Document jROg6wQ0RwvNV5666Qxjqzn9

. .* '8< 11/87 15,59 S 20 x 389 1 773 MONSANTO : REDRAFT 11/7/86 ' DRAFT: LETTER TO NJ DEP REGARDING: KEARNY PLANT SUBSURFACE INVESTIGATION AND ACTION PLANS Monsanto is reporting the results of a subsurface investigation in and near the production area at our Kearny, New Jersey plant. The investigation was completed by O.H. Materials of Findlay, Ohio, on November 10, 1986. There is no public health or en vironmental danger associated with the site, however, results from the investigation indicate two points should be reviewed: i A. EVIDENCE OF ORGANIC MATERIAL FLOATING ON THE GROUNDWATER. I STATUS: There is a layer of organio material similar to our product and raw materials floating on the groundwater. Or ganio materials have accumulated on top of the 'groundwater during 30 years of operation, under actreflflifc3yaa:di,frfroe The layer is centered around the production area, with traces ex tending several hundred feet to the south. Testiing verifies that the material has not migrated off the plant site. Test ing also indicates only very low levels of dissolved organic material in the groundwater. Our action plan, described be low, addresses both the floating organic layer and the groundwater. ACTION PLAN: 1. PREVENTION: In 1982, the plant Initiated a voluntary program of tank dike upgrading on a priority basis. We have already made operational changes and have upgraded many of our secondary spill containment sys tems. To avoid or minimize the impact of potential product leaks, additional spill containment, ourbs, and paving will be installed. MCO 7640228 PCB-ARCH-EXT0371609 / 1 2. CONTAINMENT; We will construct a subaurfaoe baffle along the southern boundary of the site to prevent possible migration off the plant site. j 3* REMOVAL: The recoverable organic layer wi^l be pumped to a containment area, separated from the groundwater, and disposed of via incinerations The resulting water will be used in plant processes or discharged to the POTW in accordance with applicable regulations. . i I 4, MONITORING: We will continue to periodically monitor ` the groundwater to detect any changes. . .. B. EVIDENCE OF PCB PRESENCE IN THE SOIL. 3TATUC; * j i In fcho 106O$, PCJ\?5 from a prooess heit transfer system in the Alkylphenol unit were landfilled nepr the pro cess area. Monsanto in 1979 excavated this area (approximate ly 85 cubic yards) and sent the contaminated soilj to an off site hazardous waste landfill. The manifest sentj to the New Jersey DEP cited the presence of PC^s in the material sent to the off-site hazardous waste landfill. In 1983 ^preliminary studies were conducted to assess the presence of any PCBfe remaining after the 1979 cleanup. In 1984, O.H. Materials was hired to conduct a thorough investigation to establish subsur face conditions and the extent of PCB?$s present and to help with defining an effective remedial action plan. . OHM1s Final Report Indicates: 1. There are itiTrf^measurable quantities of PC bound to the soil, and thej0Bt'3 are confined to that site. MCO 7640229 I i I PCB-ARCH-EXT0371610 o 2. The Pc6/1 are present in a 1/2 acre area with depths ranging from two to 16 feet maximum (confining, peat layer jit 16 feet). The majority of the contaminated soil extends less than 6-6 feet below the surface. 3. There is no exposure problem. The PdB^s are boujnd to the soil; all of the area Is either under the Ajlkylphenol unit control building, pavement, or a gravel layer. jjfe in a. In 1984, tests showed very low levels of PC the observation wells. 0. H. Materials report^ that this was due to the trauma caused by the installation of the wells, resulting in the soil being temporarily suspended in the groundwater. Subsequent tests in 1986 s^eln to confirm the "well-trauma" theory. I ACTION PLAN: 1. PREVENTION: All PCB containing electrical equipment has been removed from the plant; there is no longer any source of additional contamination. cy /t^ ^ 2/ 2. CONTAINMENT: The PCB/p^afe bound to the soil and are confined to the site. There is no exposure to em ployes or to the community. Therefore, there.i is no need at this time to Install an additional contain ment system. 3. REMOVAL: BjJ^ftrmo^here is no public health jor en- vlronmental danger associated w^th the site,.^t|iere is ot-jfe "ncT^compelling reason to remove any PCB contaminated 'y^Azy ' soil, at thl<=-tlme. Removal of thev PCB contami- ,, nated soil has more risk assooiated with it than sn- Piy leaving it in place^o^^ MCO 7640230 I i . ' i PCB-ARCH-EXT0371611 4. MONITOR: We will monitor the existing wells jto de teat any possible migration. As th floating organic material is removed, we will also periodically test . the associated groundwater for presenoe of PCBtft^'ln addition, we-will^^ctrrsn^te air -nroffTEorjing to document--tiwt--Wrera--is Tio exposure thrbbgh the , / atmosphere. ___ ____ __ We are submitting this information in the spirit of I cooperation and intend to work with the New Jersey DEP in ensuring that the environment is protected. William J. Boyle, Jri Plant Manager HCO JO-0231 I PCB-ARCH-EXT0371612