding in this delivery motor room is presently in progress. In the pickled coil storage building, electrical installation is virtually complete for crane 407 apart from the magnet cables and final check-out,. Cable terminations are being made on crane 406 and installation of the collec tor rail is now S5% complete. re KEN 004288 i WEEKLY FIELD ACTIVITY REPORT Week Ending June 11, 1968 6. 716Q - COLD MILL During the period, 2,296 cubic yards of excavation was completed for a total to date of 137,753 cubic yards. .536 cubic yards of backfill was , completed for a total to date of 4>255 cubic yards. Installation of the subdrainage piping was completed on June 6th. Setting of electrical con duit continued between columns 30 and 34 on L line with approximately 11,000 lbs. of conduit installed to date. No forming or rebar was done this period because of craft absence. 7- - 7186 - WASTE DISPOSAL FOR THE PICKLE FACILITY During the period, 56 cubic yards of concrete was placed for a total to date of 3,435 cubic yards. This concrete was for conduit encasement. A total of 185 Feet of piping was installed during the period together with the fabrication and installation of pipe supports. Piping in stalled included 61 feet of floor drain, 32 feet of clarified water, 52 feet of well water and 40 feet of steam piping. Erection of the storage room at the 107 foot elevation was started during the period^.. 8. UTILITIES j| 7110 - Power Distribution: Installation of circuit number and phase identification signs on the 13.8 KV and 132 KV towers was started on June 6th. 7112 - Drainage and Site Development: 15,772 cubic yards of excavation was completed for a total to date of 845*442 cubic yards. 5>073 cubic yards of backfill was placed for a total to date of 1,081,602 cubic yards. Westinghouse Electric continued with cable trenching on cir cuit #5 near the mold prep building. Circuit 6 i3 complete apart from the power supply from the soaking pits. Trenching was started on cir cuit 3 during the period. OAF/LM/sec 0. A. Finsand Approved by G. L. Roberts Construction Manager KEN 004289